Attachment C2 PPQ Design Experience.docx

DOCX document 29 KB Posted

Attached to
NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC) Federal contract opportunity
Solicitation number
N4425521R4000
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a past performance questionnaire for a lead design firm and details of a related indefinite delivery/indefinite quantity multiple award construction contract opportunity with the Department of the Navy Naval Facilities Engineering Command. The past performance questionnaire is to be completed by a previous client and submitted directly to the offeror or Naval Facilities Engineering Command to assess the contractor's performance on a prior design project. It requests ratings on various performance criteria. The construction contract is a partial small business set-aside to provide new construction, renovation, alteration, demolition and repair work of facilities in Washington, Oregon, Idaho, Montana, Alaska, Iowa, Minnesota, North Dakota, South Dakota, Nebraska, and Wyoming, with most work anticipated in Washington State. The annual size standard is $36.5 million. Response is requested through the federal procurement system.

View the file

Other files for this federal contract opportunity

Other files attached to NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC), newest first.
File Type Posted
21R4000_Amend 0013_8.11.22.pdf PDF
Amendment 0012_JL.pdf PDF
21R4000_Amend_0011_7.16.22.pdf PDF
SF30_Amend_0010.pdf PDF
21R4000_Amend 0009_6.21.22.pdf PDF
21R4000_Amend_0008_06.15.22.pdf PDF
21R4000_Amend_0007_6.02.22.pdf PDF
Attach 1_PPI Response Sheet.pdf PDF
Attach 2_PPI Response Sheet.pdf PDF
21R4000_Amend_0005_5.27.22.pdf PDF
Attach 1_GSA 60 day Extension01.PNG PNG image
Attachment G Financial Questionnaire Form01.docx DOCX document
21R4000_RFP_Amend 0004.pdf PDF
Attach 1_PPI Response Spreadsheet.pdf PDF
21R4000_Amend_0003_5.20.22.pdf PDF
Attach 2_PPI Response Spreadsheet.pdf PDF
Attach 1_GSA 60 day Extension.PNG PNG image
Attach L_PPI Form.doc DOC document
Attach 3_pre_proposal conference attendees.pdf PDF
Attach 4_NW MACC PreProposal Conf.pdf PDF
Attach 01 PPI Response Sheet.pdf PDF
Attachment J Task Order Editable Clauses and Provisions.docx DOCX document
Attachment D PPQ Design Experience.docx DOCX document
Attachment H HOOH and FOOH Analysis Form.xlsx XLSX spreadsheet
Attachment F SB Participation.docx DOCX document
Attachment G Surety Form.docx DOCX document
Attachment A PIEE Vendor Access Instructions.pdf PDF
Attachment I Post Award Contractors Limitations Subcontracting SB Cert.doc DOC document
Attachment C Construction Design Experience Data Sheet.docx DOCX document
Attachment G Financial Questionnaire Form.docx DOCX document
Attachment E SB Subcontracting Record.docx DOCX document
Attachment B Offeror Team Composition Management.docx DOCX document
21R4000_Amend0002.pdf PDF
Attachment 2 PPI Response Spreadsheet.pdf PDF
21R4000_Amend-0001.pdf PDF
Attachment 1 PPI Form.doc DOC document
N4425521R4000 RFP_Final.pdf PDF
Attachment E2 Financial Questionnaire Form.docx DOCX document
Attachment K SB Participation.docx DOCX document
Attachment E1 Surety Form.docx DOCX document
Attachment B Construction Design Experience Data Sheet.docx DOCX document
Attachment C1 PPQ Construction Experience.docx DOCX document
Attachment A Offeror Team Composition Management.docx DOCX document
Attachment M Task Order Editable Clauses and Provisions.docx DOCX document
Attachment L SB Subcontracting Record.docx DOCX document
Attachment F PPI Form.doc DOC document
Attachment D Safety Data Sheet Safety Narrative.docx DOCX document
Attachment H HOOH and FOOH Analysis Form.xlsx XLSX spreadsheet
Attachment J Post Award Limitation on Subcontracting Certif.doc DOC document
Attachment G PIEE Vendor Access Instructions.pdf PDF
Show all 50

NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment E.2

NAVFAC PAST PERFORMANCE QUESTIONNAIRE (Form PPQ) – Lead Design Firm

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information:

Firm Name:
Address:

DUNS:

Phone Number:
Point of Contact:Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Title:
Location:
Award Date (mm/dd/yy):
Completion Date (mm/dd/yy):
Award Amount:
Final Price:

4. Project Description:

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:
Organization/Title:
Phone Number:
Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed:

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

TO BE COMPLETED BY CLIENT

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

Rev Apr 2017 2

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

PLEASE MARK THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

E
V
S
M
U
N
1. Ability to meet quality standards specified for technical performance.
|_|
|_|
|_|
|_|
|_|
|_|
2. Compliance with contractual terms and conditions.
|_|
|_|
|_|
|_|
|_|
|_|
3. Compliance with contract design delivery/completion schedules including any significant intermediate milestones.
|_|
|_|
|_|
|_|
|_|
|_|
4. Quality/integrity of technical data/report preparation efforts.
|_|
|_|
|_|
|_|
|_|
|_|
5. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements.
|_|
|_|
|_|
|_|
|_|
|_|
6. Design documents (plans and specifications) accurate and coordinated.
|_|
|_|
|_|
|_|
|_|
|_|
7. Plans clear and detailed sufficiently.
|_|
|_|
|_|
|_|
|_|
|_|
8. Suitability of design.
|_|
|_|
|_|
|_|
|_|
|_|
9. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program).
|_|
|_|
|_|
|_|
|_|
|_|
10. Effectiveness of management of design subconsultants?
|_|
|_|
|_|
|_|
|_|
|_|
11. Designer was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports).
|_|
|_|
|_|
|_|
|_|
|_|
12. Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
|_|
|_|
|_|
|_|
|_|
|_|
13. Ability to successfully respond to emergency and/or surge situations.
|_|
|_|
|_|
|_|
|_|
|_|

14. Designer incorporated innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

|_|
|_|
|_|
|_|
|_|
|_|
15. Ability to hire/apply a qualified workforce to this effort.
|_|
|_|
|_|
|_|
|_|
|_|
16. Ability to retain a qualified workforce on this effort
|_|
|_|
|_|
|_|
|_|
|_|
17. If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
|_| Yes|_| No
18. Have there been any indications that the designer has had any financial problem? If yes, please explain below.
|_| Yes|_| No
19. In summary, provide an overall rating for the work performed by this contractor.
|_|
|_|
|_|
|_|
|_|
|_|

Any additional comments related to the contractor’s performance:

Client’s Signature: