N4008524B0045 Dwgs_Signed.pdf
PDF 7 MB Posted
- Solicitation number
- N4008526R9077
About this file
This is a final design document (set of construction drawings and specifications) for the FC436 Clarifier Repair project at Marine Corps Base Camp Lejeune, North Carolina, under Construction Contract No. N40085-24-D-0011.
The project involves demolition and repair of secondary clarifier equipment at the basewide treatment plant. Key work includes: demolishing existing truss arms, influent feed wells, sludge suction headers, scum skimmer arms, rake and scraper systems, drive units, control panels, influent wells, truss-type walkways, steel handrails, scum collection systems, scum pipes, and associated structural components; installing a new Tow-Bro circular clarifier with sludge suction manifold and scum skimmer assemblies; providing center drive cage, center influent column, drive unit and control panel; installing access bridge, stairs with handrail and toeboard; providing FRP scum baffle with 316 stainless steel supports and fasteners; providing scum trough with flushing device; replacing weir plate fasteners with 316 stainless steel; and installing new 6-inch scum line piping with appurtenances to tie into the existing 12-inch scum line. The design includes civil work such as site preparation, grading and erosion control, temporary sediment fencing, construction entrance, and permanent vegetation restoration. Electrical work includes removing existing control panel and associated appurtenances, retaining existing ductbank for reuse, removing existing junction boxes, and installing new control conduit connections from the existing 600A, 480V, three-phase motor control center. The 20-sheet final design package provides complete construction details, plans, sections, and specifications for contractor implementation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0014.pdf | ||
| 33 30 02.pdf | ||
| REGISTER.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf | ||
| Amend 0002.pdf | ||
| N4008526B0044 Dwgs_Signed.pdf | ||
| Amend 0001.pdf | ||
| RFP 240045.pdf | ||
| 26-0044 Asbestos and Lead-Paint Survey.pdf | ||
| N4008526B0044 Specs.pdf | ||
| 26-0044 DM.pdf | ||
| N4008524B0045 Specs.pdf | ||
| 26-0044 APPD.pdf | ||
| 24-0045 AppendixD.pdf | ||
| 26-0044 Basis of Design.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
N
L
Chadwick Bay
J
K
G
H
F
D
E
B
C
A
03 02 01 00
SFC450
SFC449
SFC453
SFC454
SFC456
SFC455
SFC460
SFC438
SFC448
SFC468
SFC451
SFC465
FC444
SFC463
SFC466
FC447
SFC359
FC416
FC415
FC414
FC420
FC443
FC442
FC445
FC467
CTR139
FC436
FC441
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
G-001
COVER SHEET
60044651
PROJECT SITE
INDEX OF DRAWINGS
NAVFAC SHEET NO. SHEET TITLE
60044651 1 OF 20 G-001 COVER SHEET
60044652 2 OF 20 G-002 GENERAL NOTES
60044653 3 OF 20 VF101 EXISTING CONDITIONS
60044654 4 OF 20 VF201 EXISTING SECONDARY CLARIFIER PLAN
60044655 5 OF 20 VF202 EXISTING SECONDARY CLARIFIER
SECTIONS
60044656 6 OF 20 C-001 CIVIL NOTES & LEGEND
60044657 7 OF 20 CD101 DEMOLITION PLAN
60044658 8 OF 20 CD201 SECONDARY CLARIFIER DEMOLITION PLAN
60044659 9 OF 20 CD202 SECONDARY CLARIFIER DEMOLITION
SECTION
60044660 10 OF 20 CD203 SECONDARY CLARIFIER CENTER PIER
DEMOLITION PLAN AND DETAILS
60044661 11 OF 20 CS101 SITE PLAN
60044662 12 OF 20 CG101 GRADING & EROSION CONTROL PLAN
60044663 13 OF 20 CU101 SECONDARY CLARIFIER PLAN
60044664 14 OF 20 CU102 SECONDARY CLARIFIER SECTION
60044665 15 OF 20 CU103 SECONDARY CLARIFIER CENTER PIER PLAN
AND DETAILS
60044666 16 OF 20 C-501 CIVIL DETAILS
60044667 17 OF 20 C-502 CIVIL DETAILS
60044668 18 OF 20 E001 GENERAL NOTES, LEGEND, DETAIL AND
ABBREVIATIONS
60044669 19 OF 20 ED101 SITE PLAN - DEMOLITION
60044670 20 OF 20 E101 SITE PLAN - NEW WORK
VICINITY MAP - CAMP LEJEUNE, N.C.
LOCATION MAP - U. S. MARINE CORPS BASE - CAMP LEJEUNE, N.C.
NTS
SITE LOCATION MAP SCALE: 1" = 250'
FC436 CLARIFIER REPAIR
MCB CAMP LEJEUNE
CONSTRUCTION CONTRACT NO. N40085-24-D-0011
GO
NZ
AL
EZ
B
LV
D
REASONER ST
CONNER ST
40' X 100' LAYDOWN YARD.
SURROUND WITH TEMPORARY
SEDIMENT FENCE.
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
G-002
GENERAL NOTES
60044652
GENERAL NOTES:
1. CONTRACTOR MUST HAVE A COMPLETE SET OF CONSTRUCTION DRAWINGS, SPECIFICATIONS,
ADDENDA AND APPROVED PERMITS ON THE JOB SITE AT ALL TIMES.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT
THE WORK.
3. CONTRACTOR MUST MAKE EVERY EFFORT TO SAVE PROPERTY IRONS, MONUMENTS, OTHER
PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. PROPERTY IRONS,
MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DESTROYED BY THE CONTRACTOR
MUST BE REPLACED BY A NORTH CAROLINA LICENSED LAND SURVEYOR AT THE CONTRACTOR'S
EXPENSE.
4. CONTRACTOR MUST PROVIDE MEASURES AS NECESSARY DURING CONSTRUCTION FOR EROSION
& SEDIMENTATION CONTROL, PER THE NCDEQ EROSION & SEDIMENTATION CONTROL PLANNING
AND DESIGN MANUAL.
5. CONTRACTOR MUST PROTECT EXISTING STRUCTURES, UTILITIES AND ALL OTHER PROPERTY
UNLESS THEY ARE TO BE DEMOLISHED. ANY PROPERTY NOT AUTHORIZED FOR REMOVAL, BUT
DAMAGED BY THE CONTRACTOR MUST BE RESTORED OR REPLACED BY THE CONTRACTOR TO THE
APPROVAL OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. UTILITY LOCATIONS:
THE UNDERGROUND UTILITIES SHOWN ARE BASED ON UTILITIES LOCATED FROM FIELD SURVEY
INFORMATION. ALL EX. UTILITIES MAY NOT BE SHOWN ON THE DRAWINGS AND LOCATION OF EX.
UTILITIES (VERTICALLY AND HORIZONTALLY) ARE SHOWN IN APPROXIMATE MANNER ONLY. THE CONTRACTOR MUST VERIFY LOCATION AND ELEVATION OF EX. UTILITIES BEFORE CONSTRUCTION BEGINS AND COORDINATE CHANGES TO UTILITIES, IF NEEDED, WITH THE CONTRACTING OFFICER.
7. EXISTING UTILITIES MAY NOT BE INTERRUPTED WITHOUT APPROVAL OF THE CONTRACTING
OFFICER. IF INTERRUPTION OF UTILITIES IS APPROVED, CONTRACTOR MUST PROVIDE TEMPORARY
UTILITIES SERVICES. CONTRACTOR MUST PROVIDE A PLAN FOR DEMOLITION, NEW WORK, AND
TIE-INS FOR UTILITIES. PLAN MUST LIST POINTS OF CONTACT AND INCLUDE SEQUENCE OF
CONSTRUCTION.
8. CONTRACTOR MUST BE RESPONSIBLE FOR RELOCATION OF EXISTING UTILITIES REQUIRED DURING INSTALLATION OF NEW WORK. NO ADDITIONAL PAYMENT WILL BE MADE FOR THE RELOCATION OF EXISTING UTILITIES. CONTRACTOR MUST BEAR ALL COST ASSOCIATED WITH UTILITY RELOCATION.
9. ALL PAVEMENT DAMAGED DURING CONSTRUCTION, INCLUDING GOUGES, MUST BE REPAIRED TO
THE APPROVAL OF THE CONTRACTING OFFICER. NO ADDITIONAL PAYMENT WILL BE MADE FOR
PAVEMENT REPAIR. CONTRACTOR MUST BEAR ALL COST ASSOCIATED WITH PAVEMENT REPAIR.
10. CONTRACTOR MUST REMOVE AND LEGALLY DISPOSE OF ALL CONSTRUCTION WASTE AND EXCESS
SOILS OFF OF GOVERNMENT PROPERTY IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REQUIREMENTS.
11. BURNING ON-BASE IS NOT PERMITTED AT ANY TIME.
12. CONTRACTOR MUST REPAIR ANY DAMAGE DONE TO EXISTING FACILITIES LOCATED OUTSIDE THE
LIMITS OF WORK DUE TO CONSTRUCTION ACTIVITIES. CONTRACTOR MUST REPAIR ALL SITE
ELEMENTS TO EXISTING OR BETTER CONDITIONS IF DISTURBED DURING CONSTRUCTION.
13. CONTRACTOR MUST OBTAIN ALL REQUIRED PERMITS AND APPROVALS PRIOR TO BEGINNING
CONSTRUCTION.
14. CONTRACTOR MUST MINIMIZE DUST BY USE OF WET METHODS OR OTHER APPROVED METHOD.
15. ALL DEBRIS HAULING TRUCKS MUST FULLY COVER LOADS WHEN HAULING MATERIALS FROM THE
SITE.
16. CONTRACTOR MUST COORDINATE AND ESTABLISH A LAYDOWN AREA WITH THE CONTRACTING
OFFICER. CONTRACTOR MUST SUBMIT A REQUEST AND OBTAIN APPROVAL FOR LAYDOWN AREA A
MINIMUM OF TWO WEEKS PRIOR TO BEGINNING OF CONSTRUCTION.
17. EXCAVATION AND CONSTRUCTION MUST PROCEED IN ACCORDANCE WITH LATEST OSHA
REGULATIONS.
18. ACCESS TO THE CONSTRUCTION SITES AND LAYDOWN AREA MUST BE ONLY AS DIRECTED BY THE
CONTRACTING OFFICER. THE CONTRACTOR MUST NOT USE ANY ROADS, GROUNDS AND OTHER
FACILITIES WHICH HAVE NOT BEEN SPECIFICALLY AUTHORIZED FOR USE. CONTRACTOR MUST
COORDINATE ACCESS VIA GATES WITH CONTRACTING OFFICER.
19. ROADS AND ACCESS ROUTES USED BY THE CONTRACTOR DURING THE PERFORMANCE OF THE
WORK MUST BE MAINTAINED IN GOOD CONDITION AT ALL TIMES. ALL ROADS AND ACCESS ROADS MUST BE LEFT IN A CONDITION SATISFACTORY TO THE CONTRACTING OFFICER, INCLUDING UPON
COMPLETION OF THE WORK.
Christopher Maas 29-Jul-2026
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
VF101
EXISTING CONDITIONS
60044653
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF001 FOR SURVEY NOTES & LEGEND
A1 SCALE 1" = 40'
EXISTING CONDITIONS
PLAN
NORTH
40' 80'0
GRAPHIC SCALE(S)
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
VF201
EXISTING SECONDARY CLARIFIER PLAN
60044654
GENERAL SHEET NOTES
1. EXISTING CONDITIONS ARE BASED ON RECORD DRAWINGS FROM BASEWIDE
TREATMENT PLANT UPGRADE PHASES II AND III - JAN 1997.
A1 SCALE 1/8" = 1'
EXISTING SECONDARY CLARIFIER PLAN
PLAN
NORTH
GRAPHIC SCALE(S)
8'0' 16'
SCALE: 1/8" = 1' - 0"
4'
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
VF202
EXISTING SECONDARY CLARIFIER
SECTIONS
60044655
A1 SCALE 1/4" = 1'
EXISTING SECONDARY CLARIFIER SECTIONS
GRAPHIC SCALE(S)
GENERAL SHEET NOTES
1. EXISTING CONDITIONS ARE BASED ON RECORD DRAWINGS FROM
BASEWIDE TREATMENT PLANT UPGRADE PHASES II AND III - JAN
1997.
4'0' 8'
SCALE: 1/4" = 1' - 0"
2'
CIVIL LEGEND:
LIMITS OF DISTURBANCE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT FENCE
DEMOLISH
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
C-001
CIVIL NOTES & LEGEND
60044656
CONTRACTOR LAYDOWN AREA NOTES:
1. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION AT ALL TIMES.
2. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ON SITE TO RECEIVE AND DIRECT PLACEMENT
OF DELIVERED MATERIALS AND SUPPLIES.
3. ACCESS TO THE CONTRACTOR'S ON-SITE STAGING AREA IS LIMITED TO NORMAL WORK HOURS : 7 A.M. TO 4:30 P.M (SUBJECT TO CHANGE), MONDAY THROUGH FRIDAY, EXCLUDING HOLIDAYS UNLESS APPROVED BY
CONTRACTING OFFICER.
4. THE CONTRACTOR MUST REMOVE AND DISPOSE OF ALL DEBRIS, EXCESS SOIL AND MATERIAL, AND CONSTRUCTION DERIVED WASTES IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, LOCAL AND MCAS
CHERRY POINT REGULATIONS AND REQUIREMENTS.
5. CONTRACTOR MUST RESTORE ANY AREA DAMAGED BY THE CONTRACTOR'S CONSTRUCTION OPERATIONS AND ACTIVITIES. AREAS INCLUDE BUT ARE NOT LIMITED TO CONTRACTOR LAYDOWN AREA, BATCH PLANT
SITE, AND ROADS USED TO ACCESS PROJECT SITES. CONTRACTOR MUST DOCUMENT EXISTING
CONDITIONS OF ALL AREAS PRIOR TO CONSTRUCTION AND ENSURE THAT CONDITION OF AREAS AFTER CONSTRUCTION IS EQUAL TO OR BETTER THAN THE PRE-CONSTRUCTION CONDITION. FINAL RESTORATION
ACCEPTANCE WILL BE BY, OR AT THE DIRECTION OF, THE CONTRACTING OFFICER.
6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING UTILITIES, AS NEEDED, FOR THE CONTRACTOR'S WORK AND THE OPERATION OF THE BATCH PLANT. SEE SPECIFICATION SECTION 01 50 00
"TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS".
7. CONCRETE WASHOUT IS ONLY ALLOWED WITHIN THE CONTRACTOR'S STAGING AREA OR BATCH PLANT AREA. CONCRETE WASHOUT MUST BE PERFORMED IN ACCORDANCE WITH THE DETAIL ON SHEET C-502
AND WITH NCDEQ REQUIREMENTS.
8. INTERIOR OF CONCRETE HAULING TRUCKS MUST BE WASHED OUT BETWEEN LOADS.
EROSION AND SEDIMENT CONTROL NOTES::
1. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY AND WITHIN 24 HRS OF A 1-INCH RAIN EVENT. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS REQUIRED TO BE ON SITE.
ADDITIONALLY, THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING “SELF INSPECTIONS” INDICATING THE DATE BMPS ARE INSTALLED AND STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED. BOTH INSPECTIONS ARE RECORDED ON THE SAME REPORT FORM AND MUST BE MAINTAINED
BY THE CONTRACTOR AT THE ONSITE OFFICE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED
INSPECTION RECORDS ARE TO BE FORWARDED TO EAD AND ALL TEMPORARY
EROSION/SEDIMENTATION CONTROL DEVICES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION (ES) CONTROL PLAN, ES
LETTER OF APPROVAL, NPDES CONSTRUCTION PERMIT, AND NPDES CERTIFICATE OF COVERAGE
WILL BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. IF SOIL IS REMOVED FROM OR
BROUGHT ONSITE, THE APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE DISCLOSED.
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCG01 CONSTRUCTION GENERAL PERMIT
IMPLEMENTING THE DETAILS AND SPECIFICATIONS ON THIS PLAN SHEET WILL RESULT IN
THE CONSTRUCTION ACTIVITY BEING CONSIDERED COMPLIANT WITH THE GROUND
STABILIZATION AND MATERIALS HANDLING SECTIONS OF THE NCG01 CONSTRUCTION
GENERAL PERMIT (SECTIONS E AND F, RESPECTIVELY). THE PERMITTEE SHALL COMPLY
WITH THE EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE DELEGATED
AUTHORITY HAVING JURISDICTION. ALL DETAILS AND SPECIFICATIONS SHOWN ON THIS
SHEET MAY NOT APPLY DEPENDING ON SITE CONDITIONS AND THE DELEGATED AUTHORITY
HAVING JURISDICTION.
GROUND STABILIZATION SPECIFICATION
STABILIZE THE GROUND SUFFICIENTLY SO THAT RAIN WILL NOT DISLODGE THE SOIL. USE
ONE OF THE TECHNIQUES IN THE TABLE BELOW:
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Site Area Description Timeframe variations Stabilize within this many calendar days after ceasing land disturbance
Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved.
-7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope
(a) Perimeter dikes, swales, ditches, and perimeter slopes
(b) High Quality Water (HQW) Zones
If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed
(d) Slopes 3:1 to 4:1
(e) Areas with slopes flatter than 4:1 14
-7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed
(c) Slopes steeper than 3:1
LOD LOD
SF
LOD
LO
D
LO
D LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CD101
DEMOLITION PLAN
60044657
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. REFER TO ELECTRICAL PLANS FOR LOCATIONS OF SIDEWALK DEMOLITION.
SIDEWALK SHALL BE SAWCUT AT THE NEAREST JOINTS AND REPLACED AS A
FULL SLAB.
A1 SCALE 1" = 20'
DEMOLITION PLAN
PLAN
NORTH
CONSTRUCTION KEYNOTES#
20' 40'0
GRAPHIC SCALE(S)
1. LIMITS OF DISTURBANCE1
EFFLUENT LAUNDER
30" EFFLUENT PIPE
STAIR
ROTATING SCUM PIPE
W/ACTUATOR
TRUSS TYPE
WALKWAY
INFLUENT FEED WELL
DRIVE UNIT AND
CONTROL PANEL
SCUM BAFFLE
Ø115'-0" TANK DIAMETER
TRUSS ARM W/SLUDGE
SUCTION HEADER AND SCUM
SKIMMER ARM
TRUSS ARM W/SLUDGE
SUCTION HEADER AND SCUM
SKIMMER ARM
12" 90° BENDS
SEAL
STEEL HANDRAIL &
TOEBOARD
CD
CD202
CD
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CD201
SECONDARY CLARIFIER DEMOLITION
PLAN
60044658
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. CONTRACTOR TO CHIP OUT SHAPING GROUT IN FLOOR TO PREP FOR
INSTALLATION OF NEW GROUT.
SCALE 3/16" = 1'-0"
SECONDARY CLARIFIER DEMOLITION PLAN
PLAN
NORTH
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
SCALE: 3/16" = 1' - 0"
0' 4' 8' 12'
DEMOLISH
SHEET LEGEND
1 DEMOLISH TRUSS ARM, INFLUENT FEED WELL, SLUDGE SUCTION HEADER,
SKIMMER ARM, RAKE AND SCRAPER ARM SYSTEM TYP.
DEMOLISH DRIVE UNIT AND CONTROL PANEL.
DEMOLISH INFLUENT WELL.
DEMOLISH, TRUSS TYPE WALK, STEEL HANDRAIL, AND TOEBOARD.
DEMOLISH SCUM COLLECTION SYSTEM, SCUM BOX, SCUM PIPE
SEAL, ROTATING SCUM PIPE AND ACTUATOR.
DEMOLISH (2) 12" 90° BENDS.
EXISTING 12" SCUM PIPE TO BE PLUGGED W/ NON-SHRINK GROUT
REMOVE AND REINSTALL STAIRS
9 DEMOLISH SCUM BAFFLE AND SUPPORTS.
MOTORIZED OPERATOR
FOR SCUM PIPE TRUSS TYPE
WALKWAY
12" ROTATING
SCUM PIPE
2" GROUT
SEAL
SUCTION PIPE
INFLUENT
FEED WELL
CLARIFIER DRIVE
MECHANISM ay 17.84LATE
SKIMMER BLADES (TYPICAL OF 2)
SUCTION PIPE
TOP OF WALL
EL 35.84
WEIR PLATE
BAFFLE PLATE
TOP OF FOOTING
EL 17.84
30" DIP INFLUENT PIPE
W/COLLAR @ CENTER PIER
16" DIP SLUDGE DRAW OFF PIPE
SLOPE FLOOR @ 1/4 " PER FOOT
12" 90° BENDS
12" SCUM PIPE
STEEL HANDRAIL &
TOEBOARD
12" DIP TO PRIMARY
SCUM PUMP STATION
12" 90° BENDS
STAIRS 10" TREADS, 7"
RISERS AS REQUIRED
12" DIP WALL PIPE
TRUSS TYPE
WALKWAY
INV EL 31.54
2'-6"
3'- 6"
2'- 31 2"
1'-912"
12" ROTATING
SCUM PIPE
SUCTION
PIPE
TRUSS ARM, SLUDGE
SUCTION HEADER, SCUM
SKIMMER ARM, RAKE AND
SCRAPER ARM SYSTEM TYP.
TOP OF WALL
EL 35.84
WEIR PLATE
BAFFLE PLATE
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CD202
SECONDARY CLARIFIER DEMOLITION
SECTION
60044659
GENERAL SHEET NOTES
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
DEMOLISH
SHEET LEGEND
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. CONTRACTOR TO CHIP OUT SHAPING GROUT IN FLOOR TO PREP FOR
INSTALLATION OF NEW GROUT.
1 DEMOLISH TRUSS ARM, INFLUENT FEED WELL, SLUDGE SUCTION HEADER,
SKIMMER ARM, RAKE AND SCRAPER ARM SYSTEM TYP.
DEMOLISH DRIVE UNIT AND CONTROL PANEL.
DEMOLISH INFLUENT WELL.
DEMOLISH, TRUSS TYPE WALK, STEEL HANDRAIL, AND TOEBOARD.
DEMOLISH SCUM COLLECTION SYSTEM, SCUM BOX, SCUM PIPE
SEAL, ROTATING SCUM PIPE AND ACTUATOR.
DEMOLISH (2) 12" 90° BENDS.
EXISTING 12" SCUM PIPE TO BE PLUGGED W/ NON-SHRINK GROUT
REMOVE AND REINSTALL STAIRS
9 REPLACE EXISTING GALVANIZED FASTENERS WITH STAINLESS
STEEL FASTENERS.
1 SCALE 3/16" = 1'-0"
SECONDARY CLARIFIER DEMOLITION SECTION
SCALE: 1" = 1'-0"
WEIR PLATE AND SCUM BAFFLE DETAIL2
SCALE: 1/4" =1'-0"
SCUM PIPE DETAIL3
4'0' 8'
SCALE: 1/4" = 1' - 0"
2'
SCALE: 3/16" = 1' - 0"
0' 4' 8' 12'
10 DEMOLISH SCUM BAFFLE AND SUPPORTS.
1'0' 2'
SCALE: 1" = 1' - 0"
6"
31-1/2" DIA. CENTER PIER
SEAL
CAGE
MANIFOLD MIN.1/4" THK.
1/4" 12"
16" RETURN SLUDGE LINE
30" DIA. INFLUENT LINE
2'-612" DIA. MAX.
0'- 2"
G
RO
UT CONCRETE BASE
ELEV.=16.89'
TOP OF GROUT
AT SIDEWALL
ELEV.=18.01'
7'- 3"
D
IA
CO
NC
RE
TE
B
AS
E
6'- 03 4" D
IA
. B
.C
BO
TT
OM
S
EA
L R
IN
G
3'- 21 2" B
OL
T
CI
RC
LE
CE
NT
ER
P
IE
R
25°
30°
.46
'16
℄16" RAS LINE
30" INFLUENTBOTTOM SEAL RING
℄ BRIDGE
R2'-114" 1'-0"
OPEN
A
B
CENTER PIER
UPPER SEAL
(APPROX. 17' LONG)
T-BOLT CLAMP
MANIFOLD2"
1 2"±
7'-3" DIA. CONCRETE BASE
6'-0 3/4" DIA. B.C.
3'-2 1/2" DIA. B.C.
31 12" DIA. CENTER PIER
CENTER PIER
2"
GR
OU
T
9"
LEVELING GROUT
BOTTOM
SEAL RING
LOWER SEAL -
APPROX. 22' LONG
MANIFOLD
SHAPING
GROUT
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CD203
SECONDARY CLARIFIER CENTER PIER
DEMOLITION PLAN AND DETAILS
60044660
GENERAL SHEET NOTES
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
DEMOLISH
SHEET LEGEND
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. CONTRACTOR TO CHIP OUT SHAPING GROUT IN FLOOR TO PREP FOR
INSTALLATION OF NEW GROUT.
1 DEMOLISH INFLUENT WELL, CENTER PIER, BOTTOM SEAL RING, FASTENERS,
AND LEVELING GROUT.1 SCALE 3/4" = 1'-0"
SECONDARY CLARIFIER CENTER PIER DEMOLITION PLAN AND DETAILS
SCALE: 3/4" = 1' - 0"
0' 1' 2' 3'
SCALE: 3/4" = 1'-0"
WEIR PLATE DETAIL2
SCALE: NOT TO SCALE
ENLARGEMENTB
SCALE: NOT TO SCALE
ENLARGEMENTA
D
LO
D LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CS101
SITE PLAN
60044661
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. SEE ELECTRICAL DRAWINGS FOR LOCATIONS OF NEW ELECTRICAL CONDUIT
STRUCTURES
5. CONTRACTOR MUST SOD ALL DISTURBED AREAS WITHIN THE PROJECT LIMITS.
SEE DETAIL A4/C-502 FOR SOD SCHEDULE.
6. REFER TO ELECTRICAL PLANS FOR LOCATIONS OF SIDEWALK REPLACEMENT.
SEE DETAIL C3/C-502.
A1 SCALE 1" = 20'
SITE PLAN
PLAN
NORTH
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
20' 40'0
1. LIMITS OF DISTURBANCE
2. ALL WATER DEWATERED FROM THE CLARIFIER SHOULD BE DISCHARGED INTO
THE SCUM PIT. THIS INCLUDES STORMWATER AND BIOSOLIDS.
D
LO
D LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
SFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF
GENERAL NOTES
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. LIMITS OF DISTURBANCE = 0.99 AC
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CG101
GRADING & EROSION CONTROL PLAN
60044662
GENERAL SHEET NOTES
A1 SCALE 1" = 20'
GRADING & EROSION CONTROL PLAN
PLAN
NORTH
CONSTRUCTION KEYNOTES#
20' 40'0
GRAPHIC SCALE(S)
1. LIMITS OF DISTURBANCE
2. PROVIDE TEMPORARY CONSTRUCTION ENTRANCE. SEE SHEET A1/C-501.
3. PROVIDE TEMPORARY SEDIMENT FENCE. SEE SHEET C1/C-501.
4. PROVIDE TEMPORARY DROP INLET PROTECTION XX/C-50X
#1
#2
#3
EFFLUENT LAUNDER
30" EFFLUENT PIPE
Ø115'-0" TANK DIAMETER
CU
CU102
CU
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CU101
SECONDARY CLARIFIER PLAN
60044663
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. SEE SPECIFICATION 464321 FOR CLARIFIER INSTALLATION REQUIREMENTS.
5. FOLLOWING REPLACEMENT OF WEIR PLATE FASTENERS, THE CONTRACTOR
SHALL MAKE ADJUSTMENTS AS NECESSARY TO PLUMB THE ELEVATION AND
DEPTH OF FLOW OVER THE WEIRS.
6. SEE SPECIFICATION 096600 FOR HIGH PERFORMANCE COATING REQUIREMENTS.
A1 SCALE 3/16" = 1'-0"
SECONDARY CLARIFIER PLAN
PLAN
NORTH
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
SCALE: 3/16" = 1' - 0"
0' 4' 8' 12'
1 PROVIDE TOW-BRO CIRCULAR CLARIFIER WITH SLUDGE SUCTION MANIFOLD
AND SCUM SKIMMER ASSEMBLIES.
2 PROVIDE CENTER DRIVE CAGE.
3 PROVIDE CENTER INFLUENT COLUMN.
4 PROVIDE DRIVE UNIT.
5 PROVIDE DRIVE UNIT CONTROL PANEL.
6 PROVIDE ACCESS BRIDGE, STAIRS, WITH HANDRAIL AND TOEBOARD.
7 PROVIDE FRP SCUM BAFFLE AND 316 STAINLESS STEEL SUPPORTS WITH
FASTENERS.
8 PROVIDE SCUM TROUGH WITH FLUSHING DEVICE.
9 PROVIDE WATERTIGHT CONNECTION.
10 PROVIDE WEIR PLATE REPLACE FASTENERS WITH 316 STAINLESS STEEL.
11 PROVIDE 6" SCUM LINE AND APPURTENANCES TO TIE-IN TO EXISTING 12"
SCUM LINE, 6" 90° BENDS, 6"X12" INCREASER, AND 12" 90° BEND (M.J. FITTINGS).
CONTRACTOR TO FIELD ADJUST PIPING AS REQUIRED TO ENSURE PROPER
DRAINAGE.
TOP OF WALL
EL 35.84
WEIR PLATE
TOP OF FOOTING
EL 17.84
30" DIP INFLUENT PIPE
W/COLLAR @ CENTER PIER
16" DIP SLUDGE DRAW OFF PIPE
SLOPE FLOOR @ 1/4 " PER FOOT
12" DIP TO PRIMARY
SCUM PUMP STATION
12" DIP WALL PIPE
INV EL 31.54
2'-6"
3'- 6"
2'- 31 2"
TOP OF WALL
EL 35.84
WEIR PLATE
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CU102
SECONDARY CLARIFIER SECTION
60044664
GENERAL SHEET NOTES
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. SEE SPECIFICATION 464321 FOR CLARIFIER INSTALLATION REQUIREMENTS.
5. FOLLOWING REPLACEMENT OF WEIR PLATE FASTENERS, THE CONTRACTOR
SHALL MAKE ADJUSTMENTS AS NECESSARY TO PLUMB THE ELEVATION AND
DEPTH OF FLOW OVER THE WEIRS.
6. SEE SPECIFICATION 096600 FOR HIGH PERFORMANCE COATING REQUIREMENTS.
1 SCALE 3/16" = 1'-0"
SECONDARY CLARIFIER SECTION
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
4'0' 8'
SCALE: 1/4" = 1' - 0"
2'
SCALE: 3/16" = 1' - 0"
0' 4' 8' 12'
SCALE: 1/4" =1'-0"
SCUM PIPE DETAIL3
1 PROVIDE TOW-BRO CIRCULAR CLARIFIER WITH SLUDGE SUCTION MANIFOLD
AND SCUM SKIMMER ASSEMBLIES.
2 PROVIDE CENTER DRIVE CAGE.
3 PROVIDE CENTER INFLUENT COLUMN.
4 PROVIDE DRIVE UNIT.
5 PROVIDE DRIVE UNIT CONTROL PANEL.
6 PROVIDE ACCESS BRIDGE, STAIRS, WITH HANDRAIL AND TOEBOARD.
7 PROVIDE SCUM BAFFLE WITH 316 STAINLESS STEEL FASTENERS.
8 PROVIDE SCUM TROUGH WITH FLUSHING DEVICE.
9 PROVIDE WATERTIGHT CONNECTION.
10 PROVIDE WEIR PLATE FASTENERS WITH 316 STAINLESS STEEL.
11 PROVIDE 6" SCUM LINE AND APPURTENANCES TO TIE-IN TO EXISTING 12"
SCUM LINE, 6" 90° BENDS, 6"X12" INCREASER, AND 12" 90° BEND (M.J. FITTINGS).
CONTRACTOR TO FIELD ADJUST PIPING AS REQUIRED TO ENSURE PROPER
DRAINAGE.
SCALE: 1" = 1'-0"
WEIR PLATE AND SCUM BAFFLE DETAIL2
1'0' 2'
SCALE: 1" = 1' - 0"
6"
12 PROVIDE FRP SCUM BAFFLE AND 316 STAINLESS STEEL SUPPORTS WITH
FASTENERS.
1/4" 12"
16" RETURN SLUDGE LINE
30" DIA. INFLUENT LINE
2'-612" DIA. MAX.
CONCRETE BASE
ELEV.=16.89'
.46
'16
℄16" RAS LINE
30" INFLUENT
A
B
31-1/2" DIA. CENTER PIER
SEAL
CAGE
MANIFOLD MIN.1/4" THK.
0'- 2"
G
RO
UTTOP OF GROUT
AT SIDEWALL
ELEV.=18.01'
7'- 3"
D
IA
CO
NC
RE
TE
B
AS
E
6'- 03 4" D
IA
. B
.C
BO
TT
OM
S
EA
L R
IN
G
3'- 21 2" B
OL
T
CI
RC
LE
CE
NT
ER
P
IE
R
25°
30°
BOTTOM SEAL RING
℄ BRIDGE
R2'-114" 1'-0"
OPEN
CENTER PIER
UPPER SEAL
(APPROX. 17' LONG)
T-BOLT CLAMP
MANIFOLD2"
1 2"±
7'-3" DIA. CONCRETE BASE
6'-0 3/4" DIA. B.C.
3'-2 1/2" DIA. B.C.
31 12" DIA. CENTER PIER
CENTER PIER
2"
GR
OU
T
9"
LEVELING GROUT
BOTTOM
SEAL RING
LOWER SEAL -
APPROX. 22' LONG
MANIFOLD
SHAPING
GROUT
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
CU103
SECONDARY CLARIFIER CENTER PIER
PLAN AND DETAILS
60044665
GENERAL SHEET NOTES
CONSTRUCTION KEYNOTES#
GRAPHIC SCALE(S)
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL NOTES
2. SEE SHEET VF101 FOR SURVEY NOTES & LEGEND
3. SEE SHEET C-001 FOR CIVIL NOTES & LEGEND
4. CONTRACTOR TO CHIP OUT SHAPING GROUT IN FLOOR TO PREP FOR
INSTALLATION OF NEW GROUT.
1 PROVIDE INFLUENT WELL, CENTER PIER, BOTTOM SEAL RING, FASTENERS,
AND LEVELING GROUT PER MANUFACTURERS RECOMMENDATIONS.1 SCALE 3/4" = 1'-0"
SECONDARY CLARIFIER CENTER PIER PLAN AND DETAILS
SCALE: 3/4" = 1' - 0"
0' 1' 2' 3'
SCALE: 3/4" = 1'-0"
WEIR PLATE DETAIL2
SCALE: NOT TO SCALE
ENLARGEMENTB
SCALE: NOT TO SCALE
ENLARGEMENTA
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
XX-XXXX
XXXXX
PREFINAL DESIGN - NOT
FOR CONSTRUCTION
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
C-501
CIVIL DETAILS
60044666
CONSTRUCTION:
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND
OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT.
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON
THE PLANS, AND SMOOTH IT.
3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER
SUITABLE OUTLET.
4. USE GEOTEXTILE FABRICS IN ORDER TO IMPROVE STABILITY OF THE
FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE.
MAINTENANCE:
1. INSPECT ALL MEASURES AT
LEAST WEEKLY AND AFTER
EACH RAINFALL OF 1.0 INCH
OR GREATER. MAKE ANY
REQUIRED REPAIRS
IMMEDIATELY.
2. MAINTAIN THE GRAVEL PAD
IN A CONDITION TO
PREVENT MUD OR
SEDIMENT FROM LEAVING
THE CONSTRUCTION SITE.
THIS MAY REQUIRE
PERIODIC TOPDRESSING
WITH 2-INCH STONE.
3. SEDIMENT ON ROADWAYS
IS TO BE REMOVED
IMMEDIATELY BY BROOM
AND SHOVEL, EITHER BY
MANUAL OR MECHANICAL
MEANS, AND NOT TO BE
WASHED OFF WHERE IT
HAS THE POTENTIAL TO
ENTER A STREAM,
DRAINAGE WAY OR STORM
DRAIN SYSTEM.
2-3" COURSE AGGREGATE
6" MIN.
AS R
EQUIR
ED
' M
IN
50' MIN.
IF 50' CANNOT BE REACHED, A LENGTH
SUFFICIENT ENOUGH TO RETAIN SEDIMENT ON
SITE AND OFF ROADWAYS.
GEOTEXTILE FABRIC
TO BE USED IN LOCATIONS SUBJECT TO
SEEPAGE OR HIGH WATER TABLE.
NOTES:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND. (HIGHER FENCES MAY
IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE)
3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS
ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT
POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. WIRE MESH SHOULD BE A MINIMUM 14-GAUGE WITH 6 INCH MESH SPACING.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FOOT POST SPACING DOES NOT REQUIRE A WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM OF 50 POUND TENSILE
STRENGTH.
7. EXCAVATE THE TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF THE POSTS AND
UPSLOPE FROM THE BARRIER.
8. PLACE 12 INCHES OF FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS
CRITICAL TO SILT FENCE PERFORMANCE.
10.DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
11.DO NOT PLACE ACROSS DITCHES, STREAMS, OR ANY OTHER AREAS OF CONCENTRATED FLOW.
MAINTENANCE:
1. INSPECT ALL MEASURES AT LEAST WEEKLY AND AFTER EACH
RAINFALL OF 1.0 INCH OR GREATER. MAKE ANY REQUIRED
REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR,
DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT
PROMPTLY.
3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE
ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND
REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID
UNDERMINING THE FENCE DURING CLEANOUTS.
4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT
DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT
AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN
PROPERLY STABILIZED.
STEEL POST
8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE
6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE
18-24"
8" DOWN & 4"
FORWARD
ALONG THE
TRENCH
24"
WIRE FENCE
FILTER FABRIC
PLASTIC OR
WIRE TIES 24"
8" MIN.
4" MIN.
BACKFILL TRENCH
AND COMPACT
THOROUGHLY
UPSLOPE
WIRE FENCE FILTER
FABRIC
STEEL POST
PLASTIC OR
WIRE
CROSS SECTION VIEW
SEDIMENT FENCE MAXIMUMS
SLOPE SLOPE LEN.(FT) AREA (SF)
<2% 100 10,000 2 to 5% 75 7,500
5 to 10% 50 5,000 10 to 20% 25 2,500
>20% 15 1,500
CONSTRUCTION SEQUENCE NOTES:
1. NO LAND DISTURBING ACTIVITIES SHALL TAKE PLACE OUTSIDE OF PROJECT
LIMITS.
2. NO DEMOLITION, CONSTRUCTION, OR LAND DISTURBANCE ACTIVITIES SHALL
BEGIN UNTIL ALL APPLICABLE EROSION AND SEDIMENT CONTROL
MEASURES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN ON THE
CONTRACT DRAWINGS. IF CLEARING IS REQUIRED FOR INSTALLATION OF A
GIVEN MEASURE, ALL OTHER MEASURES SHALL BE INSTALLED FIRST. THE
NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION
OF THE GIVEN MEASURE MAY THEN PROCEED.
3. UTILITIES SHOWN IN APPROXIMATE MANNER ONLY. CONTRACTOR SHALL
VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO
DEMOLITION, CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES BEGIN.
4. INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, GRAVEL SILT FENCE
OUTLETS, INLET PROTECTION AND WATTLES IN LOCATIONS SHOWN ON
PLANS. CONTRACTOR SHALL COORDINATE LOCATION OF CONSTRUCTION
ENTRANCES WITH CONTRACTING OFFICER.
5. PROVIDE TEMPORARY SEEDING TO ALL DENUDED AREAS AFTER CLEARING
OPERATIONS WITHIN 7 CALENDAR DAYS. PROVIDE PERMANENT
GROUNDCOVER WITHIN THE SHORTER OF 15 WORKING DAYS OR 60
CALENDAR DAYS OF ESTABLISHING FINAL GRADES.
6. PERMANENT EROSION CONTROL DEVICES SHALL BE INSTALLED WITH
PERMANENT DRAINAGE FEATURES.
7. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED ONCE
CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED.
8. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL DEVICES
AND STORM WATER OUTFALLS BE INSPECTED WEEKLY (EVERY 7 CALENDAR
DAYS) AND WITHIN 24 HRS OF A .5 INCH RAIN EVENT. IT WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS
AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENT BY 95%
VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING. TO FACILITATE
RAINFALL MONITORING A RAIN GAUGE IS REQUIRED TO BE ON SITE.
ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING “SELF
INSPECTIONS” INDICATING THE DATE BMPS ARE INSTALLED AND
STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED.
THE “SELF INSPECTION” REPORTS WILL BE MAINTAINED ALONG WITH THE
“NPDES” INSPECTION REPORTS. ONCE STABILIZATION HAS BEEN
ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO EAD
AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES
REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE
APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION
AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES
CONSTRUCTION PERMIT WILL BE MAINTAINED BY THE CONTRACTOR AT THE
ONSITE OFFICE. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE, THE
APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE
DISCLOSED.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF
SEDIMENT ON-SITE. IF THE APPROVED EROSION AND SEDIMENTATION
CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE
THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING
THE SITE.
10. ANY BORROW MATERIAL BROUGHT ONTO THIS SITE SHALL BE FROM A
LEGALLY OPERATED MINE OR OTHER APPROVED SOURCE. A SINGLE USE
BORROW SITE OR AN AREA TO WASTE MATERIAL IS ONLY PERMISSIBLE IF IT
IS OPERATED UNDER THE TOTAL CONTROL OF THE FINANCIALLY
RESPONSIBLE PERSON OR FIRM WHO IS DEVELOPING THIS SITE AND HAS
BEEN SEPARATELY PERMITTED AND INCORPORATED AS PART OF THIS PLAN
MEETING ALL THE REQUIREMENTS OF NC GENERAL STATUTE 74-49(7)f.
11. THE CONTRACTOR SHALL COORDINATE LOCATION OF TEMPORARY
STOCKPILE AREAS WITH THE CONTRACTING OFFICER. IMPACT OF
TEMPORARY STORAGE OF EXCAVATED SOILS SHALL BE MINIMIZED.
EXCAVATED SOILS SHALL NOT BE STORED WITHOUT PERMISSION OF THE
CONTRACTING OFFICER. STOCKPILE AREAS SHALL BE DELINEATED WITH
SILT FENCE AND PROVIDED TEMPORARY SEED.
12. PURSUANT TO NC GENERAL STATUTE 113A-54.1(e), THE CONTRACTOR SHALL
CONDUCT 'SELF-INSPECTIONS' OF EROSION CONTROL DEVICES AT
COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH
INSPECTIONS AS OUTLINED IN 5A NCAC 04B .0131.
13. CONTRACTOR SHALL MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS.
ANY CHANGES SHALL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A
COPY OF ALL PERMITS SHALL BE MAINTAINED BY THE CONTRACTOR ON-SITE
AT ALL TIMES.
14. CONTRACTOR RESPONSIBLE FOR REMOVAL OF TEMPORARY EROSION
CONTROL DEVICES ONCE PERMANENT GROUND COVER HAS BEEN
ESTABLISHED AND APPROVED.
C1 NTS
CONSTRUCTION SEQUENCE NOTES
C1 NTS
TEMPORARY SEDIMENT FENCE
A1 NTS
CONSTRUCTION ENTRANCE
A3 NTS
BLOCK AND GRAVEL INLET PROTECTION (TEMPORARY)
2:1 SLOPE GRAVEL FILTER
CONCRETE BLOCKSDEWATERING
1' MIN.
2' MAX.
TEMPORARY SEDIMENT POOL WIRE SCREEN DEWATERING
DROP INLET
WITH GRATE
NOTES:
1. LAY ONE BLOCK, ON EACH SIDE OF THE STRUCTURE, ON ITS SIDE
IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE
FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW
THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF
BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL
SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS.
IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY
PLACING 2 INCH X 4 INCH WOOD STUDS THROUGH BLOCK
OPENINGS.
2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH
WITH 1/2-INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD
GRAVEL IN PLACE.
3. USE CLEAN GRAVEL 1/2 TO 3/4 INCH IN DIAMETER, PLACED 2
INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR
FLATTER AND SMOOTH IT TO AN EVEN GRADE. NCDOT #57 WASHED
STONE IS RECOMMENDED.
SEDIMENT
MAINTENANCE:
1. INSPECT ALL MEASURES AT LEAST WEEKLY AND AFTER EVERY
RAINFALL OF 1.0 INCH OR GREATER; REPAIR IMMEDIATELY.
2. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE
STORAGE VOLUME FOR SUBSEQUENT RAINS.
3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY
STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND
EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE
DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND
COMPACT BEFORE STABILIZING.
FINAL DESIGN
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
24-0045
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
JH
2610 Wycliff Road Suite 410 Raleigh, NC 27607-3073 919.881.9939 NC License No. F-0929
Dewberry Engineers Inc.
AA
MC
DR
C-502
CIVIL DETAILS
60044667
A
A
1:1
SIDE SLOPE
(TYP.)
10 MIL
PLASTIC
LINING
3'- 0"
M
IN
X' M
AX
SECTION A-A
PLAN
SECTION B-B
HIGH
COHESIVE &
LOW FILTRATION
SOIL BERM
8"
6"
2'
HIGH
COHESIVE &
LOW FILTRATION
SOIL BERM1:1 SIDE SLOPE
(TYP.)
10 MIL
PLASTIC LINING
B
B
3'- 0"
M
IN
X' M
AX
A
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
CONCRETE
WASHOUT
CONCRETE
WASHOUT
PLAN
CLEARLY MARKED SIGNAGE
NOTING DEVICE (18"X24" MIN.)
CLEARLY MARKED SIGNAGE
NOTING DEVICE (18"X24" MIN.)
SILT FENCE
' M
IN
10' MIN
BELOW GRADE
N.T.S
ABOVE GRADE
N.T.S
CONCRETE WASHOUT NOTES:
1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE.
2. DISPOSE OF, OR RECYCLE SETTLED, HARDENED CONCRETE RESIDUE IN ACCORDANCE WITH
LOCAL AND STATE SOLID WASTE REGULATIONS AND AT AN APPROVED FACILITY.
3. MANAGE WASHOUT FROM MORTAR MIXERS IN ACCORDANCE WITH THE ABOVE ITEM AND IN
ADDITION PLACE THE MIXER AND ASSOCIATED MATERIALS ON IMPERVIOUS BARRIER AND
WITHIN LOT PERIMETER SILT FENCE.
4. INSTALL TEMPORARY CONCRETE WASHOUTS PER LOCAL REQUIREMENTS, WHERE
APPLICABLE. IF AN ALTERNATE METHOD OR PRODUCT IS TO BE USED, CONTACT YOUR
APPROVAL AUTHORITY FOR REVIEW AND APPROVAL. IF LOCAL STANDARD DETAILS ARE NOT
AVAILABLE, USE ONE OF THE TWO TYPES OF TEMPORARY CONCRETE WASHOUTS PROVIDED
ON THIS DETAIL.
5. DO NOT USE CONCRETE WASHOUTS FOR DEWATERING. STORMWATER ACCUMULATED
WITHIN THE WASHOUT MAY NOT BE PUMPED INTO OR DISCHARGED TO THE STORM DRAIN
SYSTEM OR RECEIVING SURFACE WATERS. LIQUID WASTE MUST BE PUMPED OUT AND
REMOVED FROM PROJECT.
6. LOCATE WASHOUTS AT LEAST 50 FEET FROM STORM DRAIN INLETS AND SURFACE WATERS
UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. AT
A MINIMUM, INSTALL PROTECTION OF STORM DRAIN INLET(S) CLOSEST TO THE WASHOUT
WHICH COULD RECEIVE SPILLS OR OVERFLOW.
7. LOCATE WASHOUTS IN AN EASILY ACCESSIBLE AREA, ON LEVEL GROUND AND INSTALL A
STONE ENTRANCE PAD IN FRONT OF THE WASHOUT. ADDITIONAL CONTROLS MAY BE
REQUIRED BY THE APPROVING AUTHORITY.
8. INSTALL AT LEAST ONE SIGN DIRECTING CONCRETE TRUCKS TO THE WASHOUT WITHIN THE
PROJECT LIMITS. POST SIGNAGE ON THE WASHOUT ITSELF TO IDENTIFY THIS LOCATION.
9. REMOVE LEAVINGS FROM THE WASHOUT WHEN AT APPROXIMATELY 75% CAPACITY TO LIMIT
OVERFLOW EVENTS. REPLACE THE TARP, SAND BAGS OR OTHER TEMPORARY STRUCTURAL
COMPONENTS WHEN NO LONGER FUNCTIONAL. WHEN UTILIZING ALTERNATIVE OR
PROPRIETARY PRODUCTS, FOLLOW MANUFACTURER'S INSTRUCTIONS.
10. AT THE COMPLETION OF THE CONCRETE WORK, REMOVE REMAINING LEAVINGS AND
DISPOSE OF IN AN APPROVED DISPOSAL FACILITY. FILL PIT, IF APPLICABLE, AND STABILIZE
ANY DISTURBANCE CAUSED BY REMOVAL OF WASHOUT.
A1 NTS
CONCRETE WASHOUT
STN. STL. BOLT AND NUT
WATERTIGHT SEAL EPDM =
ASTM D2000-M3-BA510
(LINKSEAL OR EQUAL)
PRESSURE PLATE
CORE DRILLED
WALL
PIPE
NOTE: PIPE AND PENETRATIONS SIZES VARY
CONTRACTOR SHALL VERIFY PIPE O.D. DIA.
AND SEAL SIZES PRIOR TO INSTALLATION.
CONTRACTOR CORE
C1 NTS
WATERTIGHT PIPE SEAL
FERTILIZER **
5-10-10 BLEND
1. CONTRACTOR SHALL INSTALL SOD AS PERMANENT VEGETATION IN ALL DISTURBED AREAS NOTED.
2. MOISTENING THE SOD AFTER IT IS UNROLLED HELPS MAINTAIN ITS VIABILITY. STORE IT IN THE SHADE DURING INSTALLATION.
2. RAKE THE SOIL SURFACE TO BREAK THE CRUST JUST BEFORE LAYING SOD. DURING THE SUMMER, LIGHTLY IRRIGATE THE SOIL, IMMEDIATELY
BEFORE LAYING THE SOD TO COOL THE SOIL AND REDUCE ROOT BURNING AND DIEBACK.
3. DO NOT SOD ON GRAVEL, FROZEN SOILS, OR SOILS THAT HAVE BEEN TREATED RECENTLY WITH STERILANTS OR HERBICIDES.
4. LAY THE FIRST ROW OF SOD IN A STRAIGHT LINE WITH SUBSEQUENT ROWS PLACED PARALLEL TO AND BUTTING TIGHTLY AGAINST EACH OTHER. STAGGER STRIPS IN A BRICK-LIKE PATTERN. BE SURE THAT THE SOD IS NOT STRETCHED OR OVERLAPPED AND THAT ALL JOINTS ARE
BUTTED TIGHTLY TO PREVENT VOIDS. USE A KNIFE OR SHARP SPADE TO TRIM AND FIT
IRREGULARLY SHAPED AREAS.
5. INSTALL STRIPS OF SOD WITH THEIR LONGEST DIMENSION PERPENDICULAR TO THE SLOPE. ON SLOPES 3:1 OR GREATER, OR WHEREVER
EROSION MAY BE A PROBLEM, SECURE SOD WITH PEGS OR STAPLES.
6. AS SODDING OF CLEARLY DEFINED AREAS IS COMPLETED, ROLL SOD TO PROVIDE FIRM CONTACT BETWEEN ROOTS AND SOIL.
7. AFTER ROLLING, IRRIGATE UNTIL THE SOIL IS WET 4 INCHES BELOW THE SOD.
8. KEEP SODDED AREAS MOIST TO A DEPTH OF 4 INCHES UNTIL THE GRASS TAKES ROOT. THIS CAN BE DETERMINED BY GENTLY TUGGING ON
THE SOD-RESISTANCE INDICATES THAT ROOTING HAS OCCURRED.
9. CONTRACTOR SHALL PLAN ON WATERING 0.5 INCHES EVERY THREE DAYS WITH A MINIMUM OF 1.0 INCH PER WEEK FOR A DURATION OF MINIMUM TWO WEEKS UNTIL THE GRASS IS ESTABLISHED AND ACCEPTED BY THE CONTRACTING OFFICER.
10. MOWING SHOULD NOT BE ATTEMPTED UNTIL THE SOD IS FIRMLY ROOTED, USUALLY 2-3 WEEKS.
DATE TYPE PLANTING RATE
APR. 1 - JULY 31 SOLID SOD 270 LBS./ACRE 4000 LBS./ACREBERMUDA GRASS
LAY SOD IN A STAGGERED PATTERN WITH STRIPS BUTTED TIGHTLY
AGAINST EACH OTHER. A SHARPENED MASON'S TROWEL CAN BE USED
TO TUCK DOWN THE ENDS AND TRIM PIECES.
BUTTING-ANGLED
ENDS CAUSED BY
THE AUTOMATIC
SOD CUTTING
MUST BE MATCHED
CORRECTLY.
USE PEGS OR STAPLES TO
FASTEN SOD FIRMLY AT THE
ENDS OF STRIPS AND IN THE
CENTER, OR EVERY 3-4' IF THE
STRIPS ARE LONG. WHEN
READY TO MOW, DRIVE PEGS
OR STAPLES FLUSH WITH THE
GROUND.
LAY SOD ACROSS
THE DIRECTION OF
FLOW.
FLOW
IN CRITICAL AREAS
(SLOPE GREATER
THAN 3:1), SECURE
SOD WITH NETTING
AND STAPLES.
MAINTENANCE:
AFTER THE FIRST WEEK, WATER AS NECESSARY TO MAINTAIN ADEQUATE MOISTURE IN THE ROOT ZONE AND PREVENT DORMANCY OF THE SOD. DO NOT REMOVE MORE THAN ONE-THIRD OF THE SHOOT IN ANY MOWING. GRASS HEIGHT SHOULD BE MAINTAINED BETWEEN 2 AND 3 INCHES UNLESS OTHERWISE SPECIFIED. AFTER THE FIRST GROWING SEASON, ESTABLISHED SOD REQUIRES FERTILIZATION, AND MAY ALSO REQUIRE LIME. FOLLOW SOIL TEST
RECOMMENDATIONS WHEN POSSIBLE.
CORRECT
INCORRECT
LIMESTONE
CENTIPEDE GRASS
DATE TYPE PLANTING RATE
1. LIME, SEED AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF
MATERIALS TO BE APPLIED PER ACRE:
DEC. 1 - APR. 15 RYE (GRAIN)
KOBE LESPEDEZA *
RYE (GRAIN)
120 LBS./ACRE
50 LBS./ACRE
120 LBS./ACRE
2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED.
3. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM
COVERAGE IS EXPECTED.
4. MULCHED AREA SHALL BE TACKED WITH LIQUID ASPHALT AT A RATE OF 0.10 GALLON PER SQUARE YARD (10 GAL/1000 SQ. FT.). HYDRAULIC TACKING
MATERIAL SHALL BE USED IN HIGH QUALITY WATER ZONES AND CRITICAL HABITAT AREAS.
5. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION.
GERMAN MILLET 40 LBS./ACREAPR. 15 - AUG. 15
AUG. 15 - DEC. 30
* OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE.
** QUANTITY OF FERTILIZER AND LIME SHALL BE CONFIRMED BY SOILS TEST.
AUG. 1 - MARCH 31 SOLID SOD 1000 LBS./ACRE 4000 LBS./ACRE
C4 N.T.S.
TYPICAL SEEDING SCHEDULE IN COSTAL AREAS (TEMPORARY)
A4 N.T.S.
TYPICAL SOD INSTALLATION DETAIL AND SCHEDULE (PERMANENT)
SE
E
D R
AW
IN
G S
BACK OF CURB OR
BUILDING
CONTRACTION
JOINTS-
5' O.C. FOR 5'
SIDEWALK, 6' O.C.
FOR 6' SIDEWALK,
ETC.
30' MAX. SPACING BETWEEN E.J.
6'-0"
1/2" E.J.
CONCRETE CURB.
COMPACTED SUBGRADE.
A LAYER OF 15 POUND BUILDING FELT IS REQUIRED
BETWEEN WALK AND ADJACENT PARALLELING
ALL SIDEWALKS SHALL BE 4" THICK, WITH 95%
CONTRACTION JOINTS SHALL BE FORMED 1" DEEP AND
EDGED WITH 1/8" RADIUS, OR MAY BE SAW CUT 1" DEEP.
4.
3.
NOTES:
2.
1.
1/2" E.J. MATERIAL REQUIRED WHERE CONCRETE SIDEWALK
ABUTS CONCRETE STRUCTURE AND 30' MAXIMUM SPACING.
1/2" EXP.
JOINTS
C3 N.T.S.
CONCRETE SIDEWALK DETAIL
LROHTR I
N IG EN REE
SEAL
053623
ENO
FORP
S ASION AN
L
CA
P
SRAEM.
KEY EN
07/22/2026
BPS
MIN
BPS
XXX
KEY NOTES
NAVFAC DRAWING NO.
CONST. CONTR. NO.
SHEET 0FSPEC.SCALE: NOTED
SATISFACTORY TO: DATE
APPROVED: DATE
DESIGN DIR.
SUBMITTED BY:
CHK.
DR.
DES.
CAMP LEJEUNE, NORTH CAROLINA
PWO OR OICC
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
MARINE CORPS BASE
SYM REVISIONS DATE APPROVED
SIZE
E1
CODE IDENT.NO
21 3 4 5
21 3 4 5
D
C
B
A
D
C
B
A
N40085-24-D-0011
X
XXXXX
FINAL DESIGN
PWO
NAME
MM/DD/YYYY
MM/DD/YYYY
FC436 CLARIFIER REPAIR
24-0045
E-001
GENERAL NOTES, LEGEND, DETAIL, AND
ABBREVIATIONS
EQUIPMENT CONNECTION
ELECTRICAL CIRCUIT RUN IN CONDUIT. 4 #12, 1 #12 GND - 1" CONDUIT, UON.
POWER
GENERAL
KEY NOTE SYMBOL
GENERAL ELECTRICAL NOTES ELECTRICAL LEGEND
E
GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL WORK
SHOWN ON ELECTRICAL DRAWINGS IS NEW WORK TO BE PROVIDED
UNDER THIS CONTRACT.
COORDINATION: COORDINATE AND COOPERATE WITH ALL TRADES ON
THE PROJECT. THE CONTRACTOR SHALL REVIEW ALL CONTRACT
DOCUMENTS INCLUDING CIVIL DRAWINGS AND SPECIFICATIONS.
CONTRACTOR SHALL COORDINATE AND ADJUST ACCORDINGLY AS
DIRECTED BY THE CONTRACTING OFFICER.
AS-BUILT DRAWINGS: SECURE AN EXTRA SET OF ELECTRICAL DRAWINGS
TO BE KEPT ON SITE AND MARK, DAILY, THE DRAWINGS IN RED AS THE
PROJECT PROGRESSES IN ORDER TO KEEP AN ACCURATE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .