Amend 0004.pdf

PDF 1 MB Posted

Attached to
SERE Parking Lot Expansion
Solicitation number
N4008525R9012
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for the SERE Parking Lot Expansion project, issued by NAVFAC Mid-Atlantic. The amendment, numbered 0004, was released on 07/28/25 for solicitation N40085-25-R-9012, with the project number 25-0703. The amendment addresses a contractor's question about clearing limits for the bridge construction area, specifying that the clearing limits are 18' and the tree canopy shall be pruned to 20' above the footbridge/concrete sidewalk surface on both sides.

The amendment includes detailed Best Management Practices for Vegetation Cutting in Wetlands, which outline specific guidelines for vegetation removal, equipment usage, and environmental preservation. Key requirements include limiting work to cutting vegetation above ground, using rubber-tired or high flotation vehicles, minimizing soil disturbance, and conducting work during dry periods to reduce impact on wetland contours and elevations. The time and date for receipt of proposals remains 1300 on 6 August 2025, and failure to acknowledge the amendment may constitute grounds for proposal rejection.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-25-R-9012 Amendment 0004

CONTINUATION SHEET

1. QUESTION: Can the Government provide a drawing showing clearing limits for the bridge construction area.

ANSWER: canopy shall be

/concrete sidewalk surface on both sides of clearing limits.

Discharging excess soil into wetland is prohibited. See the attached Best Management Practices:

Vegetation Cutting in Wetlands .

2. All other terms and conditions remain unchanged.