Biosparge OMM Monthly Report 202504full.pdf
PDF 4 MB Posted
- Solicitation number
- N4008525R0058
About this file
This document is a Monthly Progress Summary Report from KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) for the Biosparge System Operations, Maintenance, and Monitoring (OM&M) at Naval Submarine Base New London in Groton, CT, covering activities in April 2025. The report details weekly remote system checks, an on-site maintenance round completed on 09 April 2025, and observations of system performance, including flow rates at various biosparge wells, equipment maintenance, and Light Non-Aqueous Phase Liquid (LNAPL) gauging.
Key findings include that the system is running as designed, with a main and auxiliary low flow warning briefly noted on 08 April 2025. The desired flowrates were mostly achieved, though BSW-26 has not received flow for at least 6 months, potentially due to air line damage during recent asphalt paving. An oil change and air filter replacement were completed, and LNAPL was detected in monitoring well TMW5 at an estimated thickness of 1.2 feet. The report also highlights a deteriorating wooden structure protecting PVC air lines behind the Conex box, which represents a safety hazard and should be replaced. LNAPL recovery operations removed 0.75 and 1.5 gallons from 1MW4 and TMW5, respectively, bringing the total LNAPL removal to 78.65 gallons to date.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOMAN Government Solutions, LLC Phone (508) 366-7442 293 Boston Post Road West, Suite 100 Fax (508) 366-7445 Marlborough, Massachusetts 01752 www.komangs.com
01 May 2025
Mr. Joseph McCloud NAVFAC Mid-Atlantic
NAVFAC MIDLANT
9324 Virginia Ave Norfolk, VA 23511-3095
RE: Monthly Progress Summary Report – April 2025
Zones 1 and 2 Biosparge System Operations, Maintenance, and Monitoring (OM&M) Naval Submarine Base New London, Groton, CT Contract# N4008523D0073/Task Order# N4008524F6461
Dear Mr. McCloud, KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) is pleased to provide this April 2025 Monthly Progress Summary Report, detailing a summary on the Operations, Maintenance, and Monitoring (OM&M) for the biosparge system located in Zone 1 and 2, Naval Submarine Base New London, Groton, CT:
1. OM&M Activities – April 2025
a. Performed weekly remote checks on system performance.
b. On-site system maintenance round was completed on 09 April 2025.
i. KGS/Trinity tech recorded observations.
1. Observations attached.
c. Overall, the system is running as designed.
d. A main and auxiliary low flow warning was noted on 08 April 2025. The alarms deactivated within less than one minute.
e. The desired flowrate of 4.0 actual cubic feet per minute (acfm) at BSW-01 to BSW-12 was achieved.
f. The desired flowrate of 3.0 acfm at BSW-13 through BSW-30 was mostly achieved, with the exception at BSW-26. It has now been at least 6 months since this well has not received the flow. There is a new asphalt patch surrounding BSW-26 performed by another contractor. It is suspected that during asphalt paving, damage to the air line may have occurred. Further discussions on repair are warranted.
g. An oil change was completed on both blowers and air filters replaced on 09 April 2025. The used oil was disposed of at the hazardous waste facility. The old filters were disposed of as municipal trash.
h. The wooden structure that protects above the ground poly vinyl chloride (PVC) air lines behind the Conex box is severely deteriorated. Original construction of this structure by others was built out of indoor rated wood, rather than outdoor rated (i.e. pressure treated). This deterioration represents a safety hazard and should be replaced.
i. Light non-aqueous phase liquid (LNAPL) gauging occurred on 09 April 2025. LNAPL was detected in monitoring well TMW5 at estimated thicknesses of 1.2 feet. A grease like substance was detected on the probe upon retrieval at 1MW4, but it was not thick enough to measure. A strong petroleum odor emanating from the inside casing at 1MW11 was observed but no product was measured.
