This document includes a solicitation for a federal contract to perform maintenance, repair, and preservation work on Caisson 5. The solicitation seeks responses from ship repair facilities located in the Puget Sound, Washington region that can coordinate delivery of the vessel, drydock and clean its exterior surfaces, perform hull and tank blasting and preservation, structural and piping repairs, electrical system replacements, machinery upgrades, weather deck and tank modifications, and arrange return delivery of the vessel. The period of performance is from October 21, 2021 to February 21, 2022. The contract type is firm-fixed price and will be awarded on a lowest price technically acceptable basis in mid-June 2021. Interested parties must register in the System for Award Management and can access reference drawings and specifications on the DoDSafe website after emailing requests by February 27, 2020.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Caisson 5
| Enter Contractor Name Here | ||||||||||||||
| Caisson 5 | DATE: | Enter Date Here | ||||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||||||
| WORK ITEM | TITLE | Labor Cost | Labor Hours | Material Cost | TOTAL | Labor Cost | Labor Hours | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total | |
| 042-10-001 | Para 3.4.1: 14,000 sq. in. Base Metal Repair (E1) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 042-10-001 | Para 3.4.2: 960 linear in. Base Metal Repair (E1) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 077-11-001 | Hazardous Waste Produced on Caisson; control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 119-10-001 | Rubber Seal; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 120-11-001 | Hull Exterior Surfaces; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 123-16-001 | Cleaning and Pumping; Accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 123-16-002 | Tank Interior Surfaces; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 130-11-001 | Weather Deck Exterior Surface; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 167-11-001 | Access Hatch; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 167-11-002 | End & Main Tank Hatches; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 191-11-001 | Concrete Ballast; repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-001 | Power Distribution Panel; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-002 | Weather Deck Lighting; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-003 | Heater replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-004 | Modify Access Closure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 332-11-001 | Interior Lighting System; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-11-001 | Tank Vents; repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-001 | Dewatering pump valve piping; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-002 | Dewatering Pump and Motor; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-003 | Tank Drain Valves & Piping; remove | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-004 | Sea Valve End Tank Piping; remove | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-001 | Valves; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-002 | Grease Lines and Steady Bearings; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-003 | Actuator Stands; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-004 | Actuators; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-005 | Remote Valve Operator Extension Shafts; align | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 611-11-001 | Centering Fender; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 612-11-001 | Handrails and Stanchion; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-10-001 | Tank Preservation; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-10-002 | Operations Deck Compartment; preserve touch-up | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-21-001 | Handrails and Stanchions; preserve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-31-001 | Hull Preservation; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 633-11-001 | Zinc Anodes; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 634-11-001 | Non-skid; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 982-31-001 | Operational Test Support; provide | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 992-10-001 | Contractor Facilities; provide | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 997-11-001 | Docking and Undocking; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Enter Prime Labor Rate Per Hour, G&A Rate and Profit Rate Below | Base Items Total Bid: | $0.00 | ||||||||||||
| This line goes into CLIN 0001AA | ||||||||||||||
| Prime Labor Rate Per Hour: | G&A Rate: | Profit Rate: | ||||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||||||
| PARAGRAPH | TITLE | Labor Cost | Labor Hours | MATERIAL PRICE | TOTAL | Labor Cost | Labor Hours | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total | |
| Note B | Level of Effort to Completion – Growth | $0.00 | 8886 | $82,383.00 | $82,383.00 | $0.00 | $0.00 | $0.00 | $0.00 | $82,383.00 | ||||
| Column Totals | $0.00 | 8886.00 | $82,383.00 | $82,383.00 | $0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $82,383.00 | ||
| Level of Effort to Completion & Growth Reservation Pools 1 & 2 | $82,383.00 | |||||||||||||
| This line goes into CLIN 0001AB | ||||||||||||||
| Total Bid: | $82,383.00 | |||||||||||||
| This line goes into CLIN 0001 |
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed profit rates.
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
File details come from the government source that posted it. Updated .