Amend 0014.pdf
PDF 612 KB Posted
- Solicitation number
- N4008526R9077
About this file
This is Amendment 0014 to a federal construction solicitation for sanitary sewerage and lift station repairs issued by NAVFAC Mid-Atlantic to a contractor at Camp Lejeune, North Carolina. The amendment, effective September 10, 2026, extends the proposal due date to September 15, 2026 at 2:00 PM EST and clarifies testing and construction requirements through a series of six questions and answers.
The Q&A section addresses technical specifications for the project, including manhole and pipe testing requirements referenced in Sanitary Sewerage specification 33 30 02, bypass pumping operations and contractor coordination with the Owner, CCTV requirements for new sewer mains and manholes, epoxy coating requirements for new and existing sewer manholes, and scheduling flexibility regarding the sequence of gravity sewer work and lift station pump replacement. A key clarification states that contractors must submit proposals per plans and specifications, and that government rejection of a contractor-selected overhead crane will not trigger a change order—the contractor bears responsibility for selecting equipment that meets specifications. The amendment requires acknowledgment of this modification prior to proposal submission and notes that failure to acknowledge may constitute grounds for rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33 30 02.pdf | ||
| REGISTER.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf | ||
| Amend 0002.pdf | ||
| N4008526B0044 Dwgs_Signed.pdf | ||
| N4008524B0045 Dwgs_Signed.pdf | ||
| Amend 0001.pdf | ||
| RFP 240045.pdf | ||
| 26-0044 Asbestos and Lead-Paint Survey.pdf | ||
| N4008526B0044 Specs.pdf | ||
| 26-0044 DM.pdf | ||
| N4008524B0045 Specs.pdf | ||
| 26-0044 APPD.pdf | ||
| 24-0045 AppendixD.pdf | ||
| 26-0044 Basis of Design.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-26-R-9077
Amendment 0014
CONTINUATION SHEET
1.QUESTION: What are the testing requirements for the new sewer lines and manholes?
ANSWER: Manhole and pipe testing requirements are included in Sanitary Sewerage specification 33 30 02. Testing procedures for manholes and pipe materials start on section 3.3.
Force main pipe testing requirements located in Section 33 31 23.00 10 "Lift Station Sanitary
Sewer Force Main Piping" starting in section 3.2.
2. QUESTION: Is a bypass watchman required for the bypass pumping operations? Or will an auto dialer suffice?
ANSWER: See updated Sanitary Sewerage specification 33 30 02. Refer to section 3.2 for bypass pumping guidance. Contractor will need to coordinate with Owner during construction for appropriate contacts.
3. QUESTION: Is CCTV required for the new sewer mains/manholes?
ANSWER: See updated Sanitary Sewerage specification 33 30 02. Refer to section 3.3 for bypass pumping guidance.
4.QUESTION: Are there any coatings required on the new and existing sewer manholes?
ANSWER: See updated Sanitary Sewerage specification 33 30 02 for Epoxy coating for manholes. See 2.2.14
5. QUESTION: Should the gravity sewer work be completed ahead of the pump replacement at the lift station, or should the new pump be installed and operable ahead of the gravity sewer improvements?
ANSWER: Gravity sewer work can be done before or after the lift station work. Flow into the station does not change per this project thus the old and new pump set ups can handle existing sewer influent flows. This is a contractor means and methods decision.
6. QUESTION: The overhead crane provides are not wanting to provide pricing for the overhead crane without specifications. If the contractor selects a crane and submits to government for review, and the government rejects the submittal, will a change order be provided to provide what the government is wanting?
ANSWER: Proposals per plans and specifications.
7. All other terms and conditions remain unchanged.