KOMAN Government Solutions, LLC Subsidiary of the Natives of Kodiak
j. LNAPL recovery at 1MW4 and TMW5 was conducted on 09 April 2025. A peristaltic pump was used to recover 0.75, and 1.5 gallons of LNAPL, respectively. To date, 78.65-gallons of LNAPL have been removed at the site. A tracking summary sheet is provided as an attachment to this monthly report.
2. Submittals
a. March 2025 Monthly Report - 02 April 2025.
b. Final Annual Report (2024) – 03 April 2025.
3. Next Month (May 2025) Planned O&MM Activities
c. Next System Maintenance Round is tentatively scheduled for 07 May 2025. This will include:
1. LNAPL gauging and recovery.
d. Schedule repair of the wooden structure behind the Conex box.
4. Issues and Concerns
e. BSW-01 remains inaccessible due to a partial asphalt patch over the well cover.
i. Update 05 March 2025. Although inaccessible, air has been turned back on to this well and it is receiving the designed flowrate.
f. BSW-02 remains inaccessible due to a partial asphalt patch over the well cover as denoted in the June Monthly O&M Report. This well is receiving required flowrate.
g. BSW-26 is not receiving flow. It is suspected that the air line may have been damaged during a recent re-paving effort (performed by another contractor). Additional discussion regarding repair is warranted.
h. As indicated in the January 2023 Monthly report, 1MW9 had been destroyed by others during an excavation to repair a main water line. Recommend installing a replacement well as this well serves to monitor concentrations just before they enter the Thames River.
Distribution:
L. Bidder, NSBNL EV P. Schauble, KGS/Trinity
Attachments:
Recorded O&M Observations 09 April 2025 LNAPL Gauging and Recovery Summary Table Weekly System Log April 2025 Photos of damaged wooded structure behind Conex.
Photo of new asphalt paving surrounding BSW-26.
Please feel free to reach out with any additional questions/concerns.
Sincerely, KOMAN Government Solutions, LLC/Trinity
Russ McCormick, P.G. (NH, FL) Project Manager
(978) 460-9603 - mobile
Table 2 LNAPL Gauging and Recovery
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
6/8/2021 0.87 0.1392 0.50 Bailer 7/8/2021 0.05 0.008 0.50 Bailer 8/5/2021 0.02 0.0032 0.25 Bailer
9/9/2021 ND N/A N/A N/A
10/7/2021 NM N/A N/A N/A
11/18/2021 NM N/A N/A N/A
12/16/2021 NM N/A N/A N/A
1/6/2022 NM N/A N/A N/A
2/15/2022 NM N/A N/A N/A
3/10/2022 0.1 0.016 0.25 Bailer
4/20/2022 NM N/A N/A N/A
5/10/2022 NM N/A N/A N/A
6/13/2022 ND N/A N/A N/A
7/8/2022 NM N/A N/A N/A
8/15/2022 0.07 0.0112 1.00 N/A 9/16/2022 0.05 0.008 1.5 Bailer 10/7/2022 0.2 0.032 1.5 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 0.7 0.112 0.25 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 0.1 0.016 0.50 Bailer
8/10/2023 0.1 0.016 0.50 Bailer
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
2-inch1MW4
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 0.1 0.016 0.50 Peristaltic 1/5/2025 1 0.16 0.50 Peristaltic 2/5/2025 0.2 0.032 0.50 Peristaltic 3/4/2025 0.36 0.0576 0.75 Peristaltic 4/9/2025 ND N/A 0.75 Peristaltic
1.25 4.50 1.00 0.50 2.50 9.75
11/23/2022 0 0 0.5 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 NM N/A N/A N/A
4/12/2023 NM N/A N/A N/A
5/9/2023 NM N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1MW4 Removed Total CY2025 1MW4 Removed Subtotal
2-inch1MW10
2-inch1MW4
1MW4 Removed Total CY2022
1MW4 Removed Total CY2024 1MW4 Removed Total CY2023
1MW4 Removed Total CY2021
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 ND N/A N/A N/A
1/3/2025 ND N/A N/A N/A
2/5/2025 ND N/A N/A N/A
3/4/2025 ND N/A N/A N/A
4/9/2025 ND N/A N/A N/A
0.50 0.00 0.00 0.00 0.50
6/8/2021 ND N/A N/A N/A
7/8/2021 ND N/A N/A N/A
8/5/2021 ND N/A N/A N/A
9/9/2021 ND N/A N/A N/A
10/7/2021 0.16 0.0256 1.25 Bailer 11/18/2021 0.56 0.0896 1.5 Bailer 12/16/2021 0.15 0.024 1 Bailer
1/6/2022 ND N/A N/A N/A
2/15/2022 0.02 0.0032 1.25 Bailer 3/10/2022 0.5 0.08 0.5 Bailer 4/20/2022 0.1 0.016 0.5 Bailer 5/10/2022 Only on probe N/A 0.25 Bailer 6/13/2022 0.01 0.0016 0.25 Bailer
7/8/2022 ND N/A N/A N/A
8/15/2022 ND N/A N/A N/A
2-inch1MW11
1MW10 Removed Total CY2025 1MW10 Removed Total CY2024
2-inch1MW10
1MW10 Removed Subtotal
1MW10 Removed Total CY2022 1MW10 Removed Total CY2023
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
9/16/2022 0.21 0.0336 2 Bailer 10/7/2022 1.04 0.1664 1 Bailer
11/23/2022 0 0 0.5 Bailer 12/8/2022 0.03 0.0048 0.25 Bailer 1/11/2023 2.15 0.344 2 Bailer
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 0.9 0.144 1 Bailer
10/12/2023 0.2 0.032 1 Bailer 11/20/2023 0.5 0.08 1 Bailer 12/7/2023 0.3 0.048 0.5 Peristaltic 1/11/2024 0.1 0.016 0.5 Peristaltic
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 0.5 0.08 0.5 Peristaltic 5/16/2024 0.2 0.032 0.5 Peristaltic
11/15/2024 0.01 0.0016 0.15 Peristaltic 12/3/2024 0.1 0.016 0.5 Peristaltic 1/3/2025 0.1 0.016 0.5 Peristaltic 2/5/2025 0.05 0.008 0.25 Peristaltic 3/4/2025 0.01 0.0016 0.5 Peristaltic
4/9/2025 ND N/A N/A N/A
3.75 6.50 5.50 2.15
2-inch1MW11
1MW11 Removed Total CY2023 1MW11 Removed Total CY2024
1MW11 Removed Total CY2021 1MW11 Removed Total CY2022
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
1.25 19.15
6/8/2021 0.9 0.0369 0.5 Bailer 7/8/2021 1.09 0.04469 0.75 Bailer 8/5/2021 1.48 0.06068 0.75 Bailer 9/9/2021 1.34 0.05494 2 Bailer
10/7/2021 0.71 0.02911 0.75 Bailer 11/18/2021 2.09 0.08569 0.5 Bailer 12/16/2021 1.5 0.0615 1.5 Bailer
1/6/2022 1.39 0.05699 1.5 Bailer 2/15/2022 0.04 0.00164 0.25 Bailer 3/10/2022 0.67 0.02747 1.25 Bailer 4/20/2022 3.00 0.123 1.5 Bailer 5/10/2022 1.85 0.07585 0.75 Bailer 6/13/2022 0.9 0.0369 0.75 Bailer 7/8/2022 0.48 0.01968 1.25 Bailer
8/15/2022 0.52 0.02132 1.5 Bailer
9/16/2022 NM N/A N/A N/A
10/7/2022 2.7 0.1107 1 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 2.85 0.11685 1.5 Bailer 1/11/2023 4.1 0.1681 0.25 Bailer
2/15/2023 NM N/A N/A N/A
3/16/2023 6 0.246 2.0 Peristaltic 4/12/2023 3.8 0.1558 1.5 Bailer/Peristaltic 5/16/2023 NM N/A 1.0 Bailer 6/2/2023 3.7 0.1517 1.5 Bailer 7/5/2023 2 0.082 1.5 Bailer
8/10/2023 1 0.041 1.5 Bailer 9/6/2023 3.8 0.1558 1.0 Bailer
10/12/2023 2.1 0.0861 1.5 Bailer
1MW11 Removed Total CY2025 1MW11 Removed Subtotal
1-inchTMW5
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/2/2023 2.4 0.0984 N/A* N/A 12/7/2023 2.4 0.0984 1.5 Peristaltic 1/11/2024 5 0.205 2.0 Peristaltic 2/28/2024 9.3 0.3813 2.0 Peristaltic 3/19/2024 7 0.287 2.0 Peristaltic 4/11/2024 4 0.164 1.5 Peristaltic 5/16/2024 4 0.164 1.5 Peristaltic
11/15/2024 0.3 0.0123 1.0 Peristaltic 12/3/2024 3.7 0.1517 2.0 Peristaltic 1/3/2025 0.7 0.0287 2.0 Peristaltic 2/5/2025 1.9 0.0779 2.0 Peristaltic 3/4/2025 0.3 0.0123 0.5 Peristaltic 4/9/2025 1.2 0.0492 1.5 Peristaltic
6.75 11.25 13.25 12.00 6.00
49.25
11.75 22.75 19.75 14.65 9.75
78.65
Notes:
* LNAPL recovery did not occur. See monthly report.
LNAPL denotes light non-aqueous phase liquid.
N/A denotes not applicable.
ND dentoes LNAPL was not detected.
Cumulative Total Removed
TMW5 Removed Total CY2021
TMW5 Removed Subtotal
TMW5 Removed Total CY2022 TMW5 Removed Total CY2023
Cumulative Removed Total CY2025
TMW5 Removed Total CY2024
Cumulative Removed Total CY2022 Cumulative Removed Total CY2023
TMW5 Removed Total CY2025
Cumulative Removed Total CY2024
Cumulative Removed Total CY2021
1-inchTMW5
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
NM denotes not measured due in access issues with well.
Only wells with historical LNAPL are shown on the table. Wells that are not shown have not had LNAPL detected.
NSBNL Biosparge Weekly System Check
Date Time Operator
HE-101
ON/OFF
HE-201
ON/OFF
BL-101
ON/OFF
BL-101
VFD (Hz)
BL-201
ON/OFF
BL-201
VFD (Hz)
FIT-101
(scfm)
FIT-201
(scfm)
FIT-101
Total Flow
(cuFT)
FIT-201
Total Flow
(cuFT)
Alarms / Faults Active
Combined Injection Rate (scfm)
Total Combined Flow Volume (FIT-101 + FIT-
201) (cuFT)
Weekly Injection Flow Vol (cuFT)
Comments 4/3/2025 700 MS ON ON ON 51 ON 51 52 56 140103121 158603671 108 298,706,792 445,656
4/10/2025 850 MS ON ON ON 51 ON 51 52 57 140570745 159095433 109 299,666,178 959,386 4/17/2025 745 MS ON ON ON 51 ON 51 52 55 141063467 159627536 107 300,691,003 1,024,825 4/23/2025 1529 KA ON ON ON 51 ON 51 52 55 141585676 160200880 107 301,786,556 1,095,553
MS - Michael Spaulding KA - Kevin Anderson
| Table 2 LNAPL Removal Totals_v1.pdf |
| Sheet1 |
| Copy of NSBNL Biosparge Weekly System Log v2.pdf |
| system log |
| Monthly Progress Report - April 2025 |
| 09 April 2025 Treatment System Maintenance Log Checklis |
| 09 April 2025 Monitoring Well Data Sheet |
| 09 April 2025 Treatment System Data Sheet |
| LNAPL Gauging and Recovery Summary (2021-2025) |
| NSBNL Biosparge Weekly System Check |
| Photograph - Rotted Structure Behind Conex Box |
| Photograph - New Asphalt around BSW-26 |
File details come from the government source that posted it. Updated .