This is a technical specification section (Section 33 30 02) for lift station sanitary sewerage work at MCB Camp Geiger, North Carolina, part of Project 26-0044 dated July 23, 2026. The specification establishes comprehensive requirements for the design, materials, installation, testing, and inspection of sanitary sewer gravity pipelines, pressure lines, and associated appurtenances.

The specification mandates installation of gravity sewer mains using concrete pipe, ductile-iron pipe, polypropylene pipe, or polyvinyl chloride (PVC) plastic pipe, with pressure lines constructed from ductile iron pressure pipe or PVC plastic pressure pipe. Materials must conform to specific ASTM, AWWA, ACPA, and other industry standards referenced throughout the document. Key installation requirements include maintaining minimum 10-foot horizontal separation from water lines (18 inches vertical separation minimum when crossing), proper pipe laying and jointing procedures, concrete cradle support where indicated, and comprehensive testing protocols. Testing requirements include hydrostatic sewer tests for pressure lines, infiltration/exfiltration tests, negative air pressure tests, low-pressure air tests, and deflection testing for plastic pipe (limited to 4.5 percent deflection). The specification also requires extensive closed-circuit television (CCTV) inspection of all newly installed gravity sanitary sewer mains and laterals, with detailed video overlay requirements, WMV file formatting, and submission to the Engineer on external hard drives. Contractor qualifications require a current state-certified or state-registered underground utility license. Submittals requiring government approval include contractor licensing, CCTV equipment specifications, bypass pumping plans, installation drawings, product data for precast components, and all test reports. Bypass pumping operations must include primary and standby sound-attenuated pumps, 24-hour monitoring, automated controls, and detailed site plans showing 100-year flood elevations. All cleaning and CCTV inspection costs are included in bid items at no additional cost to the owner.

View the file

Other files

File Type Posted
Amend 0014.pdf PDF
REGISTER.pdf PDF
Amend 0013.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amendment 0006.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf PDF
Amend 0002.pdf PDF
N4008526B0044 Dwgs_Signed.pdf PDF
N4008524B0045 Dwgs_Signed.pdf PDF
Amend 0001.pdf PDF
RFP 240045.pdf PDF
26-0044 Asbestos and Lead-Paint Survey.pdf PDF
N4008526B0044 Specs.pdf PDF
26-0044 DM.pdf PDF
N4008524B0045 Specs.pdf PDF
26-0044 APPD.pdf PDF
24-0045 AppendixD.pdf PDF
26-0044 Basis of Design.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G575 Lift Station Repairs Project No.: 26-0044 MCB CAMP GEIGER, NC 23 July 2026

SECTION 33 30 02

LIFT STATION SANITARY SEWERAGE

05/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE PIPE ASSOCIATION (ACPA)

ACPA 01-102 (2000) Concrete Pipe Handbook

ACPA 01-103 (2000) Concrete Pipe Installation Manual

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION

(AREMA)

AREMA Eng Man (2023) Manual for Railway Engineering

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)

ASME B16.1 (2020) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250

ASME B18.2.2 (2022) Nuts for General Applications:

Machine Screw Nuts, and Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASME B18.5.2.1M (2006; R 2011) Metric Round Head Short Square Neck Bolts

ASME B18.5.2.2M (1982; R 2010) Metric Round Head Square Neck Bolts

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C104/A21.4 (2022) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water

AWWA C105/A21.5 (2018) Polyethylene Encasement for Ductile-Iron Pipe Systems

AWWA C110/A21.10 (2021) Ductile-Iron and Gray-Iron Fittings

AWWA C111/A21.11 (2023) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

AWWA C115/A21.15 (2020) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded Flanges

SECTION 33 30 02 Page 1 Revised 9 September 2026

AWWA C151/A21.51 (2023) Ductile-Iron Pipe, Centrifugally Cast

AWWA C153/A21.53 (2019) Ductile-Iron Compact Fittings for Water Service

AWWA C600 (2023) Installation of Ductile-Iron Mains and Their Appurtenances

AWWA C605 (2021) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings

AWWA C606 (2022) Grooved and Shouldered Joints

AWWA C900 (2022) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In.

Through 60 In. (100 mm Through 1,500 mm)

ASTM INTERNATIONAL (ASTM)

ASTM A47/A47M (1999; R 2022; E 2022) Standard Specification for Ferritic Malleable Iron Castings

ASTM A48/A48M (2022) Standard Specification for Gray Iron Castings

ASTM A123/A123M (2024) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A307 (2023) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A536 (2024) Standard Specification for Ductile Iron Castings

ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A746 (2018; R 2022) Standard Specification for Ductile Iron Gravity Sewer Pipe

ASTM C33/C33M (2024a) Standard Specification for Concrete Aggregates

ASTM C94/C94M (2025) Standard Specification for Ready-Mixed Concrete

ASTM C150/C150M (2024) Standard Specification for Portland Cement

ASTM C260/C260M (2024) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C270 (2025a) Standard Specification for Mortar

SECTION 33 30 02 Page 2 for Unit Masonry

ASTM C443 (2021) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets

ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections

ASTM C478M (2018) Standard Specification for Precast Reinforced Concrete Manhole Sections (Metric)

ASTM C828 (2023) Standard Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines

ASTM C923 (2008; R 2013; E 2016) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals

ASTM C969 (2024) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines

ASTM C972 (2024) Standard Test Method for Compression-Recovery of Tape Sealant

ASTM C990 (2009; R 2019) Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants

ASTM C1214 (2013) Standard Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method

ASTM C1244 (2020) Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test Prior to Backfill

ASTM C1644 (2006; R 2017) Standard Specification for Resilient Connectors Between Reinforced Concrete On-Site Wastewater Tanks and Pipes

ASTM D412 (2016; R 2021) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D543 (2020) Standard Practices for Evaluating the Resistance of Plastics to Chemical Reagents

