Summary of G575 Lift Station Repairs Design Documents
This is a comprehensive set of design and construction drawings for the G575 Lift Station Repairs project at Marine Corps Base Camp Lejeune, located at Camp Geiger in North Carolina. The project, designated NAVFAC contract number N40085-26-B-0044 (05-26-0044), involves the rehabilitation and upgrading of an existing lift station. The design team includes MBF Architects, P.A. (New Bern, NC) for architecture and Stantec Consulting Services Inc. (Raleigh, NC) for civil utilities. The project is dated 23 July 2026, with 40 sheets of drawings covering site plans, existing conditions surveys, gravity sewer systems, manhole repairs, lift station equipment demolition and installation, and structural, electrical, and lightning protection systems. Key structural work includes demolition of existing equipment and crane support infrastructure, replacement of sanitary sewerage pumps (from 20 HP and 75 HP to 35 HP and 110 HP respectively), installation of new pump discharge piping, and replacement of six sanitary sewer manholes with new precast concrete units. Design loads are based on 2024 IBC/UFC criteria with Risk Category III classification, 5,000 PSI concrete for foundations, and allowable bearing pressure of 2,000 PSF.
The electrical work focuses on modernization of the pump station motor control systems, including replacement of four adjustable speed drives (ASDs), installation of active harmonic filtering to limit total harmonic current demand distortion to 8 percent, and provision of new crane disconnect switch and lightning protection infrastructure. The project incorporates three construction phases involving coordinated sewer bypass operations to maintain system functionality during repairs. The existing lift station contains four submersible sewage pumps serving as part of the wastewater collection and treatment infrastructure. All work must comply with Navy and DoD specifications, ACI 350-20 for environmental concrete structures, AISC 360-22 for structural steel, and applicable electrical codes. Special inspections are required for concrete, steel welding, reinforcement placement, and soil compaction in accordance with IBC standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0014.pdf | ||
| 33 30 02.pdf | ||
| REGISTER.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf | ||
| Amend 0002.pdf | ||
| N4008524B0045 Dwgs_Signed.pdf | ||
| Amend 0001.pdf | ||
| RFP 240045.pdf | ||
| 26-0044 Asbestos and Lead-Paint Survey.pdf | ||
| N4008526B0044 Specs.pdf | ||
| 26-0044 DM.pdf | ||
| N4008524B0045 Specs.pdf | ||
| 26-0044 APPD.pdf | ||
| 24-0045 AppendixD.pdf | ||
| 26-0044 Basis of Design.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F ile
P ri n t
SYM. DESCRIPTION DATE APP.
REVISIONS
T
T C
E
TI
HCRAD
R E
G I S
ERE
A N
I
L
ORA
N O
R
T H
C
N
D A
R
N
DE
.J UE
ER
III
C
N
NRB E
E W
M
A
P.
STCETIHCRA
FB
BERN N.C
.NEW
CERT. NO.
UTCETIHCRA
DERET
SI
G E R
N
OI
TA
RO
PR
OC
LAR
CAROLINANORTH
50679
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP GEIGER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091
CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M B
F A
N O
SPEC.
G575 LIFT STATION REPAIRS
C U s e rs
\s c h m ie d \D o c u m e n ts
\S c h m ie d L o c a l F ile s \2
A
A R
C H
-G
-C
E N
T R
A L
S c h m ie d M
B F
A .r v t
/2
/2
:0
:1
A
M
G-001
JAS
DJE,III
CHRIS MAAS
JAS
TITLE SHEET AND INDEX OF DRAWINGS
60044573 N40085-26-B-0044
05-26-0044
23 JULY 2026
G575 LIFT STATION REPAIRS
CAMP GEIGER
MARINE CORPS BASE CAMP LEJEUNE
N
N
N
N
REGIONAL MAP
VICINITY MAP
PROJECT LOCATION
G575 SITE MAP
SITE MAP
GENERAL PROJECT NOTES
ARCHITECT
MBF ARCHITECTS, P.A.
317-C POLLOCK STREET
NEW BERN, NC 28560
CIVIL UTILITIES
STANTEC CONSULTING SERVICE INC.
801 FRANKLIN ROAD SUITE 300
RALEIGH, NC 27606
DESIGN TEAM
PROJECT NO.: 26-0044
MCB CAMP LEJEUNE
G575 SITE
PROJECT SITE
1. REPLACE INSUFFICIENTLY PROTECTED WORK DAMAGED BY CONSTRUCTION ACTIVITIES
TO MATCH ADJOINING MATERIALS, TEXTURES, PATTERNS AND COLORS
2. FIELD VERIFY EXISTING DIMENSIONS PRIOR TO EXECUTING DECONSTRUCTION OR
PROCURING MATERIALS
3. PROVIDE AND INSTALL ITEMS INDICATED IN THE INSTRUMENTS OF SERVICE
4. COORDINATE WITH THE CONTRACTING OFFICER TECHNICAL REPRESTENTATIVE (CM -
ETM) PRIOR TO THE PRECONSTRUCTION MEETING TO ESTABLISH THE LOCATION AND
SIZE OF THE LAY DOWN AREA
5. CITED PRODUCTS OF MANUFACTURERS ONLY DENOTE QUANTITIES, STANDARDS AND
FINISHES OF PRODUCTS DESIRED AND DO NOT RESTRICT PROCUREMENT TO SPECIFIC
BRANDS, SERIES, OR MANUFACTURERS AS LONG AS THE REQUIREMENTS OF THE
TECHNICAL SPECIFICATIONS ARE MET
6. COORDINATE WITH THE CONTRACTING OFFICER TECHNICAL REPRESTENTATIVE (CM -
ETM) TO ESTABLISH AND MAINTAIN PROTOCOLS FOR SECURING THE BUILDING AND
PROJECT SITE
7. ADJACENT FACILITIES, ROADS, AND INFRASTRUCTURE REMAIN OPERATIONAL DURING
CONSTRUCTION. EXECUTE WORK WITHOUT OBSTRUCTING OR INTERFERING WITH
ADJACENT ACTIVITIES
8. SUBMITTALS MUST BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO EXECUTING
THE WORK DESCRIBED THEREIN
EXISTING FEATURES PROPOSED FEATURES
ABAND ABANDONED
ABBRV ABBREVIATION
ABC AGGREGATE BASE COURSE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
AMT AMOUNT
APPD APPROVED
APPROX APPROXIMATE
ASPH ASPHALT
BDRY BOUNDARY
BKGD BACKGROUD
BL BASE LINE
BM BENCHMARK
BOC BACK OF CURB
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
CB CATCH BASIN
C/C CENTER TO CENTER
CI CAST IRON, CURB INLET
CL � CENTER LINE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CTR CENTER
D DEPTH
DAT DATUM
D.B. DEED BOOK
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DI DUCTILE IRON, DROP INLET
DIA DIAMETER
DIM DIMENSION
DIST DISTANCE
DN DOWN
DR DRAIN
DWG DRAWING
EA EACH
ELEC ELECTRIC (AL)
EL, ELEV ELEVATION
ENGR ENGINEER
EP EDGE OF PAVEMENT
EQ EQUAL
ESMT EASEMENT
EX, EXIST EXISTING
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FLEX FLEXIBLE
FT FOOT, FEET
GND GROUND
GR GRADE
HDPE HIGH DENSITY POLYETHYLENE
HDWL HEADWALL
HORIZ HORIZONTAL
HT HEIGHT
ID INSIDE DIAMETER
IN INCH
INV INVERT
INV EL INVERT ELEVATION
IP IRON PIPE
LB POUND
LF LINEAR FOOT
LFT LEFT
LG LONG, LENGTH
LIN LINEAR
LP LIGHT POLE
MATL MATERIAL
MAX MAXIMUM
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
N NORTH
NA NOT APPLICABLE
#, NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
ORIG ORIGINAL
P.B. PLAT BOOK
PERM PERMANENT
PERP PERPENDICULAR
PG PAGE
PI POINT OF INTERSECTION
PK PK NAIL
PL � PROPERTY LINE
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PROJ PROJECT
PROP PROPERTY
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
QTY QUANTITY
QUAL QUALITY
R RADIUS
RC REINFORCED CONCRETE
RCP REINFORCED CONCRETE PIPE
REBAR REINFORCING STEEL BARS
REF REFERENCE
REINF REINFORCE (D) (ING) (MENT)
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
REV REVISION
RT RIGHT
R/W RIGHT OF WAY
S SOUTH
SAN SANITARY
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SQ FT SQUARE FOOT
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SSMH SANITARY SEWER MANHOLE
SST, SSTL STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STM STORM
STN STONE
STRUCT STRUCTURAL
SWR SEWER
SYM SYMBOL
SYMM SYMMETRICAL
TBA TO BE ABANDONED
TBM TEMPORARY BENCHMARK
TBR TO BE REMOVED
TCE TEMPORARY CONSTRUCTION
EASEMENT
TEMP TEMPORARY, TEMPERATURE
THK THICKNESS
THRU THROUGH
TOC, TC TOP OF CONCRETE, TOP OF CURB
TOW TOP OF WALL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VAR VARIES
VC VITRIFIED CLAY PIPE
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
TEMPORARY CONSTRUCTION ENTRANCE
SANITARY SEWER FORCE MAIN
SILT FENCE
INDEX CONTOUR
INTERMEDIATE CONTOUR
LIMITS OF DISTURBANCE
BASE LINE AND STATION
2+001+00
W
EXISTING IRON PIN
FENCE (CHAINLINK)X X
INDEX CONTOUR
INTERMEDIATE CONTOUR
PROPERTY/BOUNDARY PARK OUTER
SANITARY SEWER LINE
WATER LINE
SANITARY SEWER MANHOLE
POWER POLE
WATER METER
FIRE HYDRANT
TREELINE
WATER VALVE
GAS LINE
OVERHEAD ELECTRIC
TREE
SIGN
WM
LIGHT POLE
EIP
S
PERMANENT SEWER EASEMENT
TEMPORARY CONSTRUCTION EASEMENTTCE
MINIMUM SETBACK
G G
OE
SS SS
PROPERTY/BOUNDARY PARK INNER
SILT FENCE OUTLET
ROCK CHECK DAM
SYMBOL
NORTH ARROW
A
A-101 SECTION CALLOUT
X or # A-101
DESCRIPTION
DETAIL CALLOUT
SHEET ON WHICH
SECTION IS DRAWN
SECTION DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL DESIGNATION
N
SYMBOLS LEGEND
DRAFTING SYMBOLS
ABBREVIATIONSPROJECT GENERAL NOTES
OWNER:
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
ADDRESS:
PHONE:
DESIGN ENGINEER:
STANTEC CONSULTING SERVICES, INC.
ADDRESS: 521 EAST MOREHEAD, SUITE 425 CHARLOTTE, NC 28202
PHONE: (704) 329-0900
SURVEYOR:
STANTEC CONSULTING SERVICES, INC.
ADDRESS: 521 EAST MOREHEAD, SUITE 425 CHARLOTTE, NC 28202
PHONE: (704) 329-0900
ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN
VERTICAL DATUM (N.A.V.D.) 1988.
SITE DATA:
PROPERTY ADDRESS: G STREET
CAMP LEJEUNE, NC, 28547
PROJECT LATITUDE: 34°44'10.4"N
PROJECT LONGITUDE: 77°26'57.6"W
PROJECT AREA: <1 ACRE
LIMITS OF GRADING AREA: <1 ACRE
TOTAL LIMITS OF DISTURBANCE AREA: <1 ACRE
THIS PROJECT INVOLVES THE REHABILITATION OF WASTEWATER LIFT STATION
INFRASTRUCTURE. THE PROJECT INCLUDES WORK AT LIFT STATION G-575
LOCATED IN CAMP GEIGER, MARINE CORPS BASE CAMP LEJEUNE.
WORK AT G-575 CONSISTS OF THE FOLLOWING:
1. REMOVE FOUR (4) EXISTING ELECTRIC SUBMERSIBLE SEWAGE PUMPS; TWO
(2) LARGE PUMPS AND TWO (2) SMALL PUMPS; AND REPLACE WITH TWO (2)
NEW LARGE AND TWO (2) NEW SMALL PUMPS. NEW PUMPS WILL BE FLYGT
PUMPS.
2. REMOVAL OF ALL EXISTING GUIDE RAILS, MOUNTING HARDWARE, AND BASE
BENDS AND INSTALL NEW EQUIPMENT (GUIDE RAILS, MOUNTING HARDWARE
AND BASE BENDS), FOR THE NEW PUMPS.
3. REPLACE EXISTING 6" DIAMETER DISCHARGE PIPING AND VALVES ON THE
SMALL PUMP PIPING WITH NEW 10" DIAMETER PIPING AND VALVES.
4. REMOVE EXISTING LEVEL SENSORS AND FLOATS AND PROVIDE NEW LEVEL
SENSORS AND FLOATS.
5. PROVIDE NEW COATINGS ON ALL PUMP DISCHARGE PIPING, FITTINGS, AND
VALVES.
6. REPLACEMENT OF FIVE (5) MANHOLES AND ASSOCIATED BYPASS PUIMPING.
7. INSTALL NEW CRANE/HOIST SYSTEM.
8. ELECTRICAL IMPROVEMENTS: LIGHTNING PROTECTION SYSTEM, NEW
MOTOR CONTROL CENTERS FOR ALL NEW PUMPS, NEW VARIABLE
FREQUENCY DRIVES (VFDs).
PROJECT DESCRIPTION
1. CONSTRUCTION AND MATERIAL SPECIFICATIONS WILL CONFORM WITH
THE PROJECT SPECIFICATIONS AND NAVAL FACILITIES ENGINEERING
SYSTEMS COMMAND STANDARD SPECIFICATIONS.
2. VERIFY THE LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES
PRIOR TO CONSTRUCTION.
3. ALL SHORING WILL BE IN ACCORDANCE WITH OSHA TRENCHING
STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE.
4. PROVIDE ALL NECESSARY EROSION AND SEDIMENTATION CONTROL
MEASURES AS REQUIRED BY NCDEQ FOR THIS TYPE OF WORK.
5. IF ADDITIONAL WORK SPACE IS NEEDED, AN ENCROACHMENT IS TO BE
AGREED UPON BETWEEN THE CONTRACTOR AND THE CONTRACTING
OFFICER AND/OR OWNER IN WRITING.
6. LOCATE AND PROTECT ALL PROPERTY MONUMENTS. IF CORNERS ARE
DISTURBED THEY MUST BE REPLACED BY A NC PLS AT NO COST TO THE
OWNER OR ENGINEER.
7. PERFORM AND CONDUCT ALL LAYOUT WORK AND SURVEYS REQUIRED
TO PROPERLY CONSTRUCT THE PROPOSED FEATURES.
8. RECONNECT DISTURBED UTILITY SERVICES ENCOUNTERED. NOTIFY
USERS 24 HOURS PRIOR TO POSSIBLE INTERRUPTIONS OF SERVICE.
9. AT LOCATIONS WHERE TELEPHONE CABLES, FIBER OPTIC CABLES, AND
JUNCTION BOXES ARE IN CONFLICT WITH PROPOSED FEATURES, TAKE
ALL ACTION NECESSARY TO LOCATE, REMOVE, AND REPLACE THESE
UTILITIES TO THE SATISFACTION OF THE CONTRACTING OFFICER AND
UTILITY OWNER.
10. ALL EXCESS EXCAVATED MATERIAL WILL BE REMOVED FROM THE
CONSTRUCTION SITE AND DISPOSED OF LEGALLY.
11. PROTECT EXISTING AND NEWLY INSTALLED UTILITIES, AT ALL TIMES
THROUGH THE DURATION OF CONSTRUCTION, FROM DAMAGE OR
DISRUPTION OF SERVICE. TAKE MEASURES TO PROTECT THE HEALTH,
SAFETY AND WELFARE OF THOSE PERSONS HAVING ACCESS TO THE
WORK SITE.
1. DURING THE CONSTRUCTION AND MAINTENANCE OF THIS PROJECT, ALL SAFETY
REGULATIONS MUST BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE MUST
BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE
SAFETY OF HIS PERSONNEL.
2. THE MAINTENANCE OF TRAFFIC CONTROL PLAN MUST BE SUBMITTED AND APPROVED BY
BASE STAFF AND APPLICABLE LOCAL AGENCIES PRIOR TO COMMENCEMENT OF
CONSTRUCTION WITHIN RIGHT OF WAYS.
3. LABOR SAFETY REGULATIONS MUST CONFORM TO THE PROVISIONS SET FORTH BY OSHA
IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
4. PROVIDE AND MAINTAIN PERSONAL SAFETY EQUIPMENT IN ACCORDANCE WITH THE
HEALTH AND SAFETY PROGRAM AND ALL OTHER APPLICABLE LEGAL AND HEALTH AND
SAFETY REQUIREMENTS. PROVIDE EMPLOYEES AND SUB CONTRACTORS WITH
ADEQUATE INFORMATION AND TRAINING TO ENSURE THAT ALL EMPLOYEES AND SUB
CONTRACTORS AND SUB CONTRACTOR'S EMPLOYEES COMPLY WITH ALL APPLICABLE
REQUIREMENTS. CONTRACTOR MUST REMAIN IN COMPLIANCE WITH ALL OCCUPATION
SAFETY AND HEALTH REGULATIONS AS WELL AS THE ENVIRONMENTAL PROTECTION
LAWS. THE FOLLOWING IS NOT TO BE PERCEIVED AS THE ENTIRE SAFETY PROGRAM BUT
JUST BASIC REQUIREMENTS.
5. ALL EXCAVATIONS MUST CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF
LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION RULES AND
REGULATIONS. PARTICULAR ATTENTION MUST BE PAID TO THE CONSTRUCTION
STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926 SUBPART P.
6. THE MINIMUM STANDARDS SET FORTH IN THE CURRENT EDITION OF "MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) BE FOLLOWED IN THE DESIGN
APPLICATION, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC CONTROL
DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE PUBLIC AND
WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS.
7. ALL TRAFFIC CONTROL MARKINGS AND DEVICES MUST CONFORM TO THE PROVISIONS
SET FORTH IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PREPARED BY THE
US DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. ALL
NORTH CAROLINA AMENDMENTS WILL APPLY.
8. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND ENFORCE ALL
APPLICABLE SAFETY REGULATIONS.
9. EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND MUST PROVIDE AT
LEAST 72 HOURS NOTICE TO NC811 PRIOR TO CONSTRUCTION TO OBTAIN FIELD
LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
10. REPAIR ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, THAT MAY
OCCUR AS A RESULT OF THE WORK PERFORMED AT NO ADDITIONAL COST TO THE
OWNER.
GENERAL CONSTRUCTION NOTES
SAFETY
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1-ge ne ra l n ot es
:1
3:
A M
NOT TO SCALE
N
1 LOCATION_PLAN
LIFT STATION G575
C-001
GENERAL NOTES - G575
JR
JR, MC
RLB
60044574
CHRIS MAAS
07/23/2026
Christopher Maas 29-Jul-2026
15148 N=362,638.587' E=2,465,898.367'
EL=13.903'
60d NAIL
15465 N=362,515.483' E=2,465,833.148'
EL=14.256'
60d NAIL
S
S
S S
S
S
S
T
T
T
T
T
T
T
T
TT
E
E
E
E
E
E
E
E E
E E
E E
CONC
SS
SS
SS
SS
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
5" CYPRESS
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SAN
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
INV=3.45'
INV=3.13'
PUMP
WOODS
9'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W W
W
W
W
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
SAN
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
2_ ex ist in g
4:
:2
PM
N
0 10' 20'
LEGEND
INV
FES
RCP
CMP
PVC
DIP
OEU
FFE
CHL
UNK
SURVEY CONTROL
SEWER MANHOLE
SEWER VALVE
CLEAN OUT
POWER POLE
UNKNOWN MANHOLE
LIGHT POLE
STORM MANHOLE
BOLLARD
TREE
SIGN
INVERT
FLARED END SECTION
REINFORCED CONCRETE PIPE
CORRUGATED METAL PIPE
POLYVINYL CHLORIDE PIPE
DUCTILE IRON PIPE
OTHER END UNKNOWN
FINISHED FLOOR ELEVATION
CHAINLINK
UNKNOWN
STORM PIPE
SANITARY SEWER PIPE
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
FENCE
WOOD LINE
D
CO
S
SD
SAN
T
G
M
I, BRUCE D. BEAVERS, CERTIFY THAT THIS SURVEY WAS COMPLETED UNDER
MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER
MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT
CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;
THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A
TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE
FIELD DATA WAS COMPLETED ON DECEMBER 3, 2025; THAT THE SURVEY MAPPING WAS
COMPLETED ON DECEMBER 31, 2025; AND ALL COORDINATES ARE BASED ON NC
'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88.
BRUCE D. BEAVERS PLS L-3451
NOTES:
1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND
INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY
OWNERSHIP INFORMATION.
2. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF DECEMBER 3, 2025.
3. SURVEYED BY: STANTEC CONSULTING SERVICES INC.
4. SURVEY DATE: DECEMBER 31, 2025
5. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET.
6. VERTICAL DATUM: NAVD 88, GEOID 12A.
7. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION
OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY.
8. ALL UNDERGROUND UTILITIES ARE SHOWN PER LEVEL "B".
C-002
EXISTING CONDITIONS SURVEY - G575
JR
JR, MC
RLB
60044575
CHRIS MAAS
S
S
S S
S
S
S
T
T
T
T
T
T
T
T
TT
E
E
E
E
E
E
E
E E
E E
E E
CONC
SS
SS
SS
SS
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SAN
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
INV=3.45'
INV=3.13'
PUMP
WOODS
9'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W W
W
W
W
W
W W
W
W
W
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93
FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
S
S
S
S
S
CRANE
FOOTINGS/MOUNTS.
SEE STRUCTURAL
FOR DETAILS
N
0 10' 20'
C-100
JR
JR,MC
RLB
60044576
CHRIS MAAS
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:2
PM
SITE IMPROVEMENTS - G575
N=362,582.138' E=2,465,830.177'
EL=13.847'
60d NAIL
N=362,617.868' E=2,465,904.550'
EL=14.184'
60d NAIL
15148 N=362,638.587' E=2,465,898.367'
EL=13.903'
60d NAIL
15465 N=362,515.483' E=2,465,833.148'
EL=14.256'
60d NAIL
S
S
S
CO
S S
S
S
S
T
T
T
T T
E
E
E
E E
E
CONC
CONC
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
5" CYPRESS
5" CYPRESS
8" CYPRESS
12" CYPRESS
16" CYPRESS
6" CYPRESS CLUSTER
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
TOP=15.18'
RECESSED
INV=3.43'
INV=3.45'
INV=3.13'
PUMP
WOODS
12'
12'
11'
10'
13'
9'
12'
12'
9'
10'
10'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
W
W W
W
W
W
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
FH
CO
E
S
AC
E E
T
SAN
LEGEND
CONC
INV
PVC
RCP
UNK
OEU
DIP
CHL
FFE
BOT
X X
SURVEY CONTROL
SEWER VALVE
CLEANOUT
SEWER MANHOLE
FIRE HYDRANT
WATER VALVE
BACK FLOW PREVENTER
ELECTRIC BOX
TRANSFORMER
AIR CONDITIONER
LIGHT POLE
TREE
BOLLARD
CONCRETE
INVERT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
UNKNOWN
OTHER END UNKNOWN
DUCTILE IRON PIPE
CHAINLINK
FINISHED FLOOR ELEVATION
BOTTOM
WOODS
SANITARY SEWER
SANITARY SEWER FORCED MAIN
FENCE
UNDERGR0UND ELECTRIC
UNDERGROUND WATER
UNDERGROUND TELEPHONE
UNKNOWN UNDERGROUND UTILITY
W
SS SS
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S
MANHOLE NO. 1
REMOVE EXIST. MANHOLE
AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 2
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 3
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
DISCHARGE MH FOR MH #1
BYPASS SEGMENT 1 & 2
ALGN 1 5+34
ALGN 1 0+00
ALGN 1 1+00
ALGN 1 2+00
ALGN 1 3+00
ALGN 1 4+00
ALGN 1 5+00
ALGN 2 0+00
ALGN 2 0+78
ALGN 3 0+00
ALGN 3 1+00
ALGN 3 2+00
ALGN 3 2+47
S
S
S
REMOVE CHAINLINK
FENCE AS REQ'D FOR
BYPASS OPERATIONS
REMOVE EXISTING ASPHALT FOR
INSTALLATION OF SEWER, CRANE
FOUNDATIONS, AND DUMPSTER
PAD. PROVIDE ASPHALT
SUBGRADE, INTERMEDIATE LAYER
AND TOP COAT LAYER. SEE DETAIL.
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C102
FOR NEW SEWER DETAILS
ALGN 4 0+00
AL
GN
1+
AL
GN
2+
ALGN 4 2+10
ALGN 5 2+99
ALGN 5 0+00
ALGN 5 1+00
ALGN 5 2+00
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 1 SHEET C102 FOR
NEW SEWER DETAILS
NEW MANHOLE NO. 4
SEE SHEET C102.
4'
N2 3°
' 1
7.8 1"E
194'
N64° 02' 07.04"E
74' S87° 58' 02.11"E
52'
S30° 48' 44.79"E
40'
N55° 30' 07.46"E
27'
N62° 34' 31.77"E
123'S55° 58' 53.70"W
281'
S42° 58' 28.11"E
274' N27° 29' 26.92"W
S
S
NEW MANHOLE NO. 5
SEE SHEET C103.
NEW MANHOLE NO. 6
SEE SHEET C103.
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
24' LENGTH 18"
DIAMETER HDPE PIPE
24" DIAMETER
HDPE PIPE
18" DIAMETER HDPE
PIPE
13' LENGTH 24"
DIAMETER HDPE PIPE
30" DIAMETER HDPE
PIPE
30" DIAMETER
HDPE PIPE
8" DIAMETER
HDPE PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
30" DIAMETER HDPE
PIPE
CRANE
FOOTINGS/MOUNTS.
SEE STRUCTURAL
FOR DETAILS
CONCRETE SIDEWALK. REMOVE
CONCRETE FOR CRANE
FOUNDATION. PROVIDE CONCRETE
SIDEWALK TO NEAREST JOINT.
N
0 20' 40'
C-101
JR
JR,MC
RLB
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:3
PM
EXISTING LIFT STATION G-575 DEMOLITION NOTES:
IT IS AT THE DISCRETION OF THE UTILITIES DEPARTMENT OF CAMP LEJEUNE IF ANY OF THE MATERIALS WILL BE RETAINED FOR STORAGE / SALVAGED. ALL MATERIALS REMOVED AND NOT SALVAGED TO THE UTILITIES DEPARTMENT WILL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE AND DISPOSED OF
PER STATE/LOCAL REGULATIONS.
GRAVITY SEWER - G575
60044577
CHRIS MAAS
-0+20 0+00 1+00 2+00 3+00 4+00 5+00 5+50
MANHOLE NO. 4
6' DIA. PRECAST. CONC.
ALGN 1: STA:2+17
RIM:13.24
INV IN:3.66 18" (NW)
INV IN:3.66 24" (SE)
INV OUT:3.45 30" (SW)
123' - 30" @ 0.23%52' - 30"
@ 0.40%27' - 30" @ 0.10%
EXIST. LIFT STATION
INFLUENT CHAMBER
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
EXIST. MANHOLE
5' DIA.
ALGN 1: 5+33.58
RIM:14.03
INV OUT:9.66 18"
281' - 18" @ 2.09%
MANHOLE NO. 1
6' DIA. PRECAST. CONC.
ALGN 1: STA:0+88
RIM:14.29
INV IN:3.16 30" (NE)
INV IN:3.16 8" (W)
INV OUT:3.16 30" (SE)
MANHOLE NO. 2
6' DIA. PRECAST. CONC.
ALGN 1: STA:0+30
RIM:13.70
INV IN:2.93 30" (NW)
INV IN:2.93 8" (SW)
INV OUT:2.93 30" (NE)
HDPE PIPE HDPE PIPE HDPE PIPE
HDPE PIPE
EXIST. GRADE
MANHOLE NO. 6
6' DIA. PRECAST. CONC.
ALGN 1: STA:5+04
RIM:14.03
INV IN:9.66 18" (NE)
INV OUT:9.66 18" (SE)
24' - 18" @ 0.00%
HDPE PIPE
0+00 1+00
EXIST. MANHOLE
4' DIA.
ALGN 2: 0+78.49
RIM:14.53
INV IN:5.12 8"
INV OUT:5.02 8"
74' - 8" @ 2.37%
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
MANHOLE NO. 1
6' DIA. PRECAST. CONC.
ALGN 1: STA:0+88
RIM:14.29
INV IN:3.16 30" (NE)
INV IN:3.16 8" (W)
INV OUT:3.16 30" (SE)
HDPE PIPE
EXIST. GRADE
-0+50 0+00 1+00 2+00 2+60
8" @ 13
.38
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
EXIST. MANHOLE
5' DIA.
ALGN 3: 2+47.17
RIM:14.70
INV OUT:9.23 8"
194' - 8" @ 0.00%
MANHOLE NO. 2
6' DIA. PRECAST. CONC.
ALGN 1: STA:0+30
RIM:13.70
INV IN:2.93 30" (NW)
INV IN:2.93 8" (SW)
INV OUT:2.93 30" (NE)
MANHOLE NO. 3
8' DIA. PRECAST. CONC.
ALGN 3: STA:0+47
RIM:14.18
INV IN:9.70 8" (SW)
INV IN:9.23 8" (SW)
INV OUT:9.23 8" (NE)
HDPE PIPE
HDPE
PI
PE
EXIST. GRADE
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:2
PM
0 20' 40'
PROFILE
HORZ: 1" = 20'
VERT: 1" = 2'
PROFILE
HORZ: 1" = 20'
VERT: 1" = 2'
PROFILE
HORZ: 1" = 20'
VERT: 1" = 2'
C-102
PROFILE - MANHOLE REPAIRS - G575
JR
JR, MC
RLB
NEW MANHOLE NO. 1 TO NW UPSTREAM EXIST. MANHOLE 2
C-102 NEW MANHOLE NO. 2 THRU TO EXIST. MANHOLE SW OF NEW MANHOLE NO. 3 3
C-102
EXIST. LIFT STATION INFLUENT TO EXIST. MANHOLE NW OF NEW MANHOLE NO 4 1
C-102
60044578
CHRIS MAAS
0+00 1+00 2+00 2+50
MANHOLE NO. 3
8' DIA. PRECAST. CONC.
ALGN 3: STA:0+47
RIM:14.18
INV IN:9.70 8" (SW)
INV IN:9.23 8" (SW)
INV OUT:9.23 8" (NE)
EXIST. MANHOLE
5' DIA.
ALGN 4: 2+10.04
RIM:14.70
INV OUT:10.00 8"
204' - 8" @ 0.14%
HDPE PIPE
REMOVE EXIST. MANHOLE AND
PROVIDE NEW MANHOLE IN PLACE.
EXIST. GRADE
-0+20 0+00 1+00 2+00 3+00
MANHOLE NO. 4
6' DIA. PRECAST. CONC.
ALGN 1: STA:2+17
RIM:13.24
INV IN:3.66 18" (NW)
INV IN:3.66 24" (SE)
INV OUT:3.45 30" (SW)
EXIST. MANHOLE
6' DIA.
ALGN 5: 2+98.71
RIM:15.18
INV OUT:3.70 24"
INV OUT:3.43 24"
274' - 24" @ 0.01%
HDPE PIPE
EXIST. GRADE
MANHOLE NO. 5
6' DIA. PRECAST. CONC.
ALGN 5: STA:2+80
RIM:15.18
INV IN:3.70 24" (E)
INV OUT:3.70 24" (NW)
13' - 24" @ 0.00%
HDPE PIPEHDPE PIPE HDPE
PIPE
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:2
PM
0 20' 40'
PROFILE
HORZ: 1" = 20'
VERT: 1" = 2'
PROFILE
HORZ: 1" = 20'
VERT: 1" = 2'
NEW MANHOLE NO. 4 TO SOUTH UPSTREAM EXIST. MANHOLE 2
C-103
C-103
PROFILE - MANHOLE REPAIRS - G575
JR
JR, MC
RLB
NEW MANHOLE NO. 3 TO SOUTH UPSTREAM EXIST. MANHOLE 1
C-103
60044579
CHRIS MAAS
E=2,465,830.177'
EL=13.847'
60d NAIL
N=362,617.868' E=2,465,904.550'
EL=14.184'
60d NAIL
15148 N=362,638.587' E=2,465,898.367'
EL=13.903'
60d NAIL
15465 N=362,515.483' E=2,465,833.148'
EL=14.256'
60d NAIL
S
S
S
CO
S S
S
S
S
T
T
T
T T
E
E
E
E E
E
CONC
CONC
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
5" CYPRESS
5" CYPRESS
8" CYPRESS
12" CYPRESS
16" CYPRESS
6" CYPRESS CLUSTER
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
TOP=15.18'
RECESSED
INV=3.43'
INV=3.45'
INV=3.13'
PUMP
WOODS
12'
12'
11'
10'
13'
9'
12'
12'
9'
10'
10'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
W
W W
W
W
W
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
FH
CO
E
S
AC
E E
T
SAN
LEGEND
CONC
INV
PVC
RCP
UNK
OEU
DIP
CHL
FFE
BOT
X X
SURVEY CONTROL
SEWER VALVE
CLEANOUT
SEWER MANHOLE
FIRE HYDRANT
WATER VALVE
BACK FLOW PREVENTER
ELECTRIC BOX
TRANSFORMER
AIR CONDITIONER
LIGHT POLE
TREE
BOLLARD
CONCRETE
INVERT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
UNKNOWN
OTHER END UNKNOWN
DUCTILE IRON PIPE
CHAINLINK
FINISHED FLOOR ELEVATION
BOTTOM
WOODS
SANITARY SEWER
SANITARY SEWER FORCED MAIN
FENCE
UNDERGR0UND ELECTRIC
UNDERGROUND WATER
UNDERGROUND TELEPHONE
UNKNOWN UNDERGROUND UTILITY
W
SS SS
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93
FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S
MANHOLE NO. 1
REMOVE EXIST. MANHOLE
AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 2
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 3
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
DISCHARGE MH FOR MH #1
BYPASS SEGMENT 1 & 2
S
S
S
REMOVE CHAINLINK
FENCE AS REQ'D FOR
BYPASS OPERATIONS
REMOVE EXISTING ASPHALT FOR
INSTALLATION OF SEWER, CRANE
FOUNDATIONS, AND DUMPSTER
PAD. PROVIDE ASPHALT
SUBGRADE, INTERMEDIATE LAYER
AND TOP COAT LAYER. SEE DETAIL.
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 1 SHEET C102 FOR
NEW SEWER DETAILS
NEW MANHOLE NO. 4
SEE SHEET C102.
4'
N2 3°
' 1
7.8 1"E
194'
N64° 02' 07.04"E
74' S87° 58' 02.11"E
52'
S30° 48' 44.79"E
40'
N55° 30' 07.46"E
27'
N62° 34' 31.77"E
123'S55° 58' 53.70"W
281'
S42° 58' 28.11"E
274' N27° 29' 26.92"W
S
S
NEW MANHOLE NO. 5
SEE SHEET C103.
NEW MANHOLE NO. 6
SEE SHEET C103.
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
24' LENGTH 18"
DIAMETER HDPE PIPE
24" DIAMETER
HDPE PIPE
18" DIAMETER HDPE
PIPE
13' LENGTH 24"
DIAMETER HDPE PIPE
30" DIAMETER HDPE
PIPE
30" DIAMETER
HDPE PIPE
8" DIAMETER
HDPE PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
30" DIAMETER HDPE
PIPE
N
0 20' 40'
C-111
JR
JR,MC
RLB
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:0
PM
PHASE 1 SEWER CONSTRUCTION AND BYPASS - G575
EXISTING LIFT STATION G-575 DEMOLITION NOTES:
IT IS AT THE DISCRETION OF THE UTILITIES DEPARTMENT OF CAMP LEJEUNE IF ANY OF THE MATERIALS WILL BE RETAINED FOR STORAGE / SALVAGED. ALL MATERIALS REMOVED AND NOT SALVAGED TO THE UTILITIES DEPARTMENT WILL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE AND DISPOSED OF PER
STATE/LOCAL REGULATIONS.
TEMPORARY BYPASS PUMPING SYSTEM REQUIREMENTS:
· TEMPORARY BYPASS PUMPING MUST BE PROTECTED FROM DEMOLITION AND CONSTRUCTION ACTIVITIES OF THE PUMP STATION AND SEWER NETWORK REHAB AND MUST
REMAIN ACTIVE DURING THE ENTIRE CONSTRUCTION DURATION UNTIL THE OWNER APPROVES AND ACCEPTS THE WORK.
· TEMPORARY BYPASS PUMPING OPERATIONS MUST BE PROVIDED IN ACCORDANCE WITH THE TEMPORARY BYPASS PUMPING SYSTEMS SPECIFICATION, THESE NOTES, THE
DRAWINGS, AND ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS.
· THE BYPASS PUMPS MUST BE PROTECTED FROM FLOODING (100-YEAR FLOOD ELEVATION / BASE FLOOD ELEVATION (BFE).
· ALL BYPASS PUMPING COMPONENTS, LISTED AND SHOWN ON THE PLANS, ARE SCHEMATIC AND REPRESENT APPROXIMATE QUANTITIES AND SIZES.
· PROVIDE A FINAL DESIGN INDICATING ALL COMPONENTS OF THE BYPASS PUMPING SYSTEM, INCLUDING NUMBER AND SIZE OF PUMPS, BYPASS PIPING DIAMETERS, PROPOSED PIPE MATERIAL, AND ALL OTHER APPURTENANCES AND ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE BYPASS SYSTEM.
· FIELD VERIFY AND CONFIRM LOCATIONS AND DEPTHS OF ALL MANHOLES AND/OR STRUCTURES PROPOSED TO BE USED DURING BYPASS OPERATIONS.
PHASE 1 - CONSTRUCTION
- PROVIDE NEW MANHOLE NO. 1
- PROVIDE NEW MANHOLE NO. 2
- PROVIDE NEW MANHOLE NO. 4
- PROVIDE NEW MANHOLE NO. 5
- PROVIDE NEW MANHOLE NO. 6
- PROVIDE NEW 30", 8", 18" AND 24" PIPE.
PHASE 1 - BYPASS NO. 1
PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 1 - BYPASS NO. 2
PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 1 - BYPASS NO. 3
PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
INDICATES EXTENTS OF WORK TO BE DONE THIS PHASE. REFER TO
"PHASE 1 - CONSTRUCTION" ABOVE FOR DETAILS.
SHADING INDICATES EXTENTS
OF PIPE INSTALLATION WORK
IN ACCORDANCE WITH PHASE 1
NEW SEWER CONSTRUCTION.
TYP. THIS SHEET.
STOP PIPE INSTALLATION
SHORT OF CONNECTION TO
EXISTING MANHOLE
STOP PIPE INSTALLATION SHORT
OF CONNECTION TO MANHOLE
NO. 3
INDICATES MANHOLES INSTALLED THIS PHASE. REFER TO "PHASE 1 -
CONSTRUCTION" ABOVE FOR DETAILS.
SHADED MANHOLES INDICATE MANHOLES
INSTALLED IN ACCORDANCE WITH PHASE
PHASE 1 NEW SEWER CONSTRUCTION.
TYP. THIS SHEET.
NO CONNECTION BETWEEN
NEW MANHOLE NO. 6 AND
UPSTREAM EXIST. MANHOLE
THIS PHASE.
NO CONNECTION BETWEEN
NEW MANHOLE NO. 6 AND
UPSTREAM EXIST. MANHOLE
THIS PHASE.
60044580
CHRIS MAAS
E=2,465,830.177'
EL=13.847'
60d NAIL
N=362,617.868' E=2,465,904.550'
EL=14.184'
60d NAIL
15148 N=362,638.587' E=2,465,898.367'
EL=13.903'
60d NAIL
15465 N=362,515.483' E=2,465,833.148'
EL=14.256'
60d NAIL
S
S
S
CO
S S
S
S
S
T
T
T
T T
E
E
E
E E
E
CONC
CONC
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
5" CYPRESS
5" CYPRESS
8" CYPRESS
12" CYPRESS
16" CYPRESS
6" CYPRESS CLUSTER
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
TOP=15.18'
RECESSED
INV=3.43'
INV=3.45'
INV=3.13'
PUMP
WOODS
12'
12'
11'
10'
13'
9'
12'
12'
9'
10'
10'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
W
W W
W
W
W
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
FH
CO
E
S
AC
E E
T
SAN
LEGEND
CONC
INV
PVC
RCP
UNK
OEU
DIP
CHL
FFE
BOT
X X
SURVEY CONTROL
SEWER VALVE
CLEANOUT
SEWER MANHOLE
FIRE HYDRANT
WATER VALVE
BACK FLOW PREVENTER
ELECTRIC BOX
TRANSFORMER
AIR CONDITIONER
LIGHT POLE
TREE
BOLLARD
CONCRETE
INVERT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
UNKNOWN
OTHER END UNKNOWN
DUCTILE IRON PIPE
CHAINLINK
FINISHED FLOOR ELEVATION
BOTTOM
WOODS
SANITARY SEWER
SANITARY SEWER FORCED MAIN
FENCE
UNDERGR0UND ELECTRIC
UNDERGROUND WATER
UNDERGROUND TELEPHONE
UNKNOWN UNDERGROUND UTILITY
W
SS SS
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93
FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S
MANHOLE NO. 1
REMOVE EXIST. MANHOLE
AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 2
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 3
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
DISCHARGE MH FOR MH #1
BYPASS SEGMENT 1 & 2
S
S
S
REMOVE CHAINLINK
FENCE AS REQ'D FOR
BYPASS OPERATIONS
REMOVE EXISTING ASPHALT FOR
INSTALLATION OF SEWER, CRANE
FOUNDATIONS, AND DUMPSTER
PAD. PROVIDE ASPHALT
SUBGRADE, INTERMEDIATE LAYER
AND TOP COAT LAYER. SEE DETAIL.
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 1 SHEET C102 FOR
NEW SEWER DETAILS
NEW MANHOLE NO. 4
SEE SHEET C102.
4'
N2 3°
' 1
7.8 1"E
194'
N64° 02' 07.04"E
74' S87° 58' 02.11"E
52'
S30° 48' 44.79"E
40'
N55° 30' 07.46"E
27'
N62° 34' 31.77"E
123'S55° 58' 53.70"W
281'
S42° 58' 28.11"E
274' N27° 29' 26.92"W
S
S
NEW MANHOLE NO. 5
SEE SHEET C103.
NEW MANHOLE NO. 6
SEE SHEET C103.
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
24' LENGTH 18"
DIAMETER HDPE PIPE
24" DIAMETER
HDPE PIPE
18" DIAMETER HDPE
PIPE
13' LENGTH 24"
DIAMETER HDPE PIPE
30" DIAMETER HDPE
PIPE
30" DIAMETER
HDPE PIPE
8" DIAMETER
HDPE PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
30" DIAMETER HDPE
PIPE
N
0 20' 40'
C-112
JR
JR,MC
RLB
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:5
PM
PHASE 2 SEWER CONSTRUCTION AND BYPASS - G575
EXISTING LIFT STATION G-575 DEMOLITION NOTES:
IT IS AT THE DISCRETION OF THE UTILITIES DEPARTMENT OF CAMP LEJEUNE IF ANY OF THE MATERIALS WILL BE RETAINED FOR STORAGE / SALVAGED. ALL MATERIALS REMOVED AND NOT SALVAGED TO THE UTILITIES DEPARTMENT WILL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE AND DISPOSED OF
PER STATE/LOCAL REGULATIONS.
TEMPORARY BYPASS PUMPING SYSTEM REQUIREMENTS:
· TEMPORARY BYPASS PUMPING MUST BE PROTECTED FROM DEMOLITION AND CONSTRUCTION ACTIVITIES OF THE PUMP STATION AND SEWER NETWORK REHAB AND MUST
REMAIN ACTIVE DURING THE ENTIRE CONSTRUCTION DURATION UNTIL THE OWNER APPROVES AND ACCEPTS THE WORK.
· TEMPORARY BYPASS PUMPING OPERATIONS MUST BE PROVIDED IN ACCORDANCE WITH THE TEMPORARY BYPASS PUMPING SYSTEMS SPECIFICATION, THESE NOTES, THE
DRAWINGS, AND ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS.
· THE BYPASS PUMPS MUST BE PROTECTED FROM FLOODING (100-YEAR FLOOD ELEVATION / BASE FLOOD ELEVATION (BFE).
· ALL BYPASS PUMPING COMPONENTS, LISTED AND SHOWN ON THE PLANS, ARE SCHEMATIC AND REPRESENT APPROXIMATE QUANTITIES AND SIZES.
· PROVIDE A FINAL DESIGN INDICATING ALL COMPONENTS OF THE BYPASS PUMPING SYSTEM, INCLUDING NUMBER AND SIZE OF PUMPS, BYPASS PIPING DIAMETERS, PROPOSED PIPE MATERIAL, AND ALL OTHER APPURTENANCES AND ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE BYPASS SYSTEM.
· FIELD VERIFY AND CONFIRM LOCATIONS AND DEPTHS OF ALL MANHOLES AND/OR STRUCTURES PROPOSED TO BE USED DURING BYPASS OPERATIONS.
PHASE 2 - CONSTRUCTION
1. CONSTRUCT NEW PIPE FROM MANHOLE NO. 6 TO
EXISTING MANHOLE.
2. CONSTRUCT NEW PIPE FROM MANHOLE NO. 5 TO
EXISTING MANHOLE.
3. CONNECT NEW 8" PIPE FROM NEW MANHOLE NO. 1
TO EXISTING MANHOLE UPSTREAM WEST OF NEW
MANHOLE NO. 1.
4. PROVIDE NEW MANHOLE NO. 3
5. CONNECT NEW 8" PIPE FROM NEW MANHOLE NO. 2
TO NEW MANHOLE NO. 3.
6. PROVIDE NEW 8" LINES UPSTREAM OF NEW
MANHOLE NO. 3.
PHASE 2 - BYPASS NO. 3
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM MANHOLE
TO WET WELL.
3. CONNECT NEW 8" PIPE TO EXISTING
MANHOLE.
PHASE 2 - BYPASS NO. 4
1. PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 2 - BYPASS NO. 5
1. PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 2 - BYPASS NO. 2
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM
MANHOLE TO WET WELL OR NEW
MANHOLE NO. 4.
3. CONNECT NEW MANHOLE NO. 5 TO
EXISTING MANHOLE.
PHASE 2 - BYPASS NO. 1
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM
MANHOLE TO WET WELL OR NEW
MANHOLE NO. 4.
3. CONNECT NEW MANHOLE NO. 6 TO
EXISTING MANHOLE.
INDICATES EXTENTS OF WORK TO BE DONE THIS PHASE. REFER TO
"PHASE 2 - CONSTRUCTION" ABOVE FOR DETAILS.
INDICATES MANHOLES INSTALLED THIS PHASE. REFER TO "PHASE 2 -
CONSTRUCTION" ABOVE FOR DETAILS.
SHADING INDICATES EXTENTS OF
PIPE INSTALLATION WORK IN
ACCORDANCE WITH PHASE 1 NEW
SEWER CONSTRUCTION.
TYP. THIS SHEET.
STOP NEW PIPE
INSTALLATION SHORT OF
CONNECTION TO EXISTING
MANHOLE
STOP NEW PIPE
INSTALLATION SHORT OF
CONNECTION TO EXISTING
MANHOLE
FINAL LENGTH CONNECTION
TO EXIST. UPSTREAM
MANHOLE
FINAL LENGTH CONNECTION
TO EXIST. UPSTREAM
MANHOLE
PROVIDE PIPE TO CONNECT
NEW MANHOLE NO. 5 TO
EXIST. UPSTREAM MANHOLE.
PROVIDE PIPE TO CONNECT
NEW MANHOLE NO. 5 TO
EXIST. UPSTREAM MANHOLE.
60044581
CHRIS MAAS
E=2,465,830.177'
EL=13.847'
60d NAIL
N=362,617.868' E=2,465,904.550'
EL=14.184'
60d NAIL
15148 N=362,638.587' E=2,465,898.367'
EL=13.903'
60d NAIL
15465 N=362,515.483' E=2,465,833.148'
EL=14.256'
60d NAIL
S
S
S
CO
S S
S
S
S
T
T
T
T T
E
E
E
E E
E
CONC
CONC
SS
SS
SS
SS
G
ATE
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
6'CHL
ASPHALT
GRAVEL
12" CYPRESS
12" CYPRESS CLUSTER
12" CYPRESS
8" CYPRESS
10" CYPRESS
9" CYPRESS
7" CYPRESS
15" CYPRESS
6" CYPRESS
3" CYPRESS
5" CYPRESS
6" CYPRESS
5" CYPRESS
5" CYPRESS
8" CYPRESS
12" CYPRESS
16" CYPRESS
6" CYPRESS CLUSTER
EE
E E
E E E
15148
FH
E
FH
CO
E
15465
EAC
ASPHALT
FUEL
TANK
PLATFORM
W/ HANDRAIL
STEPS
SPIGOT
CHEMICAL TANK
RELEASE
VALVE
CONTROL PANEL
CONTROL PANEL
SAFETY
SWITCH
FFE=14.21'
FFE=14.23'
FFE=14.19'
FFE=14.22' FFE=14.33'
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
INV=9.42'
TOP=15.40'
INSIDE DROP
TOP INV=12.92'
BOT INV=11.18'
8"PVC
4"PVC - OEU
TOP=14.53'
INV=5.12'
8"PVCINV=5.02'
TOP=14.29'INV=3.16'
INV=3.16'
30"RCP
TOP=13.70'
INV=2.37'
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
8"UNK
30"RCP
INV=2.93
8"UNK - O
EU
8"
DI
P
TOP=13.24'
INV=3.66'
TOP=14.72'
INV=4.70'
INV=4.62'
TOP=14.04'
INV=4.54'
INV=4.63'
18"PVC - OEU
18"PVC
18"PVC
24"PVC
24"PVC
TOP=15.18'
RECESSED
INV=3.43'
INV=3.45'
INV=3.13'
PUMP
WOODS
12'
12'
11'
10'
13'
9'
12'
12'
9'
10'
10'
9'
13'
13'
14'
15'
15'
15' 14
14'
14'
14'
13'
POST
BUILDING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
W
W W
W
W
W
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CONC
SPIGOT
TOP=14.18'BOT INV=9.23'
INV=9.70'
PIPES RECESSED
FFE=14.17'
30"RCP
PUMP
FH
CO
E
S
AC
E E
T
SAN
LEGEND
CONC
INV
PVC
RCP
UNK
OEU
DIP
CHL
FFE
BOT
X X
SURVEY CONTROL
SEWER VALVE
CLEANOUT
SEWER MANHOLE
FIRE HYDRANT
WATER VALVE
BACK FLOW PREVENTER
ELECTRIC BOX
TRANSFORMER
AIR CONDITIONER
LIGHT POLE
TREE
BOLLARD
CONCRETE
INVERT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
UNKNOWN
OTHER END UNKNOWN
DUCTILE IRON PIPE
CHAINLINK
FINISHED FLOOR ELEVATION
BOTTOM
WOODS
SANITARY SEWER
SANITARY SEWER FORCED MAIN
FENCE
UNDERGR0UND ELECTRIC
UNDERGROUND WATER
UNDERGROUND TELEPHONE
UNKNOWN UNDERGROUND UTILITY
W
SS SS
RECESSED PIPE
BOT CL INV=3.16'
INV=2.93FLOW ARROWS ARE CONFIRMED
FROM FIELD GUYS
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S
MANHOLE NO. 1
REMOVE EXIST. MANHOLE
AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 2
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
MANHOLE NO. 3
REMOVE EXIST. MANHOLE AND REPLACE
WITH NEW MANHOLE.
SEE SHEET C102.
DISCHARGE MH FOR MH #1
BYPASS SEGMENT 1 & 2
S
S
S
REMOVE CHAINLINK
FENCE AS REQ'D FOR
BYPASS OPERATIONS
REMOVE EXISTING ASPHALT FOR
INSTALLATION OF SEWER, CRANE
FOUNDATIONS, AND DUMPSTER
PAD. PROVIDE ASPHALT
SUBGRADE, INTERMEDIATE LAYER
AND TOP COAT LAYER. SEE DETAIL.
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C102
FOR NEW SEWER DETAILS
SEE DETAIL 3 SHEET C102
FOR NEW MANHOLE
DETAILS
SEE DETAIL 1 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 2 SHEET C103
FOR NEW SEWER DETAILS
SEE DETAIL 1 SHEET C102 FOR
NEW SEWER DETAILS
NEW MANHOLE NO. 4
SEE SHEET C102.
4'
N2 3°
' 1
7.8 1"E
194'
N64° 02' 07.04"E
74' S87° 58' 02.11"E
52'
S30° 48' 44.79"E
40'
N55° 30' 07.46"E
27'
N62° 34' 31.77"E
123'S55° 58' 53.70"W
281'
S42° 58' 28.11"E
274' N27° 29' 26.92"W
S
S
NEW MANHOLE NO. 5
SEE SHEET C103.
NEW MANHOLE NO. 6
SEE SHEET C103.
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
ABANDON EXIST. SEWER IN
PLACE
24' LENGTH 18"
DIAMETER HDPE PIPE
24" DIAMETER
HDPE PIPE
18" DIAMETER HDPE
PIPE
13' LENGTH 24"
DIAMETER HDPE PIPE
30" DIAMETER HDPE
PIPE
30" DIAMETER
HDPE PIPE
8" DIAMETER
HDPE PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
8" DIAMETER HDPE
PIPE
30" DIAMETER HDPE
PIPE
N
0 20' 40'
C-113
JR
JR,MC
RLB
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1, 4:
:5
PM
PHASE 3 SEWER CONSTRUCTION AND BYPASS - G575
EXISTING LIFT STATION G-575 DEMOLITION NOTES:
IT IS AT THE DISCRETION OF THE UTILITIES DEPARTMENT OF CAMP LEJEUNE IF ANY OF THE MATERIALS WILL BE RETAINED FOR STORAGE / SALVAGED. ALL MATERIALS REMOVED AND NOT SALVAGED TO THE UTILITIES DEPARTMENT WILL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE AND DISPOSED OF
PER STATE/LOCAL REGULATIONS.
TEMPORARY BYPASS PUMPING SYSTEM REQUIREMENTS:
· TEMPORARY BYPASS PUMPING MUST BE PROTECTED FROM DEMOLITION AND CONSTRUCTION ACTIVITIES OF THE PUMP STATION AND SEWER NETWORK REHAB AND MUST
REMAIN ACTIVE DURING THE ENTIRE CONSTRUCTION DURATION UNTIL THE OWNER APPROVES AND ACCEPTS THE WORK.
· TEMPORARY BYPASS PUMPING OPERATIONS MUST BE PROVIDED IN ACCORDANCE WITH THE TEMPORARY BYPASS PUMPING SYSTEMS SPECIFICATION, THESE NOTES, THE
DRAWINGS, AND ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS.
· THE BYPASS PUMPS MUST BE PROTECTED FROM FLOODING (100-YEAR FLOOD ELEVATION / BASE FLOOD ELEVATION (BFE).
· ALL BYPASS PUMPING COMPONENTS, LISTED AND SHOWN ON THE PLANS, ARE SCHEMATIC AND REPRESENT APPROXIMATE QUANTITIES AND SIZES.
· PROVIDE A FINAL DESIGN INDICATING ALL COMPONENTS OF THE BYPASS PUMPING SYSTEM, INCLUDING NUMBER AND SIZE OF PUMPS, BYPASS PIPING DIAMETERS, PROPOSED PIPE MATERIAL, AND ALL OTHER APPURTENANCES AND ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE BYPASS SYSTEM.
· FIELD VERIFY AND CONFIRM LOCATIONS AND DEPTHS OF ALL MANHOLES AND/OR STRUCTURES PROPOSED TO BE USED DURING BYPASS OPERATIONS.
PHASE 3 - CONSTRUCTION
1. CONSTRUCT NEW 8" LINES TO EXISTING MANHOLES.
PHASE 2 - BYPASS NO. 3
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM MANHOLE
TO WET WELL.
3. CONNECT NEW 8" PIPE TO EXISTING
MANHOLE.
PHASE 2 - BYPASS NO. 4
1. PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 2 - BYPASS NO. 5
1. PLUG MANHOLE OUTLET AND
BYPASS TO WET WELL.
PHASE 2 - BYPASS NO. 2
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM
MANHOLE TO WET WELL OR NEW
MANHOLE NO. 4.
3. CONNECT NEW MANHOLE NO. 5 TO
EXISTING MANHOLE.
PHASE 2 - BYPASS NO. 1
1. PLUG MANHOLE INLET.
2. BYPASS FROM UPSTREAM
MANHOLE TO WET WELL OR NEW
MANHOLE NO. 4.
3. CONNECT NEW MANHOLE NO. 6 TO
EXISTING MANHOLE.
INDICATES EXTENTS OF WORK TO BE DONE THIS PHASE. REFER TO
"PHASE 3 - CONSTRUCTION" ABOVE FOR DETAILS.
FINAL LENGTH CONNECTION
TO EXIST. UPSTREAM
MANHOLE.
60044582
CHRIS MAAS
GROUND LEVEL FLOOR PLAN - G575 LIFT STATION
SCALE: 1/4" = 1'-0"
C-212
C-202 C-211
C-211
C-211 C-212
C-211
C-202
C-212
0 4'-0" 8'-0" 12'-0" 16'-0" 20'-0"4'-0"
1/4"=1'-0"
REMOVE EXIST. MONORAIL,
CRANE, SUPPORTS, AND
FOOTINGS/MOUNTS. SEE
STRUCTURAL FOR DETAILS
REMOVE QUANTITY FOUR (4)
SUBMERSIBLE SANITARY
SEWERAGE PUMPS. SEE SHEET
C-211 FOR MORE DETAILS
REMOVE EXIST. 6" DIA.
SMALL PUMP VALVES
AND DISCHARGE
PIPING. SEE SHEET
C-211 FOR MORE
DETAILS
REMOVE EXIST.
CHECK VALVE
CONTROLS AND
INSTALL ON NEW
CHECK VALVES
REMOVE EXIST.
CONCRETE DUMPSTER
PAD FOR REQUIRED
CRANE WORK AND
SEWER WORK
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
1-de m o pl an p s 4:
:0
PM
NOTES:
1. THE PURPOSE OF THIS SHEET IS TO SHOW THE EXISTING LIFT STATION (G575) IN
ACCORDANCE WITH RECORD DRAWINGS PROVIDED BY THE OWNER.
2. THE INFORMATION SHOWN ON THIS SHEET IS PROVIDED AS A REPRESENTATION OF
THE EXISTING FACILITY FOR INFORMATION ONLY. THE ENGINEER NOR OWNER DO
NOT WARRANTY THAT SOME DETAILS MAY DIFFER FROM SHOWN.
C-201
DEMOLITION PLAN - G575
60044583
JR
JR, MC
RLB
EQUIPMENT ITEMS, QUANTITIES AND SIZES SHOWN IN THE EQUIPMENT
SCHEDULE ARE FROM EXISTING RECORD DRAWINGS AND ARE PROVIDED FOR
INFORMATION ONLY. THE SCHEDULE IS NOT INTENDED TO BE A COMPLETE
LISTING OF EQUIPMENT. VERIFY EXISTING EQUIPMENT.
EQUIPMENT ITEMS, QUANTITIES AND SIZES SHOWN IN THE EQUIPMENT SCHEDULE ARE FROM EXISTING RECORD DRAWINGS AND ARE PROVIDED FOR INFORMATION ONLY. THE SCHEDULE IS NOT INTENDED TO BE A COMPLETE LISTING OF EQUIPMENT. VERIFY
EXISTING EQUIPMENT.
CHRIS MAAS
REMOVE QUANTITY FOUR
(4) SUBMERSIBLE
SANITARY SEWERAGE
PUMPS
0 4'-0" 8'-0" 12'-0" 16'-0" 20'-0"4'-0"
1/4"=1'-0"
SCALE: 1/4"' = 1'-0"
SCALE: 1/4"' = 1'-0"
G575 INFLUENT CHANNEL - WETWELL PLAN
G575 LOWER WETWELL PLAN
SECTION 1
SCALE: 1/4"=1'-0"
G575 C-202
Fi le
P at h:
Pl ot D at e:
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
MCAS NEW RIVER, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
23 JULY 2026
N40085-26-B-0044 05-26-0044
G575 LIFT STATION REPAIRS
c:
\u se rs\ m ai ch ow dh ur y\ dc
\a cc do cs
\s ta nt ec c on su ltin g\
2_ ca m pl ej eu ne
_ls g5
\p ro je ct fi le s\
_w ip \0
4_ ci vil \s he et
_f ile s\ sh ee t_ se ts\
2_ c-
2-en la rg ed d em o pl an p s 4:
:3
PM
C-202
ENLARGED DEMOLITION PLAN - G575
JR
JR, MC
RLB
EQUIPMENT ITEMS, QUANTITIES AND SIZES SHOWN IN THE EQUIPMENT SCHEDULE ARE FROM
EXISTING RECORD DRAWINGS AND ARE PROVIDED FOR INFORMATION ONLY. THE SCHEDULE IS NOT
INTENDED TO BE A COMPLETE LISTING OF EQUIPMENT. VERIFY EXISTING EQUIPMENT.
60044584
CHRIS MAAS
REMOVE EXIST. SMALL PUMPS
AND DISCHARGE ELBOW WITH
PEDESTAL (TYP. 2)
SMALL PUMP SECTION VIEW 1
SCALE: 1/4"=1'-0"
G575 SECTION 3
SCALE: 1/4"=1'-0"
G575 SECTION 3
SCALE: 1/4"=1'-0" C-211C-211
C-211
0 4'-0"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .