Revised J-0200000-19 ELINs.xlsx
XLSX spreadsheet 49 KB Posted
- Solicitation number
- N4008525R2576
About this file
This document is a comprehensive Excel-based Exhibit Line Item Numbers (ELIN) attachment for a vertical transportation equipment (VTE) maintenance services contract (Solicitation #N4008525R2576) issued by the Naval Facilities Engineering Command. The contract covers maintenance, repair, installation, inspection, testing, and certification of vertical transportation equipment across multiple Navy facilities, including Naval Station Great Lakes, Captain James A. Lovell Federal Health Care Center, and other areas of responsibility.
The contract is structured with recurring and non-recurring work items across a base year and four option years, with detailed line items for different service categories such as emergency service orders, situational arrest service orders, urgent service orders, routine service orders, and corrective maintenance service orders. The document breaks down service requirements for five specific locations: CNIC (Commander, Navy Installations Command), Federal Health Care Center, Marine Force Reserves, Navy Lodge, and Navy Gateway Inn & Suites. Each location has specific quantities and descriptions for various maintenance and inspection services, with pricing to be determined by unit rates for labor hours, materials, and specific service order types. The total contract encompasses 61 vertical transportation equipment units across multiple buildings, with services ranging from monthly preventative maintenance to periodic and annual inspections and certifications.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
001 Base Yr Recurring
| ATTACHMENT J-0200000-19 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008525R2576 |
| EXHIBIT A |
| Line Item 0001 - Recurring Work - Base Year | |||||
| PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 3 | |||||
| Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS) and or Contracting Officer (KO). | |||||
| Funding of Unused Service Orders will be de-obligated back to the Government at option end. | |||||
| ELINs A001 through A005 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| A001 - CNIC | |||||
| A001AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 50 | EA | ||
| A001AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 75 | EA | ||
| A001AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 12 | EA | ||
| A001AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 6 | EA | ||
| A001AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 5 | EA | ||
| A001AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 30, 122, 130H, 150, 236, 322, 329, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 3400, 5501, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 | 12 | MO | ||
| A001AG | Quarterly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 27, 140, 400, 621, 1532, 2630, 3452 | 4 | MO | ||
| A001AH | BUMED CNIC FUNDED- Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 81H & 5501 | 12 | MO | ||
| A001AJ | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, The Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE) | 12 | MO | ||
| A001AK | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE) | 12 | MO | ||
| A001AL | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 2, 2A, 2B, 3, 122, 130H, 150, 322, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 6224, 7103, 7104, 7121, 7401. 5 YEAR CERTIFICATION NOT REQUIRED FOR WHEEL CHAIR LIFTS & MATERIAL LIFTS. | 24 | EA | ||
| A001AM | BUMED CNIC FUNDED- Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE). | 12 | MO | ||
| A001AN | BUMED CNIC FUNDED- Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE). | 12 | MO | ||
| A001AP | BUMED CNIC FUNDED- 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's periodic, annual, and 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 5501. | 1 | EA | ||
| CNIC TOTAL |
| A002 - Federal Health Care Center - FHCC | |||
| A002AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 7 | EA |
| A002AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 10 | EA |
| A002AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 5 | EA |
| A002AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 4 | EA |
| A002AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 2 | EA |
| A002AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1007 & 1017 | 12 | MO |
| A002AG | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 1017 (4 total VTE). | 12 | MO |
| A002AH | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 1017 (4 total VTE). | 12 | MO |
| A002AJ | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1007 & 1017 | 4 | EA |
| FHCC TOTAL |
| A003 - Marine Force Reserves - MARFORRES | |||
| A003AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 2 | EA |
| A003AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 10 | EA |
| A003AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 1 | EA |
| A003AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 2 | EA |
| A003AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 2 | EA |
| A003AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 3200 | 12 | MO |
| A003AG | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 (1 total VTE). | 12 | MO |
| A003AH | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 ( 1 total VTE). | 12 | MO |
| A003AJ | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 3200 NONE | 0 | EA |
| MARFORRES TOTAL |
| A004 - Navy Lodge | |||
| A004AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 2 | EA |
| A004AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 10 | EA |
| A004AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 2 | EA |
| A004AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 2 | EA |
| A004AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 2 | EA |
| A004AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 2500 | 12 | MO |
| A004AG | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500 (1 total VTE) | 12 | MO |
| A004AH | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500 (1 total VTE) | 12 | MO |
| A004AJ | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 2500. | 1 | EA |
| NAVY LODGE TOTAL |
| A005 - Navy Gateway Inn & Suites - NGIS | |||
| A005AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 4 | EA |
| A005AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 10 | EA |
| A005AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 1 | EA |
| A005AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 2 | EA |
| A005AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 2 | EA |
| A005AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldg. - 62 | 12 | MO |
| A005AG | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 62 (2 total VTE) | 12 | MO |
| A005AH | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldg. - 62 (2 total VTE) | 12 | MO |
| A005AJ | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. NONE | 0 | EA |
| NGIS TOTAL |
GRAND TOTAL
002 Base Yr Non-Recurring
| ATTACHMENT J-0200000-19 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N4008525R2576 |
| EXHIBIT A |
| Line Item 0002 - Non-Recurring Work - Base Year | ||||||
| PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - NON-RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 4 | ||||||
| Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS), and/or Contracting Officer (KO). | ||||||
| Funding of Unused Service Orders will be de-obligated back to the Government at option end. | ||||||
| ELINs A700 through A708 | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour | Unit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, during Government regular working hours, and subject to the Service Contract Act. | 150 | HR | ||
| A701 | Premium Unit Priced Labor Hour | Unit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, before and/or after Government regular working hours and subject to the Davis-Bacon Act. | 75 | HR | ||
| A702 | Unit Priced Labor Hour | Unit Priced Labor (UPL) Hour - the Contractor to perform one hour of work-in-place, per Section C 0200000 Management and Administration, Spec Item 2.15.2.1, during Government regular working hours, and subject to the Davis-Bacon Act. | 200 | HR | ||
| A703 | Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $280,000.00 | $280,000.00 |
| FACILITY INVESTMENT 1502000 | ||||||
| ELIN/Sub ELIN | Product Name | Description Extended | Quantity | Unit of Issue | Unit Price | Extended Price |
| A704 | Emergency Service Orders | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 10 | EA | ||
| A705 | Situational Arrest Service Orders | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 20 | EA | ||
| A706 | Urgent Service Orders | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 20 | EA | ||
| A707 | Routine Service Orders | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 8 | EA | ||
| A708 | Corrective Maintenance Service Orders | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 5 | EA |
GRAND TOTAL
003 Opt Yr 1 Recurring
| ATTACHMENT J-0200000-19 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008525R2576 |
| EXHIBIT B |
| Line Item 0003 - Recurring Work - Option Year 1 | |||||
| PROVIDE PRICES FOR MAINTENANCE, REPAIR, NEW INSTALLATION, INSPECTING, TESTING, AND CERTIFICATION OF VERTICAL TRANSPORTATION EQUIPMENT - RECURRING WORK - IN ACCORDANCE WITH 1502000 FACILITY INVESTMENT, SECTION C, SPEC ITEM 3 | |||||
| Service Orders can only be authorized by the Contracting Officer Representative (COR), Contract Specialist (CS) and or Contracting Officer (KO). | |||||
| Funding of Unused Service Orders will be de-obligated back to the Government at option end. | |||||
| ELINs B001 through B005 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| B001 - CNIC | |||||
| B001AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 50 | EA | ||
| B001AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 75 | EA | ||
| B001AC | Urgent Service Orders, Spec item 3.1.3, Urgent Service Orders shall consist of one (1) Unit Priced Labor (UPL) Hour for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Urgent Service Order calls during Government regular working hours. Upon receipt of an Urgent Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within two (2) regular working days. The Contractor shall complete an Urgent Service Order within five (5) regular working days of receipt of service call with ATP. | 12 | EA | ||
| B001AD | Routine Service Orders, Spec Item 3.1.4, Routine Service Orders shall consist of four (4) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Routine Service Order calls during Government regular working hours. Upon receipt of a Routine Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within three (3) regular working days. The Contractor shall complete a Routine Service Order within five (5) regular working days of receipt of service call with ATP. | 6 | EA | ||
| B001AE | Corrective Maintenance Service Orders, Spec item 3.1.5, Corrective Maintenance Service Orders shall consist of ten (10) Unit Priced Labor (UPL) Hours for on-site work, as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Corrective Maintenance Service Order calls during Government regular working hours. Upon receipt of a Corrective Maintenance Service Order call and ATP, the Contractor shall be on site ready to perform work within five (5) regular working days. The Contractor shall complete a Corrective Maintenance Service Order within eight (8) regular working days of receipt of service call with ATP. | 5 | EA | ||
| B001AF | Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 30, 122, 130H, 150, 236, 322, 329, 510, 520, 616, 830, 831, 838, 839, 1405, 1532, 3400, 5501, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 | 12 | MO | ||
| B001AG | Quarterly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 27, 140, 400, 621, 1532, 2630, 3452 | 4 | MO | ||
| B001AH | BUMED CNIC FUNDED - Monthly Preventative Maintenance (PM) Program, Spec Item 3.2, Bldgs. - 81H & 5501 | 12 | MO | ||
| B001AJ | Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, The Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's periodic inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE) | 12 | MO | ||
| B001AK | Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04 and the Periodic & Annual VTE Certifications provided in J-1502000-05 to price each elevator's annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 1H, 2, 2A, 2B, 3, 11, 26, 27, 30, 122, 130H, 140, 150, 236, 322, 329, 400, 510, 520, 616, 621, 830, 831, 838, 839, 1405, 1532, 2630, 3400, 3452, 6224, 6301, 6314, 7101, 7102, 7103, 7104, 7105, 7111, 7112, 7113, 7114, 7115, 7116, 7117, 7121, 7122, 7250, 7260, 7401 (61 total VTE) | 12 | MO | ||
| B001AL | 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's 5 year inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 30 and 6314. 5 YEAR CERTIFICATION NOT REQUIRED FOR WHEEL CHAIR LIFTS & MATERIAL LIFTS. | 6 | EA | ||
| B001AM | BUMED CNIC FUNDED- Periodic (6 Month) Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE). | 12 | MO | ||
| B001AN | BUMED CNIC FUNDED- Annual Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the Periodic & Annual VTE Certifications provided in J-1502000-05, to price each elevator's periodic and annual inspection, testing, and cerification to establish a monthly cost of services. Bldgs. - 81H & 5501 (4 total VTE). | 12 | MO | ||
| B001AP | BUMED CNIC FUNDED- 5 Year Inspection, Testing, and Certification, Spec Item 3.3, the Contractor shall utilize the VTE Inventory provided in J-1502000-04, the 5 year VTE Certifications provided in J-1502000-06 to price each elevator's periodic, annual, and 5 year inspection, testing, and cerification to establish a monthly cost of services. NONE. | 0 | EA | ||
| CNIC TOTAL |
| B002 - Federal Health Care Center - FHCC | |||
| B002AA | Emergency Service Orders, Spec Item 3.1.1, Emergency Service Orders shall consist of three (3) premium Unit Priced Labor (UPL) Hours as specified in Section C 0200000 Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work.The Contractor shall respond to Emergency Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of an emergency service call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall have 12 hours to arrest an emergency condition. | 7 | EA |
| B002AB | Situational Arrest Service Orders, Spec Item 3.1.2, Situational Arrest Service Orders shall consist of one (1) premium Unit Priced Labor (UPL) Hour as specified in Section C Management and Administration, Spec Item 2.15.2.1 - Unit Priced Labor (UPL) Hour. The Contractor and their Sub-Contractor shall execute each service order up to the Exhibit Line Item Number (ELIN) work limit; issued service orders may be utilized for labor, equipment, and material costs incurred on the assigned service work. The Contractor shall respond to Situational Arrest Service Order calls before and/or after regular working hours, 24 hours a day, every day of the year including holidays. Upon receipt of a Situational Arrest Service Order call and Authorization To Proceed (ATP), the Contractor shall be on site ready to perform work within 4 hours. The Contractor shall complete a Situational Arrest Service Order within 24 hours of receipt of service call with ATP. | 10 | EA |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .