FOUO C09.0 SOLICITATION N4523A21R1056 AMENDMENT ONE.pdf

PDF 381 KB Posted

Attached to
Caisson 5 - Maintenance, Repair, and Preservation
Solicitation number
N4523A21R1056
Issued by

About this file

This solicitation seeks proposals for maintenance, repair, and preservation work on Caisson 5, a 147-foot steel vessel. Key work includes hull and tank blasting/preservation, welding repairs, equipment replacements, and modernization of electrical systems and controls. Proposals are due by March 15, 2021 with award anticipated in mid-June to the lowest price technically acceptable offer. The period of performance is October 21, 2021 through February 21, 2022. The work will be conducted at the contractor's shipyard facility located in the Puget Sound region of Washington. Interested parties must register in SAM to receive solicitation attachments and be eligible for award. Reference drawings will be provided to SAM registrants meeting size standards who request them by February 27.

View the file

Other files

File Type Posted
FOUO C04.2 - Attachment J-2 - Caisson 5 5-way Breakdown Errata One.xls XLS spreadsheet
FOUO C09.0 SOLICITATION N4523A21R1056 AMENDMENT 2.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata 2.pdf PDF
RFC 6 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 7 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 2 - N4523A21R056 Caisson 5 Answer Errata One.pdf PDF
RFC 5 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata One.pdf PDF
RFC 2 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 4 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 3 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO D99.0 - MFR for Pre Proposal Conference.pdf PDF
RFC 1 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO C04.2 - Attachment J-2 - Caisson 5 5-way Breakdown.xls XLS spreadsheet
FOUO C04.3 - Attachment J-3 - RFC Form N4523A21R056 Caisson 5.docx DOCX document
FOUO C04.12 - Exhibit B - Caisson 5 GFP attachment.pdf PDF
FOUO C04.11 - Exhibit A - Caisson 5 - 32 CDRLs and 32 DIDs.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - 1Feb2021.pdf PDF
FOUO C04.10 - Attachment J-10 - 042-10 -001 Declining Log.xlsx XLSX spreadsheet
FOUO C04.4 - Attachment J-4 - Corporate Performance Data Sheet.pdf PDF
FOUO C04.8 - Attachment J-8 - Growth Management Program Tracking Log.xlsx XLSX spreadsheet
FOUO C04.9 - Attachment J-9 - Contractor Badging and Access Requirements Caisson 5.pdf PDF
FOUO C04.7 - Attachment J-7 - Growth Management Request Form.docx DOCX document
FOUO C04.0 - N4523A21R1056 CAISSON 5 SOLICITATION 12FEB2021.pdf PDF
FOUO C04.5 - Attachment J-5 - Corporate Experience Data Sheet.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Caisson 5

A. PURPOSE: The purpose of this amendment to solicitation N4523A21R1056 is to replace the existing Attachment J-1 w ith Attachment J-1 Errata One. The Errata adds the follow ing to the beginning of the document: Category I. FY-21 Standard Items Applicable To This Job Order Without Further Reference; Category II. FY-21 Standard Items Which May Be Invoked In The Work Items Of This Job Order; and the Index.

The Errata also deletes the portfolio of w ork items found at the end of the original Attachment J-1.

B. CHANGE: Attachment “FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - 1Feb2021” to “FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata One”

C. DUE DATE: The due date for the proposals remains 1:00PM on 15Mar2021.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4523A21R1056

X 9B. DATED (SEE ITEM 11)

12-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Feb-2021

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

1400 FARRAGUT AVE MAIL STOP 2026

BREMERTON WA 98314-2026

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A21R1056

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J - LIST OF DOCUMENTS

Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:

Part I The Schedule (Sections A through H) Part II Contract Clauses (Section I) Part III List of Documents, Exhibits and other Attachments (Section J) Part IV Representations and Instructions (Sections K through M)

Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract (FAR 15.204-1(b)).

The following is a list of attachments to the RFP. Attachments J-1, J-2, J-6, J-7, J-8, J-10 and Exhibits A and B will be incorporated into the contract along with all references listed in section two (2) of the Statement of Work (SOW), digital copies of which are available upon contractor request. Attachments J-3, J-4, J-5, and J-9 are included for the purposes of the solicitation, but will not be incorporated into the resulting contract. Additionally, the contractor shall be responsible for the latest revisions of all references, specifications and standards in effect at time of proposal closing.

Number Title Number of Pages Dated Attachment J-1 Caisson 5 – Statement of Work

Work Items - Errata One 35 Work Items

(100 pages) 15 Jan 2021 2 Feb 2021

Attachment J-2 Price Proposal Worksheet 5-Way Breakdown

2 N/A

Attachment J-3 Request for Clarifications (RFC) 1 N/A Attachment J-4 Contract Performance Data Sheet 2 N/A Attachment J-5 Corporate Experience Data Sheet 6 N/A Attachment J-6 Caisson 5 Reference Drawings 58 files Various Attachment J-7 Growth Management Request Form 2 N/A Attachment J-8 Growth Management Program Tracking Log 1 N/A Attachment J-9 Badging Instructions for Shipcheck 2 N/A

Attachment J-10 042-10 -001 Declining Balance Log 1 file N/A Exhibit A CDRLs and DIDs 66 files

64 files N/A

Exhibit B GFP Attachment 2 20 Jan 2021

NOTE 1:

"Attachment” means any documentation, appended to a contract or incorporated by reference, which does not establish a requirement for deliverables.

"Exhibit” means a document, referred to in a contract, which is attached and establishes requirements for

N4523A21R1056 deliverables.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .