RFC 7 - N4523A21R056 Caisson 5 Answer.pdf
PDF 140 KB Posted
- Solicitation number
- N4523A21R1056
About this file
This document contains a request for clarification regarding a solicitation for maintenance, repair, and preservation work on Caisson 5.
The solicitation seeks maintenance, repair, and preservation services for Caisson 5 at the contractor's facility located in the Puget Sound, WA region between October 2021 and February 2022. Work includes docking and cleaning the vessel, hull blasting and preservation, tank blasting and preservation, hull and structural repairs, electrical system upgrades, machinery repairs and replacements, deck repairs, and undocking services. Offerors must have the capability to dry dock the 147-foot vessel. The Navy will award a firm-fixed-price contract on a lowest-price, technically acceptable basis to the responsible contractor by mid-June 2021. The contractor questions if an ANSI/ISO/ASQ Q9001-2015 quality management plan would be acceptable in lieu of the quality standard specified in the solicitation, to which the Navy responds it will issue an errata clarifying the requirement.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION (RFC)
DATE OF REQUEST: QUESTION NO: 007
REQUIREMENT: CAISSON 5 REQUISITION NO.: N4523A21R1056
ITEM NO:
TITLE: Solicitation
ISSUING OFFICE POC (CODE 440.22):
Brian Fergus brian.fergus@navy.mil Steve Barry steven.e.barry@navy.mil
PARA. NO: C-1.6 (d) PAGE NO: 10 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
The solicitation states “The contractor shall have an acceptable Quality Management System, in accordance with NAVSEA Standard Item 009-04, in place at time of contract award”.
As the contractors QA system is under review, would the contractors ANSI/ISO/ASQ Q9001-2015, Quality Management Systems conforming plan be acceptable?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
An Errata will be issued addressing this question.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
mailto:brian.fergus@navy.mil mailto:steven.e.barry@navy.mil
File details come from the government source that posted it. Updated .