This document is a Section 32 93 00 specification for Exterior Plants for the MRSB Operation Support Facility at MCB Camp Lejeune, NC. The specification provides comprehensive technical requirements for landscape installation, including detailed instructions for soil preparation, plant selection, planting procedures, and maintenance. Key requirements include using organic fertilizers, implementing an integrated pest management plan, and providing a one-year full maintenance period for all planted vegetation.
The specification mandates specific soil composition standards, requiring a "Sandy Loam" classification with precise percentages of silt, clay, and sand, and an organic matter content of 5-8 percent. Planting guidelines include extensive details on plant pit excavation, handling, staking, guying, pruning, and watering. The contractor must provide temporary irrigation, conduct soil tests, use weed control fabric, apply mulch topdressing, and replace any dead or dying plants during the one-year establishment period. The document emphasizes environmental considerations, prohibiting synthetic chemical fertilizers and pesticides, and recommending the use of biological pest controls and collected stormwater for irrigation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-1574 MRSB OPERATION SUPPORT FACILITY (OSF) 1717488
MCB CAMP LEJEUNE, NC
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting
ASTM D5851 (1995; R 2015) Planning and Implementing a Water Monitoring Program
1.2 DEFINITIONS
1.2.1 Pesticide
Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.
1.2.2 Stand of Turf
100 percent ground cover of the established species.
1.2.3 Planter Beds
A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.
1.3 RELATED REQUIREMENTS
Section 32 92 23 SODDING applies to this section for installation of sod requirements, with additions and modifications herein.
Section 32 93 00 EXTERIOR PLANTS applies to this section for installation of trees, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 32 05 33 Page 1
SD-01 Preconstruction Submittals
Integrated Pest Management Plan; G
Temporary Irrigation Plan; G
SD-03 Product Data
Fertilizer; G
Mulches Topdressing
Organic Mulch Materials
SD-07 Certificates
Maintenance Inspection Report
Plant Quantities; G
SD-10 Operation and Maintenance Data
Maintenance
SD-11 Closeout Submittals
Tree Staking and Guying Removal
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
Deliver fertilizer to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, may be furnished in bulk with a certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Fertilizer, Mulch Storage
Store material in designated areas.
1.5.2.2 Antidesiccant's Storage
Do not store with fertilizers or other landscape maintenance materials.
1.5.3 Handling
Do not drop or dump materials from vehicles.
1.6 MAINTENANCE
Contractor shall provide full maintenance for 1-year. watering, mowing, replenishing mulch, selective pruning, tightening guy wires, etc. After nine months all plantings shall be evaluated. Those plants and/or sodded areas that are deemed dead or dying shall be replaced or replanted and
SECTION 32 05 33 Page 2 maintained by the contractor for the remainder of the one-year period. If the nine-month period occurs at a time when new plantings cannot be installed the contractor shall wait until the next planting season to install. The three additional months of maintenance and warranty will begin at this time even if it is outside of the original one-year window.
Submit Operation and Maintenance (O&M) Manuals for planting materials.
Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year. Provide instructions and procedures for watering; promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management. O&M Manuals must include pictures of planting materials cross referenced to botanical and common names, with a description of the normal appearance in each season.
Develop a water monitoring program for surface and ground water on the project site in accordance with ASTM D5851 and consistent with the water management program utilized during construction operations.
PART 2 PRODUCTS
2.1 POST-PLANT FERTILIZER
Fertilizer for groundcover, wildflowers, and grasses is not permitted.
Provide fertilizer for trees, plants, and shrubs as recommended by plant supplier, except synthetic chemical fertilizers are not permitted.
Fertilizers containing petrochemical additives or that have been treated with pesticides or herbicides are not permitted.
2.1.1 Granular Fertilizer
Provide granular fertilizer and rates per contractor recommendation.
2.2 WATER
Source of water must be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or graywater when available.
2.3 MULCHES TOPDRESSING
Free from noxious weeds, mold, pesticides, or other deleterious materials.
2.3.1 Organic Mulch Materials
Provide Mini Pine Nuggets.
2.4 PESTICIDES
Pesticides and herbicides are not permitted. Use black sheet polyethylene conforming to ASTM D2103, minimum thickness 5/32 inch. Submit an Integrated Pest Management Plan, including weed and pest management strategies. Use biological pest controls as approved in the Plan.
2.5 TEMPORARY IRRIGATION
Contractor to provide temporary irrigation for all new landscape. This includes turf, planting beds and vine. Temporary irrigation may be utilize above ground piping or manual water methods. Provide a temporary
SECTION 32 05 33 Page 3 irrigation plan for review that outlines temporary irrigation strategy.
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include mowing, edging, aeration, fertilizing, watering,and weeding, for all newly installed landscape areas, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.
3.1.1 Policing
Police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris. Policing must extend to both sides of fencing or walls. Collected debris must be promptly removed and disposed of at an approved disposal site.
3.1.2 Drainage System Maintenance
Remove all obstructions from surface and subsurface drain lines to allow water to flow unrestricted in swales. Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of all debris and vegetation at all times. Edges of these channels must be clear of any encroachment by vegetation.
3.2 IRRIGATION ESTABLISHMENT PERIOD
The irrigation establishment period will commence on the date that inspection by the Contracting Officer shows that temporary irrigation furnished under this contract is functional and must continue for a period of 365 days.
3.2.1 Maintenance During the Irrigation Establishment Period
Begin maintenance immediately after temporary irrigation is functional.
Inspect irrigation equipment at least once a week during the installation and establishment period and perform needed maintenance promptly.
Automatic controllers not equipped with rain shut-off sensors must be turned off during periods of rain that exceed twelve hours of continuous rainfall in one day or during rain storms of one day or more. Once the rain has subsided timers must be reactivated. Irrigation controllers must be inspected and reprogrammed after power outages. Contractor must be responsible for winterization and startup. Sprinkler heads must direct water away from buildings and hard surfaced areas.
3.2.2 Water Restrictions
Abide by state, local or other water conservation regulations in force during the establishment period. Automatic controller must be adjusted to comply with the water conservation regulations schedule.
3.2.3 Final Acceptance
Upon completion of the irrigation establishment period and final acceptance of groundcover and exterior plants, the temporary irrigation system shall be dismantled and removed.
SECTION 32 05 33 Page 4
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this contract has been satisfactorily installed to a 100 percent stand of coverage. The establishment period must continue for a period of 365 days.
3.3.1 Frequency of Maintenance
Begin maintenance immediately after turf has been installed. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.
3.3.2 Promotion of Growth
Maintain groundcover in a manner that promotes proper health, growth, natural color. Turf must have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, topdress and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan. Remove noxious weeds common to the area from planting areas by mechanical means.
3.3.3 Mowing
3.3.3.1 Turf
Mow turf at a uniform finished height. Mow turfed areas to a minimum average height of 4 inches when average height of grass becomes 8 inches for spring/summer maintenance and to a minimum average height of 4 inches when the average height of grass reaches 6 inches for fall maintenance.
The height of turf is measured from the soil. Perform mowing of turf in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area must be picked up and disposed. Adjacent paved areas must be swept/vacuumed clean.
3.3.4 Turf Edging and Trimming
Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces must be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Perform edging on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Exercise care to avoid damage to any plant materials, structures, and other landscape features.
Trimming around fences, poles, walls, and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming must be performed on the same day the turf's mowed.
Care must be exercised to avoid "Girdling" trees located in turf areas.
The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period Contractor will be responsible for removing all
SECTION 32 05 33 Page 5 protective tree collars.
3.3.5 Post-Fertilizer Application
Do not fertilize wildflowers, groundcover, and grasses. Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type and frequencies must be determined by the laboratory soil analysis results the requirements of the particular turf species. Apply fertilizer by approved methods in accordance with the manufacturer's recommendations.
3.3.6 Turf Watering
Perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities directives. The Contractor must be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application.
Abide by state, local or other water conservation regulations or restrictions in force during the establishment period..
3.3.7 Turf Clearance Area
Trees located in turf areas must be maintained with a growth free clearance of 18 inches from the tree trunk base. The use of mechanical weed whips to accomplish the turf growth free bed area is prohibited.
3.3.8 Replanting
Replant in accordance with Section 32 92 23 SODDING and within specified planting dates areas which do not have a satisfactory stand of turf.
Replant areas which do not have a satisfactory stand of other groundcover and grasses.
3.3.9 Final Inspection and Acceptance
Final inspection will be make upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.
Final turf acceptance will be based upon a satisfactory stand of turf.
Final acceptance of wildflower and grass areas will be based upon a stand of 95 percent groundcover of established species.
3.3.10 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new plants furnished under this contract have been satisfactorily installed and must continue for a period of 365 days.
SECTION 32 05 33 Page 6
3.4.1 Frequency of Maintenance
Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.
3.4.2 Promotion of Plant Growth and Vigor
Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.
