21R4000_Amend_0011_7.16.22.pdf

PDF 568 KB Posted

Attached to
NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC) Federal contract opportunity
Solicitation number
N4425521R4000
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment modifies an indefinite delivery/indefinite quantity multiple award construction contract solicitation to extend the response deadline from July 19, 2022 to August 9, 2022. The solicitation seeks proposals from contractors to provide new construction, renovation, alteration, demolition and repair services for facilities located within the Naval Facilities Engineering Command Northwest area of responsibility, including Washington, Oregon, Idaho, Montana, Alaska, Iowa, Minnesota, North Dakota, South Dakota, Nebraska, and Wyoming. Anticipated project types involve administrative, industrial, housing, child care, recreation, retail, warehouse, and other similar facilities. This is a partial small business set-aside for NAICS code 236220 with an annual size standard of $36.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC), newest first.
File Type Posted
21R4000_Amend 0013_8.11.22.pdf PDF
Amendment 0012_JL.pdf PDF
SF30_Amend_0010.pdf PDF
21R4000_Amend 0009_6.21.22.pdf PDF
21R4000_Amend_0008_06.15.22.pdf PDF
21R4000_Amend_0007_6.02.22.pdf PDF
Attach 1_PPI Response Sheet.pdf PDF
21R4000_Amend_0005_5.27.22.pdf PDF
Attach 2_PPI Response Sheet.pdf PDF
Attach 1_GSA 60 day Extension01.PNG PNG image
Attachment G Financial Questionnaire Form01.docx DOCX document
21R4000_RFP_Amend 0004.pdf PDF
Attach 1_PPI Response Spreadsheet.pdf PDF
Attach 2_PPI Response Spreadsheet.pdf PDF
Attach 1_GSA 60 day Extension.PNG PNG image
Attach L_PPI Form.doc DOC document
21R4000_Amend_0003_5.20.22.pdf PDF
Attach 3_pre_proposal conference attendees.pdf PDF
Attach 4_NW MACC PreProposal Conf.pdf PDF
Attach 01 PPI Response Sheet.pdf PDF
Attachment A PIEE Vendor Access Instructions.pdf PDF
Attachment I Post Award Contractors Limitations Subcontracting SB Cert.doc DOC document
Attachment C Construction Design Experience Data Sheet.docx DOCX document
Attachment H HOOH and FOOH Analysis Form.xlsx XLSX spreadsheet
Attachment F SB Participation.docx DOCX document
Attachment G Surety Form.docx DOCX document
Attachment J Task Order Editable Clauses and Provisions.docx DOCX document
Attachment D PPQ Design Experience.docx DOCX document
Attachment G Financial Questionnaire Form.docx DOCX document
Attachment E SB Subcontracting Record.docx DOCX document
Attachment B Offeror Team Composition Management.docx DOCX document
21R4000_Amend0002.pdf PDF
Attachment 2 PPI Response Spreadsheet.pdf PDF
21R4000_Amend-0001.pdf PDF
Attachment 1 PPI Form.doc DOC document
Attachment C2 PPQ Design Experience.docx DOCX document
Attachment D Safety Data Sheet Safety Narrative.docx DOCX document
Attachment H HOOH and FOOH Analysis Form.xlsx XLSX spreadsheet
Attachment J Post Award Limitation on Subcontracting Certif.doc DOC document
Attachment C1 PPQ Construction Experience.docx DOCX document
Attachment A Offeror Team Composition Management.docx DOCX document
Attachment M Task Order Editable Clauses and Provisions.docx DOCX document
Attachment L SB Subcontracting Record.docx DOCX document
Attachment F PPI Form.doc DOC document
N4425521R4000 RFP_Final.pdf PDF
Attachment E2 Financial Questionnaire Form.docx DOCX document
Attachment K SB Participation.docx DOCX document
Attachment E1 Surety Form.docx DOCX document
Attachment B Construction Design Experience Data Sheet.docx DOCX document
Attachment G PIEE Vendor Access Instructions.pdf PDF
Show all 50

NORTHWEST MULTIPLE AWARD CONSTRUCTION CONTRACT (NW MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Northw est Multiple Aw ard Construction Contract

See Page 2 for detailed description

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4425521R4000

X 9B. DATED (SEE ITEM 11)

04-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2022

CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE

SILVERDALE WA 98315-1101

N44255 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4425521R4000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0011

1. SF 1442, block 13, Additional Solicitation Requirements, make the following change:

Remove:

a. “Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 pm local time 24 June 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.”

And replace with:

a. “Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 pm local time 09 August 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.”

2. Section 00 21 16, Instructions to Proposers, make the following change:

Remove:

“(2) Design Experience:

Submit a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. The Government will only review five (5) projects for design. Any projects submitted in excess of five (5) for Design Experience will not be considered. For purposes of this evaluation, a relevant project is further defined as:

(i) Similar in size:

Large Business construction projects with a minimum value of $15,000,000 Small Business construction projects with a minimum value of $10,000,000

(ii) Similar in scope: New construction, renovation, alteration, demolition, and repair work by DB or DBB for administrative facilities, housing facilities, child care centers, recreation/fitness centers, retail complexes, manufacturing and industrial facilities, communication facilities, special access program facilities (SAPF) or sensitive compartmented information facilities (SCIF’s), aviation facilities (i.e.

hangars, control towers, etc.), or other similar facilities.

(iii) Similar in complexity: Involving multiple trades, working in areas with limited access, or designing various projects simultaneously.

At least two projects shall demonstrate design-build experience. Failure to provide at least two recent and relevant projects demonstrating design-build experience will result in a deficiency for Factor 2 – Experience.

N4425521R4000

A project submitted under design experience will meet the recency requirement if (a) the construction effort was at least 85% completed within seven (7) years immediately preceding the proposal due date, regardless of the design completion date, OR (b) the construction effort is ongoing, but the design completion date was reached within the seven (7) years immediately preceding the proposal due date. Each relevant completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet.”

And replace with:

“(2) Design Experience:

Submit a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. The Government will only review five (5) projects for design. Any projects submitted in excess of five (5) for Design Experience will not be considered. For purposes of this evaluation, a relevant project is further defined as:

(i) Similar in size:

Large Business construction projects with a minimum value of $15,000,000 Small Business construction projects with a minimum value of $10,000,000

(ii) Similar in scope: New construction, renovation, alteration, demolition, and repair work by DB or DBB for administrative facilities, housing facilities, child care centers, recreation/fitness centers, retail complexes, manufacturing and industrial facilities, communication facilities, special access program facilities (SAPF) or sensitive compartmented information facilities (SCIF’s), aviation facilities (i.e.

hangars, control towers, etc.), or other similar facilities.

(iii) Similar in complexity: Involving multiple trades, working in areas with limited access, or designing various projects simultaneously.

At least two projects shall demonstrate design-build experience. Failure to provide at least two recent and relevant projects demonstrating design-build experience will result in a deficiency for Factor 2 – Experience.

Projects submitted under design experience for the Offeror shall be:

(a) Substantially complete within the past ten (10) years of the date of issuance of this RFP.

“Substantial Completion” is defined as the ability to use the facility for its intended purpose.

OR

(b) The construction effort is ongoing, but the design completion date was reached within the ten

(10) years immediately preceding the proposal due date. Each relevant completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet.”

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 19-Jul-2022 02:00 PM to 09-Aug-2022 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .