25-0453 Amend 0002 and Cont page.pdf
PDF 126 KB Posted
- Attached to
- MCAS Multiple Building Painting/Flooring Repairs
- Solicitation number
- N4008526R9069
About this file
This document is Amendment 0002 to Solicitation N40085-26-R-9069 for MCAS Multiple Building Painting/Flooring Repairs, issued by NAVFAC Mid-Atlantic on September 3, 2026. The amendment consists of responses to 12 contractor inquiries regarding project scope and execution requirements across multiple buildings at the facility.
Key clarifications from the amendment include: air scrubbers are required in building G640; the facility will remain operational during construction with contractors required to minimize interference with normal operations, with specific scheduling details to be provided post-award; as-built drawings for building G640 are unavailable; painting work in building HP301 shall cover all previously painted interior and exterior surfaces excluding mechanical rooms and chases, with approximately 10 rooms designated for work; building AS4108 should be removed from the contract scope as it is scheduled for demolition; for building RR465, the occupying unit will remove only personal items while the contractor is responsible for moving and re-setting all other items including office furniture and partitions, and personnel will remain present during carpet replacement operations; and the facility will remain in operation during the construction period for building G640 with scheduling details and access information to be provided after award. The proposal receipt date and time remain unchanged, and all other terms and conditions of the original solicitation remain in effect. Contractors must acknowledge receipt of this amendment with their proposals.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0002 09/03/26 25-0453
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9069
7/31/26
25-0453, MCAS Multiple Building Painting/Flooring Repairs Amendment 0002, Answer Requests for information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9069 Amendment 0002
CONTINUATION SHEET
1. QUESTION: Will air scrubbers be required in building G640?
ANSWER: Yes
2. QUESTION: What will be the allowed working hours in building G640?
ANSWER: The facility will remain in operation during the entire construction period. The contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility. Scheduling details and access to the bldg. information will be provided after award.
3. QUESTION: Can as built drawings of the floor, reflective ceiling, and exterior elevations be provided for building G640?
ANSWER: None available.
4. QUESTION: Can the government provide a scope of work of what is intended to be painted on the interior and exterior of building HP301?
ANSWER: Paint all previously painted interior and exterior surfaces excluding mech rooms and mechanical chases.
5. QUESTION: Is there any intent to provide coatings in the mechanical chase, mechanical rooms, or the utility rooms of building HP301?
ANSWER: See previous question.
6. QUESTION: How many rooms will be given to the KTR to perform work (HP301)?
ANSWER: Approximately 10 rooms.
7. QUESTION: Will the Government move the tank and other equipment that is in the work area (A66)?
ANSWER: The float Tank will not be removed from the unit occupying the building. All other items other than personal items are the responsibility of the contractor to move.
8. QUESTION: This building is scheduled for demo per occupants (AS4108).
ANSWER: That is correct. Building should be removed from contract.
9. QUESTION: Will the Government remove the office furniture and office partitions
(RR465)?
ANSWER: The unit occupying the building will remove personal items only. The contractor is responsible for moving and re-setting all other items.
10. QUESTION: Will this space be vacated of personnel during carpet replacement
ANSWER: No
11. QUESTION: Will there be any special schedule required to complete the work contractor shall conduct his operations so as to cause the least possible interference with normal
12. QUESTION: Will special scheduling or phasing be required by the Government (G640)?
contractor shall conduct his operations so as to cause the least possible interference with normal
13. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .