This is an Asbestos Inspection Report for Building #AS4108, a Maintenance Hangar constructed in 1969 located at MCB Camp Lejeune. The building has been assigned a Hazard Rank 3/Green classification as of February 2021. The report documents the results of asbestos-containing material (ACM) surveys conducted over multiple inspection cycles from September 1999 through February 2021.

The building currently contains one identified non-friable ACM: black roofing sealant located on the lower roof C along the wall flashing to the hangar roof and miscellaneous patching areas, totaling 175 square feet and tested on 5/16/2007. No friable ACM records are found in the database. Extensive testing of other materials including 12-inch gray floor tiles and adhesive, drywall and joint materials, ceiling tiles, vinyl base, duct sealants, built-up roofing, fiberglass insulation sealants, gasket materials, and caulking materials has been conducted across multiple years, with most samples testing negative for asbestos. However, residual mastic, gasket materials, and capping insulation on fiberglass have tested positive for asbestos in various sampling events. The report emphasizes that ACM poses a health hazard only when fibers are airborne and inhaled, and recommends avoiding disturbance of identified materials. Any damage, dust, or debris from ACM must be reported to the Camp Lejeune Asbestos Program Manager at 910-451-5837. Periodic inspections will continue to evaluate changes in condition, and corrective actions have been initiated to minimize fiber release and protect personnel.

View the file

Other files

File Type Posted
25-0453 Amend 0002 and Cont page.pdf PDF
25-0453 Amend 0001.pdf PDF
Combined DIV 01 SPECS.pdf PDF
Building AS4108 FLRPLN.pdf PDF
MCAS SOW.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PD.pdf PDF
09 90 00 Painting and Coating Spec.pdf PDF
Building A66 FLRPLN.pdf PDF
Combined DIV 01 DBB SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PS.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
HP301 SR.pdf PDF
09 68 00 Carpeting Spec.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs SOW.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs PD.pdf PDF
G640 ACM REPORT.pdf PDF
AS217 ACM REPORT.pdf PDF
Contractor Environmental Guide.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs SR.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FS.pdf PDF
Building AS217 FLRPLN.pdf PDF
09 65 00 LVT Spec.pdf PDF
AS236 ACM REPORT.pdf PDF
09 90 00 PAINTS COATINGS Spec..pdf PDF
Building G640 FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs SR.pdf PDF
25-0453 RFP and pricing sheet.pdf PDF
09 65 00 RESILIENT FLOORING SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs QD.pdf PDF
Building AS236 FLRPLN.pdf PDF
Building G920 FLRPLN.pdf PDF
Building RR465 FLRPLN.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # AS4108

MCB CAMP LEJEUNE

Thursday, August 14, 2025

Print Date

Thursday, August 14, 2025 Page 1 of 11Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

AS4108

MAINTENANCE HANGAR

HAZ RANK 3/GREEN [AH FEB2021]

MASTIC

FEB2021

LTD. ABATES, ACM REMAINS

OCT2015

PVS. ACM REMAINS, MONITOR CAPPING AND GASKET ACM; ADDL SAMPLING, NO NEW ACM ID'D

APR2013

PVS. ACM REMAINS, CONCERNS OVER CAPPING ACM SINCE ALL LOCATIONS NOT KNOWN

MAR2010

PVS. ACM REMAINS, ADDL SAMPLING, CONFIRMED ACM MASTICS, ADDL ACM INCLUDES:

GASKET MATERIAL

CAPPING INSULATION

NOV07

ROOFING TESTED NON ACM, PVS. ACM MASTIC REMAINS, ADDL SAMPLING, ACM INCLUDES:

RESIDUAL MASTIC

ROOFING SEALANT, BLACK

NOV02

PVS. ACM REMAINS, NO ADDL SAMPLING

INSPECT SEP99

ACM INCLUDES:

MASTIC UNDER 12" GRAY TILE

BUILT-UP ROOFING (ASSUMED)

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

ROOFING SEALANT, BLACK 175 SFLOWER ROOF C, ALONG WALL

FLASHING TO HANGAR ROOF;

MISCELLANEOUS PATCHING

5/16/2007

Thursday, August 14, 2025 Page 2 of 11Print Date:

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

9/27/1999

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

11/7/2002

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

4/23/2014

ROOFING SEALANT, BLACK 175 SFLOWER ROOF C, ALONG WALL

FLASHING TO HANGAR ROOF;

MISCELLANEOUS PATCHING

4/23/2014

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

3/23/2010

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

10/27/2015

ROOFING SEALANT, BLACK 175 SFLOWER ROOF C, ALONG WALL

FLASHING TO HANGAR ROOF;

MISCELLANEOUS PATCHING

10/27/2015

12" GRAY FLOOR TILE AND ADHESIVE 19,300 SFSECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

2/9/2021

ROOFING SEALANT, BLACK 175 SFLOWER ROOF C, ALONG WALL

FLASHING TO HANGAR ROOF;

MISCELLANEOUS PATCHING

2/9/2021

ROOFING MATERIAL, HANGAR ROOF; HM22 ROLLED

ROOFING SEALING TAR AND PATCHING

THROUGHOUT

5/16/2007

6" BROWN VINYL BASE AND ADHESIVE SECOND FLOOR A WING, WEST

OFFICES, B and C WING, CARPETED AND

ADJACENT OFFICES

9/27/1999

12" GRAY FLOOR TILE AND ADHESIVE SECOND FLOOR A AND C WINGS,

COMMAND OFFICE AREAS; A WING

HALL; B WING, NORTH CENTER

OFFICES (REPLACEMENT OF ORIGINAL

HM01)

Thursday, August 14, 2025 Page 3 of 11Print Date:

RESIDUAL MASTIC PATCHES UNDER HM01 (REMOVED),

HM20, AND CARPETED AREAS (ON

CONCRETE) THROUGHOUT

5/16/2007

ROLLED ROOFING ROOFING SYSTEM COVERING AND

PERIMETER FLASHING (SEE ALSO HM26)

5/16/2007

ROOFING MATERIAL, ROOFING SYSTEM PATCHING AT

SUPPORTS AND FLASHINGS

5/16/2007

MISCELLANEOUS SEALANT UPPER HANGAR ROOF "WALL", PIPE

PENETRATION, C ROOF NORTHEAST

5/16/2007

DRYWALL AND JOINT MATERIAL FIRST FLOOR WEST/A WING: NORTH

EAST AND WEST; EAST/ C WING, NORTH

EAST AND WEST;

SECOND FLOOR THROUGHOUT

OFFICES, HALLS, AND MECHANICAL

SPACES

9/27/1999

DRYWALL AND JOINT MATERIAL FIRST FLOOR A WING, NORTHEAST, B

WING, NORTHWEST, and C WING, NORTHWEST RESTROOMS;

SECOND FLOOR A WING, NORTHEAS, B

WING, NORTHWEST, and C WING

NORTHWEST RESTROOMS

9/27/1999

ROOFING SEALANT, BLACK ROOFING SYSTEM BASE AND CURB

FLASHING CAP SEALANTS

5/16/2007

DUCT SEALANT, GRAY FIRST FLOOR SHOP/ MAINTENANCE

AREAS (OVERHEAD) THROUGHOUT

9/27/1999

FIBERGLASS INSULATION SEALANT LOCAL AREA MECHANICAL SPACES

AND OVERHEAD INSULATED LINES

THROUGHOUT

9/27/1999

BUILT-UP ROOFING ROOFING SYSTEM (ASSUMED) 9/27/1999

2'x4' CEILING TILE, SECOND FLOOR OFFICE SPACES

THROUGHOUT A, B, C WINGS

9/27/1999

BLACK VINYL BASE AND ADHESIVE, 4" THROUGHOUT HM01 FLOOR TILED

AREAS, FIRST AND SECOND FLOORS

9/27/1999

GASKET MATERIAL MECHANICAL ROOMS THROUGHOUT,

TANK FLANGES; STEAM SYSTEM

PIPING THROUGHOUT, FLANGES

3/23/2010

FIBERGLASS INSULATION SEALANT MIXED USE, MECHANICAL ROOMS AND

STEAM PIPING THROUGHOUT

3/23/2010

CAPPING INSULATION ON MAIN MECHANICAL ROOM STEAM

PIPING, POSSIBLE OVERHEAD STEAM

PIPING SYSTEMS (FULL LOCATIONS

UNKNOWN)

3/23/2010

CLOTH LAGGING MATERIAL FIBERGLASS PIPING INSULATED LINES

THROUGHOUT

3/23/2010

12" BEIGE FLOOR TILE AND ADHESIVE SECOND FLOOR PATCHING OF HM01, 21

AREAS

10/27/2015

CAULKING MATERIAL WOOD AND METAL DOOR FRAMES,

INTERIOR AND EXTERIOR

3/23/2010

12" GRAY FLOOR TILE AND ADHESIVE SECOND FLOOR WEST WING/A, NORTH

WING/B, EAST WING/C: THROUGHOUT

EXCEPT HEADS, STAIRWELLS, AND

MECHANICAL SPACES

Thursday, August 14, 2025 Page 4 of 11Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

BUILT-UP ROOFING ROOFING SYSTEM (ASSUMED), NOT

ACCESSED

11/7/2002

ROOFING SEALANT, BLACK ROOFING SYSTEM BASE AND CURB

FLASHING CAP SEALANTS

3/23/2010

DUCT SEALANT, GRAY FIRST FLOOR SHOP/ MAINTENANCE

AREAS (OVERHEAD) THROUGHOUT

3/23/2010

ROOFING MATERIAL, HANGAR ROOF; HM22 ROLLED

ROOFING SEALING TAR AND PATCHING

THROUGHOUT

3/23/2010

GASKET MATERIAL MECHANICAL ROOMS THROUGHOUT,

TANK FLANGES; STEAM SYSTEM

PIPING THROUGHOUT, FLANGES

4/23/2014

FIBERGLASS INSULATION SEALANT MIXED USE, MECHANICAL ROOMS AND

STEAM PIPING THROUGHOUT

4/23/2014

RESIDUAL MASTIC PATCHES UNDER HM01 (REMOVED),

HM20, AND CARPETED AREAS (ON

CONCRETE) THROUGHOUT

4/23/2014

CAPPING INSULATION ON MAIN MECHANICAL ROOM STEAM

PIPING, POSSIBLE OVERHEAD STEAM

PIPING SYSTEMS (FULL LOCATIONS

UNKNOWN)

4/23/2014

DRYWALL AND JOINT MATERIAL FIRST FLOOR WEST/A WING: NORTH

EAST AND WEST; EAST/ C WING, NORTH

EAST AND WEST;

SECOND FLOOR THROUGHOUT

OFFICES, HALLS, AND MECHANICAL

SPACES (SEE ALSO HM03)

3/23/2010

DRYWALL AND JOINT MATERIAL FIRST FLOOR A WING, NORTHEAST, B

WING, NORTHWEST, and C WING, NORTHWEST RESTROOMS;

SECOND FLOOR A WING, NORTHEAS, B

WING, NORTHWEST, and C WING

NORTHWEST RESTROOMS

3/23/2010

RESIDUAL MASTIC PATCHES UNDER HM01 (REMOVED),

HM20, AND CARPETED AREAS (ON

CONCRETE) THROUGHOUT

10/27/2015

GASKET MATERIAL MECHANICAL ROOMS THROUGHOUT,

TANK FLANGES; STEAM SYSTEM

PIPING THROUGHOUT, FLANGES

10/27/2015

CAPPING INSULATION ON MAIN MECHANICAL ROOM STEAM

PIPING, POSSIBLE OVERHEAD STEAM

PIPING SYSTEMS (FULL LOCATIONS

UNKNOWN)

10/27/2015

Thursday, August 14, 2025 Page 5 of 11Print Date:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Thursday, August 14, 2025 Page 6 of 11Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

AS4108-01-00ri02 11/7/200201 N/A 9 9 912" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-00ri07 5/16/200701 N/A, HM01 OTHER

LOCATIONS

1 1 112" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-00ri13 4/23/201401 N/A 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-00ri15 10/27/201501 N/A 9 9 912" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-00ri20 2/9/202101 N/A 9 9 912" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-01 9/27/199901 A WING, SW RM204 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-02 9/27/199901 B WING, HALL MIDDLE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-03 9/27/199901 C WING, HALL EAST 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-04 9/27/199901 B WING, HALL CNTR EAST 8 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-05 9/27/199901 A WING, NORTH HALL, CNTR 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-30 5/16/200701 2ND FL C, SE HALLWAY 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-40 3/23/201001 1ST FL C, NE SM. OFFICE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-40tem 3/23/201001 1ST FL C, NE SM. OFFICE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-41 3/23/201001 2ND FL A, SW OFFICE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-42 3/23/201001 2ND FL A, NW LG. OFFICE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-43 3/23/201001 2ND FL A, NORTH HALL, EAST 3 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-44 3/23/201001 2ND FL B, HALLWAY, CNTR 3 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-45 3/23/201001 2ND FL C, NORTH CNTR

OFFICE

3 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

Thursday, August 14, 2025 Page 7 of 11Print Date:

HA Sample Location Chr

Amo

Oth

Description

AS4108-01-46 3/23/201001 2ND FL C, SE OFFICE CLOSET/

STORAGE

0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-01-47 3/23/201001 2ND FL C, EAST HALL,

SOUTH END

0 0 012" GRAY FLOOR TILE

AND ADHESIVE

w/ WHITE STREAKS

AS4108-02-01 9/27/199902 2ND FL A WING, SW RM204 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-02 9/27/199902 2ND FL A WING, NORTH

HALL, CNTR

0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-03 9/27/199902 2ND FL B WING, EAST RM264 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-04 9/27/199902 2ND FL B WING, WEST RM241 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-05 9/27/199902 1ST FL C WING, WEST MECH

RM148A

0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-40 3/23/201002 1ST FL C, NE MECH RM 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-42 3/23/201002 1ST FL B, WEST OFFICE 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-43 3/23/201002 1ST FL A, NE TELEPHONE 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-45 3/23/201002 1ST FL A, NW MECH AREA 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-46 3/23/201002 2ND FL A, SW HALL 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-47 3/23/201002 2ND FL A, NE HEAD 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-02-48 3/23/201002 2ND FL B, HALL EAST 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

AS4108-03-01 9/27/199903 2ND FL A; NE RESTROOM

RM232

0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

AS4108-03-02 9/27/199903 2ND FL B; NW RESTROOM

RM241

0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

AS4108-03-0241 3/23/201003 1ST FL C, NW HEAD 0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

AS4108-03-0244 3/23/201003 1ST FL A, NE HEAD 0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

AS4108-03-03 9/27/199903 1ST FL A; NE RESTROOM

RM121

0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

Thursday, August 14, 2025 Page 8 of 11Print Date:

HA Sample Location Chr

Amo

Oth

Description

AS4108-04-01 9/27/199904 2ND FL B, NW RM244 0 0 02'x4' CEILING TILE, FISSURED

AS4108-0401QC 9/27/199904 2ND FL B, NW RM224 0 0 02'x4' CEILING TILE, FISSURED

AS4108-04-02 9/27/199904 2ND FL A, SW RM204 0 0 02'x4' CEILING TILE, FISSURED

AS4108-04-03 9/27/199904 2ND FL C, SE RM295 0 0 02'x4' CEILING TILE, FISSURED

AS4108-05-01 9/27/199905 2ND FL A, NORTH HALL 0 0 0BLACK VINYL BASE

AND ADHESIVE, 4"

