This document contains a federal contract opportunity notice for maintenance, repair, and preservation work on Caisson 5. The Naval Supply Systems Command is seeking proposals to dock, clean, perform hull and tank repairs, replace equipment and valves, upgrade electrical systems, and undertake other work on the 147-foot caisson vessel at the contractor's Puget Sound, Washington area shipyard. Offerors must be able to dry-dock the vessel to complete all work. The period of performance is from October 2021 to February 2022. The contract will be awarded as a fixed-price agreement in mid-June 2021 to the responsible contractor offering the lowest price and meeting technical standards. The pre-proposal teleconference is scheduled for February 25th and proposals are due by February 27th.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION (RFC)
DATE OF REQUEST: 2/25/2021 QUESTION NO: 002 Errata One
REQUIREMENT: CAISSON 5 REQUISITION NO.: N4523A21R1056
ITEM NO: 546-21-002
TITLE: Missing references
ISSUING OFFICE POC (CODE 440.22):
Brian Fergus brian.fergus@navy.mil
Steve Barry steven.e.barry@navy.mil
PARA. NO: PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Please provide the following references –
1. 80219 (M-1), Caisson #4 Valve Stem Reach Rod Coupling
2. 39987, Pumping & Flooding Elevation Details
3. 4MD683, Sectional Illustration, Single Stage #16 Niagara Mixflow Pump
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: C. Besaw SERIAL NO:
Per docking/caisson engineer:
Drawing/Reference ‘80219 (M-1), Caisson #4 Valve Stem Reach Rod Coupling’ has been provided to contracting and shall suffice for Caisson #5.
Drawing/Reference ‘ 39987, Pumping & Flooding Elevation Details’ will be replaced with: DWG 15969 (139763) Navy Yard Pearl Harbor T.H. Dry Dock No. 2, Puget
Sound Wash Dry Dock No. 5 Caisson Pumping Equipment, Plans and Details.
Drawing/Reference ‘4MD683’ will not be included into the drawing references.
Drawing ‘4MD683’ does not add any value as it does not illustrate any grease lines.
Reference/Drawing to be utilized: 546-21-002 – Grease Lines & Steady
Bearings, Replacement
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
mailto:brian.fergus@navy.mil mailto:steven.e.barry@navy.mil
File details come from the government source that posted it. Updated .