FOUO C04.1 - Attachment J-1 - Caisson 5 Work Items - Errata 2.pdf
PDF 1 MB Posted
- Solicitation number
- N4523A21R1056
About this file
This document describes a federal solicitation for maintenance, repair, and preservation work on Caisson 5. The solicitation seeks offers to drydock, clean, blast and preserve the vessel's hull and tanks at the offeror's facility located in the Puget Sound, WA region between Olympia and Bellingham. Required work includes hull and tank preservation, welding repairs, electrical system replacement and upgrades, machinery replacement and repairs, concrete repairs, inspection and testing, and undocking services. The period of performance is from October 2021 to February 2022. The government will award a firm-fixed price contract in mid-June 2021 on a lowest price, technically acceptable basis in accordance with FAR 15.101-2. Interested parties must register in SAM and download reference drawings from DoDSafe by February 27, 2021. The ship check is scheduled for February 25, 2021 and Section L provides base access registration deadlines.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NWRMC (NMD)
DRYDOCK CAISSON NO 5 (RMC 50)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NWRMC-701-21
ERRATA 2 INCLUDES ALL CHANGES THROUGH 3/11/2021
INDEX
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) NWRMC-701-21
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
03/06/2020 CH-2
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
07/24/2019 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original
009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2019 Original
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
01/14/2020 CH-1
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
10/01/2019 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
Page 1 of 5 PLANNED WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
04/30/2018 Original
009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
099-01NW General Occupational Safety and Health Requirements for the Bremerton
Naval Complex (BNC); accomplish
04/19/2019 Original
099-02NW General Contractor Environmental Protection Requirements for Bremerton
Naval Complex (BNC); accomplish
07/01/2016 Original
099-03NW General Contractor Air Pollution Control and Reporting Requirements for
Bremerton Naval Complex (BNC); accomplish
09/11/2018 Original
099-04NW General Contractor Hazardous Material Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-05NW General Contractor Water Pollution and Spill Prevention Requirements for
Bremerton Naval Complex (BNC); accomplish
06/24/2018 Original
099-06NW General Contractor Waste Management Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-07NW General Contractor Solid Waste Management Requirements for Bremerton
Naval Complex (BNC); accomplish
01/11/2017 Original
099-08NW Schedule and Associated Reports for Availabilities at Puget Sound Naval
Shipyard Over 9 Weeks in Duration; provide and manage
06/24/2018 Original
099-09NW Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
06/24/2018 Original
099-10NW Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
04/19/2019 Original
099-11NW Compartment Closeout; accomplish 06/24/2018 Original
099-12NW General Requirements for Service Contracts; accomplish 04/19/2019 Original
Page 2 of 5 PLANNED WORK
CHANGE DATETITLEITEM NO.
CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
CHANGE
009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2019 Original
009-17 Rotating Electrical Equipment; repair 10/01/2019 Original
009-32 Cleaning and Painting Requirements; accomplish 03/06/2020 CH-2
009-103 Weight and Moment Change Data; provide 04/30/2018 Original
Page 3 of 5 PLANNED WORK
ITEM NO. TITLE
Workplace Requirements; accomplish042-10-001
Hazardous Waste; control077-11-001
Rubber Seal; replace119-10-001
Hull Exterior Surfaces; inspect120-11-001
Cleaning and Pumping; accomplish123-16-001
Tank Interior Surfaces; inspect123-16-002
Weather Deck Exterior Surface; inspect130-11-001
Access Hatch; replace167-11-001
End & Main Tank Hatches; replace167-11-002
Concrete Ballast; repair191-11-001
Power Distribution Panel; replace324-11-001
Weather Deck Lighting; replace324-11-002
Heater; replace324-11-003
Furnishing Access Enclosure; modify324-11-004
Interior Lighting System; replace332-11-001
Tank Vents; repair529-11-001
Dewatering and Equalizing valve piping; inspect529-21-001
Dewatering Pump and Motor; replace529-21-002
Tank Drain Valves & Piping; remove529-21-003
Sea Valve-End Tank Piping; remove529-21-004
Valves; replace546-21-001
Grease Lines and Steady Bearings; replace546-21-002
Actuator Stands; replace546-21-003
Actuators; replace546-21-004
Remote Valve Operator Extension Shaft Assemblies; align546-21-005
Centering Fendering; install611-11-001
Handrails and Stanchions; install612-11-001
Tank Preservation; accomplish631-10-001
Operations Deck Compartment; preserve touch-up631-10-002
Handrail Stanchions; preserve631-21-001
Page 4 of 5 PLANNED WORK
Hull Preservation; accomplish631-31-001
Zinc Anodes; install633-11-001
Non-skid; replace634-11-001
Operational Test Support; provide982-31-001
Contractor Facilities; provide992-10-001
Drydocking and Undocking; accomplish997-11-001
Page 5 of 5 PLANNED WORK
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 042-10-001 (E1)
COAR: 00 PCN: SERV-L010
CSWT FILE NO: 042-001 (PC 1) CMP: NONE
REVISED: 18 Sep 2019 PLANNER: LOCKWOOD, HOLLIS
LEWIS, ANNA
SSP: NWRMC-701-21 1 of 6 ITEM NO: 042-10-001 ERRATA NO. One
1. SCOPE:
1.1 Title: Structural Workplace Repairs; Requirements; accomplish (E1)
1.2 Location of Work:
1.2.1 Rubber Seal Steel Mating Surfaces
1.2.2 Hull Exterior Surfaces
1.2.3 Forward Trim Tank
1.2.4 Main Ballast Tank
1.2.5 AFT Trim Tank
1.2.6 Weather Deck Exterior Surfaces
1.2.7 Steel Surfaces Exposed by Concrete Removal
1.2.8 Tank Vents
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 S-9086-CH-STM-010/CH-074, Welding and Allied Processes
2.3 T9074-AS-GIB-010/271, NAVSEA Technical Publication Requirements for Nondestructive Testing Methods
3. REQUIREMENTS:
3.1 Accomplish DELETEDWeld build-up of a cumulative total of 14,000 square inches on the vessel. Repairs to be distributed on the following work items 119-10-001, 120-11-001, 123-16-002, 130-11-001, 191-11-001 and 529-11-001 based on contractor structural inspection results.
(E1)
3.2 DELETEDAccomplish "V” Out Excavate and Weld Fill Repairs of 960 Linear Inches on the vessel. Repairs to be distributed on the following work items 119-10-001, 120-11-001, 123-16-002, 130-11-001, 191-11-001 and 529-11-001 based on contractor structural inspection results.
(E1)
(V)(G) "JOINT INSPECTION"
3.3 Accomplish a joint inspection with the SUPERVISOR to verify the locations and dimensions of structural repairs identified by the SUPERVISOR based on Ultrasonic Inspection and Visual Inspection Reports submitted via CFR for each respective item listed in 3.4. 1.
(E1)
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media, of a Repair Plan listing the location and dimensions of repairs identified in 3.3 to the SUPERVISOR.
3.4 Accomplish In accordance with 009-12 accomplish repairs approved by the SUPERVISOR listed in the Repair Plan of 3.3.1 for locations in 1.2, (E1)
SHIP: DRYDOCK CAISSON NO 5 (RMC 50)
SSP: NWRMC-701-21 2 of 6 ITEM NO: 042-10-001 ERRATA NO. One in accordance with 2.1 through 2.3.
3.4.1 Total area of weld build up not to exceed 14,000 square inches.
(E1)
3.4.2 Total area of "V" out excavate and fill repairs not to exceed 960 linear inches.
(E1)
3.4.3 Template exact sizes, locations, and configurations from existing shipboard conditions prior to removal and re-installation.
(E1)
3.4.4 Unidentified dented or deformed hull and/or tank structure shall be reported within 48 hours of discovery to SUPERVISOR.
(E1)
(I) "NON DESTRUCTIVE VISUAL TESTING"
3.5 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 after completion of weld repairs at the locations listed in the Repair Plan of 3.3.1.
(V)(G) "FINAL INSPECTION"
3.6 Accomplish a joint inspection with the SUPERVISOR to verify all repairs are accomplished by the Contractor in the locations and dimensions as identified in the Repair Plan of 3.3.1 prior to final Blast and Paint.
3.7 Keep a Declining Log listing at a minimum: the CFR that each repair was identified on, the location and dimensions of the repair, the linear inches of each weld repair approved, and square inches of each weld repair approved. Also provide a total number of linear inches of weld repair approved and a total number of square inches of weld repair approved. Report shall be in a form as provided by the SUPERVISOR and in conjunction with the SUPERVISOR.
3.7.1 Submit one legible copy, in hard copy or approved
transferrable media, of the Declining Log for repairs identified in
3.6 Weekly to the SUPERVISOR.
3.8 Develop a Test Plan incorporating each Work Item in the job order, LOA Chits or Statements of Work (SOW). The initial Test Plan must include all inspections and tests required by zero-tier references and first tier references, as well as symbols (I)(V)(Q) test/inspections and (G) government notification identified in the Work Item, and any additional tests and inspections the contractor deems necessary to substantiate product conformance.
(E1)
3.8.1 Submit the initial copy of the Test Plan to the SUPERVISOR no later than 3 days prior to the availability start date.
(E1)
3.8.1.1 Submit one legible copy of the initial Test Plan, in
hard copy or approved transferrable media that can be sorted (e.g., Excel spreadsheet).
(E1)
3.8.1.2 Submit one legible copy, in hard copy or approved
transferrable media that can be sorted (e.g., Excel spreadsheet) of an updated Test Plan when requested by the SUPERVISOR not to exceed one per week.
SSP: NWRMC-701-21 3 of 6 ITEM NO: 042-10-001 ERRATA NO. One
3.8.2 A Test Plan must: (E1)
3.8.2.1 Be revised prior to the start of productive work and
updated as work proceeds on each Work Item. Supporting data for tests and inspections requiring government notification (G), including accept/reject criteria, must be available at the location of each test and inspection. Include provisions for documenting the date, time, and identification of the SUPERVISOR's representative notified and government representative attending each (G)-Point on the Test Plan.