3.4.3 Planter Bed Maintenance
Planter beds must be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break must be maintained between turf areas and planter beds. Fertilize exterior planting materials to promote healthy plant growth without encouraging excessive top foliar growth. Remove noxious weeds common to the area from planting areas by mechanical means.
3.4.3.1 Shrub Selective Maintenance
In addition to the above requirements, shrubs must be selectively pruned, and shaped for health and safety when the following conditions exist:
Remove growth in front of windows, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. Dispose of all pruning debris in a proper manner.
3.4.3.2 Vine Maintenance
Vine maintenance must include training of vines to climb up on screen panels. Vine shoots that start to grow on the ground, should first be tied around the plant climbing guide or weaved into the metal screen.
3.4.4 Slope Erosion Control Maintenance
Provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped. Maintenance tasks include immediate repairs to weak spots in sloped areas, and maintaining clean, clear culverts, to intercept and direct water flow to prevent development of large gullies and slope erosion. Eroded areas must be filled with amended topsoil and replanted with the same plant species.
3.4.5 Removal of Dying or Dead Plants
Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, guys, mulch and eroded earth mound water basins. Provide an additional 90 day establishment period for replacement plants beyond the original warranty period. A tree must be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover must be considered dying or dead when a minimum of 20 percent of the plant has died. This condition must be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying
SECTION 32 05 33 Page 7 plant material and must provide recommendations for replacement. The Contractor must determine the cause for dying plant material and provide recommendations for replacement.
3.4.6 Tracking of Unhealthy Plants
Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.
Install replacement plantings in accordance with Section 32 93 00 EXTERIOR
PLANTS.
3.4.7 Final Inspection
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the establishment period. Final inspection will be based upon satisfactory health and growth of plants and on the following:
3.4.7.1 Total Plants on Site
Plants have been accepted and required number of replacements have been installed.
3.4.7.2 Mulching and Weeding
Planter beds and earth mound water basins are properly mulched and free of weeds.
3.4.7.3 Remedial Work
Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.
3.4.8 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.5 FIELD QUALITY CONTROL
3.5.1 Maintenance Inspection Report
Provide maintenance inspection report to assure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations must be documented at the start of the establishment period, then quarterly following the start, and at the end of establishment period. Submit results of site observation visits to the Contracting Officer within 7 calendar days of each site observation visit.
3.5.2 Plant Quantities
Provide Contracting Officer with the number of plant quantities. In addition, provide total exterior area of hardscape and landscaping such as
SECTION 32 05 33 Page 8 turf and total number of shrubs.
3.5.3 Tree Staking and Guying Removal
Provide a certified letter that all stakes and guys are removed from all project trees at the end of the establishment period.
-- End of Section --
SECTION 32 05 33 Page 9
SECTION 32 11 23
AGGREGATE BASE COURSES
05/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing
ASTM C131/C131M (2020) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM D75/D75M (2019) Standard Practice for Sampling Aggregates
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D3665 (2012; R 2017) Standard Practice for Random Sampling of Construction Materials
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D4718/D4718M (2015) Standard Practice for Correction of Unit Weight and Water Content for Soils Containing Oversize Particles
ASTM D4791 (2019) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate
SECTION 32 11 23 Page 1
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM E11 (2022) Standard Specification for Woven Wire Test Sieve Cloth and Test Sieves
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT)
NCDOT SS (2018) Standard Specifications for Roads and Structures
1.2 DEFINITIONS
For the purposes of this specification, the following definitions apply.
1.2.1 Aggregate Base Course
Aggregate base course (ABC) is well graded, durable aggregate uniformly moistened and mechanically stabilized by compaction.
1.2.2 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum laboratory dry density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum dry density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the laboratory maximum dry density in accordance with ASTM D1557 Method C and corrected with ASTM D4718/D4718M .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Equipment and Tools; G
SD-06 Test Reports
Initial Tests; G
In-Place Tests; G
1.4 QUALITY ASSURANCE
Perform sampling and testing using a laboratory approved in accordance with Section 01 45 00.00 20 QUALITY CONTROL. Do not start work requiring testing until the testing laboratory has been inspected and approved.
Test the materials to establish compliance with the specified requirements and perform testing at the specified frequency. Furnish copies of test
SECTION 32 11 23 Page 2 results within 24 hours of completion of the tests.
1.4.1 Sampling
Take samples for laboratory testing in conformance with ASTM D75/D75M.
