This is a Submittal Register form used to track construction contract submissions and approvals. The document serves as a comprehensive checklist for managing contractor deliverables throughout the contract lifecycle, from preconstruction through closeout phases.

The form organizes required submittals into several categories: SD-01 Preconstruction Submittals include Schedule of Prices, List of Contact Personnel, Construction Schedule, Equipment Delivery Schedule, Crane Work Plan, Activity Hazard Analysis, Accident Prevention Plan, Traffic Control Plan, Environmental Protection Plan, Preconstruction Survey, MSDS for Class I ODS Waivered Products, Permit for Storm Water Discharge, and Notice of Intent. SD-03 Product Data requires Backflow Preventers documentation where applicable. SD-06 Test Reports encompass Reports, Accident Reports, Monthly Exposure Reports, Regulatory Citations and Violations, and Crane Reports, along with Backflow Preventer Tests. SD-07 Certificates include Confined Space Entry Permits, Backflow Tester Certification, Backflow Preventers Certificates, Certificate of Compliance, and Third Party Certification of Barge-Mounted Mobile Cranes. SD-11 Closeout Submittals require Interim DD1354 Transfer & Acceptance of Military Real Property, Submittal Register, Quality Control Plan, and Complete Submittal Package. The form provides columns for tracking action codes, submission dates, material needed dates, approval authority routing, and reviewer coordination, enabling systematic management of contractor deliverables and government approvals throughout the contract performance period.

View the file

Other files

File Type Posted
25-0453 Amend 0002 and Cont page.pdf PDF
25-0453 Amend 0001.pdf PDF
Combined DIV 01 SPECS.pdf PDF
Building AS4108 FLRPLN.pdf PDF
MCAS SOW.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PD.pdf PDF
09 90 00 Painting and Coating Spec.pdf PDF
Building A66 FLRPLN.pdf PDF
Combined DIV 01 DBB SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs PS.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
09 68 00 Carpeting Spec.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs SOW.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs PD.pdf PDF
G640 ACM REPORT.pdf PDF
AS217 ACM REPORT.pdf PDF
Contractor Environmental Guide.pdf PDF
25M114CN MCAS Multiple Building Paint and Flooring Repairs SR.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs FS.pdf PDF
Building AS217 FLRPLN.pdf PDF
09 65 00 LVT Spec.pdf PDF
AS236 ACM REPORT.pdf PDF
09 90 00 PAINTS COATINGS Spec..pdf PDF
Building G640 FLRPLN.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs SR.pdf PDF
25-0453 RFP and pricing sheet.pdf PDF
09 65 00 RESILIENT FLOORING SPECS.pdf PDF
26M101CN BEQ HP301 Paint-Flooring Repairs QD.pdf PDF
Building AS236 FLRPLN.pdf PDF
Building G920 FLRPLN.pdf PDF
AS4108 ACM REPORT.pdf PDF
Building RR465 FLRPLN.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

Crane Reports

SD-07 CERTIFICATES

Confined Space Entry Permit

Approving AuthorityContractor Schedule Dates

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

SD-01 PRECONSTRUCTION SUBMITTALS

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Third Party Certification of Barge-

Mounted Movile Cranes

SD-11 CLOSEOUT SUBMITTALS

Qaulity Control Plan (QC Plan)

Certificate of Compliance

Backflow Tester Certification (If Applicable)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES