25M114CN MCAS Multiple Building Paint and Flooring Repairs SR.pdf

PDF 88 KB Posted

Attached to
MCAS Multiple Building Painting/Flooring Repairs
Solicitation number
N4008526R9069
Issued by

About this file

This is a Submittal Register template used to track contractor submissions and approvals for federal construction contracts. The form provides a standardized format for managing preconstruction submittals, test reports, certificates, product data, and closeout documentation throughout the contract lifecycle.

The register documents submissions across multiple categories including SD-01 Preconstruction Submittals (Accident Prevention Plan, Quality Control Plan, Construction Schedule, Equipment Delivery Schedule, Activity Hazard Analysis, Crane Work Plans, Traffic Control Plans, Environmental Protection Plans, and Preconstruction Surveys); SD-03 Product Data (Backflow Preventers); SD-06 Test Reports (Backflow Preventer Tests); SD-07 Certificates (Confined Space Entry Permits, Certificates of Compliance, Third Party Crane Certifications, Backflow Preventer Certifications, and Backflow Tester Certifications); and SD-11 Closeout Submittals (Interim DD1354 Transfer & Acceptance, Complete Submittal Package, and Submittal Register). The form tracks action codes, submission dates, approval needed dates, material needed dates, contractor action dates, dates forwarded to approving authority, dates received from contractor, dates forwarded to other reviewers, dates received from other reviewers, mailing dates, and approving authority receipt dates. The template accommodates remarks and references specification sections for each submittal item. This form is designated as the January 1996 edition with previous editions marked obsolete.

View the file

Other files

File Type Posted
25-0453 Amend 0002 and Cont page.pdf PDF
25-0453 Amend 0001.pdf PDF
Combined DIV 01 SPECS.pdf PDF
Building AS4108 FLRPLN.pdf PDF
MCAS SOW.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PD.pdf PDF
09 90 00 Painting and Coating Spec.pdf PDF
Building A66 FLRPLN.pdf PDF
Combined DIV 01 DBB SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PS.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
HP301 SR.pdf PDF
09 68 00 Carpeting Spec.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs SOW.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs PD.pdf PDF
G640 ACM REPORT.pdf PDF
AS217 ACM REPORT.pdf PDF
Contractor Environmental Guide.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FS.pdf PDF
Building AS217 FLRPLN.pdf PDF
09 65 00 LVT Spec.pdf PDF
AS236 ACM REPORT.pdf PDF
09 90 00 PAINTS COATINGS Spec..pdf PDF
Building G640 FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs SR.pdf PDF
25-0453 RFP and pricing sheet.pdf PDF
09 65 00 RESILIENT FLOORING SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs QD.pdf PDF
Building AS236 FLRPLN.pdf PDF
Building G920 FLRPLN.pdf PDF
AS4108 ACM REPORT.pdf PDF
Building RR465 FLRPLN.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

Crane Reports

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

(Enter Contractor Name Here)

Qaulity Control Plan (QC Plan)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

Certificate of Compliance

SD-01 PRECONSTRUCTION SUBMITTALS

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

DESCRIPTION ITEM SUBMITTED

SD-11 CLOSEOUT SUBMITTALS

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

Backflow Preventer Tests (If Applicable)

SD-07 CERTIFICATES

Third Party Certification of Barge-

Mounted Movile Cranes

Confined Space Entry Permit

Approving AuthorityContractor Schedule Dates

Contractor Action

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Backflow Preventers Certificate (If Applicable)

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicable)

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

Backflow Tester Certification (If Applicable)