Amend 0002.pdf
PDF 1 MB Posted
- Attached to
- SERE Parking Lot Expansion
- Solicitation number
- N4008525R9012
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the SERE Parking Lot Expansion project at Camp Lejeune. Amendment 0002, issued by NAVFAC Mid-Atlantic on 07/23/25, updates instructions for the footbridge/sidewalk realignment, specifically requiring the contractor to realign the footbridge for a more direct path from the parking lot expansion to an existing turnstile. The new concrete sidewalk will be installed on the parking lot side (site layout points PT38 to PT36) and extend across wetlands, with the contractor responsible for necessary surveying to accomplish the timber footbridge/sidewalk realignment.
The solicitation remains open with the time and date for receipt of proposals unchanged at 1300, 6 August 2025. The amendment applies to solicitation N40085-25-R-9012 for the Department of the Navy Naval Facilities Engineering Command, with the project number 25-0703. Contractors are required to acknowledge this amendment when submitting proposals, with failure to do so potentially resulting in proposal rejection.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-9012 Amendment 0002
CONTINUATION SHEET
1. Updated instruction regarding the footbridge/sidewalk:
Realign the footbridge/sidewalk for a more direct path from the parking lot expansion to the existing turnstile located at RR526/RR527 (per attachment below).
Install the new concrete sidewalk on parking lot side (site layout points PT38 to PT36) per sheets CS102-C & C-003. New timber footbridge will begin at PT36 and extend across the wetlands to the plan southeast T.O.B., then the new concrete sidewalk will continue from the plan southeast T.O.B. to the existing asphalt running trail (per attachment below).
The contractor will be responsible for surveying required to accomplish the timber footbridge/sidewalk realignment.
2. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .