This document is a Monthly Progress Summary Report for the Biosparge System Operations, Maintenance, and Monitoring (OM&M) at Naval Submarine Base New London in Groton, Connecticut, prepared by KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) for the month of May 2025. The report details the ongoing environmental remediation efforts, focusing on light non-aqueous phase liquid (LNAPL) monitoring and recovery across multiple monitoring wells (1MW4, 1MW10, 1MW11, and TMW5). Key activities in May 2025 included weekly remote system performance checks, an on-site maintenance round on May 7th, and LNAPL gauging and recovery, with a total of 0.5, 0.5, and 1.0 gallons of LNAPL removed from 1MW4, 1MW11, and TMW5, respectively.
The report highlights several issues and concerns, including partially inaccessible wells (BSW-01 and BSW-02) due to asphalt patches and a non-functioning well (BSW-26) suspected of having air line damage during recent re-paving. The team also completed a wooden structure repair behind the Conex box, replacing the existing structure with pressure-treated materials and adding asphalt starting shingles for non-slip grip. The next system maintenance round is tentatively scheduled for June 10, 2025, which will include LNAPL gauging, recovery, and an inspection of BSW-26 using a downhole camera. To date, a total of 80.65 gallons of LNAPL have been removed from the site.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOMAN Government Solutions, LLC Phone (508) 366-7442 293 Boston Post Road West, Suite 100 Fax (508) 366-7445 Marlborough, Massachusetts 01752 www.komangs.com
06 June 2025
Mr. Robert Bray NAVFAC Mid-Atlantic
NAVFAC MIDLANT
9324 Virginia Ave Norfolk, VA 23511-3095
RE: Monthly Progress Summary Report – May 2025
Zones 1 and 2 Biosparge System Operations, Maintenance, and Monitoring (OM&M) Naval Submarine Base New London, Groton, CT Contract# N4008523D0073/Task Order# N4008524F6461
Dear Mr. Bray, KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) is pleased to provide this May 2025 Monthly Progress Summary Report, detailing a summary on the Operations, Maintenance, and Monitoring (OM&M) for the biosparge system located in Zone 1 and 2, Naval Submarine Base New London, Groton, CT:
1. OM&M Activities – May 2025
a. Performed weekly remote checks on system performance.
b. On-site system maintenance round was completed on 07 May 2025.
i. KGS/Trinity tech recorded observations.
1. Observations attached.
c. Overall, the system is running as designed.
d. The desired flowrate of 4.0 actual cubic feet per minute (acfm) at BSW-01 to BSW-12 was achieved.
e. The desired flowrate of 3.0 acfm at BSW-13 through BSW-30 was mostly achieved, with the exception at BSW-26. It has now been at least 7 months since this well has not received the flow. There is a new asphalt patch in the vicinity of BSW-26 performed by another contractor. It is suspected that during asphalt paving, damage to the air line may have occurred. Further discussions on repair are warranted.
f. The wooden structure that protects the above ground poly vinyl chloride (PVC) air lines behind the Conex box was replaced with pressure treated (outdoor rated) materials on 27 May 2025. Asphalt starting shingles were placed on the finished floor to provide a non-slip grip. Refer to photolog attached to this monthly report.
g. Light non-aqueous phase liquid (LNAPL) gauging occurred on 07 May 2025. LNAPL was detected in monitoring well TMW5 at an estimated thickness of 1.06 feet. A sheen was noted on the measuring probe for 1MW4 and 1MW11.
h. LNAPL recovery at 1MW4, 1MW11, and TMW5 was conducted on 07 May 2025. A peristaltic pump was used to recover 0.5, 0.5, and 1.0 gallons of LNAPL, respectively. To date, 80.65-gallons of LNAPL have been removed at the site. A tracking summary sheet is provided as an attachment to this monthly report.
2. Submittals
a. April 2025 Monthly Report - 01 May 2025.
KOMAN Government Solutions, LLC Subsidiary of the Natives of Kodiak
3. Next Month (June 2025) Planned O&MM Activities
b. Next System Maintenance Round is tentatively scheduled for 10 June 2025. This will include:
1. LNAPL gauging and recovery.
c. Inspect BSW-26 with a downhole camera to try and determine why there is no flow.
4. Issues and Concerns
d. BSW-01 remains inaccessible due to a partial asphalt patch over the well cover.
i. Update 05 June 2025. Although inaccessible, air has been turned back on to this well but may not be getting into this well. Repair of biosparge well substructures are not within the scope of this current contract.
e. BSW-02 remains inaccessible due to a partial asphalt patch over the well cover as denoted in the June Monthly O&M Report. This well is receiving and maintaining the required flowrate.
f. BSW-26 is not receiving flow. It is suspected that the air line may have been damaged during a recent re-paving effort (performed by another contractor). Repair of biosparge substructures is not within the scope of the current contract.
g. As indicated in the January 2023 Monthly report, 1MW9 had been destroyed by others during an excavation to repair a main water line by another contractor. Recommend installing a replacement well as this well serves to monitor concentrations just before they enter the Thames River. Well installations are not within the scope of the current contract.
Distribution:
L. Bidder, NSBNL EV P. Schauble, KGS/Trinity
Attachments:
Recorded O&M Observations 07 May 2025 LNAPL Gauging and Recovery Summary Table (2021-2025) Weekly System Log May 2025 Photos of repaired wooded structure behind Conex.
Please feel free to reach out with any additional questions/concerns.
Sincerely, KOMAN Government Solutions, LLC/Trinity
Russ McCormick, P.G. (NH, FL) Project Manager
(978) 460-9603 - mobile
Oate
Weae
OpeaY
Gsss unyens itn
Pressc VOCs
Monltoring Well Data Sheet Aiosparge Treatrment byNaval Submarine Base Non CERCLA Zones & 2, Lower Subbase, New London, Connecticut
(mg)
4.13
Depth to
LNAPL
(n TOC)
Shein
Depth to Water
(n-TOC) stem
LNAPL
Thickness
Estimated LNAPL Well
Volume (ga)
LNAPL Volume Removed (gal)
Removal Method
KGS
Notes onty collect data f no product is in wel
OScOect data daa aoduct sun we only colect data if no product is in wel
Date Weather
Operator
Biosparge Wel
8SW
8SW?
BSW3
8SW
8SWS
BSWS
8SW7
BSWB
8SW9
8SW10
8SW11
BSW12
BSW13
BSW14
8SW15
FIT-101 Man ow FIT-201, Auliary tow
PL101, Pressure T101, Temperatue
P-102. Pressure T102, Temperature
P-201, Pressure T-201, Temperature
P202, Pressure T+202. Temperature
Time Pressure
(psig)
.0
Treatment System Data Sheot Biosparge Treatment System
Non-CERCLA Zones 1 , Lowor Subbase, OU4 Naval Submarine Base New London, Connecticut
S.0
6,6
(actm) (actm) (psig) ('F) (psig) ("F)
(acfm)
(psig) ("F)
Flow
(psig) ('F)
DO Mode SN Oryguard Polaris 081063A91A0000 Pre-cal mgt Post-cal mgL
Biosparge Well
BSW16
BSW17
PID Model-S/N:
BSW18
Ambient ppm
BSW19
BSW20
BSW21
BSW22
BSW23
BSW24
BSW25
BSW26
BSW27
BSW28
BSW29
BL-101, Total Runtime:
BL-201, Total Runtime.
TSH/TSL-801, Inside Temp.
BSW30
BL-101 VFD frequency:
BL-201 VFD fr equency
FIT-101, (on PLC) total flow:
FIT-201, on PLC total flowW
9.0
Time
49463.5
0-6 S0.L
KGS
Pressure
(psig)
Post-cal ppm:
S-o
Flow
(acfm)
3.4
3.0
(hours) (hours) (F) (Hz) (Hz)
(cu-t) (cu-t)
Equipment
Rotary Claw Compressors
Rotary Claw
Compressors
Rotar Claw Compressos
Rotary Claw
Compressors
Rotary Claw Compressors
Heat Exchangers
Compact Filter Silencers
Rotameters
General lnspection
Electrical
Biosparge and Monitoring Wells
Ireatment Sy stem Maintenalce Log Biosparge Ireatment Sy sten
Non-CERCLA Zones 1, Lower Subbasc, OU4 Naval Submarnc Basc
Ncw Lodon, Connccticut
Suggestcd Maintenance
Chech inlct ar tilter, if nccCvsary, rcplae
Remoyc dust and dcbris fnom fan and sy stcm inlet.
Choh tthe levcl ot sy nchronizng gcat ol, levcl should be aborc the nniddlc of thc sught glass. If below, thc unnt ts lcakng ol and will roquite rraf
Mahe sure houslng is fr fom dust and dtirt.
clcan if nvcan
Remoc acousti cnclosurc and clcan tan cow lings, fan whcls, cntilation gnlles and cwing fans
Replace inlet air filter
Check the inlet srec, clcan if neessar
Change s nchronizing gear oil
Check that the sy stem is operating correctly
Remove dust and debris from cooling fan and heat exchanger
Remove weather hood and inspect element, clean if needed
Remove fouling and moisture buildup in rotameter when adjusting flow becomes difficult
Visual inspection from compressor inlet to air flow leaving the system. Inspect for leaks, system damage or any items that seem out of place. Repair as needed
Visual inspections of electrical lines for shorts, blown fuses, burnt out lights, or weather damage Visually inspect biosparge and monitoring wells for broken fittings, damaged well vaults, or wells
Suggestcd Schcdule
Monthly
Ivcry Month
Every 6 Months
Every year
Every 20,000 hours or 6 years, whatever comes first
Monthly
Every 6 months
Inspect Monthly, as needed
Monthly
Monthly
Monthly
KIS
Last Conpleted
LNAPL Gauging and Recovery Summary (2021-2025)
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
6/8/2021 0.87 0.1392 0.50 Bailer 7/8/2021 0.05 0.008 0.50 Bailer 8/5/2021 0.02 0.0032 0.25 Bailer
9/9/2021 ND N/A N/A N/A
10/7/2021 NM N/A N/A N/A
11/18/2021 NM N/A N/A N/A
12/16/2021 NM N/A N/A N/A
1/6/2022 NM N/A N/A N/A
2/15/2022 NM N/A N/A N/A
3/10/2022 0.1 0.016 0.25 Bailer
4/20/2022 NM N/A N/A N/A
5/10/2022 NM N/A N/A N/A
6/13/2022 ND N/A N/A N/A
7/8/2022 NM N/A N/A N/A
8/15/2022 0.07 0.0112 1.00 N/A 9/16/2022 0.05 0.008 1.5 Bailer 10/7/2022 0.2 0.032 1.5 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 0.7 0.112 0.25 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 0.1 0.016 0.50 Bailer
8/10/2023 0.1 0.016 0.50 Bailer
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
2-inch1MW4
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 0.1 0.016 0.50 Peristaltic 1/5/2025 1 0.16 0.50 Peristaltic 2/5/2025 0.2 0.032 0.50 Peristaltic 3/4/2025 0.36 0.0576 0.75 Peristaltic 4/9/2025 ND N/A 0.75 Peristaltic 5/7/2025 sheen N/A 0.50 Peristaltic
1.25 4.50 1.00 0.50 3.00
10.25 11/23/2022 0 0 0.5 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 NM N/A N/A N/A
4/12/2023 NM N/A N/A N/A
5/9/2023 NM N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
11/20/2023 ND N/A N/A N/A
2-inch1MW4
1MW4 Removed Total CY2022
1MW4 Removed Total CY2024 1MW4 Removed Total CY2023
1MW4 Removed Total CY2021
1MW4 Removed Subtotal
2-inch1MW10
1MW4 Removed Total CY2025
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 ND N/A N/A N/A
1/3/2025 ND N/A N/A N/A
2/5/2025 ND N/A N/A N/A
3/4/2025 ND N/A N/A N/A
4/9/2025 ND N/A N/A N/A
5/7/2025 ND N/A N/A N/A
0.50 0.00 0.00 0.00 0.50
6/8/2021 ND N/A N/A N/A
7/8/2021 ND N/A N/A N/A
8/5/2021 ND N/A N/A N/A
9/9/2021 ND N/A N/A N/A
10/7/2021 0.16 0.0256 1.25 Bailer 11/18/2021 0.56 0.0896 1.5 Bailer 12/16/2021 0.15 0.024 1 Bailer
1/6/2022 ND N/A N/A N/A
2/15/2022 0.02 0.0032 1.25 Bailer 3/10/2022 0.5 0.08 0.5 Bailer 4/20/2022 0.1 0.016 0.5 Bailer 5/10/2022 Only on probe N/A 0.25 Bailer 6/13/2022 0.01 0.0016 0.25 Bailer
1MW10 Removed Subtotal
1MW10 Removed Total CY2022 1MW10 Removed Total CY2023 1MW10 Removed Total CY2024
2-inch1MW10
2-inch1MW11
1MW10 Removed Total CY2025
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
7/8/2022 ND N/A N/A N/A
8/15/2022 ND N/A N/A N/A
9/16/2022 0.21 0.0336 2 Bailer 10/7/2022 1.04 0.1664 1 Bailer
11/23/2022 0 0 0.5 Bailer 12/8/2022 0.03 0.0048 0.25 Bailer 1/11/2023 2.15 0.344 2 Bailer
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 0.9 0.144 1 Bailer
10/12/2023 0.2 0.032 1 Bailer 11/20/2023 0.5 0.08 1 Bailer 12/7/2023 0.3 0.048 0.5 Peristaltic 1/11/2024 0.1 0.016 0.5 Peristaltic
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 0.5 0.08 0.5 Peristaltic 5/16/2024 0.2 0.032 0.5 Peristaltic
11/15/2024 0.01 0.0016 0.15 Peristaltic 12/3/2024 0.1 0.016 0.5 Peristaltic 1/3/2025 0.1 0.016 0.5 Peristaltic 2/5/2025 0.05 0.008 0.25 Peristaltic 3/4/2025 0.01 0.0016 0.5 Peristaltic
4/9/2025 ND N/A N/A N/A
5/7/2025 Sheen N/A 0.5 N/A
3.751MW11 Removed Total CY2021
2-inch1MW11
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
6.50 5.50 2.15 1.75
19.65 6/8/2021 0.9 0.0369 0.5 Bailer 7/8/2021 1.09 0.04469 0.75 Bailer 8/5/2021 1.48 0.06068 0.75 Bailer 9/9/2021 1.34 0.05494 2 Bailer
10/7/2021 0.71 0.02911 0.75 Bailer 11/18/2021 2.09 0.08569 0.5 Bailer 12/16/2021 1.5 0.0615 1.5 Bailer
1/6/2022 1.39 0.05699 1.5 Bailer 2/15/2022 0.04 0.00164 0.25 Bailer 3/10/2022 0.67 0.02747 1.25 Bailer 4/20/2022 3.00 0.123 1.5 Bailer 5/10/2022 1.85 0.07585 0.75 Bailer 6/13/2022 0.9 0.0369 0.75 Bailer 7/8/2022 0.48 0.01968 1.25 Bailer
8/15/2022 0.52 0.02132 1.5 Bailer
9/16/2022 NM N/A N/A N/A
10/7/2022 2.7 0.1107 1 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 2.85 0.11685 1.5 Bailer 1/11/2023 4.1 0.1681 0.25 Bailer
2/15/2023 NM N/A N/A N/A
3/16/2023 6 0.246 2.0 Peristaltic 4/12/2023 3.8 0.1558 1.5 Bailer/Peristaltic 5/16/2023 NM N/A 1.0 Bailer 6/2/2023 3.7 0.1517 1.5 Bailer 7/5/2023 2 0.082 1.5 Bailer
1-inchTMW5
1MW11 Removed Total CY2023 1MW11 Removed Total CY2024
1MW11 Removed Total CY2022
1MW11 Removed Subtotal 1MW11 Removed Total CY2025
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
8/10/2023 1 0.041 1.5 Bailer 9/6/2023 3.8 0.1558 1.0 Bailer
10/12/2023 2.1 0.0861 1.5 Bailer 11/2/2023 2.4 0.0984 N/A* N/A 12/7/2023 2.4 0.0984 1.5 Peristaltic 1/11/2024 5 0.205 2.0 Peristaltic 2/28/2024 9.3 0.3813 2.0 Peristaltic 3/19/2024 7 0.287 2.0 Peristaltic 4/11/2024 4 0.164 1.5 Peristaltic 5/16/2024 4 0.164 1.5 Peristaltic
11/15/2024 0.3 0.0123 1.0 Peristaltic 12/3/2024 3.7 0.1517 2.0 Peristaltic 1/3/2025 0.7 0.0287 2.0 Peristaltic 2/5/2025 1.9 0.0779 2.0 Peristaltic 3/4/2025 0.3 0.0123 0.5 Peristaltic 4/9/2025 1.2 0.0492 1.5 Peristaltic 5/7/2025 1.06 0.04346 1.0 Peristaltic
6.75 11.25 13.25 12.00 7.00
50.25
11.75 22.75 19.75 14.65 11.75 80.65
Notes:
1-inchTMW5
Cumulative Removed Total CY2021
Cumulative Total Removed
TMW5 Removed Total CY2021
TMW5 Removed Subtotal
TMW5 Removed Total CY2022 TMW5 Removed Total CY2023
Cumulative Removed Total CY2025
TMW5 Removed Total CY2024
Cumulative Removed Total CY2022 Cumulative Removed Total CY2023
TMW5 Removed Total CY2025
Cumulative Removed Total CY2024
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
* LNAPL recovery did not occur. See monthly report.
LNAPL denotes light non-aqueous phase liquid.
N/A denotes not applicable.
ND dentoes LNAPL was not detected.
NM denotes not measured due in access issues with well.
Only wells with historical LNAPL are shown on the table. Wells that are not shown have not had LNAPL detected.
NSBNL Biosparge Weekly System Check
Date Time Operator
HE-101
ON/OFF
HE-201
ON/OFF
BL-101
ON/OFF
BL-101
VFD (Hz)
BL-201
ON/OFF
BL-201
VFD (Hz)
FIT-101
(scfm)
FIT-201
(scfm)
FIT-101
Total Flow
(cuFT)
FIT-201
Total Flow
(cuFT)
Alarms / Faults Active
Combined Injection Rate (scfm)
Total Combined Flow Volume (FIT-101 + FIT-
201) (cuFT)
Weekly Injection Flow Vol (cuFT)
Comments 5/1/2025 1909 KA OFF OFF OFF 0 OFF 0 0 0 141921594 160570015 BL-101/ BL-201 VFD 0 302,491,609 705,053 5/7/2025 900 KA ON ON ON 51 ON 51 52 55 141994745 160648911 107 302,643,656 152,047
5/13/2025 5/23/2025 1720 KA ON ON ON 51 ON 51 71 54 145418376 161874992 125 307,293,368 4,649,712 5/29/2025 1700 KA ON ON ON 51 ON 51 59 53 146211453 162307413 112 308,518,866 1,225,498
NO DATA
MS - Michael Spaulding BrA - Brett Anchukaitis
Biosparge Wooden Structure Repair Photographic Log
Naval Submarine Base New London Groton, CT
PHOTO 1 PHOTO 2
DATE: DATE:
5/27/2025 5/27/2025
ORIENTATION: ORIENTATION:
West to East West to East
TAKEN BY: TAKEN BY:
Russ McCormick Russ McCormick
DESCRIPTION: DESCRIPTION:
Exposed substructure.
No middle support installed.
PHOTO 3 PHOTO 4
DATE: DATE:
5/27/2025 5/27/2025
ORIENTATION: ORIENTATION:
East to West East to West
TAKEN BY: TAKEN BY:
Russ McCormick Russ McCormick
DESCRIPTION DESCRIPTION
Newly installed substructure with weathered rated materials.
Completed flooring with weathered rated material.
Completed flooring with asphalt starting shingles for non-slip grip.
| May 2025 - Monthly Progress Summary Report, Zones 1 and 2 Biosparge System OM&M, Naval Submarine Base New London, Groton, CT |
| 07 May 2025 Monitoring Well Data Sheet |
| 07 May 2025 Biosparge Treatment System Data Sheet |
| 07 May 2025 Biosparge Treatment System Checklist |
| LNAPL Gauging and Recovery Summary Table (2021-2025) |
| Weekly System Log - May 2025 |
| Photograph Log |
{ "type": "Form", "isBackSide": false }
{ "type": "Form", "isBackSide": false }
File details come from the government source that posted it. Updated .