FOUO C04.2 - Attachment J-2 - Caisson 5 5-way Breakdown Errata One.xls

XLS spreadsheet 64 KB Posted

Attached to
Caisson 5 - Maintenance, Repair, and Preservation
Solicitation number
N4523A21R1056
Issued by

About this file

This document includes a solicitation for a federal contract to perform maintenance, repair, and preservation work on Caisson 5. The solicitation seeks responses from ship repair facilities located in the Puget Sound, Washington region that can coordinate delivery of the vessel, drydock and clean its exterior surfaces, perform hull and tank blasting and preservation, structural and piping repairs, electrical system replacements, machinery upgrades, weather deck and tank modifications, and arrange return delivery of the vessel. The period of performance is from October 21, 2021 to February 21, 2022. The contract type is firm-fixed price and will be awarded on a lowest price technically acceptable basis in mid-June 2021. Interested parties must register in the System for Award Management and can access reference drawings and specifications on the DoDSafe website after emailing requests by February 27, 2020.

View the file

Other files

File Type Posted
FOUO C09.0 SOLICITATION N4523A21R1056 AMENDMENT 2.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata 2.pdf PDF
RFC 6 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 7 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 2 - N4523A21R056 Caisson 5 Answer Errata One.pdf PDF
RFC 5 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata One.pdf PDF
RFC 2 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO C09.0 SOLICITATION N4523A21R1056 AMENDMENT ONE.pdf PDF
RFC 4 - N4523A21R056 Caisson 5 Answer.pdf PDF
RFC 3 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO D99.0 - MFR for Pre Proposal Conference.pdf PDF
RFC 1 - N4523A21R056 Caisson 5 Answer.pdf PDF
FOUO C04.2 - Attachment J-2 - Caisson 5 5-way Breakdown.xls XLS spreadsheet
FOUO C04.3 - Attachment J-3 - RFC Form N4523A21R056 Caisson 5.docx DOCX document
FOUO C04.12 - Exhibit B - Caisson 5 GFP attachment.pdf PDF
FOUO C04.11 - Exhibit A - Caisson 5 - 32 CDRLs and 32 DIDs.pdf PDF
FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - 1Feb2021.pdf PDF
FOUO C04.10 - Attachment J-10 - 042-10 -001 Declining Log.xlsx XLSX spreadsheet
FOUO C04.4 - Attachment J-4 - Corporate Performance Data Sheet.pdf PDF
FOUO C04.8 - Attachment J-8 - Growth Management Program Tracking Log.xlsx XLSX spreadsheet
FOUO C04.9 - Attachment J-9 - Contractor Badging and Access Requirements Caisson 5.pdf PDF
FOUO C04.7 - Attachment J-7 - Growth Management Request Form.docx DOCX document
FOUO C04.0 - N4523A21R1056 CAISSON 5 SOLICITATION 12FEB2021.pdf PDF
FOUO C04.5 - Attachment J-5 - Corporate Experience Data Sheet.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Caisson 5