AS4108-05-02 9/27/199905 2ND FL B, NORTH CNTR

RM245

0 0 0BLACK VINYL BASE

AND ADHESIVE, 4"

AS4108-05-03 9/27/199905 2ND FL C, NORTH CNTR

RM276

0 0 0BLACK VINYL BASE

AND ADHESIVE, 4"

AS4108-06-01 9/27/199906 2ND FL A, NW OFFICE RM213 0 0 06" BROWN VINYL BASE

AND ADHESIVE

AS4108-0601QC 9/27/199906 2ND FL A, NW OFFICE RM213 0 0 06" BROWN VINYL BASE

AND ADHESIVE

AS4108-06-02 9/27/199906 2ND FL A, SW RM205 0 0 06" BROWN VINYL BASE

AND ADHESIVE

AS4108-06-03 9/27/199906 2ND FL C, SE RM298 0 0 06" BROWN VINYL BASE

AND ADHESIVE

AS4108-07-01 9/27/199907 1ST FL C, SE RM169 0 0 0DUCT SEALANT, GRAY

AS4108-07-02 9/27/199907 1ST FL A, SW RM103 0 0 0DUCT SEALANT, GRAY

AS4108-07-03 9/27/199907 1ST FL A, NE MECH RM123 0 0 0DUCT SEALANT, GRAY

AS4108-07-40 3/23/201007 1ST FL C, NORTH CNTR TOOL

RM

0 0 0DUCT SEALANT, GRAY

AS4108-08-00RI07 5/16/200708 N/A 9 9 9BUILT-UP ROOFING AND COMPONENTS

AS4108-09-00ri02 11/7/200208 N/A 1 1 1BUILT-UP ROOFING AND COMPONENTS

AS4108-10-01 9/27/199910 1ST FL A, NE MECH RM123 0 0 0FIBERGLASS

INSULATION SEALANT

GRAY

AS4108-10-02 9/27/199910 1ST FL B, NE SHOP RM146 0 0 0FIBERGLASS

INSULATION SEALANT

GRAY

AS4108-10-03 9/27/199910 1ST FL B, NE SHOP RM146 0 0 0FIBERGLASS

INSULATION SEALANT

GRAY

AS4108-20-30 5/16/200720 2ND FL C, SE OFFICE 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

Thursday, August 14, 2025 Page 9 of 11Print Date:

