This is Amendment 0003 to a federal solicitation for the MARSOC Storage and Training Facilities project at Camp Lejeune, North Carolina. The amendment, issued on February 18, 2026, provides responses to Requests for Information (RFI) submitted by potential offerors regarding the construction project. The solicitation number is N40085-26-R-9012, and the project number is 25-0029. NAVFAC Mid-Atlantic is administering the contract through the Resident Officer in Charge of Construction located at 1107A Birch Street, Camp Lejeune, NC 28547-2521.
The amendment addresses two key technical questions from offerors. First, regarding Pre-Engineered Metal Building (PEMB) standing seam roofing, the Government clarified that PEMB standing seam roof panels must comply with the contract specifications, addressing concerns about whether a standard 16-inch vertical seam panel could be substituted for the T-shaped panel shown in the contract drawings. Second, the Government clarified that the three coats required for the floor finish should be a clear sealer rather than an epoxy. The receipt date for proposals remains unchanged, and all other contract terms and conditions remain in effect. Offerors must acknowledge receipt of this amendment when submitting their proposals, as failure to do so may result in rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0015.pdf | ||
| Amend 0015 Pricing Sheet.pdf | ||
| Amend 0014.pdf | ||
| Amend 0014 Pricing Sheet.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| Amendment 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| 22-0047 Prac App Combined Sheets - ASI 01.pdf | ||
| Amend 0008.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 250029 Geotechnical Report.pdf | ||
| 250029 BASIS OF DESIGN.pdf | ||
| 250029_APPXD.pdf | ||
| N4008525B0029 Dwgs.pdf | ||
| 250029 APPXD.pdf | ||
| Gen MACC RFP.pdf | ||
| N4008525B0029 Specs.pdf | ||
| N4008525B0029_Dwgs.pdf | ||
| N4008525B0029_Specs.pdf | ||
| 250029 Facility Geotechnical Report.pdf | ||
| Encl 1 Pricing Sheet.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0003 02/18/26 25-0029
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9012
02/05/26
25-0029 - P1625 MARSOC Storage and Training Facilities
Amendment 0003, Responses to RFI's.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
N40085-26-R-9012 Amendment 0001
CONTINUATION SHEET
1. QESTION: There is not a standalone standing seam roofing spec for these two buildings.
Will the Government allow the PEB supplier to provide their standard standing seam roof panel?The PEB panel would be a 16” panel with vertical seam leg not the T shape on the drawings. On other projects we have had to use the Garland panel that will be installed on the PEB structure.
ANSWER: PEMB standing seam roof panels shall comply with the contract specifications.
2. QUESTION: Could the Government please clarify if the three coats required for the floor should be a clear sealer or an epoxy?
ANSWER: Three coats clear sealer.
3. The time and date for receipt of proposals remains unchanged.
4. All other terms and conditions remain unchanged.