This document summarizes a solicitation for construction services to repair and modernize Lima Wharf at Naval Base Guam. The Navy seeks to replace the steel sheet pile bulkhead, mooring system, heavy weather mooring system, fender system, and electrical substation. Additional work includes replacing utilities, constructing wharf lighting, and building a bilge oily water treatment system. The estimated value is between $100-250 million. Offerors must submit technical and past performance proposals as well as prices for evaluation. A $3 million bid bond is required. The pre-proposal conference and site visit will be held with questions due in advance. Foreign visitors must submit passport copies. The point of contact is Janeen Bais.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY21 SPECIAL PROJECT RM 14-1420, Repair Lima Wharf, Naval Base Guam
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4019220R1300
X 9B. DATED (SEE ITEM 11)
16-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2020
CODE
COMMANDING OFFICER - NAVFAC MARIANAS
MAR MCON
PSC 455, BOX 195
FPO AP 96540-2937
N40192 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4019220R1300
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0009
A. In accordance with FAR 52.252-3 Alterations in Solicitation (APR 1984), portions of this solicitation are altered as follows:
1. Incorporate the following revisions to the Price Proposal Schedule. The Price Proposal Schedule incorporating the directed changes is issued as part of this amendment and provided herein as Enclosure (1):
a. CLIN 0001 TOTAL BASE BID
Remove the following text:
“Total price of Base Bid SubCLINs 0001A through 0001P for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the repair and modernization of LIMA Wharf and appurtenances in accordance with the drawings and specifications for WON 1383711; except for work described in CLINs 0002-0007.”
Replace text with the following:
“Total price of Base Bid SubCLINs 0001A through 0001R for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the repair and modernization of LIMA Wharf and appurtenances in accordance with the drawings and specifications for WON 1383711; except for work described in CLINs 0002-0007.”
b. SUBCLIN 0001N BASE BID ITEM N – Fill Import
Remove the following text:
“Total price for the entire work required for the importation, placement and compaction of select fill in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.”
Replace text with the following:
“Total price for the entire work required for the importation, placement and compaction of select fill where soils require replacement due to contamination in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211- 18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.”
(The above revision to Base Bid Item N was included in the revised Price Proposal Schedule issued with RFP Amendment 0003 but was not identified in the Summary of Changes.)
B. Notice 9 is provided in response to requests for information and is provided herein as Enclosure (2). Notice 9 is provided for INFORMATION ONLY. The solicitation remains unchanged unless it is amended in writing.
N4019220R1300
C. The date for receipt of proposals remains unchanged at August 31, 2020 at 4:30pm local time.
D. Offerors shall acknowledge this amendment in Block 19 of the Standard Form 1442 with their proposals.
(End of Summary of Changes)
CLIN SubCLIN Quantity Unit Unit Price
Extended Total
Grand Total
0001 $
0001A BASE BID ITEM A 1 LS $ $
0001B BASE BID ITEM B 44,070 MT $ $
0001C BASE BID ITEM C 1 LS $ $
0001D BASE BID ITEM D 23 EA $ $
0001E BASE BID ITEM E 1 LS $ $
0001F BASE BID ITEM F 1 LS $ $
0001G BASE BID ITEM G 1 LS $ $
0001H BASE BID ITEM H 1 LS $ $
0001I BASE BID ITEM I 1 LS $ $
0001J BASE BID ITEM J 1 LS $ $
0001Ka BASE BID ITEM Ka 1 LS $ $Mobilize and Demobilize Dredge
PRICE PROPOSAL SCHEDULE for
WON 1383711 (RM14-1420)
Lima Wharf Repair, NBG Apra Harbor
TOTAL BASE BID
Total price of Base Bid SubCLINs 0001A through 0001R for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the repair and modernization of LIMA Wharf and appurtenances in accordance with the drawings and specifications for WON 1383711; except for work described in CLINs 0002-0007.
RFP Amendment 0009
New Electrical Substation
Utilities
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the new electrical substation including foundation, building, and all equipment therein, in accordance with the drawings and specifications.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the new electrical ductbank extension in accordance with the drawings and specifications.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for demolition of the existing electrical substation in accordance with the drawings and specifications.
Crane Rail Rehabilitation
Paving
Existing Electrical Substation Demolition
New Electrical Ductbank Extension
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the potable water, sewer, drainage, electrical and telecommunications utilities in accordance with the drawings and specifications.
Description
Floating Fenders
Heavy Weather Mooring System Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the landside heavy weather mooring system, including concrete anchor blocks and piles, in accordance with the drawings and specifications.
Total price for the entire work required for the floating fenders, in accordance with the drawings and specifications. The unit price for this Base Bid SubCLIN shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work complete for price adjustment in accordance with FAR 52.243-4, Changes.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the steel sheet pile bulkhead, tie back anchor beams, anchor piles, tie rods, including replacement of the mooring and fender systems, not including the fenders themselves, in accordance with the drawings and specifications.
Total price for the entire work required for the installation of the stone columns, including test section, complete and in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN wil be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Stone Columns
Wharf Structural Repair and Modernization
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the paving in accordance with the drawings and specifications.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the rehabilitation and reinstallation of the crane rails in accordance with the drawings and specifications.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for mobilizing dredge and all related equipment and personnel onto and off project site.
Price
Extended Total
Grand Total
PRICE PROPOSAL SCHEDULE for
WON 1383711 (RM14-1420)
Lima Wharf Repair, NBG Apra Harbor RFP Amendment 0009
Description
0001Kb BASE BID ITEM Kb 4840 CY $ $
0001L BASE BID ITEM L MEC Clearance 1 LS $ $
0001Ma BASE BID ITEM Ma 790 LF $ $
0001Mb BASE BID ITEM Mb 2000 SF $ $
0001Mc BASE BID ITEM Mc 600 CY $ $
0001Md BASE BID ITEM Md Hydrocarbon Impacted Buried Debris Removal and Disposal 100 CY $ $
0001Me BASE BID ITEM Me Pesticides and Lead Impacted Soil Removal and Disposal 130 CY $ $
0001Mf BASE BID ITEM Mf 400 SF $ $
0001Mg BASE BID ITEM Mg 7000 LF $ $
0001Mh BASE BID ITEM Mh 1000 GAL $ $
Dredging
Total price for the entire work required for the removal, containment, and safe disposal of pesticide and lead impacted soils materials in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Lead-Based Paint Removal and Disposal
ACM Sewer Line Removal and Disposal
Total price for the entire work required for dredging in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required in accordance with Specification 01 57 19.01 20, complete and in accordance with the Request for Proposal. These costs include, but are not necessarily limited to, MEC equipment and personnel mobilization/demobilization, MEC work plans, MEC reporting, MEC Personnel, MEC safety briefings and awareness training, reduced production rates associated with debris removal, equipment, scanning, additional costs to shield equipment operators, dredge spoils drying, screening and/or broadcasting, equipment and scanning, and anomaly clearance.
Total price for the entire work required for the removal, containment, and safe disposal of ACM sewer line in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Total price for the entire work required for the removal, containment, and safe disposal of hydrocarbon impacted soils materials in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Total price for the entire work required for the removal, containment, and safe disposal of hydrocarbon impacted buried debris materials in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Total price for the entire work required for the removal, containment, and safe disposal of lead-based paint materials in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Hydrocarbon Impacted Soil Removal and Disposal
Oily Water Less Than 2 ppm Removal and Disposal Total price for the entire work required for the removal, containment, and safe disposal of oily water less than 2 ppm in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
ACM Building 2078 Removal and Disposal Total price for the entire work required for the removal, containment, and safe disposal of ACM materials at Building 2078 in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
PLIC Cables Removal and Disposal Total price for the entire work required for the removal, containment, and safe disposal of PLIC cable materials in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Price
Extended Total
Grand Total
PRICE PROPOSAL SCHEDULE for
WON 1383711 (RM14-1420)
Lima Wharf Repair, NBG Apra Harbor RFP Amendment 0009
Description
0001Mi BASE BID ITEM Mi Oily Water Greater Than 2 ppm Removal and Disposal 4000 GAL $ $
0001N BASE BID ITEM N 830 CY $ $
0001O BASE BID ITEM O 500 LF $ $
0001P BASE BID ITEM P 500 CY $ $
0001Q BASE BID ITEM Q 1 LS $ $
0001R BASE BID ITEM R 11,988 LF $ $
0002 BID OPTION 1 1 LS $
0003 BID OPTION 2 1 LS $
0004 BID OPTION 3 North End Wharf Structural Repair and Modernization 1 LS $
0005 BID OPTION 4 1 LS $
0006 BID OPTION 5 1 LS $
0007 BID OPTION 6 1 LS $
Total price for the entire work required for the removal, containment, and disposal of unforeseen abandoned utilities as directed in specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Bilge Oily Water Treatment System (BOWTS) Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the construction of the BOWTS in accordance with the drawings and specifications; except for work described in CLINs 0001 and 0003-0007.
Total price for the entire work required for the removal, containment, and disposal of unforeseen abandoned utilities as directed in specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Demolition of Unforeseen Concrete or Rubble
Corner Fender at Lima-Mike Wharf Intersection Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the installation of the corner fender at Lima-Mike wharf intersection in accordance with the drawings and specifications; except for work described in CLINs 0001-0005 and 0007.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the installation of the steam infrastructure in accordance with the drawings and specifications; except for work described in CLINs 0001-0006.
Steam Infrastructure
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the north end wharf structural repair and modernization, including one industrial power mound, in accordance with the drawings and specifications; except for work described in CLINs 0001-0003 and 0005-0007.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the wharf lighting including associated transformers and switchgear in accordance with the drawings and specifications; except for work described in CLINs 0001-0002 and 0004- 0007.
Wharf Lighting
Total price for the entire work required for the removal, containment, and safe disposal of oily water greater than 2 ppm in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Fill Import Total price for the entire work required for the importation, placement and compaction of select fill where soils require replacement due to contamination in accordance with the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Demolition of Unforeseen Existing Utilities
Demolition of Building 2078 Total price to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the removal, containment, and disposal of Building 2078, building and foundation, including associated utilities, piping and equipment as directed in the drawings and specifications; except for work described in Base Bid Items 0001Ma thru 0001Mi.
Procurement and Installation of HP16x88 Tie Back Anchor Piles Total price for the entire work required for the procurement and installation of HP16x88 piles at the tie back anchor as directed in the drawings and specifications. The unit price in this Base Bid SubCLIN will be used to adjust the contract price for any increase or decrease in the estimated quantity for this Base Bid SubCLIN subject to FAR 52.211-18, Variation in Estimated Quantity, and shall include all necessary labor, material, transportation, supervision, equipment, and other incidental work.
Total price for the entire work to provide all necessary labor, material, transportation, supervision, equipment, and other incidental work required for the demolition of the existing electrical ductbank in accordance with the drawings and specifications; except for work described in CLINs 0001-0004 and 0006-0007.
Existing Electrical Ductbank Demolition
Price
Extended Total
Grand Total
PRICE PROPOSAL SCHEDULE for
WON 1383711 (RM14-1420)
Lima Wharf Repair, NBG Apra Harbor RFP Amendment 0009
Description
0001 SUBTOTAL BASE BID $
0002 SUBTOTAL BID OPTION 1 Bilge Oily Water Treatment System (BOWTS) $ 0003 SUBTOTAL BID OPTION 2 Wharf Lighting $ 0004 SUBTOTAL BID OPTION 3 North End Wharf Structural Repair and Modernization $ 0005 SUBTOTAL BID OPTION 4 Existing Electrical Ductbank Demolition $ 0006 SUBTOTAL BID OPTION 5 Corner Fender at Lima-Mike Wharf Intersection $ 0007 SUBTOTAL BID OPTION 6 Steam Infrastructure $
SUMMARY:
TOTAL BASE BID + OPTIONS
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
N4019220R1300 Notice 9
18 August 2020
NOTICE 9
REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N4019220R1300 FY21 SPECIAL PROJECT RM 14-1420
REPAIR LIMA WHARF, NAVAL BASE GUAM
QUESTION (Q) 32: Importation, Placement, and Compaction of Select Fill – Reference RFP Part A, SF1442, Price Proposal Schedule, SubCLIN 0001N Base Bid Item N - Fill Import:
Please clarify where this pay item is applicable, there are numerous locations/activities requiring import select fill, refer below but not limited to the following:
(a) Detail A1/S-605 (typ), is the engineered fill to replace the excavated in-situ soil measured and paid under item 0001N?
(b) Is the import fill to replace the removed contaminated soils going to be paid under item 0001N?
Answer (A) 32 (REVISED): SubCLIN is intended to cover replacement of unsuitable soil materials due to contamination. The price proposal schedule is amended to clarify intent of the SubCLIN. Refer to RFP Amendment 0009.
Q121: Stone Columns – Reference RFP Part B, Specification Section 31 62 00 Stone Columns:
(a) Will the Government accept a measurement volume of stone as a means to calculate area replacement ratio directly rather than using weight which has to be converted to volume using an assumed on-site density?
(b) If the data acquisition system malfunctions, can the Contractor continue to install stone columns for a reasonable time until the data acquisition system is repaired?
A121: (a) Contractor shall bid Stone Columns as a measurement of weight per the Price Proposal Schedule.
(b) Contractor shall provide documentation per Paragraph 1.7.2 of Section 31 62 00 for every stone column installed.
Q129: Dredging Debris Quantity – Reference RFP Part B, Specification Section 35 20 23 Dredging, Paragraph 1.5 Artificial Obstructions:
Specification Section 35 20 23, paragraph 1.5 – Artificial Obstructions states: “The Government has knowledge of debris such as, but not limited to, metal cables, wood fragments, pieces of broken cable, rope, metal pipe, ship fenders, oil booms, ladders broken piles, and other miscellaneous debris.” and “Debris removed from the dredged area shall be removed from the water.” For bidding purposes, please provide the quantity of debris to be removed in cubic yards that the Offerors should include in their proposals. It is impossible for the Offerors to determine this quantity so the Government should provide a basis for the proposal pricing.
A129: Debris volume is included in the dredge volume stated in the Price Proposal Schedule.
Q132: Alternative Identification Markings – Reference RFI Notice 3 Response to Question 44 and RFP Part B, Specification Section 31 41 16 Metal Sheet Piling, Paragraph 1.6 Delivery, Storage, and Handling:
It is requested that the requirement for engraving of the king piles and sheet piles be reconsidered to allow alternative identifications markings to the king pile and sheet pile system. Any engraving process to the steel would be done by the steel manufacturer prior to the application of the required coating system. The coating process would both damage and cover up the engraved markings making the engraving a costly and unnecessary process that would provide little to no identifiable information on the end product.
A132: Engraving shall be provided on uncoated portion of the pile in accordance with the specification.
Q133: – Reference RFP Part B, Specification Section 03 31 29 Marine Concrete with Service Life Modeling, Paragraph 1.7.6.2 Hardened Concrete Properties, Item a(3), and Section 03 31 30 Marine Concrete, Paragraph 1.7.4.2 Hardened Concrete Properties, Item a(3):
Specification Section 03 31 29, Paragraph 1.7.6.2 a. (3) states: "The required average compressive strength may not exceed the specified strength at the same age by more than 25 percent unless approved by the Engineer of Record." Specification Section 03 31 30, , Paragraph 1.7.4.2.a. (3) states: "The average compressive strength may not exceed the specified strength at the same age by more than 20 percent unless approved by the Engineer of Record."
(a) The statement of "at the same age" within the referenced specification sections does not make it clear on when the comparison of concrete strength would occur. Please clarify at what concrete sampling age (i.e 28 days) would the comparison of concrete strength occur?
(b) Specification Section 03 31 30, Paragraph 1.7.4.2.a. (3) states that standard marine concrete may not exceed strength at the same age by more than 20 percent. Please clarify if the not to exceed strength percentage for both types of marine concrete is 25% or 20%?
A133: (a) Sampling age shall be as specified in Section 03 31 29 MARINE CONCRETE WITH SERIVE LIFE MODELING Paragraph 1.7.6.2 a.(1)
(b) Concrete strength may not exceed the specified strength by more than 25%.
Q134: Crane Rail System – Reference RFP Part B, Specification Section 02 41 00 Demolition and Deconstruction, Paragraph 3.3.2.1 Crane Rails, and RFP Part C, Drawing No. S-533 (Miscellaneous Details), Detail C1 Crane Rail Foundation:
The existing crane rail that is planned to be cleaned and re-installed for use is anticipated to require at least 200 linear feet of new rail. The only reference to rail size is in Drawing S-533 and the rail is shown as "110#". 110lb/yd rail is no longer rolled by any mill globally. Can you please provide the dimensions of the rail, or the specified rail profile to use.
(a) Can you please clarify the means in which the rail is to be connected together? Is the existing rail welded at the splices or are they bolted together using mechanical splice bars?
(b) Drawing S-533 (Detail C1 - Crane Rail Foundation) is the only detail on the crane rail system. Is there a specification for what type of finish (bare steel, hot dip galvanized, or primed) is required on the rail sole plates (ref. 3/4"x8"x1'2")? Is the same finish specified for the anchor bolts (ref. 1" BOLTS W/8" EMBED @6'-0" O.C.) and associated fasteners, i.e. bearing plate, shims, lock washer, hex nut?
(c) Drawing S-533 (Detail C1-Crane Rail Foundation) shows the anchor bolts for the rail sole plates at 6'- 0" centers. Is that consistent for the entire approximate 2000 linear feet of rail that will be removed and re-installed?
(d) Drawing S-533 (Detail C1-Crane Rail Foundation) shows a rail clip (ref. 3/4"X3"X5" CLAMP) is a rigid non-engineered clip that is not rated for lateral side force on the rail. Can the anticipated lateral side force on the rail be provided so that a load rated rail clip can be used?
A134: Exact configuration of the crane rail at Lima Wharf is unknown. Configuration shown is based on drawings "FY88 MCON Project P-002 Repair Wharves Improvement" (previously provided via DoD SAFE in addition to reference drawings requested in Question 49) and "Periodic Survey: Gantry Crane Rails Lima Wharf" (see attachment to this RFI notice). Contractor shall verify existing crane rail profile and section during construction. Where matching rail sections are not available, Contractor shall select a product with similar shape and profile and submit for approval by the Contracting Officer.
(a) Adjacent rail sections shall be welded together.
(b) Where existing plates cannot be reused, provide galvanized ASTM A36 plates. Anchor bolts shall be galvanized ASTM F1554, Grade 36. Washer and nuts are as specified in Section 05 12 00 STRUCTURAL
STEEL.
(c) Confirmed.
(d) Rail will be non-functional after installation. Provide rail clips as specified.
Q135: Existing Tie Beam – Reference RFP Part C, Drawing No. SD301 (Typical Demolition Section - 1), Detail A1:
Existing tie beam is shown at 18’-0” O.C. with 2’-0” height and 32’-0” length. Enlarged demolition plans indicate what appears to be 9’-0” width tie-beams. Please confirm or provide width of tie beam.
A135: No tie beams are shown on the enlarged demolition drawings SD102 through SD104 for clarity.
Existing tie rods are shown at 9 ft spacing on the enlarged plans. See response to Question 75 for tie beam dimensions.
Q137: Angled Connection of PVC Piping – Reference RFP Part C, Drawing No. S-512 (Bulkhead Cap Details - 3), Detail A4:
Please explain the angled connection of the 6" PVC piping around the tie rod as it enters the existing bulkhead. What is this material, and can the PVC continue at the same elevation throughout the overall distance of the rod from the concrete dead man to the king pile?
A137: Deferred
Q138: Finishes – Reference RFP Part C, Drawing No. A-601 (Room Finish Schedule, Door & Window Schedule and Types):
What are the finishes for the BOWTS building? Do the CMU walls paint? Is there an oil resistant coating on the floor area? Please provide information.
A138: Deferred
Q139: Existing Steam Duct-Bank – Reference RFP Part C, Drawing No. CD101 (Site Demolition Plan - 1):
Please provide information of existing steam duct-bank construction (depth of walls, bottom construction thickness of walls). Appendix M of the wharf survey report provides photos but the documents do not provide the required information for demolition and bidding purposes.
A139: Existing information on the ductbank is limited. Refer to reference drawings "FY88 MCON Project P-002 Repair Wharves Improvement" for available information (previously provided via DoD SAFE in addition to reference drawings requested in Question 49).
Q140: SF1442 – Reference RFP Part A, SF 1442 Block 13:
Item A in Block 13 on the first page of the SF1442 has the original due date, which is July 31, 2020. Will a revised SF1442 be issued? Or do we include the SF1442 as it is in our proposal?
A140: A revised SF1442 will not be issued. Offerors shall use original SF1442 and acknowledge all amendments in Block 19 of the SF1442 with their proposals.
Q141: CLIN 0001 Total – Reference RFP Amendment 0003, Price Proposal Schedule:
CLIN 0001 Total Base Bid states that it is the “Total Price of Base Bid SubCLINs 0001A through 0001P”. Should this be “Total price of Base Bid subCLINs 0001A through 0001R” since subCLINs 0001Q and 0001R were added? Please clarify.
A141: CLIN 0001 Total Base Bid should be “Total price of Base Bid subCLINs 0001A through 0001R.”
Refer to RFP Amendment 0009.
Q142: Bollard/Mooring Bolt Pull Testing – Reference RFP Part B, Specification Section 05 12 00 Structural Steel, Paragraph 3.8.4.1 Anchor Bolts:
Paragraph 3.8.4.1 states, “All anchor bolts shall be load tested to 130 kips for 300 ton bollards and 44 kips for 100 ton bollards in tension…”
Do the mooring cleats on the North Wharf also need anchor bolt testing? If yes, please provide the load testing criteria.
A142: Deferred
Q143: – Reference RFP Amendment 0003, Price Proposal Schedule, SubCLIN 0001B Base Bid Item B - Stone Columns:
SubCLIN 0001B is indicated in a unit of MT. Please confirm that this unit is metric tons versus tons (2,000 pounds)? The rest of the project documents use imperial units versus metric units.
A143: Deferred
Q144: Cathodic Protection – Reference RFP Part C, Drawing No. CP301 (Cathodic Protection Layout), Detail B4:
Detail B4 on drawing CP301 states the following, “Provide a minimum 6” long weld at each sheet pile interlock prior to concrete cap installation to provide electrical continuity.”
Does this weld just need to take place where the sheet piles interlock? Or is a continuity weld also needed where the sheet piles interlock with the king piles?
Based on past projects a 6” weld for continuity at each interlock seems excessive. This continuity weld will take place below water and will have to be performed by divers so any additional welding can have significant cost impacts.
A144: Deferred
Q145: Waterstops – Reference RFP Part B, Specification Section 03 31 29 Marine Concrete with Service Life Modeling and Section 03 31 30 Marine Concrete:
Both the Marine Concrete with Service Life Modeling and the Marine Concrete specification sections mention waterstops. Please confirm if waterstops are required for the new concrete bulkhead and anchor wall.
A145: Deferred
Q146: Mudline Elevation – Reference RFP Part C, Drawing Nos. SD301 (Typical Demolition Section -
1) and CN301 (Dredging Sections):
Drawing SD301 shows a lower mudline elevation compared to CN301. Please confirm which mudline elevation is correct.
A146: Deferred
Q147: Options Award Schedule – Reference SF1442, Price Proposal Schedule (Schedule of Prices):
The note on page 6 of 59 of the RFP states that, “It is anticipated that the Government may exercise one or more option(s) at time of award.”
For the Factor 2 – Technical Approach construction schedule and phasing plan, please advise what date(s) Offerors should use for the award of the option item(s). Should Offerors use the Contract Award Date for the award of the option item(s)?
A147: Deferred
Q148: Crane Rail Fastening System – Reference RFP Part C, Drawing No. S-533 (Miscellaneous Details), Detail C1 - Crane Rail Foundation:
Please provide the following clarifications:
(a) There is no grade for the Steel Base Plates or embedded Anchor Bolts for the Crane Rail System specified. Please confirm if ASTM A36 would be acceptable for the plate and ASTM A307 for the Anchor Bolt. Does this material need to be HDG?
(b) What is the spacing of the 3/4" Bearing Plates? The Detail shows the Anchor Bolts spaced every 6', is that accurate? Industry Standard is 2' o/c.
(c) What is the purpose of the 1/4" and 1/8" shims on top of the bearing plates? Since this is a new installation, the contractor would set the 3/4" bearing plate at the elevation required, prior to grouting.
Would this be acceptable?
A148: Deferred
Q149: 110# Crane Rail – Reference RFP Part B, Specification Section 01 57 19.02 (formerly 01 57
19.01 20) Supplemental Temporary Environmental Controls, Paragraph 3.6.1 Crane Rails:
SECTION 01 57 19.02 (formerly 01 57 19.01 20, refer to RFP Amendment 0006), Page 12, PARAGRAPH 3.6.1 CRANE RAIL States "Sections of rail that have incurred greater than 20% section loss due to corrosion must be replaced in-kind to match existing profile and material where possible."
The 110lb/yd Rail has not been made since well before 1977 (Reference ArcelorMITTAL Steelton, previously Bethlehem Steel). There is no exact match profile that is currently produced. ArcelorMITTAL produces the 115lb/yd RE Rail which appears to be the closest match.
(a) Is it the intention of NAVFAC to operate on this rail after it is reinstalled? If so, what are the installation tolerances for the rail profiles?
(b) Would NAVFAC please indicate which profile is an appropriate replacement to the 110 lb/yd Rail, since this profile is no longer produced, as Section 3.3.2.1 (SECTION 02 41 00 Page 10) indicates that the contractor should assume 200LF of new rail in the base bid?
A149: Deferred
Q150: Coating to Sheet Pile Interlock Surfaces – Reference RFP Part B, Specification Section 09 97
13.26 Coating of Steel Waterfront Structures, Zero VOC, (SZC) Splash Zone Coating:
Please clarify if sheet pile interlock surfaces will be coated. Detail B5/S-501 states to "exclude coating to sheet pile interlock surfaces” while specification 09 97 13.26 paragraph 3.2 implies to coat all surfaces including the joints.
A150: Deferred
--=--::::::1 ~----,------. B E R T H L ''v~ I I A a-se ,WA11:"~ OUiL?
- ~.:t.Z ~,,' 8:05 " 7!~S 'aos
\ ~UT'LET TO?J:=.L. 5.78
\ ~ IWV,\E:t.,Z,81
'li aCG
--"'~··"?"'-'-'-·"~>"'~---'--;<:~-~~~~1~::t VAL.~/~i:- / / / / . >" ..... - /,. // --~-".;~/ ,//:. -- -_. ///. >' '"_'1 1,-'/ __ -',-" - _""""r' ••• - ' ____ ,v
/ / / ,/ / / / / - / t "
,;,~.*!2' Q)'''::~>/' /_ .. _(.Ile~?+ ___ . ____ ,_ ,/{J)6.'1~/" / '/',"&/3..1$// ~_ .. _ 0)648'/ _. _____ ./:_~ ___ ~-_-~'tl" /·1J)8~"g'}_ ..
~>S.5~ . .' -OO~.Iii." ~~"-,~.,, .. / we,,,,e -'7'-""'" ... "" ..... ",_ /WS.C,7" "_/_",_,.1/0013."",, /" f),1ii" ,-"~~,,,'------- (3) ~.11'-"'~"-' "--.,~ ,~, -, (.1"-7" - --,,-, .,,- L ___ , ~~," G> s,n---" ""-,,- "J ,,-,,:z ---- .,... ...- ~'<~--I"'-"-'~ 11>1 $.<>£)- ---" '''~- (+) e ..... " (4) £,70 (4) fJ.14 (41 &,75 (4) 8."9 " II (4) B· ~~.
(,1'8.5"" (.)e,~c.7 (5) 1."99 (;J 13,~~1 (l1l fj~"9 ,," (r;J g,{i!3'1
~ ("'lB~ ("')e • .&'5' (6.654c..) IPJ@.'",\! (e.<;fAc-J f"')S,~ (6hb.4.C~ @)8,$'Z- {Bl>tPA.c., lr~_~_s_,,,'€1 (~MliAGi
• 1..1 ,', e.'1:9 .11 TO P 6\.-' '), B 7 '", 0'''4-~. lJ) I I~Y, 6'-. 5.47
1? "1.'13#, .'e.;!,;,; .. e,59 , e,,,";, fj',!' '= 'I ,,, 8.04 oG. . !Iii?' e I~ 7.· C,=,· , $7
~ '. --~--L,c".p WATERVALV!;'TOP'5L,8.~ _",'" • liI)f.VALV.t; M.H.-To.P EL:e.u '~ (z.s)(. 3.0) ! ' , ~ ~ ~ , lS.':VAI-Ve:. M.H.-TOPEL.S.Z:3'/() ill ! ...
ro
C' 8.('>5
, -.--~, -AD' .:~ ~ , --~:'
,)8A?
.'a~l'
" 8.$4
II
II
II
OUi~5T TOP EL. B.64- I~V, EL, 1.,!l6
,,'&04- <0 :i!!o:C8 py"'- -·I:.-:~--:~r ~ /"S_OJ J/O r~;G/ed/' e:oB
.,~ Sil'Z'
/ ('''M~ " Q> 8.71, / 'N 8,,",, . ' , 'it! .MO I I, . / ./ -OJ s.:7!J~~_~././ jfu "~~G / ./ A 7 /(J) Mi'7-'Z"'--/ (0 e.co'!;
f;> 'Mie / fpJ 6.<>!i' / 00 8,';;6 , / ~ &,.r.;6 .~_._ / ~ . "" 8.1#2, ___ ~ _ ':' ..... / ~> 8S':>/ -'~~ ~ ~ / ~ 8.~;>/ . .. ," ~I?!.f'" -.~--~,~, -(})8.ti'!'J ~ -,,'~- .~ .. , (;) 8.0 - --. ~ --~~-- ---- -~ @) 8.<4 .-~.,,~,---~,,~ -@ ilI)8."" J'I -- il»8,"" . ." .~"')fl,¥-> Go)a,91> / ('> ",:4-"
LQ1 (+) fi.f;'7 (4) 8.71 1+1 $.71 'C}) (4) sm II (4) ti·~ : (4) 8,70 ' (4) S ... ~ (4) 8.~7 I' ./
5) 8 s) 6 (.9:t e.'+1 (5) 9.~ (" 8.<;2'" (s'l 6.",* (5) ",G. (5) e,,,",, '.' ...... D, (Go) 8:~( 'Om "'''''~(H8''C'' J~l M;S .(Iil~/J.t.)(&"I/fIA'::'...n5Il1C) ~ 6'''6 (S.~ACO>("&74C''''''I'SU)€) l")e~~ I ~ S.6<> tS6fi:A ,GY ~)f5,,,S 19.?9""',~ :(t;) S.~&.61A4Cs.""A.o. 11=)8.-74 Ul'
Ollf'SIPE) 0 I "''''''''''> (8,"'3
G: . A., N TRY C RA, N .. ERA I L II' TOP a. 7,82 ~ .. &) :J J.L.~.' I R v. EL, 'a,en "
".44- 8.3'1
·(lg.~9 g.S7 ,13.5"0, 8:71
1lJllllIlI, :r:
.:; 8.08' . __ I -- _ ' '1/~'~ 0; 8.'bd ) IM't): J 8.:!l2 .0
8.10 c';~!""" ., 7·$6 7.93 7/J6 s.t:>r "" ~x~w <
::2:
,,' 6.6:.'7
:SAS E' LI N E- 'ICll'~<4 ..! ----.~_J-"--_+:+I ______ ,J::S8<.'.:.,:':"~:~ 1,,>1.,114-, ',' ,:6.'70,' ',',: "....,,,.," " , " " c" 1\," . ' a~~ C", sfs BASE t.11,(I= ~ IfcJo -' ~,'e.~ -", 2+00
~:) 8.:?-1
~'·8.70 ":: ",; " iQ~' ~~,tJ.ri2. '-; .. .3 .- ,; .. 8.~_ ' __ "'~~ 'OJ"" tJ.t:.4·'.' C'_'~'~ "'6,,"8 j;;
L " ,~~1~~i~::.;;i,:, :: J>, '!:~~ ~~~:~:(~:~~) l; ~:~, .~l~J;I~(~,~;:.)~~~,.t:f:~'q,}~(~.~~AF) MI ~'~~, ~~gAI':(~;"'6~h " , %> ~~~ ~~~~~£i';D I .09 ~,!~)tJ,~i~;";""') ~~,i', '1, . ~~i~~~'(~i1i~.4G): ·':·"'·~:OO~'>5.115 ~~~';Wfi;~A~)~~;Ac :~~:~, ~::J:CSM.A9, ,~~~;~ ~s~;kt,,~cxli:T<~a;,;,;;;~~~:~<t ~st!f} (e,.I;1AC) "~ :::;~~,'k~(e.~,.f<:>~:;;,W~'W CS.'nM) I 'I8JB;~b ~ ',,' «> "-M ' 'r;)8,15 ~>8'15 '-.:./I:'Jf3.l115 !!»8,11'1 ',(e.~"" . (31""~ '~1a.11 (&'77AG'~">I""S. eur5loE)~) 3,~ifI. "" B46 I:'>g,115 (,3) """ ~)M4- 1:'4J8.7?(4Ig'7~ I~) 6.75'. (.0) S~ltP ~(41 B,~G '(>\}8"~ W 6,79 (4) g.gO (41 6m, (4) $'77 (41,';;·77 (4) $.77 (4) 8·71 (4) S'7!/- ~ ,;/ i
.l'_ '~".;;:' ~ . . .• (J:'8./:P4. .1.','8.5'J " 8x:;s • (" ~.<i5 ? • C.' 8.:11: . .1.'18.72 .,' • ' . .j 6;;7:3 . , " 'r'65~ i (,
- G '
_, STA,()+OS BEG, OFFlAI L
.,' aq,a ~i 'I'SPS " , , ~(I) 6.J!1iO _ ~.;) 6.!J3 .,_,ass " f5.G:,2
@ NOTES CCONT'o)
A . I ~LRAISE THE QUTI30bF?,QRAI.L FROM.STA. Ot>O,!7TOGTA. f;i+7~; APJ=>ROXI MATI:LY; TV !:LE.YATION 8.70.
. 9-f :4"i.ATStq DUT"L!::;!
LI _B_E R T.H. IVI
,(:i--e;;a&I ~;. _8.4-5 -:. '7;4."7 i) 6.:i'7 ~. -13~U c~' 8..1,4- -:,) e;ZS :: \8.(1.2:
F' /' /~' .''';,''~ •
.. .' D·,··· / ./ ; ---/ ./" . , A
I -- ---- .- iy....----·--· -- -- _. . .
+_R""M9VbTI:lt=. AAIL .AND pU\ce~~6A'RrN0'" PLAT¥,"OR.~FL:6.TE;.'$ ··.·IN .. MUI .. TI PL55, OF 1/4-=1NC:H TIfICKf.J!:5G", A'5~3;HONN " I.N ",PI:TAi C;:' Wfl E:F.'EDR5<QUll"<:SO ;~WRN', 'FORTION .aRr:;XISn NG~!3o LTSk;,N:t:>' WeLd'], EW
- :5?NEi:S:,'ltlA'>OYJPE 5U~!='ICI E flTLt=.NGOTrt r . " . . .
5; PAINT WITH a>AI. TAR THE EXPOSED 'PARTS "OF ANCHOR ASGEMBLY AI-JP BACKFILL. RESTOl=>.E ":,PI5TURI3ED A.C, !"'AVINa: TO 6RIGINAL.
q- TOP l::L. 4-.08 '~ .4<lcP '1lAr{;.R OUTLET .\
!NY, t=L" "t.ss _ _ _.+~r" ,_ ' , I 'vi &.:$1 1 ! ,".) S,*>', ::::', 8.44 .:., 841) lL" ~. 7,(: ~, e;.SO
11-;'~7
JI/ ./
-0 uolfJ;1-,YI'.!..VE, TOP i::L.B.ro
/ '~". ·k/-
~~'/L/y/Q)M"/ / 7 / 6)M"'/<~B' / ;1".n( / z: /.' ~,;;;/ / ;-i!l~ - <JtJ$.t"" h>&~' • (fJIMa -, ~ -'.' - -- ~ ~.Il,o$a ., pq{G~d// /'/c/ / / .... /~:///>' tJ)e.,::7~ , • -W S.Oz, (I) fJ.,7,5 ~»)e..Q,a,:- . fJJs,J?!1:<:' , , ':.:-:-: -'::f$.} 13.-:'12
/ ' - -b18,@!P _ / /' I'j _ ,/ y:' WB~,·.n _, /" " 'fP,S.a.fl / ~e~~:s / _.:,.,":: -j_'/ /' . W'8.tdS :':::"'::-_~, __ / ____ . ___ r'_' ._._. " fllS .. ?,p
/' /_ (0 S::'ti~ ,,7' >:-~~ :,/ ~).'e.s.G ..,. .. __ .. _ . / ~O?f!.~ ( _ /' // / 008~:gJ:·' ,. -". ., ~),'8.G$-/ -~-.". - '-;r'-~"" '/ OOfJ.:rf;o. . /'. •
- )8.:M.' ca) 6!P4 ( / aP. 9~ (3) E!o.G:<:t- < - '-~ (3) {j.Q~ " ,-: . « (4) 8."'1 (4) 8.~ I l.~ e.~ (~) e.1?1 "'-"''1.e) , (41 8· i;r, , l41 $-1P8 tiJ rS)e'''~1 (5) 8."!>4 It', ;;.-ti ~ tW ", .. I.. i~ ;;',i#r, G.).J$'1 [%1;",0.) - (618,6S(8,57A.Cg(e,~AC, VALVe lA.H, [4. 5',,,'0") ,iO)6.6",$,~X8,,;'9"'GotITSWE!) (.~~.JH. (e.&" .. ,c~
Z UT5IDE) 'tOP ",-,S"'" ..J
:r:
U I-
... $2 8.06
81';'5
- !"8:"'7
,iii:" (")'6:"99.~'
" i-:f.'...-
'6.1;$
W 8.~U] (5/W;jD.T_~ __ _
". C83~a B41
"" C 16 't' VAL-V!: .1.4.1-:1.' TOP EI-. 8·M
·0 0_J8i(P. VAL.YE: IA.H. Wp 8L. 8.4;;;'
,'l.' fJ.G9 "~-
,-. -:-~-----""" s.iif(;~'- . 8,"10
4+00 ~d3,.GS., .
-'0- w'l{:>-NATeR-,'1A!..YIE.
"TOP GL. 8.ae
(,' fJ;4·,~
9.44
(,\ B.a;;4. :,. , .. , --.--'-.------- (3) e.'ilO -- : __ ~_. __ . __ L, .. - ... _ .. ,- .. -----' (aJ 8."1l:J ._.-_ .. '::::' / ~.------ - -- $)6.a>;B , --
/r'" (+1 g.70 (41 8·70 (ot) 8,'11 . () ~ /orl. D "A.~ ,/-I!!\ A LrJ /t::l_'Q ,~r:::e 't:=" (~B.1in8.",AC)(S.7",4LoOrn,"") ~,,) e: .. ::;· (e"'7A":;~'(fi8'.G,~ Ci1.70AC.)
.<2 A.. N .. or R. Y C R·A N E.
• (, e.sc .9S9
(,. 6.49
UC
13 As t= LIN E !' B.G" ,:.~ ,.·8,~3', •.. ::~,:,,' =---______ --..-
\'e,24 6.34
!5+CJO
:: 8,,$'8, '. "','
PI A I
- @)S,O,£j ,,-_. .. ,,-, - :... --- I,"~ ...-;'. (J)f!;,(~S - - - - . . " .. :?{J) 8:]0
~~!-::! I WA:i:~~",:-= ~~_~_~)~?),,7"" ..."
(ii~Oi-··=..4 (S,7SA,c;'j II '-":(C)'I6.-:14'te;.iG4A;C)-{B;~: :(")e;:71{1!J;7t8A;C,).
L :Ii '1~"""",,",) -' ~ CA;;C.-01trSI05) ... -.,.. I ; .
TOP .~,8.IO
rfJY. !;;L ::'.!~
,'",,'~2~ iI·IS, ,) 9,,,,,,,.' c.,a (z.s'x e/-o")
..:JB.~.4-
,-19.20
;&~51 6 ... Z"3
,.J 6.S!!:;', ,::;.,:3
G> &,?Z ()() 6."'" IJV e.?2 C"o/$;:15C:',- ("ii) ... ~ . _ . .... ..~.(.f.) 6,;'a 1:?.):lS;:L<:2SL -- ~ O?)S. I'll!. ,,,.. '.!<)8.G,~ , ~) 8;7?-[6,7<:?A~~ (i!J.73A.C~. @»S.7Srl!t.-rIA;")~C@il$.7f···
"'UT'5TDS) ""(2l. 7<:?.4;C;OUT5IDe) .. (>#.70""') ., ,'Ce,7+AC, 8;}'" . !::&"37
0;;;+00 ,J_; 8$'8 .i;·
~' . .' 6.s4
_, B:"RP
. 8.":'" "
" :OUTSGOIi.
" ·S"·'f;"3····
6,;;17 ' tn· , 'lU , z :J :r:
::2:
".i'-(" [, "(>;5) 8.711 '_ .. ," , m'M3', (lO):e;'14;' Ie,aSA.c.) .
~6A.4.
(~) 8,7f
·,,.re-'1"'· ,(6),6,.,,,, (~(OI5A,<:') <?) S.!14
(+J S'75
'l#1g: 1;9+' . , "l5l8-7'3 ~ .•• a.,,) ~~"~~"~X;~~'/I;~~.;.~~~:~~,t~~~~~6.b1 U"7
@)8_1,$ 1- (P) e.,Q:2
(of) fj1.72. (4) B·73
.",\ ",8,74 '(i)8.6'J1 &h ~I ~8.,,7"'L0a..7+- .'01
@}8,74 .(fYnAt'-)
(4) 8·74-
10 8.<'7:4- (g)-8 .. 119 ~) 6·"1(3 (4-1 g.75
5)IUi~(. ". , ,7<1-(831'':<.)
0584ii-,5'1"8 •.. , (;)8.1<2- {~)8:'14'te."7A,0 ~)8 . .!?:a,
(4) 8'7+
6,~"'7~)6. 70+., '.
008.",~ ((.)'$;W:{a>"f4<') I)) $.tJ-3 .
(4') 11-74-
1Jj8.7~:=C]Q::j;~721'E' ',-- " '-(9 M' (S,)@:7(>,:.,,'........'''(08,Q..-,-O;:)!l£:7CTg-.. -'''''' -a)8-C''''l·Cs)l;.7(>4.' 0>8.'7" oo1!.~"lP):':6<'75 t'8;"'~A:C.)- (;,) e."", f .. 'ytP.75'C8;67A.C';),~M0~f6,) f5;-;.'?(e;i1<O A:G) (o).B,-7:'!:cCG.)8.75 f$)fJ;-7" .
OJd.Q~ (jJ) 8,'7"'. (.) ",'19 ---'(f>?~ A <:: "'UT~ De) w 8.72 . 'g~ uA .. ) .. ' $)8,78 l+) 6,74- (4.) 8'0 . (4-) 6·740 ,'=> •.... , ~I L41 g'7+:'~'T "'7'.. (418'75'
, (G.) <B;-J<'i1 {a.",e"';C.)C~.70.A.C.,,,,, , ,OUTSIDE) ., '_', ,_""~,, __ '
, .e .... ~Ai .. ,c ...
• "8."'" "ao. ¥ALvel5X (2.0:"",,;.) .'e..tl~ ",,8,~"aT'5I?E'.) '.,. e.",:?, , a.= .~':' ~~~ .,,,'(J.~ .:.:)f3,.GO ,.c-e.a:s .";' 8.54 .. ;.:,8,f,;:9 ._,! e.t:40 .;) fM,:7
: io..P_"EL.::;,i!J.rao s ···· ER T H
- - - -, ,--·,1 _ MA
'I ~
L ." "----'," ... .A " , "'A,TE-"" oUT:"CT I..-r--" , 11 r" r" \..~-,~._.T()F -SL. '?,"!)t3 tf I!-JY, 'et.., 2.&8'
Ie 8,,,,, ," tJ,~'2 GB.34 (.: S;4-." I
II
(\"6.4-1 W 8.!!f5 '" e,,,", , .8,".7 .) as:] (I) if.4:":'l-
CI . I, ~if"l ",'" v,' CY~ ~OPCL 8 0 - _~ I <p '1'\ '-!1!' _. ,';" I
" .. attic,?«, " __ ~'" SiJM.4. (jJi3.,7t:J0>~"'I .• ~,_" . j ())"",7" , .0)$:81 ... "~,, ___ , '(o~7"'''{':;')8,;&;:z;:(e;.;;rA;.c')~o •• ?2(f;i;):6;'''''''(e . .,;eAC.) -<1>8;:7;) .----"---~~,--, . ~OJS,71 10 ,8,'7a _''''~'' 'f;J • .7f' ~"m?' ""8.,7," i" (~S.·7"'" (7)8,"[;''' . ~,,~- ., ""s.,,,,,~~::Cj!;;<""'A;-c;'OU1'5IDe)l>S;'''t':': .• ,:,:,.:,::: .::.':'.' '. ,."",,'*, .. :.,", .@e4+'
, t;»S,?2:. '~J8.7.. ,(;O>8.'7~ ..">/5,'7"... 1'1 ~)a"", {iJJe,,.,f , we,,,",, .... , , .. ' (;)8.""""..1" .. _"'''',., ... "'>"'''~.,,,,~,_ ... ,,,, . {J)",<>~ III (()"'739 . (4lS.1P ~.(~\8.'''.S ..•.. , . (4)e.,qR.:::",,:::~.,,- ',1. (4Ie'''6 l~8- J9 J::....·::.'.I"!-)S.S9,:::::".,.: .... ::c.",:~{"'')e; ... ''''t': ,,,,' ... ,., .. '" ,«1-)8.:<PZ-.~~ ": ... :.,('Q:1!l,=.
Z (~JJ./I~-'6 (SJ 8,H"~ (:> ~,~9&,.~ ... ...... . ...... (f;)~.~ge; ....... ,~- {)")1.71. ( )t\ . _ LQG.: .. ~~--~~~ , :e;" ,,- "-""-' "'_-~O"')"£;-';':;;"''';,~''~''-''''''' __ "'~' ........ '5.)8.5%", ~ ... (:.)6; "rlf f,.,,,,A£,)le. 7otA<::OU:r51~d;).'lI.1.~~(8;-11 A "2{~' 74-AiC. _ .~).'1Ji-r!5 {f),1<>'M).{€J;,t,~.A tJ ' .. {f)Po; 7'3 IfJ.t;,{ikc.'J ,I.. l-"~ 18. "11 ~l $.,ffi 8A ,":} .",' (GL'8Q,7. ta .... 1<"'<') . '. ,,,J"'/~ ."'I8:-:.,:-:-"c-:c-.-:,~:c~:,:::,QfT:B.,~'3~.u: :_U._:::::~_.~ ·::::"":::~a;;)6;"'_I5:(S;'-;;':3A;c,1:(6;"7.:,,-~.f;;Y~7r8.597"".C.)(I!J.';;>;;7
<:- iUc;.,'9 .""e4~
II
I
3) 1!) .8.:1,)3 ......'., ::._H 'w /3."'/- "'~,~"... I ' tz>,t1.~:.h\: ,::..:~_~::- ::_:~ __ .' ".__ ~:,~~t;,r2,;
$) 'e. !Sf) I) £!i.~2 1
(4)e.~., '/ (4) 8.5'~ I .
{f.»=I.' ... ,,: '. '(?)6.59I . . II
'.: • .(")I;M5.~,7 . (l!>cS$7A.C) {;s,,;, 27:, {G~BA:3 (8 ... 0 A.C.) I
',,-' 6.34- . '. 0., 8, SJ~
·(V8.,~$. (I),6.74- ,tiJ6.r;.,"·, ,OO& .. ,'7'~
fp) "a;;' (P) 8·7 J y
IJ.J
Z
-.I , ~')8'''7. (4) e. ."'."0>
5.)80 .. 41('5)17, 74- ~)B.tPa (6,G7A.C;) ". (8.73A.C.)I.:r:. ' . ..•.. lB;';;5A.C, OUTSIDE) ... () J . '" . ~'OUTSID1S).. :=c:.~.-' ... "U'l'-SIDS):,,(6~'1>!J''''''C:DIi1'5IOS),'1 l'&177A.C,O()7"s0~ .. ,{~t~;i;gyG' AN. T R YC RA f..1 ERA I L A~~"~_'K=\· .. ,.A.C.OUT6IDI') .
::c r I, TOPE~.8J;:" o ~Jk ,NY,'",!", B,za
1-, " e."" ' EMj!/!) ... '::'8.4-8' .' . ,; 8,I/-J .)lll1lWj'. '"'t':e,,az
~c e,!;4- '-B;<3I'
, g.·/iiS )~l;3" . .)8.58
8."117
,,;c--'A;C; OuTSIDEY'" .. . "'11 ' .l TDP OE.J..,6,.JO
" g,44 6,1"1
, g,$8 9,'2.1
_ ' HN. EL. 6~25
'8·4-1 B-31
I-
, • e.i/o.? .1. ~'.
. B41"
2: VALVE13)(,(S.o"".s) '(","x,g~o) « t·'?3 8.4::3 .. 8'0.' ...... 8.=-"C' B." .-.~-" 1i'.Zf!, , ,- TOP', EL..SA·'/ .
m,B.51 ··fi!,.ct7
BA.S E LI N'E ----'"
'~ '"'::;'" lri',:1'0 .
C,B:
(Z,SX8.0)
:', $.~f)
8t<?,Cj",,, .' , c,,'" ~ - ~ +~5.~, .. >~_' '.I; s~~ .,:; t:.'- $tOO '-""-~ ____ ~', e.i04" .' 2,,·, ",t!5C> '.') 8,JQrf ,>: S.~;:';;
7+00 {0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .