This document is an Amendment of Solicitation for Vertical Transportation Equipment (VTE) Maintenance Services for Naval Station Great Lakes, IL, and Captain James A. Lovell Federal Health Care Center facilities. The solicitation (RFP Number N4008525R2576) is issued by Naval Facilities Engineering Systems Command Mid-Atlantic Division and extends the proposal due date from 09 December 2025 to 16 December 2025 at 2:00pm EST.

The contract involves comprehensive vertical transportation equipment maintenance, including labor, management, supervision, tools, materials, diagnostic, troubleshooting, repair, alteration, demolition, and minor construction services. Key requirements include strict adherence to licensing, insurance, and subcontracting limitations, with specific wage determinations under Service Contract Act and Davis-Bacon Act. A site visit is scheduled for 19 November 2025 at 12:00pm CST at the NAVSTA GL Visitors' Center, with specific base access requirements for attendees. Proposals must be submitted electronically via PIEE Solicitation Module, with detailed submission guidelines covering technical and price proposal components.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 09 Dec 2025 16 Dec 2025

Miscellaneous text in this section has been modified to:

COMMANDER

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

MID-ATLANTIC DIVISION

CONTRACTING CORE

NORFOLK, VIRGINIA 23511-3095

NAVFAC SPECIFICATION

No. 05-25-2576

RFP NUMBER N4008525R2576

VERTICAL TRANSPORTATION EQUIPMENT (VTE) MAINTENANCE SERVICES FOR NAVAL STATION GREAT LAKES, IL, CAPTAIN JAMES A LOVELL FEDERAL HEALTH CARE CENTER (FHCC) FACILITIES AND OTHER AREAS OF RESPONSIBILITY (AOR).

NOTICE

All inquiries concerning any phase of the specification, prior to the proposal due date shall be submitted electronically, Attn: Asia Bracey, asia.c.

bracey.civ@us.navy.mil

Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-C3 rating in accordance with the provisions of DPA Regulation 1 and/or DMS Regulation 1.

PROPOSAL DUE DATE:

Proposals are due on 28 October 2025 by 2:00pm local time. Proposals delivered shall be in accordance with Section B.22.

N4008525R25760004

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

Amendment 0004 Pre-Proposal Inquiries and Responses

1. Question: We are seeking clarification regarding the appropriate wage rate classification for the VTE maintenance work described in the Performance Work Statement (PWS).

The PWS (Section C, 1502000 - Facility Investment, Spec Item 1.1) outlines the contractor's responsibilities to "provide labor, management, supervision, tools, material, maintenance service, diagnostic, troubleshooting, repair, alteration, demolition and minor construction Of Vertical Transportation Equipment and DDC Systems." These tasks align with the duties typically performed by an Elevator Mechanic, which is listed under the Wage Rate Requirements Construction (Davis-Bacon Act) in Section J-0200000-04, with a rate of $70.68 per hour plus benefits.

However, the Service Contract Act Wage Determination (J-0200000-04) also includes a classification for "11060 - Elevator Operator" at a rate of $17.99 per hour. The description of work for an "Elevator Operator" generally pertains to operating, rather than maintaining or repairing, vertical transportation equipment. Given the detailed scope of maintenance, repair, and diagnostic services required in the PWS, applying the "Elevator Operator" classification to the core technical work of this contract appears to be a misclassification.

We kindly request official clarification on which wage rate classification (Elevator Mechanic under Davis-Bacon or Elevator Operator under SCA) is intended to apply to the primary technical services described in the PWS, particularly for the maintenance, repair, and diagnostic tasks.

Response: See amendment 0004, revised Section J, Attachment J-0200000-19 ELINs. Note Line Item 700 is subject to the Service Contract Act, Line Item 701 is subject to the Davis Bacon/Construction Act, and Line Item 702 is subject to the Davis Bacon/Construction Act. In addition, refer to Section B, B.6 Wage Determination (Service)/Wage Decision (Construction) and the revised Section I- Contract Clauses, FAR Clause 52.222-42 Statement of Equivalent Rates for Federal Hires.

2. Question: There is no work in the statement of work that can be legally performed by a non-licensed elevator contractor. However, we have been contacted by several SDVOSB general contractors to provide quotes for this project. None of them are elevator contractors and all of them freely admit that they plan to disregard the limits on subcontracting. Will the limits of subcontracting be strictly enforced in the evaluation of proposals for this procurement?

Response: Yes. According to Section C, Annex 1502000, Specification Item 2.2.1, all Contractor personnel performing work must meet the requirements outlined in that specification. In addition, see Factor 1- Technical/Management Approach, i. Solicitation Submittal Requirements, b(4). Furthermore, refer to Section I - Contract Clauses, FAR Clause 52.219-14.

3. Question: Elevator work is specifically excluded from non-elevator company insurance policies. Non-elevator contractors are not covered for elevator related work. Will bidders (not their subcontractors) be required to demonstrate insurance coverage for elevator-related work?

Response: Yes, See Section C, Annex 0200000 Management and Administration, Spec Item 2.3.5. The prime contractor is responsible for all work performed on the contract.

4. Question: 1502000/ 1.1 refers to including demolition, minor construction, restoration and modernization for all the vertical equipment. In order to have a reasonable bid for all bidders, this language is unclear and it would be near impossible to give a reasonable comparative bid/price to include an indefinite quantity of items and work. In order for bidders to submit a fair bid, a clear scope of work of what is to be included is needed.

Please define what work is considered "demolition" for this contract. Please itemize all demolition work expected to be incorporated in this contract including existing known items.

Response: Per Spec item 1.1, demolition may be necessary to facilitate minor construction, restoration, and modernization efforts for all vertical equipment.

Section C, Annex 1502000, specification item 1.1, outlines the Concept of Operations for Building Systems. Specification items 3- 4 delineate a comprehensive scope of work/Performance Work Statement. Section J, Attachment J-1502000-08 VTE Historical Service Order Workload, lists a total of 194 different types of service items.

5. Question: 1502000/ Spec Item 3: Refers to maintaining, troubleshooting ground structures and, personal property equipment and installed equipment and systems. Can you specify what this includes beyond the VTE?

Response: Section C, Annex 1502000 Facility Investment, Spec Item 3 states "Facilities, ground structures, personal property equipment, and installed equipment and systems are in normal working condition and function properly in accordance with specified standards."

6. Question: Exhibit A/ Emergency Service Orders, Routine Service Orders, Corrective Maintenance Orders line items all have a set amount of hours for each (3, 4 and 10 hrs. correspondingly). For each of these items, is the contractor to bill the set hours for each request (i.e. emergency service order is 3 hrs.) or time and material of each request is over or under the set amount? Why is the "Corrective Maintenance Order" line item set at 10 hrs. per instance? Can you please define what crane work is to be included in this contract and all known existing needed crane work? IUEC Mechanics do not perform crane work.

Response: Per Section C, Annex 1502000 Facility Investment, Specification Items 3.1- 3.1.5, the contractor is required to propose labor hours as outlined in each specification.

In order to provide the required services defined in the specifications, the contractor may deem crane work necessary. If crane work becomes essential, the contractor must adhere to all stipulations specified in Annexes C, F, and J of 0200000 Management and Administration as well as Section C, Annex 1502000 Facility Investment, in order to complete the designated task.

7. Question: Please define regular working hours.

Response: See Section C, Annex 0200000 Management and Administration ,specification item 2.2.1, Government Regular Working Hours.

8. Question: Historically, this bid included a mechanic for 40 hours a week on site. We have not found a scope of work and requirements for elevator maintenance and repair beyond maintaining to code. What are the requirements for hours per month per elevator for maintenance? Are you looking for a full time mechanic on site? If not, what are the expectations for a mechanic to be on site?

Response: This is a performance-based contract therefore, the Government specifies what services are required and the contractor decides how they are going to perform the services. Refer to all stipulations specified in Annexes C, F, and J of 0200000 Management and Administration as well as Section C, Annex 1502000 Facility Investment, in order to complete the designated tasks. Specification items 3- 4 delineate a comprehensive scope of work/Performance Work Statement. Furthermore, Section J, Attachment J-1502000-08, details the VTE Historical Service Order Workload and lists a total of 194 different types of service items in relation to Section J, Attachment J-1502000-04 VTE Inventory & PM Frequency.

9. Question: We intend to partner with a subcontractor to meet labor demands. How much direct labor can be subcontracted for this Solicitation?

Response: See Factor 1- Technical/Management Approach, i. Solicitation Submittal Requirements, b(4). In addition, refer to Section I - Contract Clauses, FAR Clause 52.219-14.

10. Question: Are 3rd party inspection fees to be paid by the Contractor or NAVFAC?

Response: 3rd party inspection fees to be paid by the Contractor.

11. Question: Are the following excluded from what is considered included recurring work: repairing or replacement of any components of the elevator cab, elevator floor covering, hung/drop ceilings, light fixtures and bulbs, car sills, face plates for signal fixtures, any batteries associated with the equipment, telephone service, communication devices, intercom or music systems, ventilators, emergency power generators, air conditioners or heaters, media displays, the hoist way enclosure doors, frames and sills, hinges and closers on swing doors, emergency lighting and power units, or components installed or connected for emergency standby power use, main line power switches, breakers and feeders to control equipment, replacement of obsolete parts or equipment (defined as parts components, or equipment either 20 or more years from original installation or no longer available from the original equipment manufacturer or an industry parts supplier, replaceable only by refabrication), smoke detectors or sensors for Fireman's Control Feature. On Hydraulic elevators, hydraulic cylinders and plungers, buried or unexposed piping, rams, and excessive or abnormal loss of hydraulic fluid. This contract does not cover computer and microcomputer devices such as terminal keyboards and display units.

Response: See Section C, Annex 1502000 Facility Investment, specification items 3 delineate a comprehensive scope of work/Performance.

12. Question: Are repairs or renewal not necessitated by ordinary wear and tear included in this contract. Is the Contractor required to make adjustments, repairs or renewals necessitated by reason of negligence on the part of others, misuse or vandalism of the equipment, flooding, water damage, power failure, earthquake, weather, power surges, repairs by others or by reason of any other cause beyond the contractors control? Is the Contractor required to install new attachments on the elevator or elevators whether or not required and/or recommended or directed by Insurance Companies or by Governmental Authorities, or to make any replacements with parts of a different design or alter, modernize, or install new attachments to any units?

Response: See Sections C and F, Annexes 0200000 Management and Administration and 1502000 Facility Investment in order to complete the designated tasks.

Section C - Descriptions and Specifications

ANNEXES 1,2 AND 15

This is a performance-based contract which incorporates performance-based specifications by reference as if they were fully set forth herein.

Attachment "N4008525R2576 Section C ANNEXES" is hereby incorporated by reference and includes the following performance-based Section C Annexes:

0100000 C- General Information 0200000 C - Management and Administration 1502000 C - Facility Investment

CLAUSES INCORPORATED BY FULL TEXT

C.2 Reporting Requirements. A detailed report allocating value of work/quantities performed by Contract Line Items CLINs)/Sub-Line Items (SLINs) identified in the schedule and any accompanying Exhibits with Exhibit Line Items (ELINs) is to be submitted monthly, including all Firm Fixed Price (FFP) and Indefinite Quantity (IQ) Work items completed. The Contracting Officer shall be notified when 75% of any IQ Line Item (CLIN/SLIN /ELIN) is reached.

C.3 Government Purchase Card Program. The contractor shall accept orders placed by authorized GPC users. The Government Purchase Card is a purchasing instrument issued through a commercial bank to a Government Agency to facilitate micro purchases. A micro purchase is any order for supplies in the amount of $10,000.00 or less, services of $2,500.00 or less, or order for construction services of $2,000.00 or less. The Contractor processes micro purchases under the GPC program exactly as they would process a charge by an individual using a personal credit card.

a. Limitation of GPC Pricing for Non-recurring Work: The Contractor shall be required to offer Non-recurring pre-priced line item services to authorized Government personnel when they are ordering the work directly via the Government Purchase Card Program. The Contractor shall be required to offer the pre-priced Non-recurring line item services, at the same prices in accordance with the schedule of pricing information, Section B and Exhibits (if any). Contractor is responsible for tracking quantities and reporting total used each month and year to date to the Contracting Officer by the fifth day of each month. See Section H for additional details.

C.4 ADDITIONAL REPORTING REQUIREMENTS (Enterprise-wide Contractor Manpower Reporting Application (ECMRA). The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractor via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://sam.gov

Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs /SAM.

October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://sam.gov/SAM.

N4008525R25760004 https://sam.gov/SAM.

https://sam.gov/SAM.

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

INSTRUCTIONS TO OFFERORS

L.1 :Contractor Proposal Certification

Contractor is required to certify in writing on page 1 of the proposal the following:

_________________________________ (Name of Offeror) warrants that its proposal

_________________________ (of date or other Identifier) incorporated herein by reference, including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during the execution thereof. The contractor is not excused from meeting such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.

L.2 :Contractor Payment Schedule

Reserved.

L.3 :Inquiries

All questions from offerors concerning any aspect of this request for proposal (RFP) must be submitted in writing. Prospective offerors are requested to submit written questions specifying the section and paragraph of the specification for which clarification is desired. All inquires will be answered in writing. Telephone questions will not be entertained. Offerors are specifically cautioned that verbal discussions and replies to questions shall not have the effect of changing the provisions of the written RFP.

All questions must be submitted at least 10 days before proposals are due. This is the most efficient way to ensure all questions are addressed in a timely manner.

Pre-Proposal Inquires shall be electronically sent to Asia Bracey, at the following email addresses: asia.c.bracey.civ@us.navy.mil

L.4 :Disposition of Proposals

Proposals from unsuccessful offerors will not be returned to the offeror but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

L.5 Content of Proposal:

(a) Non-cost/price Factors Submission Requirements: The offeror shall submit one (1) electronic copy marked original via PIEE to including all the solicitation submittal requirements identified below. See Section B.22 of this RFP for more information about submitting proposals via PIEE Solicitations. In addition, non- price/technical information included in the price proposal will not be considered, likewise, price information included in the nonprice/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.)

- 8 1/2 x 11 format;

mailto:asia.c.bracey.civ@us.navy.mil

- No smaller than 10-point Arial or Times New Roman font;

- 100-page limit (inclusive of all charts, forms and other documentation responsive to the solicitation requirements except as noted below), pages sequentially numbered

- Include a cover page with Contract Number, Contract Title, Prime Contractor Name, Address, Phone Number, Fax Number, Unique Entity ID, Cage Code, Point of Contact and their phone and email address;

- Include only information in response to Factors 1, 2, 3 and 4 separated by tabs, as applicable;

- Provide signed JV Agreement or SBA approved Mentor-Protege Agreement (if applicable); and

- The non-cost/price proposal shall include responses to each non-cost/price factor as specified in Section M;

- Provide signed JV Agreement or SBA approved Mentor-Protege Agreement (if applicable); and

- The non-cost/price proposal shall include responses to each non-cost/price factor as specified in Section M;

NOTE: Offerors are cautioned that merely repeating the Performance Work Statement Performance Objectives, with a statement of intent to perform, does not reflect an understanding of the requirement or capability to perform, and may result in finding that the proposal is Unacceptable for that factor.

The following are not included in the 100-page limitation: Price proposals, JV Agreements, CPARS for projects submitted under Factor 2, Corporate Experience. Pages exceeding the 100-page limitation shall not be considered during evaluation of the proposal.

NOTE: The non-cost/price proposal shall include submittals for each non-cost/price factor as specified below:

(b) Price:

(i) : The offeror shall submit one (1) electronic copy marked original via PIEE to including all the solicitation submittal Price Submittal Requirements requirements identified below. See Section B.22 of this RFP for more information about submitting proposals via PIEE Solicitations. In addition, non-price/technical information included in the price proposal will not be considered, likewise, price information included in the non-price/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.)

- Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, Unique Entity ID, Cage Code and Point of Contact (POC) with their phone number and email address;

- Signed Solicitation, Offer and Award Forms (SF33), including Section B (CLINs 0001 through 0010), with all amendments acknowledged;

- Attachment J-0200000-19 (Exhibits A through E). Pricing shall only go This includes Offerors ensuring the Excel pricing cells two decimal places.

do not include additional, hidden decimal places. The proposal shall include this attachment as a Microsoft Excel File;

- If applicable, where Exhibit Line Items/sub Exhibit Line Items contain a quantity of , unit pricing shall be provided in the zero or a blank quantity event future quantities are added;

- The Unique Entity ID and/or CAGE for all the Offeror's team members (e.g. Partnership, joint venture, teaming arrangement, or parent company /subsidiary/affiliate) identified in the proposal; and

- Completed Contractor Proposal Certification (See Section L, Paragraph 1)

- SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section K of the RFP is not provided in SAM, include the representation or certification in your price proposal.

- FAPIIS. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete, as required by FAR 52.209-7, Information Regarding Responsibility Matters.

- VETS-4212 registration. Confirmation of filing of Veterans' Employment and Training (VETS-4212) for the 2023 filing cycle, if the Offeror is required to submit. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.

gov/vets/vets4212.htm. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the

Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request email confirmation of submission.

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:

1. Provide name of financial institution, point of contract, telephone number, and email address. Provide a signed statement of release giving the reference permission to release the information to the Navy.

2. One (1) signed bank reference demonstrating adequate financial resources. If offeror's firm has a line of credit, provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures- exact line of credit is not required).

3. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

4. Description of offeror's facilities and equipment.

5. Other offeror's work presently under contract.

Offerors are not required to submit financial information as detailed in the price submission instructions via PIEE Solicitation Module. Should the Offeror choose not to submit the above detailed Responsibility Determination Information via PIEE Solicitation Module, it shall be submitted via email to the Government's point of contact identified in Factor 4, Past Performance.

Although required to be submitted with offeror's price proposal, this information will not be evaluated as part of the price proposal. This information will be used as the basis of your firm's responsibility determination should your firm be considered for award.

L.6 SITE VISIT

A site visit will be conducted on 19 November 2025 at 12:00pm CST.

Please meet at the NAVSTA GL Vistors' Center (ID Card Issuing Office) Building 6130, located at 2535 Sheridan Road, Great Lakes, Illinois 60088.

Site Visit Registration Requirements: The Government Representative for the site visit will be Mr. Denocchio Bacon. You must send the completed base access spreadsheet (Attachment J-020000-24) by email to Ms. Asia Bracey at asia.c.bracey.civ@us.navy.mil by Thursday, 13 November 2025 at 12:00 P.M. Attendees must be US Citizens and must present a valid photo ID with the real ID or 2 forms of ID. You must also have a valid driver's license, registration and proof of insurance in order to gain access to the base.

NOTE: As of 24 December 2013, DOD now requires all individuals not associated with the military WILL provide two (2) forms of valid state or federal government issued identifications. For a list of acceptable forms please refer to the Form I-9 (http://www.uscis.gov/i-9), page 9.

IDCode: J
Page: 1
Pages: 9
AmendNo: 0004
EffDate: 08 Dec 2025
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

ASIA BRACEY, Email: asia.c.bracey.civ@us.navy.mil Telephone: 7573411226 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008525R2576
SolDate: 25 Sep 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This amendment is issued to extend the proposal due date from 09 December 2025 to 16 December 2025 at 2:00pm EST. In addition, incorporate Section J, Annex J-1502000 Facility Investment, a revised Section J, Attachment J-0200000-19 ELINs and the Site Visit Sign-In Sheet. Furthermore, revise FAR Clause 52.222-42 and provide Pre-Proposal Inquiries and responses related to the solicitation.
ContNameTitle:
CoNameTitle: ASIA C. BRACEY
ContDate:
CODate: 08 Dec 2025

File details come from the government source that posted it. Updated .