HA Sample Location Chr

Amo

Oth

Description

AS4108-20-31 5/16/200720 2ND FL A, SW HALL 0 0 012" GRAY FLOOR TILE

AND ADHESIVE

AS4108-21-00ri13 4/23/201421 N/A 9 9 9RESIDUAL MASTIC

AS4108-21-00ri15 10/27/201521 N/A 9 9 9RESIDUAL MASTIC

AS4108-21-30 5/16/200721 2ND FL C, SE STAIRWELL 8 0 0RESIDUAL MASTIC

AS4108-22-30 5/16/200722 ROOF C LOWER, NE CORNER 0 0 0ROLLED ROOFING

AS4108-22-31 5/16/200722 HANGAR ROOF, NW 0 0 0ROLLED ROOFING

AS4108-22-32 5/16/200722 ROOF A LOWER, SW CORNER 0 0 0ROLLED ROOFING

AS4108-23-30 5/16/200723 ROOF C LOWER, SE FLASH 0 0 0ROOFING MATERIAL, TAR

AS4108-24-00ri13 4/23/201424 N/A 9 9 9ROOFING SEALANT, BLACK

AS4108-24-00ri15 10/27/201524 N/A 9 9 9ROOFING SEALANT, BLACK

AS4108-24-00ri21 2/9/202124 N/A 1 1 1ROOFING SEALANT, BLACK

AS4108-24-30 5/16/200724 ROOF C LOWER, NE 8 0 0ROOFING SEALANT,

BLACK

AS4108-24-31 5/16/200724 ROOF B LOWER, CNTR PATCH 0 0 0ROOFING SEALANT,

BLACK

AS4108-25-30 5/16/200725 ROOF C LOWER, EAST OF

HANGAR WALL

0 0 0MISCELLANEOUS

SEALANT

RED

AS4108-26-30 5/16/200726 HANGAR ROOF, EAST CNTR 0 0 0ROOFING MATERIAL, TAR

AS4108-26-31 5/16/200726 HANGAR ROOF, SOUTH CNTR 0 0 0ROOFING MATERIAL, TAR

AS4108-26-32 5/16/200726 HANGAR ROOF, CNTR WEST 0 0 0ROOFING MATERIAL, TAR

AS4108-26-33 5/16/200726 HANGAR ROOF, WEST CNTR 0 0 0ROOFING MATERIAL, TAR

AS4108-26-40 3/23/201026 HANGAR ROOF, EAST CNTR 0 0 0ROOFING MATERIAL, TAR

AS4108-27-30 5/16/200727 ROOF B LOWER, SE FLASHING 0 0 0ROOFING SEALANT,

BLACK

AS4108-27-41 3/23/201027 ROOF B, EAST END OF

"WALL"

0 0 0ROOFING SEALANT,

BLACK

AS4108-27-42 3/23/201027 ROOF B, WEST END OF

"WALL"

0 0 0ROOFING SEALANT,

BLACK

Thursday, August 14, 2025 Page 10 of 11Print Date:

HA Sample Location Chr

Amo

Oth

Description

AS4108-30-40 3/23/201030 1ST FL C, SE EXT. DOOR,

WOOD

0 0 0CAULKING MATERIAL WHITE

AS4108-30-41 3/23/201030 1ST FL C, SE INT. DOOR,

METAL

0 0 0CAULKING MATERIAL WHITE

AS4108-30-42 3/23/201030 1ST FL A, SW EXT. DOOR,

METAL

0 0 0CAULKING MATERIAL WHITE

AS4108-31-00ri13 4/23/201431 N/A 9 9 9GASKET MATERIAL GRAY

AS4108-31-00ri15 10/27/201531 N/A 9 9 9GASKET MATERIAL GRAY

AS4108-31-40 3/23/201031 1ST FL C, NE CORNER LOFT,

VALVE

70 0 0GASKET MATERIAL GRAY

AS4108-31-41 3/23/201031 1ST FL C, NW MECH RM,

TANK FLANGE

70 0 0GASKET MATERIAL GRAY

AS4108-31-42 3/23/201031 1ST FL C, NW MECH RM,

TANK FLANGE

70 0 0GASKET MATERIAL GRAY

AS4108-31-43 3/23/201031 1ST FL A, NE MECH/TELE RM

FLANGE

43 0 0GASKET MATERIAL GRAY

AS4108-32-40 3/23/201032 1ST FL C, NE LOFT, OVHD

PIPING

0 0 0FIBERGLASS

INSULATION SEALANT

TAN

AS4108-32a-00ri13 4/23/201432a N/A 9 9 9CAPPING INSULATION

ON

FIBERGLASS

AS4108-32a-00ri15 10/27/201532a N/A 19 19 19CAPPING INSULATION

ON

FIBERGLASS

AS4108-32a-41 3/23/201032a 1ST FL C, NW MECH RM

PIPING

40 0 0CAPPING INSULATION

ON

FIBERGLASS

AS4108-33-40 3/23/201033 1ST FL C, NW STAIR PIPING 0 0 0CLOTH LAGGING

MATERIAL

AS4108-40-60 10/27/201540 2ND FL A SECTION .1 .1 .112" BEIGE FLOOR TILE

AND ADHESIVE

w/GRAY SPECS

AS4108-40-61 10/27/201540 2ND FL C SECTION .1 .1 .112" BEIGE FLOOR TILE

AND ADHESIVE