1.4.2 Tests
1.4.2.1 Gradation Analysis
Perform gradation analysis in conformance with ASTM C117 and ASTM C136/C136M using sieves conforming to ASTM E11.
1.4.2.2 Liquid Limit and Plasticity Index
Determine liquid limit and plasticity index in accordance with ASTM D4318.
1.4.2.3 Moisture-Density Determinations
Determine the laboratory maximum dry density and optimum moisture content in accordance with paragraph DEGREE OF COMPACTION.
1.4.2.4 Field Density Tests
Measure field density in accordance with ASTM D1556/D1556M , or ASTM D6938.
For the method presented in ASTM D1556/D1556M use the base plate as shown in the drawing. For the method presented in ASTM D6938 check the calibration curves and adjust them, if necessary, using only the sand cone method as described in Annex A2 of ASTM D6938. Use ASTM D6938 to determine the moisture content of the soil. Check the calibration curves furnished with the moisture gauges along with density calibration checks as described in ASTM D6938. Make the calibration checks of both the density and moisture gauges using the prepared containers of material method, as described in Annex A2 of ASTM D6938, on each different type of material being tested at the beginning of a job and at intervals as directed.
Submit calibration curves and related test results prior to using the device or equipment being calibrated.
1.4.2.5 Wear Test
Perform wear tests on ABC course material in conformance with
ASTM C131/C131M.
1.4.2.6 Flat and Elongated Pieces
Determine flat and elongated pieces on ABC course material in conformance with ASTM D4791, Method A.
1.4.3 Regulatory Requirements
Provide work and materials in accordance with applicable requirements of NCDOT SS except as noted otherwise herein. Divisions and Sections mentioned herein refer to those specifications. NCDOT SS parargraphs "Measurement and Payment" shall not apply.
1.4.3.1 Modifications of References
Where term "Engineer" and "State" is used in NCDOT SS it shall be construed to mean Contracting Officer and Federal Government, respectively.
SECTION 32 11 23 Page 3
1.5 ENVIRONMENTAL REQUIREMENTS
Perform construction when the atmospheric temperature is above 35 degrees F.
When the temperature falls below 35 degrees F, protect all completed areas by approved methods against detrimental effects of freezing. Correct completed areas damaged by freezing, rainfall, or other weather conditions to meet specified requirements.
1.6 ACCEPTANCE
1.6.1 Tolerances
Acceptance of ABC is based on compliance with the tolerances presented in Table 1. Remove any materials found to be non-compliant and replace with compliant material or rework, as directed, to meet the requirements of this specification
TABLE 1
Measurement Tolerance
Grade Plus 1/4 inch, Minus 1/2 inch
Smoothness Plus/Minus 3/8 inch
Individual Test Total Thickness Plus/Minus
Average Job Thickness Plus/Minus
Compaction Minimum 100 percent
1.6.2 Test Section
A test section is not required.
PART 2 PRODUCTS
2.1 AGGREGATES
NCDOT SS, materials for construction of the base course shall be in accordance with Sections 1005 and 1010, Size No. ABC.
2.2 TESTS, INSPECTIONS, AND VERIFICATIONS
2.2.1 Initial Tests
Perform one of each of the following initial tests on the proposed material within 12 months prior to commencing construction to demonstrate that the proposed material meets all specified requirements when furnished. Complete this testing for each source if materials from more than one source are proposed. If testing has been performed within 12 months prior to commencing construction provide a certificate that the material conforms to specified requirements
a. Gradation Analysis.
SECTION 32 11 23 Page 4
b. Liquid limit and plasticity index.
c. Moisture-density relationship.
d. Wear.
e. Flat and Elongated Pieces.
2.2.2 Approval of Material
Tentative approval of material will be based on initial test results and/or certification of materials..
2.3 EQUIPMENT, TOOLS, AND MACHINES
All equipment and tools used in the performance of the work are subject to approval by the Government before the work is started. Maintain all plant, equipment, and tools in satisfactory working condition at all times.
Submit a list of proposed equipment, including descriptive data. Use equipment capable of minimizing segregation, producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
When the ABC is constructed in more than one lift, clean the previously constructed lift of loose and foreign matter by sweeping with power sweepers or power brooms. Use hand brooms in areas where power cleaning is not practicable. Provide adequate drainage during the entire period of construction to prevent water from collecting or standing on the working area.
3.2 OPERATION OF AGGREGATE SOURCES
Condition aggregate sources on private lands in accordance with local laws or authorities.
3.3 STOCKPILING MATERIAL
Clear and level storage sites prior to stockpiling of material. Stockpile all materials, including approved material available from excavation and grading, in the manner and at the locations designated. Stockpile aggregates on the cleared and leveled areas designated to prevent segregation. Stockpile materials obtained from different sources separately.
3.4 PREPARATION OF SUBGRADE
Preparation of subgrade shall be in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. Clean the underlying course or subgrade of all foreign substances prior to constructing the base course. Do not construct base course on underlying course or subgrade that is frozen.
Construct the surface of the underlying course or subgrade to meet specified compaction and surface tolerances. Correct ruts or soft yielding spots in the underlying courses, areas having inadequate compaction, and deviations of the surface from the specified requirements set forth herein by loosening and removing soft or unsatisfactory material
SECTION 32 11 23 Page 5 and adding approved material, reshaping to line and grade, and recompacting to specified density requirements. For cohesionless underlying courses or subgrades containing sands or gravels, as defined in ASTM D2487, stabilize the surface prior to placement of the base course.
Stabilize by mixing ABC into the underlying course and compacting by approved methods. Proof roll in accordance with paragraph PROOF ROLLING.
Consider the stabilized material as part of the underlying course and meet all requirements of the underlying course. Do not allow traffic or other operations to disturb the finished underlying course and maintain in a compliant condition until the base course is placed.
3.5 GRADE CONTROL
Provide a finished and completed base course conforming to the lines, grades, and cross sections shown. Place line and grade stakes as necessary for control.
3.6 MIXING AND PLACING MATERIALS
3.6.1 Mixing
Deliver ABC material to the project site thoroughly mixed to the proper gradation. Make adjustments in mixing procedures or in equipment to obtain true grades, to minimize segregation or degradation, to obtain the required water content, and to produce a satisfactory base course meeting all requirements of this specification.
3.6.2 Placing
Place the mixed material on the prepared subgrade or subbase in lifts of uniform thickness with an approved spreader. Place the lifts so that when compacted they are true to the grades or levels required with the least possible surface disturbance. Where the base course is placed in more than one lift, clean the previously constructed lift of loose and foreign matter by sweeping with power sweepers, power brooms, or hand brooms.
Make adjustments in placing procedures or equipment to obtain true grades, to minimize segregation and degradation, to adjust the water content, and to produce an acceptable base course.
3.7 LAYER THICKNESS
Compact the completed base course to the thickness indicated. Limit individual compacted lifts to a maximum thickness of 6 inches and a minimum thickness of 3 inches. Compact the base course to a total thickness that is within the tolerances of paragraph ACCEPTANCE of the thickness indicated. Where the measured thickness is more than 1/2 inch deficient, correct such areas by scarifying, adding new material of proper gradation, reblading, and recompacting as directed. Where the measured thickness is more than 1/2 inch thicker than indicated, the course will be considered as conforming to the specified thickness requirements.
However, the requirements for wearing course thickness and plan grade are still applicable. The average job thickness will be the average of all thickness measurements taken for the job and within the tolerances of paragraph ACCEPTANCE of the thickness indicated.
3.8 COMPACTION
Compact each lift of the base course, as specified, with approved compaction equipment. For cohesive soils, maintain water content during
SECTION 32 11 23 Page 6 the compaction procedure to within plus or minus 2 percent of the optimum water content determined from laboratory tests as specified and for cohesionless soils, maintain the water content to facilitate compaction without bulking. Begin rolling at the outside edge of the surface and proceed to the center, overlapping on successive trips at least one-half the width of the roller. Slightly vary the length of alternate trips of the roller. Adjust speed of the roller as needed so that displacement of the aggregate does not occur. Compact mixture with hand-operated power tampers in all places not accessible to the rollers. Continue compaction until each lift is compacted through the full depth to meet the compaction requirements of Table 1. Make such adjustments in compacting or finishing procedures to obtain true grades, to minimize segregation and degradation, to reduce or increase water content, and to produce a compliant base course. Remove any materials found to be non-compliant and replace with compliant material or rework, as directed, to meet the requirements of this specification.
3.9 PROOF ROLLING
In addition to the compaction specified, proof roll areas designated on the drawings by application of 4 coverages of a heavy pneumatic-tired roller having four or more tires abreast, each tire loaded to a minimum of 30,000 pounds and inflated to a minimum of 125 psi. A coverage is defined as the application of one tire print over the designated area. In the areas designated, apply proof rolling to the top of the underlying material on which the base course is laid and to the top of each lift of base course. Maintain water content of the underlying material and each lift of the base course as specified in Paragraph COMPACTION from start of compaction to completion of proof rolling of that lift. Remove any base course materials or any underlying materials that produce permanent deformation exceeding 3/8 inch by proof rolling and replace with satisfactory materials. Then recompact and proof roll to meet these specifications.
3.10 EDGES OF BASE COURSE
Place the base course so that the completed section is a minimum of 2 feet wider, on all sides, than the next lift that will be placed above it.
Place approved material along the outer edges of the base course in sufficient quantity to compact to the thickness of the course being constructed. When the course is being constructed in two or more lifts, simultaneously roll and compact at least a 2 foot width of this shoulder material with the rolling and compacting of each lift of the base course.
3.11 FINISHING
Finish the surface of the top lift of base course after final compaction and proof rolling by cutting any overbuild to grade and rolling with a steel-wheeled roller. Do not add thin lifts of material to the top lift of base course to meet grade. If the elevation of the top lift of base course exceeds the tolerances of paragraph ACCEPTANCE, scarify the top lift to a depth of at least 3 inches and blend new material in and compact and proof roll to bring to grade. Make adjustments to rolling and finishing procedures to minimize segregation and degradation, obtain grades, maintain moisture content, and produce an acceptable base course.
If the surface become rough, corrugated, uneven in texture, or traffic marked prior to completion, scarify the non-compliant portion and rework and recompact it or replace as directed.
SECTION 32 11 23 Page 7
3.12 SMOOTHNESS TEST
Construct the top lift so that the surface shows no deviations exceeding the tolerances of paragraph ACCEPTANCE when tested with a 12 foot straightedge. Test the entire area in both a longitudinal and a transverse direction on parallel lines. Perform the transverse lines at a maximum spacing of 15 feet or less apart, as directed. Perform the longitudinal lines at the centerline of each placement lane, regardless of whether multiple lanes are allowed to be paved at the same time, and at the 1/8th point in from each side of the lane. Hold the straightedge in contact with the surface and moved ahead one-half the length of the straightedge for each successive measurement. Determine the amount of surface irregularity by placing the freestanding (unleveled) straightedge on the pavement surface and measuring the maximum gap between the straightedge and the pavement surface. Determine measurements along the entire length of the straight edge. Correct deviations exceeding this amount by removing material and replacing with new material, or by reworking existing material and compacting it to meet these specifications.
3.13 FIELD QUALITY CONTROL
3.13.1 In-Place Tests
Perform each of the following in-place tests on samples taken from the placed and compacted ABC. Determine sample locations using random sampling in accordance with ASTM D3665. Take samples and test at the rates indicated. Perform sampling and testing of recycled concrete aggregate at twice the specified frequency until the material uniformity is established.
a. Perform density tests on every lift of material placed and at a frequency of one set of tests for every 250 square yards, or portion thereof, of completed area. Gradations containing more than 30 percent retained on the ¾ inch sieve can produce inconsistent compacted density values when tested in accordance with paragraph DEGREE OF
COMPACTION.
b. Perform gradation analysis on every lift of material placed and at a frequency of one sieve analysis for every 500 square yards, or portion thereof, of material placed.
c. Perform liquid limit and plasticity index tests at the same frequency as the sieve analysis.
d. Measure the thickness of the base course at intervals providing at least one measurement for each 500 square yards of base course or part thereof. Measure the thickness using test holes, at least 3 inch in diameter through the base course.
3.13.2 Approval of Material
Final approval of the materials will be based on tests for gradation, liquid limit, and plasticity index performed on samples taken from the completed and fully compacted course.
3.14 TRAFFIC
Completed portions of the base course can be opened to limited traffic, provided there is no marring or distorting of the surface by the traffic.
Do not allow heavy equipment on the completed base course except when
SECTION 32 11 23 Page 8 necessary for construction. When it is necessary for heavy equipment to travel on the completed base course, protect the area against marring or damage to the completed work. Repair damage to meet these specifications.
3.15 MAINTENANCE
Maintain the base course in a satisfactory condition until the full pavement section is completed and accepted. Immediately repair any defects and repeat repairs as often as necessary to keep the area intact.
Retest any base course that was not paved over prior to the onset of winter to verify that it still complies with the requirements of this specification. Rework or replace any area of base course that is damaged as necessary to comply with this specification.
3.16 DISPOSAL OF UNSATISFACTORY MATERIALS
Dispose of any unsuitable materials that have been removed outside the limits of Government-controlled land. No additional payments will be made for materials that have to be replaced.
SECTION 32 11 23 Page 9
SECTION 32 12 13
BITUMINOUS TACK COAT
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2995 (1999; R 2009) Determining Application Rate of Bituminous Distributors
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT)
NCDOT SS (2018) Standard Specifications for Roads and Structures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Testing
SD-07 Certificates
Tack Coat; G
1.3 QUALITY ASSURANCE
Certificates of compliance for asphalt materials delivered will be obtained and checked to ensure that specification requirements are met.
Quantities of applied material will be determined. Payment will be for amount of residual asphalt applied. Tack coat materials will not be diluted.
1.3.1 Regulatory Requirements
Provide work and materials in accorance with applicable requirements of NCDOT SS except as noted otherwise herein. Divisions and Sections mentioned herein refer to those specifications. NCDOT SS parargraphs "Measurement and Payment" shall not apply.
1.3.1.1 Modifications of References
Where term "Engineer" and "State" is used in NCDOT SS it shall be construed to mean Contracting Officer and Federal Government, respectively.
SECTION 32 12 13 Page 1
1.4 DELIVERY, STORAGE, AND HANDLING
Inspect the materials delivered to the site for contamination and damage.
Unload and store the materials with a minimum of handling.
1.5 EQUIPMENT, TOOLS AND MACHINES
1.5.1 General Requirements
Equipment, tools and machines used in the work are subject to approval.
Maintain in a satisfactory working condition at all times. Calibrate equipment such as asphalt distributors, scales, batching equipment, spreaders and similar equipment within 12 months of their use. If the calibration expires during project, recalibrate the equipment before work can continue.
1.5.2 Bituminous Distributor
Provide a self propelled distributor with pneumatic tires of such size and number to prevent rutting, shoving or otherwise damaging the surface being sprayed. Calibrate the distributer in accordance with ASTM D2995. Design and equip the distributor to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled total liquid rates from 0.03 to 1.0 gallons per square yard, with a pressure range of 25 to 75 psi and with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include with the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor will be capable of circulating and agitating the bituminous material during the heating process.
1.5.3 Heating Equipment for Storage Tanks
Use steam, electric, or hot oil heaters for heating the bituminous material. Provide steam heaters consisting of steam coils and equipment for producing steam, so designed that the steam cannot come in contact with the bituminous material. Fix an armored thermometer to the tank with a temperature range from 40 to 400 degrees F so that the temperature of the bituminous material may be determined at all times.
1.5.4 Power Brooms and Power Blowers
Use power brooms and power blowers suitable for cleaning the surfaces to which the bituminous coat is to be applied.
1.6 ENVIRONMENTAL REQUIREMENTS
Apply bituminous coat only when the surface to receive the bituminous coat is dry. Apply bituminous coat only when the atmospheric temperature in the shade is 50 degrees F or above and when the temperature has not been below 35 degrees F for the 12 hours prior to application, unless otherwise directed.
SECTION 32 12 13 Page 2
PART 2 PRODUCTS
2.1 TACK COAT
2.1.1 Asphalt Cement
Provide asphalt cement conforming to NCDOT SS, Section 605.
PART 3 EXECUTION
3.1 PREPARATION OF SURFACE
Immediately before applying the bituminous coat, remove all loose material, dirt, clay, or other objectionable material from the surface to be treated by means of a power broom or blower supplemented with hand brooms. Apply treatment only when the surface is dry and clean.
3.2 APPLICATION RATE
The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contracting Officer.
3.2.1 Tack Coat
Apply tack coat to all bituminous or concrete surfaces to receive or abut bituminous concrete. Apply bituminous material for the tack coat in quantities of not less than 0.03 gallons nor more than 0.10 gallons per square yard of residual asphalt onto the pavement surface as approved by the Contracting Officer.
3.3 APPLICATION TEMPERATURE
3.3.1 Viscosity Relationship
Apply asphalt at a temperature that will provide a viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematic. Furnish the temperature viscosity relation to the Contracting Officer.
3.3.2 Temperature Ranges
The viscosity requirements determine the application temperature to be used. The following is a normal range of application temperatures:
Cutback Asphalts
MC-30 85-190 degrees F
SC-70, MC-70,
RC-70
120-225 degrees F
SC-250, MC-250,
RC-250
165-270 degrees F
Asphalt Emulsion
All Grades 70-160 degrees F
SECTION 32 12 13 Page 3
Cutback Asphalts
Asphalt Cement
All Grades 275-350 degrees F
3.4 APPLICATION
3.4.1 General
Following preparation and subsequent inspection of the surface, apply the bituminous tack coat at the specified rate with uniform distribution over the surface to be treated. Properly treat all areas and spots, not capable of being sprayed with the distributor, with the hand spray. Until the succeeding layer of pavement is placed, maintain the surface by protecting the surface against damage and by repairing deficient areas at no additional cost to the Government. If required, spread clean dry sand to effectively blot up any excess bituminous material. No smoking, fires, or flames other than those from the heaters that are a part of the equipment are permitted within 25 feet of heating, distributing, and transferring operations of cutback materials. Prevent all traffic, except for paving equipment used in constructing the surfacing, from using the underlying material, whether primed or not, until the surfacing is completed. The bituminous coat requirements are described herein.
3.4.2 Tack Coat
Unless authorized otherwise by the Contracting Officer, apply a tack coat to every bound surface (asphalt or concrete pavement) that is being overlaid with asphalt mixture and at transverse and longitudinal joints and vertical surfaces of abutting asphalt or concrete. Apply the tack coat when the surface to be treated is clean and dry. Immediately following the preparation of the surface for treatment, apply the bituminous material by means of the bituminous distributor, within the limits of temperature specified herein and at a rate as specified above in paragraph APPLICATION RATE. Apply the bituminous material so that uniform distribution is obtained over the entire surface to be treated. Treat lightly coated areas and spots by spraying with a hand wand or using other approved method. Following the application of bituminous material, allow the surface to cure without being disturbed for period of time necessary to permit setting of the tack coat. Apply the bituminous tack coat only as far in advance of the placing of the overlying layer as required for that day's operation. Maintain and protect the treated surface from damage until the succeeding course of pavement is placed.
3.5 CURING PERIOD
Following application of the bituminous material and prior to application of the succeeding layer of asphalt mixture allow the bituminous coat to cure and water or volatiles to evaporate prior to overlaying. Maintain the tacked surface in good condition until the succeeding layer of pavement is placed, by protecting the surface against damage and by repairing and recoating deficient areas.
3.6 FIELD QUALITY CONTROL
Obtain certificates of compliance for all asphalt material delivered to the project. Obtain samples of the bituminous material under the
SECTION 32 12 13 Page 4 supervision of the Contracting Officer. The sample may be retained and tested by the Government at no cost to the Contractor.
3.7 TESTING
Furnish certified copies of the manufacturer's test reports indicating temperature viscosity relationship for cutback asphalt or asphalt cement, compliance with applicable specified requirements, not less than 5 days before the material is required in the work.
3.7.1 Calibration Test
Furnish all equipment, materials, and labor necessary to calibrate the bituminous distributor. Calibrate using the approved job material and prior to applying the bituminous coat material to the prepared surface.
Calibrate the bituminous distributor in accordance with ASTM D2995.
3.7.2 Testing During Construction
Perform quality control testing as required in paragraph FIELD QUALITY
CONTROL.
3.8 TRAFFIC CONTROLS
Keep traffic off surfaces freshly treated with bituminous material.
Provide sufficient warning signs and barricades so that vehicular or pedestrian traffic will not travel over freshly treated surfaces.
SECTION 32 12 13 Page 5
SECTION 32 12 16.16
ROAD-MIX ASPHALT PAVING
11/20
PART 1 GENERAL
1.1 PAYMENT
1.1.1 Method of Measurement
Measurement of the quantity of hot-mix asphalt pavement per lot will be made for the purposes of assessing acceptance stipulated in paragraph
ACCEPTANCE.
1.1.2 Basis of Payment
The measured quantity of hot-mixed asphalt pavement will be paid for and included in the lump sum contract price.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 156 (2013; R 2017) Standard Specification for Requirements for Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures
AASHTO T 304 (2011; R 2015) Standard Method of Test for Uncompacted Void Content of Fine Aggregate
AASHTO T 329 (2015) Standard Test Method for Moisture Content of Hot Mix Asphalt (HMA) by Oven Method
ASPHALT INSTITUTE (AI)
AI MS-2 (2015) Asphalt Mix Design Methods
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing
ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM C128 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate
SECTION 32 12 16.16 Page 1
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C566 (2013) Standard Test Method for Total Evaporable Moisture Content of Aggregate by Drying
ASTM D979/D979M (2015) Sampling Bituminous Paving Mixtures
ASTM D2041/D2041M…