25M114CN MCAS Multiple Building Paint and Flooring Repairs SR.pdf
PDF 88 KB Posted
- Attached to
- MCAS Multiple Building Painting/Flooring Repairs
- Solicitation number
- N4008526R9069
About this file
This is a Submittal Register template used to track contractor submissions and approvals for federal construction contracts. The form provides a standardized format for managing preconstruction submittals, test reports, certificates, product data, and closeout documentation throughout the contract lifecycle.
The register documents submissions across multiple categories including SD-01 Preconstruction Submittals (Accident Prevention Plan, Quality Control Plan, Construction Schedule, Equipment Delivery Schedule, Activity Hazard Analysis, Crane Work Plans, Traffic Control Plans, Environmental Protection Plans, and Preconstruction Surveys); SD-03 Product Data (Backflow Preventers); SD-06 Test Reports (Backflow Preventer Tests); SD-07 Certificates (Confined Space Entry Permits, Certificates of Compliance, Third Party Crane Certifications, Backflow Preventer Certifications, and Backflow Tester Certifications); and SD-11 Closeout Submittals (Interim DD1354 Transfer & Acceptance, Complete Submittal Package, and Submittal Register). The form tracks action codes, submission dates, approval needed dates, material needed dates, contractor action dates, dates forwarded to approving authority, dates received from contractor, dates forwarded to other reviewers, dates received from other reviewers, mailing dates, and approving authority receipt dates. The template accommodates remarks and references specification sections for each submittal item. This form is designated as the January 1996 edition with previous editions marked obsolete.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
1.11
1.14.6
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
SD-03 PRODUCT DATA
Backflow Preventers (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
Crane Reports
(Enter Contract No. Here)
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P A R A G R A P H
N O
S P E C
S E C T
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
(Enter Contractor Name Here)
Qaulity Control Plan (QC Plan)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
Certificate of Compliance
SD-01 PRECONSTRUCTION SUBMITTALS
TITLE AND LOCATION
(Enter Contract Title and Locaiton Here)
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A C T I V I T Y
N O
T R A N S M I T T A L
N O
(d)
DESCRIPTION ITEM SUBMITTED
SD-11 CLOSEOUT SUBMITTALS
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
Backflow Preventer Tests (If Applicable)
SD-07 CERTIFICATES
Third Party Certification of Barge-
Mounted Movile Cranes
Confined Space Entry Permit
Approving AuthorityContractor Schedule Dates
Contractor Action
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Backflow Preventers Certificate (If Applicable)
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicable)
Environmental Protection Plan
Preconstruction Survey
Notice of Intent (If applicable)
Backflow Tester Certification (If Applicable)
File details come from the government source that posted it. Updated .