This is a Questions and Answers (Q&A) document from a federal contract solicitation for environmental remediation work at Nomans Land, Massachusetts, a U.S. Navy site. The document records 34 contractor inquiries submitted between May 5 and May 20, 2026, with corresponding government responses addressing technical, scheduling, logistical, and compliance clarifications.
The solicitation addresses metal-in-the-earth (MEC) surface clearance and unexploded ordnance (UXO) fieldwork across approximately 50 acres of beach areas and 14 acres of roads/trails, plus interior dry pond areas. Key clarifications include: the proposal due date was extended to June 22, 2026 at 2:00 PM; award will be based on low price using price analysis without cost realism evaluation under FAR 15.404-1(d); fieldwork must occur outside bird nesting season (mid-April to mid-September); SCA Wage Determination No. #2015-407 Revision 22 (dated 5/13/2026) applies to labor categories including UXO Technicians; the dry ponds are included within the accessible clearance acreage; and the Government will not provide direct logistical support but will assist contractors in obtaining staging areas and USCG docking access at Menemsha Harbor. The Navy indicated several documents would be posted in PIEE and SAM, including background clearance reports, the Operations & Maintenance Plan, Land Use Control Report, sign specifications, and MEC item identification lists. Contractors should anticipate some operational flexibility regarding landing locations and staging methods, though specific details will be finalized post-award. Additional information regarding biological monitoring requirements, existing equipment availability (Conex boxes and mooring systems), and final sign specifications was deferred to future amendments pending further information from USFWS.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para.
1 5/5/2026 Please provide the following background documents from the 2021 Clearance: 1) After Action Report; 2) QAPP; 3) ESS Documents posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0001
2 5/6/2026 6 4 1 The documents listed in Section 4 of the Solicitation are dated from 2014. Would it be possible to obtain the ESS and QAPP from most recent clearance event in 2022? Documents posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0001
3 5/6/2026 The wage determination provided is for DBA. Please provide the SCA Wage Determination for this area. There are not any current applicable SCA wage rates.
Heather Dennis, heather.m.dennis13.civ@us.navy.mil 0001
4 5/13/2026 2
Proposal Due Date: Because the proposal preparation period includes the long Memorial Day weekend, and it will be necessary to request competitive quotes from multiple vendors, we request the government consider extending the proposal due date to 22 June 2026 to allow all contractors to get the most competitive vendor pricing possible. The proposal due date will extended to 6/22/26 @ 2:00pm.
Heather Dennis, heather.m.dennis13.civ@us.navy.mil 0002
5 5/14/2026 3
Basis for Award: The basis for award is stated to be low price. Please confirm FAR 15.404-1(d) Cost Realism will not be used when evaluating the low price but price analysis will?
Correct. The proposed task order will be awarded to the responsible offeror offering the best value to the Government. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each offeror on price only therefore FAR 15.404-1(d) is not applicable.
Heather Dennis, heather.m.dennis13.civ@us.navy.mil 0002
8 5/14/2026 1 2 1 Please provide the Record of Decision, November 2021. Document posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
9 5/14/2026 2 2.2.2 1 Please confirm the MR-QAPP is to follow Module 2 Toolkit.
The MR-QAPP is to follow the Module 2 Toolkit as has been done previously.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
10 5/14/2026 2 2.2.2 1 Please confirm if the Limited MEC surface clearance includes the dry ponds. The dry ponds are included.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
11 5/14/2026 4 2.3.2 1 Please provide the O&M Plan. Document posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
12 5/14/2026 4 2.3.2 1
Are there any work limitations or restrictions in terms of work hours, work days, weeks or months that could affect our schedule, impact production and our projected completion date?
Assume that the fieldwork will need to take place outside of the bird nesting season which runs from mid-April to mid- September.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
13 5/14/2026 4 2.6 2 Please provide the most recent Land Use Control Report. Document posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
14 5/14/2026 7 4 1 Please provide the 3 documents listed in this section (i.e., Final ESS 2014; Work Plan 2014; and Final After Action Report 2015.) Documents posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0002
15 5/14/2026 6 2.6 1 Please provide an example of image, detail, and specification on signs in terms of content, language, color, material of construction, mounting, and post embedment.
To be provided in another Amendment once the information is obtained from USFWS.
16 5/14/2026 6 2.3.4 1
In order to determine the size of equipment and estimate the vegetation density present on the island, what is the mowing schedule for the USFWS? When was the last mowing event?
To be provided in another Amendment once the information is obtained from USFWS.
GOVERNMENT RESPONSEQUESTION
Amend No.
GOV'T RESPONDER
NAME, E-MAIL
REFERENCE
Date
SubmittedPPI No.
17 5/14/2026 4 2.3.2 1 Is there a preferred season to conduct work as related to protection concerns for biological/protected species/endangered species?
Assume that the field work will need to take place outside of the bird nesting season which runs from mid-April to mid- September.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
18 5/14/2026 4 2.2.2 1 Do the 50 acres of beaches and 14 acres of roads/trails include the dry pond areas? The dry ponds are in addition to the 64 acres mentioned.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
19 5/20/2026
During the 2022 MEC clearance there were MEC items identified by USFWS that required removal. Is there a list of MEC items identified by USFWS since the 2022 clearance that will require removal?
To be provided in another Amendment once the information is obtained from USFWS.
20 5/20/2026 2.6 2 Can you provide a photo of the sign so that we know what it is supposed to look like? Document posted in PIEE and SAM.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
21 5/20/2026
Will sign installation be limited to replacement of existing signs, or should the Contractor anticipate installation of new sign locations?
The signs will be placed in areas where signs originally were, but may have been completely lost so a new installation would be needed.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
22 5/20/2026
The Q&A issued with Amendment 1 to the solicitation indicated that there are not applicable SCA wage determinations for this work. Nomans Land, Massachusetts is located in Dukes County as part of the town of Chilmark. Can the Navy please confirm that SCA WD No. ma, revision 33, dated 5/13/26 are applicable to this solicitation to cover labor categories such as UXO Techs and other relevant positions.
There was not an applicable SCA WD at the time of the Solicitation. Yes. SCA WD #2015-407 Rev 22 dated 5/13/26 is applicable and and posted in PIEE and SAM.
Heather Dennis, heather.m.dennis13.civ@us.navy.mil 0003
23 5/20/2026
Please clarify anticipated USFWS seasonal restrictions, nesting restrictions, shoreline access limitations, and allowable fieldwork windows.
Assume that the field work will need to take place outside of the bird nesting season which runs from mid-April to mid- September.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
24 5/20/2026
Please identify any Government-furnished support that will be provided, including staging areas and USCG docking access at Menemsha Harbor.
The Navy will not provide direct support for this activity, but will assist the contractor as needed.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
25 5/20/2026
Does the Government require onsite biological monitoring during vegetation clearing, marine operations, shoreline access activities, demolition operations, or MEC/UXO fieldwork, and if so, shall the Contractor include dedicated biological monitoring personnel within the proposal?
To be provided in another Amendment once the information is obtained from USFWS.
26 5/20/2026
Will the Contractor be permitted flexibility to adjust landing locations, staging methods, marine access approaches, temporary pier configurations, and other marine logistics methods based on weather, field conditions, and operational requirements, and will the Government provide prior project GIS data, MEC/MD locations, mooring coordinates, marine layouts, production reports, and access/staging information to support planning and execution?
There is some flexibility in making adjustments, but those options should be discussed in the planning documents. GIS data will be provided once the contract has been awarded.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
27 5/20/2026
Please clarify the anticipated MEC surface clearance acreage associated with the “accessible areas” identified in the PWS. The PWS identifies approximately 50 acres of beach areas and approximately 14 acres of roads/trails for surface clearance. Should the Contractor also anticipate MEC surface clearance within the interior “dry pond” areas as part of the accessible acreage, or is the anticipated clearance scope generally limited to beaches, existing roads, trails, and previously established access corridors/work areas?
It is expected that the accesible areas will include the dry ponds along with the beach areas and trails.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
28 5/20/2026 PWS - 6 2.3.2 1
Can the government please identify seasonal work restrictions and the allowable time of the year work can be performed?
Assume that the field work will need to take place outside of the bird nesting season which runs from mid-April to mid- September.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
29 5/20/2026 PWS - 6 2.3.3 1
During previous investigations, use of onsite Conex boxes was allowed. Please confirm if the existing Conex boxes can be used for storage during field operations.
To be provided in another Amendment once the information is obtained from USFWS. 0003
30 5/20/2026 PWS - 6 2.3.3 1
During previous investigation, a mooring system was installed. Is this mooring system still present and available for contractors to use? Assume that the mooring system is no longer present.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
31 5/20/2026 PWS - 6 2.3.3 1
During prior investigations, the USCG dock at Menemsha Harbor was used for storage of the transport vessel. Can contractors assume this space will be available during this investigation?
Yes. Assume the USCG dock at Menemsha Harbor will be available during investigation.
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
32 5/20/2026 PWS - 6 2.4 1
Due to the remote and restricted nature of the site, will any identified MEC require guarding or storage or can the item be left in place until disposition at the end of the field work?
It appears as though MEC was stored on-site during the previous clearance activity, but the contractor does need to ensure that method would be allowed by law or regulation
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
33 5/20/2026 PWS - 6 2.6 2
PWS indicates land use control inspection report sections are provided as an attachment. Please provide the land use control inspection report.
Same response as line 13 (Document posted in PIEE and
SAM).
Derek Pinkham, derek.j.pinkham.civ@us.navy.mil 0003
34 5/20/2026 PWS - 6 2.6 2
Can the government provide specifications for the signs to be installed including style, graphics, and support posts.
To be provided in another Amendment once the information is obtained from USFWS.