ASTM D624 (2000; R 2020) Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers

SECTION 33 30 02 Page 3

ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics

ASTM D695 (2010) Standard Test Method for Compressive Properties of Rigid Plastics

ASTM D790 (2017) Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

ASTM D1784 (2025) Standard Classification System and Basis for Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds

ASTM D1785 (2021) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120

ASTM D2241 (2020) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)

ASTM D2321 (2020) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications

ASTM D2412 (2021) Standard Test Method for Determination of External Loading Characteristics of Plastic Pipe by Parallel-Plate Loading

ASTM D2464 (2015) Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80

ASTM D2466 (2023) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40

ASTM D2467 (2020) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80

ASTM D2584 (2018) Standard Test Method for Ignition Loss of Cured Reinforced Resins

ASTM D3034 (2016) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings

ASTM D3139 (2019) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals

ASTM D3212 (2020) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals

SECTION 33 30 02 Page 4

ASTM D3350 (2021) Polyethylene Plastics Pipe and Fittings Materials

ASTM D4101 (2017) Standard Classification System and Basis for Specification for Polypropylene Injection and Extrusion Materials

ASTM D4541 (2022) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers

ASTM F477 (2014; R 2021) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe

ASTM F667/F667M (2016; R 2021) Standard Specification for 3 through 24 in. Corrugated Polyethylene Pipe and Fittings

ASTM F714 (2024) Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter

ASTM F758 (2014; R 2023) Smooth-Wall Poly(Vinyl Chloride) (PVC) Plastic Underdrain Systems for Highway, Airport, and Similar Drainage

ASTM F794 (2021) Standard Specification for Poly(Vinyl Chloride) (PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter

ASTM F894 (2024) Standard Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and Drain Pipe

ASTM F949 (2025) Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.27 (Nov 2016) Scaffolds and Roope Descent Systems

UNI-BELL PVC PIPE ASSOCIATION (UBPPA)

UBPPA UNI-B-6 (1998) Recommended Practice for Low-Pressure Air Testing of Installed Sewer Pipe

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SECTION 33 30 02 Page 5

SD-01 Preconstruction Submittals

Contractor's License ; G

CCTV Equipment ; G

Bypass Pumping Plan ; G

SD-02 Shop Drawings

Installation Drawings ; G

SD-03 Product Data

Precast Concrete Manholes

Frames, Covers, and Gratings

Gravity Pipe

Pressure Pipe

Epoxy Manhole Liner ; G

SD-06 Test Reports

Precast Concrete Sewer Manhole Test ; G

Hydrostatic Sewer Test ; G

Infiltration Tests And Exfiltration Tests ; G

Negative Air Pressure Test ; G

Low-Pressure Air Tests ; G

Tests For Pressure Lines ; G

Deflection Testing

Concrete Pipe Test ; G

CCTV Video Media ; G

SD-07 Certificates

Portland Cement

1.3 QUALITY CONTROL

1.3.1 Installer Qualifications

Install specified materials by a licensed underground utility Contractor licensed for such work in the state where the work is to be performed.

Verify installing Contractor's License is current and state certified or state registered.

SECTION 33 30 02 Page 6

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery and Storage

Check upon arrival; identify and segregate as to types, functions, and sizes. Store off the ground in a manner affording easy accessibility and not causing excessive rusting or coating with grease or other objectionable materials.

1.4.1.1 Piping

Inspect materials delivered to site for damage; store with minimum of handling. Store materials on site in enclosures or under protective coverings. Store plastic piping and jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes and fittings free of dirt and debris.

1.4.1.2 Cement, Aggregate, and Reinforcement

As specified in Section 03 30 02 LIFT STATION CAST-IN-PLACE CONCRETE and

03 30 55 LIFT STATION MISCELLANEOUS CAST-IN-PLACE CONCRETE.

1.4.2 Handling

Handle pipe, fittings, and other accessories in such manner as to ensure delivery to the trench in sound undamaged condition. Take special care not to damage linings of pipe and fittings; if lining is damaged, make satisfactory repairs. Carry, do not drag, pipe to trench. Store solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install the plastic pipe in accordance with the manufacturer's recommendation and discard those materials if the storage period exceeds the recommended shelf life. Discard solvents in use when the recommended pot life is exceeded.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.1.1 Sanitary Sewer Gravity Pipeline

Provide mains of diameters indicated on plans of concrete pipe, ductile-iron pipe, polypropylene pipe, or polyvinyl chloride (PVC) plastic pipe.

2.1.2 Sanitary Sewer Pressure Lines

Provide pressure lines of ductile iron pressure pipe or polyvinyl chloride (PVC) plastic pressure pipe.

2.2 MATERIALS

Provide materials conforming to the respective specifications and other requirements specified below. Submit manufacturer's product specification,standard drawings or catalog cuts.

SECTION 33 30 02 Page 7

2.2.1 Gravity Pipe

2.2.1.1 Ductile Iron Gravity Sewer Pipe and Associated Fittings

2.2.1.1.1 Ductile Iron Gravity Pipe and Fittings

Provide ductile iron pipe conforming to ASTM A746 with cement-mortar lining in conforming to AWWA C104/A21.4 , Pressure Class 250. Provide push-on joints conforming to AWWA C111/A21.11 .

2.2.1.2 PVC Gravity Sewer Piping

2.2.1.2.1 PVC Gravity Pipe and Fittings

ASTM D3034, SDR 35, or ASTM F949 with ends suitable for elastomeric gasket joints. ASTM F794, Series 46, for ribbed sewer pipe with smooth interior, size 8 inch through 48 inch diameters.

2.2.1.2.2 PVC Gravity Joints and Jointing Material

Provide joints conforming to ASTM D3212. Gaskets are to conform to

ASTM F477.

2.2.2 Pressure Pipe

2.2.2.1 Ductile Iron Pressure Piping

2.2.2.1.1 Ductile Iron Pressure Pipe and Fittings

Provide push-on-joint, mechanical joint, or flanged ductile-iron pipe conforming to AWWA C151/A21.51 , Pressure Class 250. Provide fittings conforming to AWWA C110/A21.10 or AWWA C153/A21.53 . Provide fittings with push-on joint ends conforming to AWWA C111/A21.11 . Use fittings which have a pressure rating at least equivalent to that of the pipe. Pipe and fittings are to have cement-mortar lining conforming to AWWA C104/A21.4 , standard thickness.

2.2.2.1.2 Ductile Iron Pressure Joints and Jointing Materials

a. Joints, general: Use push-on joints or mechanical joints for pipe and fittings except as otherwise specified in this paragraph. Use mechanical-joints where indicated. Use flanged joints where indicated. Joints made with sleeve-type mechanical coupling may be used in lieu of push-on joint. Grooved or shouldered type joints may be used in lieu of push-on joint or flanged joint, except where joint is buried.

b. Push-on joints: Shape of pipe ends and fitting ends, gaskets, and lubricant for joint assembly are to conform to AWWA C111/A21.11 .

c. Mechanical joints: Dimensional and material requirements for pipe ends, glands, bolts and nuts, and gaskets are to conform to

AWWA C111/A21.11 .

d. Flanged joints: Provide bolts, nuts, and gaskets for flanged connections as recommended in the Appendix to AWWA C115/A21.15 .

Provide flange for setscrewed flanges of ductile iron, ASTM A536, Grade 65-45-12, and conforming to the applicable requirements of ASME B16.1 , Class 250. Provide 190,000 psi tensile strength, heat

SECTION 33 30 02 Page 8 treated, and zinc-coated steel setscrews for setscrewed flanges.

Conform gasket for setscrewed flanges to the applicable requirements for mechanical-joint gaskets specified in AWWA C111/A21.11 . Design of setscrewed gasket are to provide for confinement and compression of gasket when joint to adjoining flange is made.

e. Joints made with sleeve-type mechanical couplings: Provide couplings designed to couple plain-end piping by compression of a ring gasket at each end of the adjoining pipe sections. Provide couplings consisting of one middle ring flared or beveled at each end to provide a gasket seat, two follower rings, two resilient tapered rubber gaskets, and bolts and nuts to draw the follower rings toward each other to compress the gaskets. The middle ring and the follower rings are to be true circular sections free from irregularities, flat spots, and surface defects; the design is to provide for confinement and compression of the gaskets. The middle ring is to be of cast-iron or steel, and the follower rings are to be of malleable iron or ductile iron. Cast iron couplings are to conform to ASTM A48/A48M and not be less than Class 25. Malleable iron couplings are to conform to ASTM A47/A47M. Ductile iron couplings are to conform to ASTM A536.

Steel is to have a strength not less than that of the pipe. Gaskets are to be designed for long life and resistance to set after installation and meet the applicable requirements specified for gaskets for mechanical joint in AWWA C111/A21.11 . Bolts are to be track-head type; bolts and nuts are to be either of the following:

bolts conforming to the tensile requirements of ASTM A307, Grade A, with nuts conforming to the tensile requirements of ASTM A563, Grade A; or round-head square-neck type bolts conforming to ASME B18.5.2.1M and ASME B18.5.2.2M with hex nuts conforming to ASME B18.2.2 . Bolt holes in follower rings are to be of a shape to hold fast the necks of the bolts used. Sleeve-type mechanical couplings are not to be used as an optional method of jointing except where pipeline is adequately anchored to resist tension pull across the joint.

f. Grooved and Shouldered Type Joints: Grooved pipe ends, shouldered pipe ends, and couplings are to conform to AWWA C606. Joint dimensions are to be as specified in AWWA C606 for rigid joints.

2.2.2.2 PVC Pressure Pipe and Associated Fittings

Pipe, couplings and fittings are to be manufactured of materials conforming to ASTM D1784, Class 12454B.

2.2.2.2.1 Pipe and Fittings Less Than 4 inch Diameter

2.2.2.2.1.1 Screw-Joint

Provide pipe conforming to dimensional requirements of ASTM D1785, Schedule 80, with joints meeting requirements of 150 psi working pressure, 200 psi hydrostatic test pressure, unless otherwise shown or specified.

Provide fittings for threaded pipe conforming to requirements of ASTM D2464, threaded to conform to the requirements of ASME B1.20.1 for use with Schedule 80 pipe and fittings. Pipe couplings when used, are to be tested as required by ASTM D2464.

2.2.2.2.1.2 Push-On Joint

ASTM D3139, with ASTM F477 gaskets. Fittings for push-on joints are to be iron conforming to AWWA C110/A21.10 or AWWA C153/A21.53 and AWWA C111/A21.11 with a cement-mortar lining conforming to AWWA C104/A21.4 , SECTION 33 30 02 Page 9 standard thickness.

2.2.2.2.1.3 Solvent Cement Joint

Provide pipe conforming to dimensional requirements of ASTM D1785 or ASTM D2241 with joints meeting the requirements of 150 psi working pressure and 200 psi hydrostatic test pressure. Fittings for solvent cement jointing are to conform to ASTM D2466 or ASTM D2467.

2.2.2.2.2 Pipe and Fittings 4 inch Diameter And Larger

Provide pipe conforming to AWWA C900 and be plain end or gasket bell end, Pressure Class 150 (DR 18), with cast-iron-pipe-equivalent OD. Fittings are to be gray-iron or ductile-iron conforming to AWWA C110/A21.10 or AWWA C153/A21.53 and AWWA C111/A21.11 with a cement-mortar lining conforming to AWWA C104/A21.4 , standard thickness. Fittings for pipe to pipe push-on joint ends are to conform with AWWA C900.

2.2.2.3 High Density Polyethylene Pipe (HDPE)

ASTM F894, Class 63, size 18 inch through 120 inch . ASTM F714, size 4 inch through 48 inch , will have pipe stiffness greater than or equal to 1170/D for cohesionless material pipe trench backfills. For all PE pipes, the polyethylene are to be certified by the resin producer as meeting the requirements of ASTM D3350, cell Class 334433C or higher. Fittings for High Density Polyethylene Pipe are to meet the same material specifications as the pipe class. Joints for HDPE meeting ASTM F894 will be rubber gasket joints conforming to ASTM F477. HDPE meeting ASTM F714 will have fused joints in accordance with manufacturer's instruction.

2.2.3 Piping Beneath Railroad Right-of-Way

Where pipeline passes under the right-of-way of a commercial railroad, piping is to conform to the specifications for pipelines conveying nonflammable substances in AREMA Eng Man, except as otherwise specified in this paragraph. For casing pipe provide ductile-iron pipe in lieu of cast-iron soil pipe. Ductile-iron pipe is to conform to and have strength computed in accordance with ASTM A746.

2.2.4 Cement Mortar

Provide cement mortar conforming to ASTM C270, Type M with Type II cement.

2.2.5 Portland Cement

Submit certificates of compliance stating the type of cement used in manufacture of concrete pipe, fittings, septic tanks, and precast manholes. Provide portland cement conforming to ASTM C150/C150M, Type II or V for concrete used in concrete pipe, concrete pipe fittings, septic tanks, and manholes and type optional for cement used in concrete cradle, concrete encasement, and thrust blocking. Use air-entraining admixture conforming to ASTM C260/C260M with Type V cement. Use a cement containing less than 0.60 percent alkalies where aggregates are alkali reactive, as determined by Appendix XI of ASTM C33/C33M.

2.2.6 Portland Cement Concrete

Provide portland cement concrete conforming to ASTM C94/C94M, compressive strength of 4000 psi at 28 days, except for concrete cradle and encasement

SECTION 33 30 02 Page 10 or concrete blocks for manholes. Concrete used for cradle and encasement is to have a compressive strength of 2500 psi minimum at 28 days. Protect concrete in place from freezing and moisture loss for 7 days.

2.2.7 Precast Concrete Manholes

Provide precast concrete manholes , risers, base sections, and tops conforming to ASTM C478.

2.2.8 Gaskets and Connectors

Provide gaskets for joints between manhole sections conforming to ASTM C443.

Resilient connectors for making joints between manhole and pipes entering manhole are to conform to ASTM C1644, ASTM C923, or ASTM C990.

2.2.9 External Preformed Rubber Joint Seals

An external preformed rubber joint seal is an accepted method of sealing cast iron covers to precast concrete sections to prevent ground water infiltration into sewer systems. All finished and sealed manholes constructed in accordance with paragraph entitled "Manhole Construction" are to be tested for leakage in the same manner as pipelines as described in paragraph entitled "Leakage Tests." The seal is to be multi-section with a neoprene rubber top section and all lower sections made of Ethylene Propylene Diene Monomer (EPDM) rubber with a minimum thickness of 60 mils .

Each unit is to consist of a top and bottom section and have mastic on the bottom of the bottom section and mastic on the top and bottom of the top section. The mastic is to be a non-hardening butyl rubber sealant and seal to the cone/top slab of the manhole/catch basin and over the lip of the casting. Extension sections are to cover up to two more adjusting rings. Properties and values are listed in the following table:

Properties, Test Methods and Minimum Values for Rubber used in Preformed Joint Seals

Physical Properties Test Methods EPDM Neoprene Butyl Mastic

Tensile, psi ASTM D412 1840 2195 --

Elongation, percent ASTM D412 553 295 350

Tear Resistance, ppi ASTM D624 (Die B)

280 160 --

Rebound, percent, 5 minutes ASTM C972 (mod.) -- -- 11

Rebound, percent, 2 hours ASTM C972 -- -- 12

2.2.10 Sewage Absorption Field Materials

Pipe is to be perforated corrugated polyethylene tubing conforming to ASTM F667/F667M . Pipe is to be perforated PVC pipe conforming to ASTM F758. Chambers are to be high density polyethylene conforming to

IAPMO PS 63.

SECTION 33 30 02 Page 11

2.2.11 Frames, Covers, and Gratings for Manholes

Submit certification on the ability of frame and cover to carry the imposed live load. Frame and cover are to be cast gray iron, ASTM A48/A48M, Class 35B, cast ductile iron, ASTM A536, Grade 65-45-12, or reinforced concrete, ASTM C478 ASTM C478M. Frames and covers are to be circular with vent holes. Size are to be as indicated on the plans. Stamp or cast the words "Sanitary Sewer" into covers so that it is plainly visible.

2.2.12 Manhole Steps

Zinc-coated steel as indicated conforming to 29 CFR 1910.27 with a plastic or rubber coating pressure-molded to the steel is to be used. Provide plastic coating conforming to ASTM D4101, copolymer polypropylene. Rubber is to conform to ASTM C443, except shore A durometer hardness is to be 70 plus or minus 5. Aluminum steps or rungs will not be permitted. Steps are not required in manholes less than 4 feet deep.

2.2.13 Manhole Ladders

Provide a steel ladder where the depth of a manhole exceeds 12 feet . The ladder is not to be less than 16 inches in width, with 3/4 inch diameter rungs spaced 12 inches apart. The two stringers are to be a minimum 3/8 inch thick and 2 inches wide. Galvanize ladders and inserts after fabrication in conformance with ASTM A123/A123M .

2.2.14 Epoxy Manhole Liner

A manhole liner shall be used on new manholes where so indicated on the plans.

Material: 100 percent solids, solvent-free ultra high-build structural epoxy system exhibiting the following minimum characteristics:

a. Product Type: Amine cured epoxy

b. VOC Content ( ASTM D2584): 0 percent

c. Compressive Strength ( ASTM D695): 18,000 psi

d. Tensile Strength ( ASTM D638): 7,500 psi

e. Flexural Modulus ( ASTM D790): 600,000 psi

f. Adhesion to Concrete, mode of failure ( ASTM D4541): Substrate (concrete) failure

g. Chemical Resistance ( ASTM D543/G20) all types of service for:

(1) Municipal sanitary sewer environment

(2) Hydrogen Sulfide

(3) Sulfuric Acid, 30 percent

(4) Nitric Acid, 20 percent

(5) Sodium Hydroxide, 5 percent

Application procedures shall conform to the recommendations of the coating product(s) manufacturer, including: environmental controls, product handling, mixing, liner thickness, application equipment, and methods.

SECTION 33 30 02 Page 12

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Installation Drawings

Submit Installation Drawings showing complete detail, both plan and side view details with proper layout and elevations.

3.2 INSTALLATION

Backfill after inspection by the Contracting Officer. Before, during, and after installation, protect plastic pipe and fittings from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer.

3.2.1 Connections to Existing Lines

Obtain approval from the Contracting Officer before making connection to existing line. Conduct work so that there is minimum interruption of service on existing line.

3.2.2 General Requirements for Installation of Pipelines

These general requirements apply except where specific exception is made in the following paragraphs entitled "Special Requirements."

3.2.2.1 Location

Terminate the work covered by this section at a point approximately 5 feet from the building, unless otherwise indicated. Install pressure sewer lines beneath water lines only, with the top of the sewer line being at least 2 feet below bottom of water line. When these separation distances can not be met, contact the Contracting Officer for direction.

3.2.2.1.1 Sanitary Piping Installation Parallel with Water Line

3.2.2.1.1.1 Normal Conditions

Install sanitary piping or manholes at least 10 feet horizontally from a water line whenever possible. Measure the distance from edge-to-edge.

3.2.2.1.1.2 Unusual Conditions

When local conditions prevent a horizontal separation of 10 feet , the sanitary piping or manhole may be laid closer to a water line provided that:

a. The top (crown) of the sanitary piping is to be at least 18 inches below the bottom (invert) of the water main.

b. Where this vertical separation cannot be obtained, construct the sanitary piping with AWWA-approved ductile iron water pipe pressure and conduct a hydrostatic sewer test without leakage prior to backfilling.

c. The sewer manhole is to be of watertight construction and tested in

SECTION 33 30 02 Page 13 place.

3.2.2.1.2 Installation of Sanitary Piping Crossing a Water Line

3.2.2.1.2.1 Normal Conditions

Lay sanitary sewer piping by crossing under water lines to provide a separation of at least 18 inches between the top of the sanitary piping and the bottom of the water line whenever possible.

3.2.2.1.2.2 Unusual Conditions

When local conditions prevent a vertical separation described above, use the following construction:

a. Construct sanitary piping passing over or under water lines with AWWA-approved ductile iron water pressure piping and conduct a hydrostatic sewer test without leakage prior to backfilling.

b. Protect sanitary piping passing over water lines by providing:

(1) A vertical separation of at least 18 inches between the bottom of the sanitary piping and the top of the water line.

(2) Adequate structural support for the sanitary piping to prevent excessive deflection of the joints and the settling on and breaking of the water line.

(3) That the length, minimum 20 feet , of the sanitary piping be centered at the point of the crossing so that joints are equidistant and as far as possible from the water line.

3.2.2.1.3 Sanitary Sewer Manholes

No water piping must pass through or come in contact with any part of a sanitary sewer manhole.

3.2.2.2 Earthwork

Perform earthwork operations in accordance with Section 31 00 02 LIFT

STATION EARTHWORK.

3.2.2.3 Pipe Laying and Jointing

Inspect each pipe and fitting before and after installation; replace those found defective and remove from site. Provide proper facilities for lowering sections of pipe into trenches. Lay nonpressure pipe with the bell or groove ends in the upgrade direction. Adjust spigots in bells and tongues in grooves to give a uniform space all around. Blocking or wedging between bells and spigots or tongues and grooves will not be permitted. Replace by one of the proper dimensions, pipe or fittings that do not allow sufficient space for installation of joint material. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads. Provide batterboards not more than 25 feet apart in trenches for checking and ensuring that pipe invert elevations are as indicated. Laser beam method may be used in lieu of batterboards for the same purpose. Construct branch connections by use of regular fittings or solvent cemented saddles as approved. Provide saddles for PVC pipe conforming to Table 4 of ASTM D3034.

SECTION 33 30 02 Page 14

3.2.3 Special Requirements

3.2.3.1 Installation of Concrete Gravity Sewer Piping

Install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the provisions for rubber gasket jointing and jointing procedures of ACPA 01-103 or of ACPA 01-102 , Chapter 9, "Installation, Inspection and Construction Testing." Make joints with the gaskets specified for concrete gravity sewer pipe joints. Clean and dry surfaces receiving lubricants, cements, or adhesives. Affix gaskets to pipe not more than 24 hours prior to the installation of the pipe. Protect gaskets from sun, blowing dust, and other deleterious agents at all times. Before installation of the pipe, inspect gaskets and remove and replace loose or improperly affixed gaskets. Align each pipe section with the previously installed pipe section, and pull the joint together. If, while pulling the joint, the gasket becomes loose and can be seen through the exterior joint recess when the pipe is pulled up to within 1 inch of closure, remove the pipe and remake the joint.

3.2.3.2 Installation of Ductile Iron Gravity Sewer Pipe

Unless otherwise specified, install pipe and associated fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the requirements of AWWA C600 for pipe installation and joint assembly.

a. Make push-on joints with the gaskets and lubricant specified for this type joint and assemble in accordance with the applicable requirements of AWWA C600 for joint assembly. Make mechanical-joints with the gaskets, glands, bolts, and nuts specified for this type joint and assemble in accordance with the applicable requirements of AWWA C600 for joint assembly and the recommendations of Appendix A to

AWWA C111/A21.11 .

b. Exterior protection: Completely encase buried ductile iron pipelines with polyethylene tube or sheet in accordance with AWWA C105/A21.5 , using Class C polyethylene film.

3.2.3.3 Installation of Ductile-Iron Pressure Lines

Unless otherwise specified, install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the requirements of AWWA C600 for pipe installation, joint assembly, and valve-and-fitting installation.

a. Make push-on joints with the gaskets and lubricant specified for this type joint and assemble in accordance with the applicable requirements of AWWA C600 for joint assembly. Make mechanical-joints with the gaskets, glands, bolts, and nuts specified for this type joint;

assemble in accordance with the applicable requirements of AWWA C600 for joint assembly and the recommendations of Appendix A to AWWA C111/A21.11 . Make flanged joints with gaskets, bolts, and nuts specified for this type joint. Make flanged joints up tight, taking care to avoid undue strain on flanges, fittings, and other accessories. Align bolt holes for each flanged joint. Use full size bolts for the bolt holes; use of undersized bolts to make up for misalignment of bolt holes or for any other purpose will not be

SECTION 33 30 02 Page 15 permitted. Do not allow adjoining flange faces to be out of parallel to such degree that the flanged joint cannot be made watertight without overstraining the flange. When flanged pipe or fittings have dimensions that do not allow the making of a proper flanged joint as specified, replace it by one of proper dimensions. Assemble joints made with sleeve-type mechanical couplings in accordance with the recommendations of the coupling manufacturer, as approved. Make grooved and shouldered type joints with the couplings previously specified for this type joint connecting pipe with the grooved or shouldered ends specified for this type joint and assemble in accordance with the recommendations of the coupling manufacturer, as approved. Groove pipe in the field only with approved groove cutting equipment designed especially for the purpose and produced by a manufacturer of grooved joint couplings; secure approval for field-cut grooves before assembling the joint.

b. Exterior protection: Completely encase buried ductile iron pipelines with polyethylene tube or sheet in accordance with AWWA C105/A21.5 , using Class A polyethylene film.

c. Pipe anchorage: Provide concrete thrust blocks (reaction backing) for pipe anchorage. Size and position thrust blocks as indicated. Use concrete conforming to ASTM C94/C94M having a minimum compressive strength of 2,000 psi at 28 days; or use concrete of a mix not leaner than one part cement, 2 1/2 parts sand, and 5 parts gravel, having the same minimum compressive strength.

3.2.3.4 Installation of PVC Piping

Install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the requirements of ASTM D2321 for laying and joining pipe and fittings. Make joints with the gaskets specified for joints with this piping and assemble in accordance with the requirements of ASTM D2321 for assembly of joints.

Make joints to other pipe materials in accordance with the recommendations of the plastic pipe manufacturer.

3.2.3.5 Installation of PVC Pressure Pipe

Unless otherwise specified, install pipe and fittings in accordance with AWWA C605. AWWA C605 includes requirements such as excavation, installation, and placement of apputenances.

3.2.3.5.1 Pipe Less Than 4 Inch Diameter

3.2.3.5.1.1 Threaded Joints

Make by wrapping the male threads with joint tape or by applying an approved thread lubricant, then threading the joining members together.

Tighten the joints with strap wrenches which will not damage the pipe and fittings. Tighten the joint no more than 2 threads past hand-tight.

3.2.3.5.1.2 Push-On Joints

Bevel the ends of pipe for push-on joints to facilitate assembly. Mark pipe to indicate when the pipe is fully seated. Lubricate the gasket to prevent displacement. Exercise care to ensure that the gasket remains in proper position in the bell or coupling while making the joint.

SECTION 33 30 02 Page 16

3.2.3.5.1.3 Solvent-Weld Joints

Comply with the manufacturer's instructions.

3.2.3.5.2 Pipe 4 inch Diameter And Larger

Make push-on joints with AWWA C900 pipe with intrgral elastomeric gasket .

For pipe-to-pipe push-on joint connections, use only pipe with push-on joint ends having factory-made bevel. For push-on joint connections to fittings, use cut spigot end of pipe off square, marked to match the manufacturer's insertion line and beveled to match factory supplied bevel. .

Use an approved lubricant recommended by the pipe manufacturer for push-on joints. Assemble push-on joints for pipe-to-pipe joint connections in accordance with the requirements of AWWA C605. Assemble push-on joints for connection to fittings in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories and with the applicable requirements of AWWA C600 for joint assembly. Make mechanical-joints or flanged jointswith the gaskets, glands, bolts, nuts, and internal stiffeners specified for this type joint and assemble in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories or with the applicable requirements of AWWA C600 for ductile iron joint assembly, and with the recommendations of Appendix A to AWWA C111/A21.11 . Cut off spigot end of pipe for mechanical-joint or flanged jointconnections and do not bevel.

3.2.3.5.3 Pipe Anchorage

Provide concrete thrust blocks (reaction backing) for pipe anchorage.

Size and position thrust blocks as indicated. Use concrete conforming to ASTM C94/C94M having a minimum compressive strength of 2,000 psi at 28 days; or use concrete of a mix not leaner than one part cement, 2 1/2 parts sand, and 5 parts gravel, having the same minimum compressive strength.

3.2.4 Concrete Work

Cast-in-place concrete is included in Section 03 30 02 LIFT STATION

CAST-IN-PLACE CONCRETE03 30 55 LIFT STATION MISCELLANEOUS CAST-IN-PLACE

CONCRETE. Support the pipe on a concrete cradle, or encased in concrete where indicated or directed.

3.2.5 Manhole Construction

Construct base slab of cast-in-place concrete or use precast concrete base sections. Make inverts in cast-in-place concrete and precast concrete bases with a smooth-surfaced semi-circular bottom conforming to the inside contour of the adjacent sewer sections. For changes in direction of the sewer and entering branches into the manhole, make a circular curve in the manhole invert of as large a radius as manhole size will permit. For cast-in-place concrete construction, either pour bottom slabs and walls integrally or key and bond walls to bottom slab. No parging will be permitted on interior manhole walls. For precast concrete construction, make joints between manhole sections with the gaskets specified for this purpose; install in the manner specified for installing joints in concrete piping. Parging will not be required for precast concrete manholes.

Perform cast-in-place concrete work in accordance with the requirements specified under paragraph entitled "Concrete Work" of this section. Make joints between concrete manholes and pipes entering manholes with the resilient connectors specified for this purpose; install in accordance

SECTION 33 30 02 Page 17 with the recommendations of the connector manufacturer. Where a new manhole is constructed on an existing line, remove existing pipe as necessary to construct the manhole. Cut existing pipe so that pipe ends are approximately flush with the interior face of manhole wall, but not protruding into the manhole. Use resilient connectors as previously specified for pipe connectors to concrete manholes.

3.2.6 Miscellaneous Construction and Installation

3.2.6.1 Connecting to Existing Manholes

Connect pipe to existing manholes such that finish work will conform as nearly as practicable to the applicable requirements specified for new manholes, including all necessary concrete work, cutting, and shaping.

Center the connection on the manhole. Holes for the new pipe are be of sufficient diameter to allow packing cement mortar around the entire periphery of the pipe but no larger than 1.5 times the diameter of the pipe. Cut the manhole in a manner that will cause the least damage to the walls.

3.2.6.2 Metal Work

3.2.6.2.1 Workmanship and Finish

Perform metal work so that workmanship and finish will be equal to the best practice in modern structural shops and foundries. Form iron to shape and size with sharp lines and angles. Do shearing and punching so that clean true lines and surfaces are produced. Make castings sound and free from warp, cold shuts, and blow holes that may impair their strength or appearance. Give exposed surfaces a smooth finish with sharp well-defined lines and arises. Provide necessary rabbets, lugs, and brackets wherever necessary for fitting and support.

3.2.6.2.2 Field Painting

After installation, clean cast-iron frames, covers, gratings, and steps not buried in concrete to bare metal, remove mortar, rust, grease, dirt, and other deleterious materials and apply a coat of bituminous paint. Do not paint surfaces subject to abrasion.

3.2.7 Sewage Absorption Trench Construction

Grade trenches uniformly with no slope. Lay perforated pipe with the perforations downward. Comply with the chamber manufacturer's instructions.

3.2.8 Installations of Wye Branches

Install wye branches in an existing sewer using a method which does not damage the integrity of the existing sewer. Do not cutinto piping for connections except when approved by the Contracting Officer. When the connecting pipe cannot be adequately supported on undisturbed earth or tamped backfill, support on a concrete cradle as directed by the Contracting Officer. Provide and install concrete required because of conditions resulting from faulty construction methods or negligence without any additional cost to the Government. Do not damage the existing sewer when installing wye branches in an existing sewer.

SECTION 33 30 02 Page 18

3.2.9 Bypass Pumping

If pumping is required, an identical standby pump shall be on site in the event of failure of the primary pump. The standby pump shall include its own bypass piping system or shall be connected to the primary bypass piping system, so the standby pump can immediately be placed into service when needed. All pumps shall be sound attenuated to 68 dBA at 23 feet .

The bypass pumping system must be continuously monitored by the Contractor at all times bypass pumping is occurring. This includes 24-hour monitoring when no work is being performed. If at any time during construction, effluent from the existing sewer is not fully contained by the bypass system, gravity service will be restored by a temporary tie to the new construction and work shall be suspended until the problem is resolved to the satisfaction of the Engineer. All bypass pumping and piping operations shall be installed a minimum of 2 feet above the 100-year flood elevation.

Plugging or blocking of sewage flows shall incorporate a primary and secondary plugging device for 15 inches up to 30-inch diameter pipe. When plugging or blocking is no longer needed for performance and acceptance or work, it is to be removed in a manner that permits the sewage flow to slowly return to normal without surge, to prevent surcharging or causing other major disturbances downstream.

The Contractor shall tie-off and/or anchor temporary plugs used in the bypassing of flow such that plugs are not able to proceed into downstream piping.

During any bypass pumping operations, signage and emergency contact information must be clearly visible at the bypass pumping operations site.

Sustained bypass pumping operations (operations exceeding 24 hours) will require installation of an auto-dialer, even if the operation is continuously monitored by a person.

Contractor shall provide a temporary cast iron or steel cover over the bypass pumping suction manhole and discharge manhole to safeguard the manholes, to prevent inflow and to minimize odors. At the discharge manhole, the Contractor shall route the discharge piping down into the manhole and shall install 90-degree bends on the end of the piping to direct the flow out of the discharge manhole and heading downstream. The piping arrangement shall be such that the flow is not vertically directed. This piping arrangement will help to direct the flow and minimize turbulence (and odors) in the discharge manhole.

The Contractor will be required to submit, for approval by the Engineer, a detailed plan of the method the Contractor proposes to maintain the existing flow during construction. The bypass pumping plan must include a provision for handling the existing peak flow by pumping or bypassing by gravity. At a minimum the following items must be included with the submittal:

1. Number of pumps including pump manufacturer data and pump curves. A backup pump(s) must be provided such that the peak bypass flow can be maintained with the largest pump out of service.

2. The primary and standby pumps shall be piped so no changes in piping are required to switch between pumps. Automated controls are required to switch between the primary and standby pump(s).

SECTION 33 30 02 Page 19

3. Provision for manned 24-hour monitoring, as long as bypass pump is in operation.

4. Site plan showing location of bypass pumping operations, suction manholes, discharge manholes, bypass piping layout/alignment, and access. The layout shall include the profile, including 100-year flood elevation, the pump elevations, manhole rim elevations, invert elevations, bypass piping profile -- on grade or trenched installation.

5. Expected duration of bypass pumping operations.

6. Location and number of proposed tie-off and/or anchors used to prevent movement or blowouts for plugs.

Upon approval of the plan, and prior to initiating bypass pumping operations, the Contractor will be required to verify his method of handling sewer flows during construction by pumping at peak flows for four

(4) hours for each pump. Testing shall include verification of automated controls, automated switch to standby pump, and auto-dialer operations.

This test must be witnessed by the Contracting Officer.

The Contractor will be required to perform bypass pumping operations during dry weather, unless otherwise authorized by the Contracting Officer.

If a failure of bypass pumping operations occurs, the Contractor shall be responsible for any fines levied as a result of effluent reaching creeks and waterways.

Flow from all connecting sewers must be accommodated. Bypass piping for connecting sewers 8-inch to 12-inch may utilize lay flat hose. Bypass piping for connecting sewers 15-inch to 30-inch shall utilize hard piping and must have primary and standby sound-attenuated diesel auto-priming pumps. If connecting to the main bypass discharge line, the connection must have an isolating gate valve.

3.3 FIELD QUALITY CONTROL

The Contracting Officer will conduct field inspections and witness field tests specified in this section. Be able to produce evidence, when required, that each item of work has been constructed in accordance with the drawings and specifications.

3.3.1 Tests

Perform field tests and provide labor, equipment, and incidentals required for testing.

3.3.1.1 Hydrostatic Sewer Test

When unusual conflicts are encountered between sanitary sewer and waterlines a hydrostatic pressure sewer test will be performed in accordance with the applicable AWWA standard for the piping material or

AWWA C600.

3.3.1.2 Leakage Tests for Nonpressure Lines

Test lines for leakage by either infiltration tests and exfiltration tests, negative air pressure tests, or by low-pressure air tests. When

SECTION 33 30 02 Page 20 necessary to prevent pipeline movement during testing, place additional backfill around pipe sufficient to prevent movement, but leaving joints uncovered to permit inspection. When leakage or pressure drop exceeds the allowable amount specified, make satisfactory correction and retest pipeline section in the same manner. Correct visible leaks regardless of leakage test results.

3.3.1.2.1 Infiltration Tests and Exfiltration Tests

3.3.1.2.1.1 Precast Concrete Pipe Sewer Lines

Test leakage of precast concrete pipe in accordance with ASTM C969. The allowable leakage limit is located in ASTM C969. Make calculations in accordance with the Appendix to ASTM C969.

3.3.1.2.2 Negative Air Pressure Test

3.3.1.2.2.1 Concrete Pipe

Test concrete pipe test in accordance with ASTM C1214. The allowable vacuum loss is located in ASTM C1214 Make calculations in accordance with the Appendix to ASTM C1214.

3.3.1.2.2.2 Precast Concrete Manholes

Test precast concrete sewer manhole test in accordance with ASTM C1244.

The allowable vacuum drop is located in ASTM C1244 Make calculations in accordance with the Appendix to ASTM C1244.

3.3.1.2.3 Low-Pressure Air Tests

3.3.1.2.3.1 Clay Pipelines

Test clay pipe in accordance with ASTM C828. The allowable pressure drop is located in ASTM C828. Make calculations in accordance with the Appendix to ASTM C828.

3.3.1.2.3.2 PVC Pipelines

Test PVC pipe in accordance with UBPPA UNI-B-6 . The allowable pressure drop is located in UBPPA UNI-B-6 . Make calculations in accordance with the Appendix to UBPPA UNI-B-6 .

3.3.1.3 Tests for Pressure Lines

Test pressure lines in accordance with the applicable standard specified in this paragraph, except for test pressures. For hydrostatic pressure test, use a hydrostatic pressure 50 psi in excess of the maximum working pressure of the system, but not less than 100 psi , holding the pressure for a period of not less than one hour. For leakage test, use a hydrostatic pressure not less than the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test.

3.3.1.3.1 Ductile-Iron Pressure Pipe

Test ductile-iron pressure pipe in accordance with the requirements of AWWA C600 for hydrostatic testing. Leakage on ductile-iron pipelines with mechanical-joints or push-on joints are not to exceed the amounts given in

SECTION 33 30 02 Page 21

AWWA C600; no leakage will be allowed at joints made by any other methods.

3.3.1.3.2 PVC Pressure Pipe

Test PVC pressure pipe in accordance with the requirements of AWWA C605 for hydrostatic and leakage tests. The quantity of water that must be supplied during testing is not to exceed the quantity of water calculated in accordance with AWWA C605 to maintain the specified test pressure within 5 psi .

3.3.1.4 Deflection Testing

Perform a deflection test on entire length of installed plastic pipeline on completion of work adjacent to and over the pipeline, including leakage tests, backfilling, placement of fill, grading, paving, concreting, and any other superimposed loads determined in accordance with ASTM D2412.

Deflection of pipe in the installed pipeline under external loads is not to exceed 4.5 percent of the average inside diameter of pipe. Determine whether the allowable deflection has been exceeded by use of a pull-through device or a deflection measuring device.

3.3.1.4.1 Pull-Through Device

This device is to be a spherical, spheroidal, or elliptical ball, a cylinder, or circular sections fused to a common shaft. Space circular sections on the shaft so that the distance from external faces of front and back sections will equal or exceed the diameter of the circular section.