This document contains a solicitation for maintenance, repair, and preservation work on Caisson 5, along with an attachment providing a breakdown of line items.
The Navy is seeking a contractor to dry-dock Caisson 5 at their Puget Sound, WA facility between October 2021 and February 2022. Required work includes hull repairs and preservation; electrical system replacements; valve, pump, and piping replacements; concrete repairs; and preservation, testing, and undocking services. The attachment outlines over 40 line items and provides spaces for contractors to input labor, material, and pricing details. Offerors must be registered in SAM and capable of dry-docking the 147-foot vessel. The solicitation will result in a firm-fixed-price contract award in mid-June to the lowest priced technically acceptable offeror in accordance with FAR 15.101-2. The pre-proposal conference will be held telephonically and drawings are available through DoDSafe upon request by February 27th.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Caisson 5
| Enter Contractor Name Here | ||||||||||||||
| Caisson 5 | DATE: | Enter Date Here | ||||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||||||
| WORK ITEM | TITLE | Labor Cost | Labor Hours | Material Cost | TOTAL | Labor Cost | Labor Hours | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total | |
| 042-10-001 | Para 3.1: 14,000 sq. in. Base Metal Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 042-10-001 | Para 3.2: 960 linear in. Base Metal Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 077-11-001 | Hazardous Waste Produced on Caisson; control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 119-10-001 | Rubber Seal; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 120-11-001 | Hull Exterior Surfaces; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 123-16-001 | Cleaning and Pumping; Accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 123-16-002 | Tank Interior Surfaces; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 130-11-001 | Weather Deck Exterior Surface; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 167-11-001 | Access Hatch; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 167-11-002 | End & Main Tank Hatches; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 191-11-001 | Concrete Ballast; repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-001 | Power Distribution Panel; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-002 | Weather Deck Lighting; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-003 | Heater replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 324-11-004 | Modify Access Closure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 332-11-001 | Interior Lighting System; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-11-001 | Tank Vents; repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-001 | Dewatering pump valve piping; inspect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-002 | Dewatering Pump and Motor; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-003 | Tank Drain Valves & Piping; remove | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 529-21-004 | Sea Valve End Tank Piping; remove | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-001 | Valves; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-002 | Grease Lines and Steady Bearings; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-003 | Actuator Stands; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-004 | Actuators; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 546-21-005 | Remote Valve Operator Extension Shafts; align | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 611-11-001 | Centering Fender; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 612-11-001 | Handrails and Stanchion; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-10-001 | Tank Preservation; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-10-002 | Operations Deck Compartment; preserve touch-up | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-21-001 | Handrails and Stanchions; preserve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 631-31-001 | Hull Preservation; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 633-11-001 | Zinc Anodes; install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 634-11-001 | Non-skid; replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 982-31-001 | Operational Test Support; provide | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 992-10-001 | Contractor Facilities; provide | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 997-11-001 | Docking and Undocking; accomplish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Enter Prime Labor Rate Per Hour, G&A Rate and Profit Rate Below | Base Items Total Bid: | $0.00 | ||||||||||||
| This line goes into CLIN 0001AA | ||||||||||||||
| Prime Labor Rate Per Hour: | G&A Rate: | Profit Rate: | ||||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||||||
| PARAGRAPH | TITLE | Labor Cost | Labor Hours | MATERIAL PRICE | TOTAL | Labor Cost | Labor Hours | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total | |
| Note B | Level of Effort to Completion – Growth | $0.00 | 8886 | $82,383.00 | $82,383.00 | $0.00 | $0.00 | $0.00 | $0.00 | $82,383.00 | ||||
| Column Totals | $0.00 | 8886.00 | $82,383.00 | $82,383.00 | $0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $82,383.00 | ||
| Level of Effort to Completion & Growth Reservation Pools 1 & 2 | $82,383.00 | |||||||||||||
| This line goes into CLIN 0001AB | ||||||||||||||
| Total Bid: | $82,383.00 | |||||||||||||
| This line goes into CLIN 0001 |
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed profit rates.
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
File details come from the government source that posted it. Updated .