(E1)
3.8.2.2 Each test and inspection must be identified by its
respective Work Item number and Work Item paragraph number, including Standard Item paragraph number, and must include inspection symbols (I)(Q) and (V), and the government notification (G) Point symbol where applicable.
(E1)
3.8.2.3 Provide identification of the item to be inspected by name, number, and location (e.g., number 3 main feed pump, 5-180- 0-E).
(E1)
3.8.2.4 Provide identification of each characteristic of the
items to be inspected and provide the criterion for acceptance for each characteristic (e.g., air test; 2 PSIG for 10 minutes;
no drop).
(E1)
3.9 Test and Inspection records must: (E1)
3.9.1 Include the ship's name and hull number, Job Order and Work Item number, applicable PCP number, paragraph number, component identification, accept/reject criteria, date, time, unique identification of test equipment used, and signature, of the contractor's authorized representative who witnessed or performed the test or inspection. The signature occurs after the checkpoint is determined to be satisfactory or unsatisfactory and any exceptions are documented.
(E1)
3.9.2 Be maintained at a contractor location accessible to the site of the work required by the Job Order.
(E1)
3.9.3 Be documented within one day of accomplishment or prior to the subsequent tests or inspections, whichever is less. The records must indicate the results of the test and or inspection accomplished. Test or inspection records will clearly identify each location or component when multiple locations or multiple components are listed on a single record. Records must be incorporated into the Test Plan within 4 days after completion of each test or inspection.
(E1)
3.9.3.1 For tests and inspections involving (G)-points, records must be documented upon acceptance or rejection and a hard copy (or electronic copy as authorized by the SUPERVISOR) provided to the SUPERVISOR at the conclusion of each (G)-Point. (See 4.4)
(E1)
3.9.4 Required reports resulting from tests or inspections must include the appropriate design criterion for each attribute or measurement required by the Work Item.
(E1)
3.10 The SUPERVISOR will consider the Work Item incomplete if the contractor's documentation and records are not complete.
3.11 Accomplish (I), (V) and (Q) tests/inspections that do not have (E1)
SSP: NWRMC-701-21 4 of 6 ITEM NO: 042-10-001 ERRATA NO. One associated (G)-points, with qualified and/or currently certified personnel where required by the technical documents (e.g., NBPI, NACE, nondestructive testing, electrical cableway inspection, Oxygen Cleanliness Inspector, etc.) as follows:
3.11.1 (I) inspections require verification and documentation by a separate individual, other than the person who has accomplished the work, who is qualified as an inspector.
(E1)
3.11.2 (V) inspections require verification and documentation by the qualified tradesperson, trade supervisor, or inspector.
(E1)
3.11.3 (Q) inspections require verification and documentation by a qualified Technical Representative in accordance with 009-90 of 2.1 and associated PCP requirements.
(E1)
3.11.4 The authority to accomplish, document, accept and reject (I) and (V) inspections may be delegated to qualified subcontractor personnel, without regards to geographical location, subject to SUPERVISOR approval.
(E1)
3.12 Accomplish (G)-Point (government notification) as follows: (E1)
3.12.1 (G) is a symbol inserted in a Work Item to establish a point in the sequence of accomplishment of work at which time the SUPERVISOR must be notified by the prime contractor in all cases to permit observation of a specific test or inspection (I)(V) by the government. When the symbol (G) precedes tests or inspections in a Work Item which are applicable to more than one action, the symbol
(G) must identify the action required, e.g., (G) "HYDROSTATIC TEST".
When more than one unit is involved, the (G) notification requirement applies to each unit.
(E1)
3.12.2 3.14.2 Notify the SUPERVISOR's designated representative as directed by the SUPERVISOR via FAX, hard copy, or by electronic method.
(E1)
3.12.2.1 Notify the SUPERVISOR prior to commencing the specific requirements in a paragraph annotated with the symbol (G), during normal day shift working hours with at least 2 hours, but not more than one-day notice. Following the required notification, the requirements in the | paragraph annotated with the symbol (G) may proceed prior to the scheduled time as approved by the SUPERVISOR. Notify the SUPERVISOR to cancel a scheduled test or inspection no later than 30 minutes prior to the scheduled event or as negotiated with the SUPERVISOR.
(E1)
3.12.2.2 Notify the SUPERVISOR not later than 4 hours before the end of the last preceding normal work day when tests or inspections following a (G) Point are scheduled after normal day shift working hours, on a weekend, or on a federal holiday.
Following the required notification, the requirements in the paragraph annotated with the symbol (G) may proceed prior to the scheduled time as approved by the SUPERVISOR. Notify the SUPERVISOR to cancel a scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled event.
(E1)
3.12.2.3 Notify the SUPERVISOR at least 48 hours, but not more than 72 hours, prior to commencing (G)-Points at contractor's/subcontractor's plants located in excess of 50 miles by the most direct roadway nearest to the place of performance of
SSP: NWRMC-701-21 5 of 6 ITEM NO: 042-10-001 ERRATA NO. One the contract. Document the date, time, and identification of the SUPERVISOR's representative notified. Following the required notification, the requirements in the paragraph annotated with the symbol (G) may proceed prior to the scheduled time as approved by the SUPERVISOR. Notify the SUPERVISOR to cancel a scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled event.
