ES104-C - Amend 0005.pdf

PDF 368 KB Posted

Attached to
SERE Parking Lot Expansion
Solicitation number
N4008525R9012
Issued by

About this file

The document is an engineering drawing (ES104-C) for a Partial Site Lighting Plan, part of the P-1574 MRSB Operational Support Facility (OSF) project at Camp Lejeune, NC. The drawing details site lighting specifications for a naval facility, including multiple scaled site lighting plan views with specific lighting installation instructions. Key technical notes include extending existing controlled site lighting branch circuits, mounting photocells facing north, installing UL wet-listed motion sensors for walkway bridge lighting, and aiming sign lighting for even illumination. The drawing is prepared by NAVFAC Mid-Atlantic and involves electrical infrastructure modifications for the Marine Corps base, with the site lighting plan controlled via lighting relay panel "LRP1". The contract is associated with construction contract number N40085-19-D-9164 and was approved on 6/22/2023.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PT

36PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

T.O.S.

T.O.S.

T.O.B.

T.O.B.

P-1574U

RR527

SW2 SW2B SW2

SW2

SW1SW1BSW1

SW1

SW1

SW2B

SW2

SW3B

SW3B

SW1

SW2

PE

SF1

(VIA LRP1-10)

1LN1-19

SP1

UL1

P2-26

UL1

RR

U L1

SP1

UL1

UL1

SP1

U L1

SP1

UL1

(VIA LRP1-8)

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

SW4

1LN1-15

UL2

(TYP.)

10' - 0"

SP1

UL1

No 83262

STATE OF

CI

R

P R

O F

N

SS

OI

E

LA ENG

IN

E E

R

LICENSE

F LORI DA

E

E

N U

A

RBLAHCIM

ENGINEERS + SURVEYORS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N O

R F

O L

K V

A

AS NOTED

D C

C O

R E

U .S

. M A

R

IN

E C

O R

P S

1717488

C A

M P

L E

JE

U

N E

, N C

P -1

M R

S B

O P

E R

A

TI

O N

A L

S U

P P

O R

T

FA

C

IL

IT

Y

O

S F)

KDB/SVR

EJA

DSN

Approved by Sofia Schwartz, Asset Management Branch Director, PWD G-F, MCIEAST-MCB Camp Lejeune via email.

JAS

06/05/2023

/2

/2

:1 :0

P

M

A u to d e s k D o c s /2

.0

P

M R

S B

O S

F /B

L D

G -P

-1

-E .r v t

ES104-C

P A

R

TI

A L

S

IT

E L

IG

H

TI

N

G P

LA

N

B

ID

O

P

TI

O N

NGZ

12886072

REZ REZ

N40085-19-D-9164

E S

-C

1" = 30' 0 30' 120'60'

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

KEY NOTES#

1 SEE C1/ES502 FOR BRIDGE STEP LIGHTING INSTALLATION DETAIL.

2 EXTEND EXISTING CONTROLLED SITE LIGHTING BRANCH CIRCUIT TO

SERVE NEW AND RELOCATED LIGHT FIXTURES AS INDICATED.

3 SEE SHEET EL101 FOR CONTINUATION.

4 MOUNT PHOTOCELL TO ROOF FACING NORTH.

5 REFEED EXISTING LUMINAIRE TO EXISTING CONTROLLED LIGHTING

BRANCH CIRCUIT SERVING THIS AREA.

6 REFER TO C1/ES501 FOR FLOOD LIGHT DETAIL. AIM SIGN LIGHTING FOR

EVEN ILLUMINATION ACROSS SIGN.

7 PROVIDE UL WET LISTED MOTION SENSOR FOR CONTROL OF WALKWAY

BRIDGE LIGHTING. SEE A3/EL602 FOR FOOT BRIDGE LIGHTING CONTROL

DIAGRAM.

PLAN

NORTH

A. SITE LIGHTING PLAN IS CONTROLLED VIA LIGHTING RELAY PANEL "LRP1".

1" = 20'-0"C2

PARTIAL SITE LIGHTING PLAN - BID OPTION

1" = 30'-0"A1

PARTIAL SITE LIGHTING PLAN - BID OPTION

1" = 20'-0"A2

PARTIAL SITE LIGHTING PLAN - BID OPTION

1" = 20' 0 20' 80'10' 40'

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

File details come from the government source that posted it. Updated .