Enter Contractor Name Here
Caisson 5DATE:Enter Date Here
PRIMESUBCONTRACTORPRIMEPRIME
WORK ITEMTITLELabor CostLabor HoursMaterial CostTOTALLabor CostLabor HoursMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
042-10-001Para 3.4.1: 14,000 sq. in. Base Metal Repair (E1)$0.00$0.00$0.00$0.00$0.00$0.00
042-10-001Para 3.4.2: 960 linear in. Base Metal Repair (E1)$0.00$0.00$0.00$0.00$0.00$0.00
077-11-001Hazardous Waste Produced on Caisson; control$0.00$0.00$0.00$0.00$0.00$0.00
119-10-001Rubber Seal; replace$0.00$0.00$0.00$0.00$0.00$0.00
120-11-001Hull Exterior Surfaces; inspect$0.00$0.00$0.00$0.00$0.00$0.00
123-16-001Cleaning and Pumping; Accomplish$0.00$0.00$0.00$0.00$0.00$0.00
123-16-002Tank Interior Surfaces; inspect$0.00$0.00$0.00$0.00$0.00$0.00
130-11-001Weather Deck Exterior Surface; inspect$0.00$0.00$0.00$0.00$0.00$0.00
167-11-001Access Hatch; replace$0.00$0.00$0.00$0.00$0.00$0.00
167-11-002End & Main Tank Hatches; replace$0.00$0.00$0.00$0.00$0.00$0.00
191-11-001Concrete Ballast; repair$0.00$0.00$0.00$0.00$0.00$0.00
324-11-001Power Distribution Panel; replace$0.00$0.00$0.00$0.00$0.00$0.00
324-11-002Weather Deck Lighting; replace$0.00$0.00$0.00$0.00$0.00$0.00
324-11-003Heater replacement$0.00$0.00$0.00$0.00$0.00$0.00
324-11-004Modify Access Closure$0.00$0.00$0.00$0.00$0.00$0.00
332-11-001Interior Lighting System; replace$0.00$0.00$0.00$0.00$0.00$0.00
529-11-001Tank Vents; repair$0.00$0.00$0.00$0.00$0.00$0.00
529-21-001Dewatering pump valve piping; inspect$0.00$0.00$0.00$0.00$0.00$0.00
529-21-002Dewatering Pump and Motor; replace$0.00$0.00$0.00$0.00$0.00$0.00
529-21-003Tank Drain Valves & Piping; remove$0.00$0.00$0.00$0.00$0.00$0.00
529-21-004Sea Valve End Tank Piping; remove$0.00$0.00$0.00$0.00$0.00$0.00
546-21-001Valves; replace$0.00$0.00$0.00$0.00$0.00$0.00
546-21-002Grease Lines and Steady Bearings; replace$0.00$0.00$0.00$0.00$0.00$0.00
546-21-003Actuator Stands; replace$0.00$0.00$0.00$0.00$0.00$0.00
546-21-004Actuators; replace$0.00$0.00$0.00$0.00$0.00$0.00
546-21-005Remote Valve Operator Extension Shafts; align$0.00$0.00$0.00$0.00$0.00$0.00
611-11-001Centering Fender; install$0.00$0.00$0.00$0.00$0.00$0.00
612-11-001Handrails and Stanchion; install$0.00$0.00$0.00$0.00$0.00$0.00
631-10-001Tank Preservation; accomplish$0.00$0.00$0.00$0.00$0.00$0.00
631-10-002Operations Deck Compartment; preserve touch-up$0.00$0.00$0.00$0.00$0.00$0.00
631-21-001Handrails and Stanchions; preserve$0.00$0.00$0.00$0.00$0.00$0.00
631-31-001Hull Preservation; accomplish$0.00$0.00$0.00$0.00$0.00$0.00
633-11-001Zinc Anodes; install$0.00$0.00$0.00$0.00$0.00$0.00
634-11-001Non-skid; replace$0.00$0.00$0.00$0.00$0.00$0.00
982-31-001Operational Test Support; provide$0.00$0.00$0.00$0.00$0.00$0.00
992-10-001Contractor Facilities; provide$0.00$0.00$0.00$0.00$0.00$0.00
997-11-001Docking and Undocking; accomplish$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals$0.000.0$0.00$0.00$0.00- 0$0.00$0.00$0.00$0.00$0.00$0.00
Enter Prime Labor Rate Per Hour, G&A Rate and Profit Rate BelowBase Items Total Bid:$0.00
This line goes into CLIN 0001AA
Prime Labor Rate Per Hour:G&A Rate:Profit Rate:
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPHTITLELabor CostLabor HoursMATERIAL PRICETOTALLabor CostLabor HoursMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
Note BLevel of Effort to Completion – Growth$0.008886$82,383.00$82,383.00$0.00$0.00$0.00$0.00$82,383.00
Column Totals$0.008886.00$82,383.00$82,383.00$0.000.00$0.00$0.00$0.00$0.00$0.00$82,383.00
Level of Effort to Completion & Growth Reservation Pools 1 & 2$82,383.00
This line goes into CLIN 0001AB
Total Bid:$82,383.00
This line goes into CLIN 0001

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed profit rates.

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

File details come from the government source that posted it. Updated .