3.12.3 Proceed with the test or inspection if the SUPERVISOR is not present, provided the required advance notice has been furnished to the SUPERVISOR and the contractor has completed and documented the preceding tests and inspections.
(E1)
3.12.4 A partial test or inspection requiring (G) notification may be accomplished in the event that all work cannot be completed and work progress would be delayed in waiting for total completion of work. Comply with the requirements of 3.14.2 when the incomplete work is completed and ready for the remainder of the test or inspection.
Note partial inspections on the test or inspection form.
(E1)
3.12.5 A qualified contractor representative must be present to accomplish, accept or reject and document tests or inspections associated with the symbol (G).
(E1)
3.12.5.1 The authority to witness or perform, document and
accept/reject (I)(G), (Q)(G), and (V)(G) tests and inspections is a prime contractor's responsibility but, subject to SUPERVISOR approval within a 50-mile radius of the contractor’s plant nearest to the place of performance of the contract, may be delegated to subcontractors who are MSRA or ABR agreement holders, SSPC QP1 certified, NDT certified, or have a current QMS accepted by the SUPERVISOR.
(E1)
3.12.5.2 The contractor may delegate responsibility to
subcontractors to perform, document and accept/reject (I)(G) and (V)(G) tests and inspections performed at plants located outside a 50-mile radius of the contractor's plant nearest to the place of performance of the contract subject to SUPERVISOR prior approval.
(E1)
3.12.5.3 Associated (G)-Point notification requirements must not be delegated.
(E1)
3.13 For work being performed outside a 50-mile radius of the place of contract performance, the prime contractor must submit one legible copy, in hard copy or approved transferrable media, of purchase orders to the SUPERVISOR within 2 days or otherwise as directed by the SUPERVISOR, prior to issue of purchase order and shipment of equipment. For contractors who do not utilize purchase orders as a vehicle for accomplishing work within their company, a report identifying the delineation of the specific Work Item requirements, in lieu of the purchase order must be submitted to the SUPERVISOR.
(E1)
3.14 Maintain a current list for reference by the SUPERVISOR, designating the contractor's qualified and currently certified inspectors who witness or perform and sign for symbol (I) inspections, indicating the type of tests and inspections for which each inspector is qualified and currently certified. When subcontractors are delegated responsibility, the subcontractor's qualified and currently certified inspectors must be included on this list.
SSP: NWRMC-701-21 6 of 6 ITEM NO: 042-10-001 ERRATA NO. One
4. NOTES:
4.1 Inspection to be accomplished on the following work items 119-10- 001, 120-11-001, 123-16-002, 130-11-001, 191-11-001 and 529-11-001.
(E1)
4.2 Utilize the structural references listed in 119-10-001, 120-11-001, 123-16-002, 130-11-001, 191-11-001 and 529-11-001 as guidance in way of structural weld repairs.
(E1)
4.3 Areas listed in 1.2 will not be released to the contractor for final blast and paint until the SUPERVISOR has verified that all weld repairs have been completed.
(E1)
4.4 A partial (G)-point may be accomplished for a fraction of the work specification components. When elected, the contractor is responsible to account for the inspection status of each component. A final (G)-point is required for the last remaining component(s).
(E1)
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 077-11-001
COAR: 00 PCN: SERV-L034
CMP: NONE
PLANNER: LEWIS, ANNA
LOCKWOOD, HOLLIS
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 5 ITEM NO: 077-11-001
1. SCOPE:
1.1 Title: Hazardous Waste; control
1.2 Location of Work:
1.2.1 Caisson 5
1.3 Identification:
1.3.1 Quantity (One EA), Drydock Caisson No. 5, 147 Feet 4 Inches Length, 22 Feet 11 Inches Width, 54 Foot Height, 28 Feet Draft, 1729 Long Tons Light Load Displacement
2. REFERENCES:
2.1 42 U.S.C. 6901, Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311, Repair or Maintenance of Naval Vessels; handling of hazardous waste
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 through 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy, in hard copy or electronic media, of
2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented
SSP: NWRMC-701-21 2 of 5 ITEM NO: 077-11-001 to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.2.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include N/A N/A N/A spent sulfamic, citric, SSP: NWRMC-701-21 3 of 5 ITEM NO: 077-11-001 chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) N/A N/A N/A
Sodium Hydroxide N/A N/A N/A
Cleaning Solvents N/A N/A 65 gls.
Sodium Phosphates (Tri, Bi, N/A N/A N/A or Mono)
Fluorocarbons N/A N/A N/A
Morpholine N/A N/A N/A
Sodium Chromates N/A N/A N/A
Hydrazine N/A N/A N/A
Methyl Ethyl Ketone N/A N/A N/A
Spent Abrasive Blast Material N/A N/A 790 Tons
(contaminated with a known hazardous waste)
Trichloroethane N/A N/A N/A
Miscellaneous Chemicals N/A N/A N/A
(Ignitable)
(Corrosive)
(TCLP Toxic)
(Reactive)
Oil (Synthetic) N/A N/A 5 gls.
