ES104-C - Amend 0005.pdf
PDF 368 KB Posted
- Attached to
- SERE Parking Lot Expansion
- Solicitation number
- N4008525R9012
About this file
The document is an engineering drawing (ES104-C) for a Partial Site Lighting Plan, part of the P-1574 MRSB Operational Support Facility (OSF) project at Camp Lejeune, NC. The drawing details site lighting specifications for a naval facility, including multiple scaled site lighting plan views with specific lighting installation instructions. Key technical notes include extending existing controlled site lighting branch circuits, mounting photocells facing north, installing UL wet-listed motion sensors for walkway bridge lighting, and aiming sign lighting for even illumination. The drawing is prepared by NAVFAC Mid-Atlantic and involves electrical infrastructure modifications for the Marine Corps base, with the site lighting plan controlled via lighting relay panel "LRP1". The contract is associated with construction contract number N40085-19-D-9164 and was approved on 6/22/2023.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PT
36PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
T.O.S.
T.O.S.
T.O.B.
T.O.B.
P-1574U
RR527
SW2 SW2B SW2
SW2
SW1SW1BSW1
SW1
SW1
SW2B
SW2
SW3B
SW3B
SW1
SW2
PE
SF1
(VIA LRP1-10)
1LN1-19
SP1
UL1
P2-26
UL1
RR
U L1
SP1
UL1
UL1
SP1
U L1
SP1
UL1
(VIA LRP1-8)
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
SW4
1LN1-15
UL2
(TYP.)
10' - 0"
SP1
UL1
No 83262
STATE OF
CI
R
P R
O F
N
SS
OI
E
LA ENG
IN
E E
R
LICENSE
F LORI DA
E
E
N U
A
RBLAHCIM
ENGINEERS + SURVEYORS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N O
R F
O L
K V
A
AS NOTED
D C
C O
R E
U .S
. M A
R
IN
E C
O R
P S
1717488
C A
M P
L E
JE
U
N E
, N C
P -1
M R
S B
O P
E R
A
TI
O N
A L
S U
P P
O R
T
FA
C
IL
IT
Y
O
S F)
KDB/SVR
EJA
DSN
Approved by Sofia Schwartz, Asset Management Branch Director, PWD G-F, MCIEAST-MCB Camp Lejeune via email.
JAS
06/05/2023
/2
/2
:1 :0
P
M
A u to d e s k D o c s /2
.0
P
M R
S B
O S
F /B
L D
G -P
-1
-E .r v t
ES104-C
P A
R
TI
A L
S
IT
E L
IG
H
TI
N
G P
LA
N
B
ID
O
P
TI
O N
NGZ
12886072
REZ REZ
N40085-19-D-9164
E S
-C
1" = 30' 0 30' 120'60'
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
KEY NOTES#
1 SEE C1/ES502 FOR BRIDGE STEP LIGHTING INSTALLATION DETAIL.
2 EXTEND EXISTING CONTROLLED SITE LIGHTING BRANCH CIRCUIT TO
SERVE NEW AND RELOCATED LIGHT FIXTURES AS INDICATED.
3 SEE SHEET EL101 FOR CONTINUATION.
4 MOUNT PHOTOCELL TO ROOF FACING NORTH.
5 REFEED EXISTING LUMINAIRE TO EXISTING CONTROLLED LIGHTING
BRANCH CIRCUIT SERVING THIS AREA.
6 REFER TO C1/ES501 FOR FLOOD LIGHT DETAIL. AIM SIGN LIGHTING FOR
EVEN ILLUMINATION ACROSS SIGN.
7 PROVIDE UL WET LISTED MOTION SENSOR FOR CONTROL OF WALKWAY
BRIDGE LIGHTING. SEE A3/EL602 FOR FOOT BRIDGE LIGHTING CONTROL
DIAGRAM.
PLAN
NORTH
A. SITE LIGHTING PLAN IS CONTROLLED VIA LIGHTING RELAY PANEL "LRP1".
1" = 20'-0"C2
PARTIAL SITE LIGHTING PLAN - BID OPTION
1" = 30'-0"A1
PARTIAL SITE LIGHTING PLAN - BID OPTION
1" = 20'-0"A2
PARTIAL SITE LIGHTING PLAN - BID OPTION
1" = 20' 0 20' 80'10' 40'
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
File details come from the government source that posted it. Updated .