This document is a comprehensive Exhibit Line Item Numbers (ELIN) spreadsheet for a Vertical Transportation Equipment (VTE) Maintenance Services contract, covering five contract periods (Base Year and Option Years 1-4) for multiple Navy facilities. The contract involves maintenance, repair, new installation, inspection, testing, and certification of vertical transportation equipment across several Navy locations including CNIC, Federal Health Care Center, Marine Force Reserves, Navy Lodge, and Navy Gateway Inn & Suites.

The contract includes both recurring and non-recurring work, with detailed line items for various service order types such as Emergency, Situational Arrest, Urgent, Routine, and Corrective Maintenance Service Orders. Each period includes monthly preventative maintenance programs, periodic and annual inspections, and testing/certification for elevators in specific buildings. The non-recurring work sections include provisions for unit-priced labor hours (regular, premium, and Davis-Bacon Act), and a $280,000 material cost allocation per contract period. Service orders can only be authorized by specific government representatives, and unused service order funding will be de-obligated at the end of each option period.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

001 Base Yr Recurring

ATTACHMENT J-0200000-19
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-24-D-XXXX
EXHIBIT A
Line Item 0001 - Recurring Work - Base Year
PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 3
Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS) and or Contracting Officer (KO).
Funding of Unused Service Orders will be de-obligated back to the Government at option end.
ELINs A001 through A005
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001 - CNIC
A001AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.50EA$0.00717S
A001ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.75EA$0.00717S
A001ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.12EA$0.00717S
A001ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.6EA$0.00717S
A001AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.5EA$0.00717S
A001AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 30, 122, 130H, 150, 236, 322, 329, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 3400, 5501, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 740112MO$0.00717S
A001AGQuarterly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 27, 140, 400, 621, 1532, 2630, 34524MO$0.00717S
A001AHBUMED CNIC FUNDED- Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 81H & 550112MO$0.00717S
A001AJPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, The Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE)12MO$0.00717S
A001AKAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE)12MO$0.00717S
A001AL5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 2, 2A, 2B, 3, 122, 130H, 150, 322, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 6224, 7103, 7104, 7121, 7401. 5 YEAR CERTIFICATION NOT REQUIRED FOR WHEEL CHAIR LIFTS & MATERIAL LIFTS.24EA$0.00717S
A001AMBUMED CNIC FUNDED- Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE).12MO$0.00717S
A001ANBUMED CNIC FUNDED- Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE).12MO$0.00717S
A001APBUMED CNIC FUNDED- 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's periodic, annual, and 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 5501.1EA$0.00717S
CNIC TOTAL$0.00
A002 - Federal Health Care Center - FHCC
A002AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.7EA$0.00
A002ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.10EA$0.00
A002ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.5EA$0.00
A002ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.4EA$0.00
A002AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.2EA$0.00
A002AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1007 & 101712MO$0.00
A002AGPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 1017 (4 total VTE).12MO$0.00
A002AHAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 1017 (4 total VTE).12MO$0.00
A002AJ5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 10174EA$0.00
FHCC TOTAL$0
A003 - Marine Force Reserves - MARFORRES
A003AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.2EA$0.00
A003ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.10EA$0.00
A003ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.1EA$0.00
A003ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.2EA$0.00
A003AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.2EA$0.00
A003AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 320012MO$0.00
A003AGPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 (1 total VTE).12MO$0.00
A003AHAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 ( 1 total VTE).12MO$0.00
A003AJ5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 NONE0EA$0.00
MARFORRES TOTAL$0
A004 - Navy Lodge
A004AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.2EA$0.00
A004ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.10EA$0.00
A004ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.2EA$0.00
A004ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.2EA$0.00
A004AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.2EA$0.00
A004AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 250012MO$0.00
A004AGPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500 (1 total VTE)12MO$0.00
A004AHAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500 (1 total VTE)12MO$0.00
A004AJ5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500.1EA$0.00
NAVY LODGE TOTAL$0
A005 - Navy Gateway Inn & Suites - NGIS
A005AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.4EA$0.00
A005ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.10EA$0.00
A005ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.1EA$0.00
A005ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.2EA$0.00
A005AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.2EA$0.00
A005AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 6212MO$0.00
A005AGPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 62 (2 total VTE)12MO$0.00
A005AHAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 62 (2 total VTE)12MO$0.00
A005AJ5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. NONE0EA$0.00
NGIS TOTAL$0

GRAND TOTAL $0.00

002 Base Yr Non-Recurring

ATTACHMENT J-0200000-19
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-24-D-XXXX
EXHIBIT A
Line Item 0002 - Non-Recurring Work - Base Year
PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - NON-RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 4
Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS), and/or Contracting Officer (KO).
Funding of Unused Service Orders will be de-obligated back to the Government at option end.
ELINs A700 through A708
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Unit Priced Labor HourUnit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, during Government regular working hours, and subject to the Service Contract Act.150HR$0.00717S
A701Premium Unit Priced Labor HourUnit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, before and/or after Government regular working hours.75HR$0.00717S
A702Unit Priced Labor HourUnit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, during Government regular working hours, and subject to the Davis-Bacon Act.200HR$0.00717S
A703Material CostsProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.1LS$280,000.00$280,000.00717S
FACILITY INVESTMENT 1502000
ELIN/Sub ELINProduct NameDescription ExtendedQuantityUnit of IssueUnit PriceExtended PriceIMAP

CAC

A704Emergency Service OrdersEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.10EA$0.00717S
A705Situational Arrest Service OrdersSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.20EA$0.00717S
A706Urgent Service OrdersUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.20EA$0.00717S
A707Routine Service OrdersRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.8EA$0.00717S
A708Corrective Maintenance Service OrdersCorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.5EA$0.00717S

GRAND TOTAL $280,000.00

003 Opt Yr 1 Recurring

ATTACHMENT J-0200000-19
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-24-D-XXXX
EXHIBIT B
Line Item 0003 - Recurring Work - Option Year 1
PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 3
Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS) and or Contracting Officer (KO).
Funding of Unused Service Orders will be de-obligated back to the Government at option end.
ELINs B001 through B005
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001 - CNIC
B001AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.50EA$0.00717S
B001ABSituational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP.75EA$0.00717S
B001ACUrgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP.12EA$0.00717S
B001ADRoutine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP.6EA$0.00717S
B001AECorrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP.5EA$0.00717S
B001AFMonthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 30, 122, 130H, 150, 236, 322, 329, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 3400, 5501, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 740112MO$0.00717S
B001AGQuarterly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 27, 140, 400, 621, 1532, 2630, 34524MO$0.00717S
B001AHBUMED CNIC FUNDED - Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 81H & 550112MO$0.00717S
B001AJPeriodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, The Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE)12MO$0.00717S
B001AKAnnual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE)12MO$0.00717S
B001AL5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 30 and 6314. 5 YEAR CERTIFICATION NOT REQUIRED FOR WHEEL CHAIR LIFTS & MATERIAL LIFTS.6EA$0.00717S
B001AMBUMED CNIC FUNDED- Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE).12MO$0.00717S
B001ANBUMED CNIC FUNDED- Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE).12MO$0.00717S
B001APBUMED CNIC FUNDED- 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's periodic, annual, and 5 year inspection, testing, and cerification to establish a monthly cost of services. NONE.0EA$0.00717S
CNIC TOTAL$0.00
B002 - Federal Health Care Center - FHCC
B002AAEmergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition.7EA$0.00