Paints (Enamel, Latex, Epoxy, N/A N/A N/A thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, N/A N/A 110 gls.
cadmium, or chrome)
SSP: NWRMC-701-21 4 of 5 ITEM NO: 077-11-001
Paint Strippers (phenols, N/A N/A N/A lead, chromium)
Sludge (Contaminated with N/A N/A 250 lbs.
a known hazardous waste)
Wool Felt (contaminated with N/A N/A N/A chromium and PCB's)
Rags N/A N/A 1,180 lbs.
3.6 Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the
SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Consider coatings to contain heavy metals (e.g. lead, chromium, cadmium), hexavalent chromium, crystalline silica, and/or other toxic or hazardous substances until laboratory analysis establishes otherwise.
Comply with all procedures and precautions required for employee protection, sampling, removal, and disposal.
3.8 Consider insulation, lagging, and mastics to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable method(s), that the material does not contain asbestos.
Ensure compliance with the requirements of 29 CFR 1915.1001.
3.9 Consider materials, debris, and/or residue associated with ventilation systems to contain toxic/hazardous substances including but not limited to cadmium, chromium, and PCB’s until laboratory analysis establishes otherwise.
3.10 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste
SSP: NWRMC-701-21 5 of 5 ITEM NO: 077-11-001 generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
CONT PROCURE PARTS
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 119-10-001
COAR: 00 PCN: SERV-L026
CMP: NONE
PLANNER: LEWIS, ANNA
LOCKWOOD, HOLLIS
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 3 ITEM NO: 119-10-001
1. SCOPE:
1.1 Title: Rubber Seal; replace
1.2 Location of Work:
1.2.1 Hull Exterior
1.3 Identification:
1.3.1 Quantity (548 EA), Stud, Monel, Item No. 1 of 2.2
1.3.2 Quantity (548 EA), Nut, Monel, Item No. 2 of 2.2
1.3.3 Quantity (548 EA), Washer, Monel, Item No. 3 of 2.2
1.3.4 Quantity (One LT), Rubber Filler One Part, Item No. 4 of 2.2
1.3.5 Quantity (46 EA), Rubber Seal Type One, Item No. 5 of 2.2
1.3.6 Quantity (2 EA), Rubber Seal Type 2, Item No. 6 of 2.2
1.3.7 Quantity (4 EA), Rubber Seal Type 3, Item No. 7 of 2.2
1.3.8 Quantity (4 EA), Rubber Seal Type 4, Item No. 8 of 2.2
2. REFERENCES:
2.1 Standard Items
2.2 997-6901533, Caisson #4, 5 & Spare Rubber Seal Manufacturer & Installation
2.3 111-7283069, PSNS Rubber Seal For Dry Dock No. 6 Caisson Gate
2.4 PW 43449, Dry Dock No 4 & 5 Spare Caisson (PORT Side) Record of Shell Thickness Ultra Sonic Test.
2.5 PW 43449, Dry Dock No 4 & 5 Spare Caisson (STBD Side) Record of Shell Thickness Ultra Sonic Test.
3. REQUIREMENTS:
3.1 Remove existing and install new equipment listed in 1.3.2 through
1.3.8 in the locations listed in 1.2.1, using 2.2 for guidance.
3.2 Ultrasonic Test (UT) measurement accomplish the rubber seal steel mating surface in accordance with 2.2 and paragraph 6 of 2.3, using 2.4 through 2.5 for guidance.
3.2.1 Inspect the entire length of the rubber seal steel mating surface at 2 foot intervals, in three equally spaced locations per interval. Measure and record in columnar form the following:
3.2.2 List in One column the design thickness;
3.2.3 List and record in a corresponding column the actual reading taken;
3.2.4 List and notate if reading is taken over an existing doubler
SSP: NWRMC-701-21 2 of 3 ITEM NO: 119-10-001 or insert plate;
3.2.5 List, identify, and record corresponding specific measurement locations and/or areas in relationship to structural members or with measurements from suitable hull reference points
3.2.6 Generate a sketch/table for test sites results and calculate, identify, and highlight measurements indicating a difference (wastage) greater than or equal to 25 percent of the designed plate thickness using 2.4 and 2.5 as guidance.
3.2.7 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.2 to the SUPERVISOR
3.3 Visual Inspection (VT) accomplish the entire length of the rubber seal steel mating surface, using 2.2 through 2.5 for guidance.
3.3.1 Search for, mark, identify, and record defective (actual and suspect) areas that exhibit signs of severe pitting, excessive erosion, deterioration, damage, or which may be detrimental to the structural and watertight integrity of the vessel.
3.3.2 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.3 to the SUPERVISOR
3.4 VT accomplish thread damage, corrosion, and bent studs the equipment listed in 1.3.1.
3.4.1 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.4, including the location of 200 replacement fasteners to the SUPERVISOR
3.5 Remove existing and install new QTY 200 EA. equipment listed in the report of 3.4.1 exhibiting thread damage/corrosion/cracked welds/material loss.
(I)(G) "STUD REMOVAL SITE PT"
3.5.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Lines One through 7 and 10 for locations listed in 3.4.1.
3.5.2 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.5.1 to the SUPERVISOR.
3.6 Install new equipment listed in 1.3.2 through 1.3.8 in the location listed in 1.2.1 using 2.2 for guidance.
3.6.1 Lubricate 100 percent of each threaded surface with anti-seize compound meeting the requirements of CID-A-A-59004-A.
(I)(G) "FASTENER TORQUE"
3.6.2 Fastener torque inspect using General Note 2.04 of 2.3 for guidance.
3.6.3 Submit one legible copy, in electronic media, of a report
SSP: NWRMC-701-21 3 of 3 ITEM NO: 119-10-001 listing results of the requirements of 3.6.2 to the SUPERVISOR.
3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Hull preservation to be accomplished on work item 631-31-001.
4.2 Long Lead Time Materials: Monel Studs, Nuts and Washers. Contractor is advised to order at contract award.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 120-11-001
COAR: 00 PCN: SERV-L027
CMP: NONE
PLANNER: LEWIS, ANNA
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 2 ITEM NO: 120-11-001
1. SCOPE:
1.1 Title: Hull Exterior Surfaces; inspect
1.2 Location of Work:
1.2.1 Hull Exterior, Port Side
1.2.2 Hull Exterior, Starboard Side
1.3 Identification:
1.3.1 Quantity (One EA), Drydock Caisson No. 5, 147 Feet 4 Inches Length, 22 Feet 11 Inches Width, 54 Foot Height, 28 Feet Draft, 1729 Long Tons Light Load Displacement
2. REFERENCES:
2.1 Standard Items
2.2 Caisson 05, UT Testing Caisson No. 5 Hull Structural Survey 2020
2.3 T9074-AS-GIB-010/271, NAVSEA Technical Publication Requirements for Nondestructive Testing Methods
2.4 15969, 139763) Navy Yard Pearl Harbor TH. Dry Dock No. 2 Navy Yard, Puget Sound, Wash Dry Dock No. 5 Caisson Pumping Equipment Plan and
Details
2.5 15970, (139764) Navy Yard Pearl Harbor T.H. Dry Dock No. 2, Puget
Sound Wash Dry Dock No. 5 Caisson Pumping Equipment, Sections
2.6 PW 15957, 139751) Navy Yard Pearl Harbor T.H. Dry Dock No. 2, Puget Sound Wash Dry Dock No. 5 Caisson Welded Shell Plating & Details
3. REQUIREMENTS:
3.1 Accomplish ultrasonic test (UT) measurement inspections of the equipment listed in 1.3.1 in the locations listed in 1.2.1 and 1.2.2 in accordance with 2.2 and paragraph 6 of 2.3, using 2.4 through 2.6 for guidance.
3.1.1 Calculate, identify, and highlight measurements indicating a difference (wastage) greater than or equal to 25 percent of the designed plate thickness.
3.1.2 Submit one legible copy, in electronic media, of the entirely filled out reference 2.2 to the SUPERVISOR.
3.2 Accomplish a visual inspection of the equipment listed in 1.3.1 in the locations listed in 1.2, using 2.4 through 2.6 for guidance.
3.2.1 Search for, mark, identify, and record defective (actual and suspect) areas that exhibit signs of severe pitting, excessive erosion, deterioration, damage, or which may be detrimental to the
SSP: NWRMC-701-21 2 of 2 ITEM NO: 120-11-001 structural and watertight integrity of the vessel.
3.2.2 Inspection shall include all hull openings, overboards, attachments, and appendages.
3.2.3 A two dimensional, or Autocad 2016, sketch or drawing showing hull/structural configurations, arrangements, relationships, and a listing of the inspection location's data is an acceptable alternative.
3.2.4 Submit one legible copy, in electronic media, of a report listing the results of the requirements of 3.2 to the SUPERVISOR.
4. NOTES:
4.1 Preservation being accomplished on 631-31-001.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
GAS FREE CERTIFICATION REQUIRED
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 123-16-001
COAR: 00 PCN: SERV-L039
CMP: NONE
PLANNER: LEWIS, ANNA
LOCKWOOD, HOLLIS
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 3 ITEM NO: 123-16-001
1. SCOPE:
1.1 Title: Cleaning and Pumping; accomplish
1.2 Location of Work:
1.2.1 End Tank "Forward"
1.2.2 Center Tank
1.2.3 End Tank "Aft"
1.3 Identification:
1.3.1 Quantity (One EA), Drydock Caisson No. 5, 147 Feet 4 Inches Length, 22 Feet 11 Inches Width, 54 Foot Height, 28 Feet Draft, 1729 Long Tons Light Load Displacement
2. REFERENCES:
2.1 Standard Items
2.2 29 CFR PART 1915, Occupational Safety and Health Standards for Shipyard Employment
2.3 MIL-STD-777E(SH), Schedule of Piping, Valves, Fittings and Associated Piping Components
3. REQUIREMENTS:
3.1 Open, ventilate, empty, clean, render dry, and maintain "Safe for Workers" and/or "Safe for Hot Work", in accordance with the requirements of 2.2, any tank or space including adjacent tanks, spaces, or piping systems where the scope of repairs will result in a need for certification during the performance of this Job Order.
3.1.1 Ensure that harmful vapors, fumes, and mists are ventilated to the exterior of the vessel.
3.1.2 Install expandable plugs or blanks, painted blaze orange, in associated tank piping at the first valve or flange. Associated piping is defined as "an assembly of pipe, tubing, valves, fittings, and related components forming a whole or a part of a system which starts or terminates in subject area, thus being common to and associated with same."
3.1.2.1 Submit one legible copy, in hard copy or electronic
media, of a report listing the location of each installed expandable plug and blank to the SUPERVISOR.
3.1.2.2 Remove each expandable plug or blank upon completion of repairs and testing and install new gaskets and fasteners in
SSP: NWRMC-701-21 2 of 3 ITEM NO: 123-16-001 accordance with applicable groups and categories of 2.3.
3.2 Remove and dispose of a cumulative total of 10,000 gallons of liquids and 1,000 pounds of solids from the locations listed in 1.2 in the equipment listed in 1.3.1 in accordance with federal, state, and local laws, codes, ordinances, rules, and regulations and as follows:
3.2.1 Meter, measure, and record actual amounts of residual liquids (in gallons) and solids (in pounds) removed from the locations listed in 1.2 for the equipment listed in 1.3.
3.2.1.1 Total quantities greater or less than the quantities
listed in 3.2, when authorized by the Contracting Officer, will be the subject of an equitable adjustment.
3.2.2 Accomplish laboratory chemical analysis of liquid waste, sludge, and debris being disposed of in accordance with applicable federal, state and local laws, codes, ordinances, rules, and regulations.
3.2.3 Submit one legible copy, in hard copy or electronic media, of the results of the of 3.2.1 and 3.2.2 to the SUPERVISOR.
(V)(G) "INSPECT TANK CLEANLINESS"
3.3 Accomplish a cleanliness inspection of each location listed in 1.2 for the equipment listed in 1.3.1 upon final completion of all Contractor work within each tank and prior to final closure.
3.3.1 Ensure each location is clean, dry, and free of industrial debris, industrial equipment, refuse, dirt, scrap materials, and other extraneous materials.
3.3.2 Submit one legible copy, in hard copy or electronic media, of a report listing the results of 3.3 and the names of all personnel present during inspection to the SUPERVISOR within 72 hours after completion of final closing.
3.4 Install manhole cover for each tank upon completion and satisfactory final inspection acceptance by the SUPERVISOR .
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 For the purpose of this Work Item, the term "tank or space" includes voids, cofferdams, and inaccessible or confined areas.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
SSP: NWRMC-701-21 3 of 3 ITEM NO: 123-16-001
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 123-16-002
COAR: 00 PCN: SERV-L037
CMP: NONE
PLANNER: LEWIS, ANNA
LOCKWOOD, HOLLIS
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 2 ITEM NO: 123-16-002
1. SCOPE:
1.1 Title: Tank Interior Surfaces; inspect
1.2 Location of Work:
1.2.1 Forward Trim Tank
1.2.2 Main Ballast Tank
1.2.3 AFT Trim Tank
1.3 Identification:
1.3.1 Quantity (One EA), Drydock Caisson No. 5, 147 Feet 4 Inches Length, 22 Feet 11 Inches Width, 54 Foot Height, 28 Feet Draft, 1729 Long Tons Light Load Displacement
2. REFERENCES:
2.1 Standard Items
2.2 Caisson 05, UT Testing Caisson No. 5 Hull Structural Survey 2020
2.3 T9074-AS-GIB-010/271, NAVSEA Technical Publication Requirements for Nondestructive Testing Methods
2.4 15958, (139752) Navy Yard Pearl Harbor T.H. Dry Dock No. 2 Navy Yard, Puget Sound, Wash. Dry Dock No. 5 Caisson (Welded) Section & Breast
Hooks
2.5 15969, (139763) Navy Yard Pearl Harbor TH. Dry Dock No. 2 Navy Yard, Puget Sound, Wash Dry Dock No. 5 Caisson Pumping Equipment Plan and
Details
2.6 15970, (139764) Navy Yard Pearl Harbor T.H. Dry Dock No. 2, Puget
Sound Wash Dry Dock No. 5 Caisson Pumping Equipment, Sections
3. REQUIREMENTS:
3.1 Ultrasonic Test (UT) measurement accomplish interior structural surfaces of the equipment listed in 1.3.1 in the locations listed in
1.2.1 through 1.2.3 in accordance with 2.2 and paragraph 6 of 2.3, using
2.4 and 2.5 for guidance.
3.1.1 Calculate, identify, and highlight measurements indicating a difference (wastage) greater than or equal to 25 percent of the designed plate thickness.
3.1.2 Submit one legible copy, in electronic media, of the entirely
SSP: NWRMC-701-21 2 of 2 ITEM NO: 123-16-002 filled out reference 2.2 to the SUPERVISOR.
3.2 Visual Inspection (VT) accomplish equipment listed in 1.3.1 in the locations listed in 1.2, using 2.4 and 2.5 for guidance.
3.2.1 Search for, mark, identify, and record defective (actual and suspect) areas that exhibit signs of severe pitting, excessive erosion, deterioration, damage, or which may be detrimental to the structural and watertight integrity of the vessel.
3.2.2 VT shall include steel surfaces exposed as a result of the requirements of work item 191-11-001.
3.2.3 A two dimensional, or Autocad 2016, sketch or drawing showing hull/structural configurations, arrangements, relationships, and a listing of the inspection location's data is an acceptable alternative.
3.2.4 Submit one legible copy, in electronic media, of a report listing the results of the requirements of 3.2 to the SUPERVISOR.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 130-11-001
COAR: 00 PCN: SERV-L030
CMP: NONE
PLANNER: LEWIS, ANNA
LOCKWOOD, HOLLIS
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 2 ITEM NO: 130-11-001
1. SCOPE:
1.1 Title: Weather Deck Exterior Surface; inspect
1.2 Location of Work:
1.2.1 Weather Deck of Caisson (G-6)
1.3 Identification:
1.3.1 Quantity (One EA), Drydock Caisson No. 5, 147 Feet 4 Inches Length, 22 Feet 11 Inches Width, 54 Foot Height, 28 Feet Draft, 1729 Long Tons Light Load Displacement
2. REFERENCES:
2.1 Standard Items
2.2 Caisson 05, UT Testing Caisson No. 5 Hull Structural Survey 2020
2.3 T9074-AS-GIB-010/271, NAVSEA Technical Publication Requirements for Nondestructive Testing Methods
2.4 15969, (139763) Navy Yard Pearl Harbor TH. Dry Dock No. 2 Navy Yard, Puget Sound, Wash Dry Dock No. 5 Caisson Pumping Equipment Plan and Details
2.5 15970, (139764) Navy Yard Pearl Harbor T.H. Dry Dock No. 2, Puget Sound Wash Dry Dock No. 5 Caisson Pumping Equipment, Sections
3. REQUIREMENTS:
3.1 Accomplish ultrasonic test (UT) measurement inspections of the equipment listed in 1.3.1 in the location listed in 1.2.1 in accordance with 2.2 and paragraph 6 of 2.3, using 2.4 through 2.5 for guidance and as follows:
3.1.1 Calculate, identify, and highlight measurements indicating a difference (wastage) greater than or equal to 25 percent of the designed plate thickness.
3.1.2 Submit one legible copy, in electronic media, of the entirely filled out reference 2.2 to the SUPERVISOR.
3.2 Accomplish a visual inspection of the equipment listed in 1.3.1 in the location listed in 1.2.1, using 2.4 and 2.5 for guidance and as follows:
3.2.1 Inspection shall include all attachments, fittings, and protrusions (e.g. chocks, cleats, bitts, soft patches, toe guards, etc.) attached to the deck surfaces.
3.2.2 Search for, mark, identify, and record defective (actual and suspect) areas that exhibit signs of severe pitting, excessive
SSP: NWRMC-701-21 2 of 2 ITEM NO: 130-11-001 structural and watertight integrity of the vessel.
3.2.3 A two dimensional, or Autocad 2016, sketch or drawing showing hull/structural configurations, arrangements, relationships, and a listing of the inspection location's data is an acceptable alternative.
3.2.4 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: DRYDOCK CAISSON NO 5 (RMC 50) ITEM NO: 167-11-001
COAR: 00 PCN: SERV-L009
CMP: NONE
PLANNER: LEWIS, ANNA
TIEMEYER , JOHN
SSP: NWRMC-701-21 1 of 3 ITEM NO: 167-11-001
1. SCOPE:
1.1 Title: Access Hatch; replace
1.2 Location of Work:
1.2.1 Weather Deck (G-6)
1.2.2 Mezzanine deck(G-5)
1.3 Identification:
1.3.1 Quantity (1 EA), Watertight Deck Hatch, FWD, Starboard, between frames 20 through 24 of Longitudinal Section on Centerline in 2.5.
1.3.2 Quantity (2 EA), Access Ladder Handrails, 1-Inch Pipe Rail, FWD, Starboard, between frames 20 through 24 in 2.5.
2. REFERENCES:
2.1 Standard Items
2.2 PW 70147 , (16002112), DD3 Caisson Replacement (Access Enclosure)
2.3 PW 70115, (16002080), DD3 Caisson Replacement (General
Notes/Materials)
2.4 Wo210824-01, Manly Marine, Aluminum Type B-Door, Model D-020
2.5 15958, (139752) Navy Yard Pearl Harbor T.H. Dry Dock No. 2 Navy Yard, Puget Sound, Wash. Dry Dock No. 5 Caisson (Welded) Section & Breast Hooks
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Lines One through 7 for locations listed in 1.2.
3.2 Remove existing access hatch for equipment listed in 1.3.1 for locations listed in 1.2.1, in accordance with 2.1 though 2.5.
3.2.1 Grind surfaces flush and smooth in way of removals.
3.3 Install new Access enclosure using 2.2 and 2.3 as guidance.
3.3.1 Template exact location from existing shipboard conditions.
3.3.1.1 New Access Enclosure should be centerline with removed hatch,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .