This document is a Monthly Progress Summary Report for February 2025 from KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) detailing Operations, Maintenance, and Monitoring (OM&M) activities for the biosparge treatment system at Naval Submarine Base New London in Groton, Connecticut. The report covers activities for Zones 1 and 2, including weekly remote system checks, on-site maintenance performed on 05 February 2025, and light non-aqueous phase liquid (LNAPL) gauging and recovery efforts.
Key findings include the system running as designed, with one variable frequency drive (VFD) fault occurring on 16 February 2025 possibly due to freezing conditions. LNAPL was detected in monitoring wells 1MW4, 1MW11, and TMW5, with recovery volumes of 0.5, 0.25, and 2.0 gallons respectively. The total LNAPL removed to date is 74.65 gallons. Planned activities for March 2025 include the next system maintenance round on 04 March 2025, which will involve LNAPL gauging and recovery, and addressing comments on the 2024 Annual Report. The report includes detailed maintenance logs, monitoring well data sheets, and a comprehensive LNAPL gauging and recovery summary table.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOMAN Government Solutions, LLC Phone (508) 366-7442 293 Boston Post Road West, Suite 100 Fax (508) 366-7445 Marlborough, Massachusetts 01752 www.komangs.com
04 March 2025
Mr. Joseph McCloud NAVFAC Mid-Atlantic
NAVFAC MIDLANT
9324 Virginia Ave Norfolk, VA 23511-3095
RE: Monthly Progress Summary Report – February 2025
Zones 1 and 2 Biosparge System Operations, Maintenance, and Monitoring (OM&M) Naval Submarine Base New London, Groton, CT Contract# N4008523D0073/Task Order# N4008524F6461
Dear Mr. McCloud, KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) is pleased to provide this February 2025 Monthly Progress Summary Report, detailing a summary on the Operations, Maintenance, and Monitoring (OM&M) for the biosparge system located in Zone 1 and 2, Naval Submarine Base New London, Groton, CT:
1. OM&M Activities – February 2025
a. Performed weekly remote checks on system performance.
b. On-site system maintenance round was completed on 05 February 2025.
i. KGS/Trinity tech recorded observations.
1. Observations attached.
c. Overall, the system is running as designed.
d. Turned BSW-01 back on.
e. One VFD fault occurred on 16 February 2025 possibly due to freezing conditions.
f. The desired flowrate of 4.0 actual cubic feet per minute (acfm) at BSW-01 to BSW-12 was achieved.
g. The desired flowrate of 3.0 acfm at BSW-13 thru BSW-30 was achieved, with the exception at BSW-26.
h. Light non-aqueous phase liquid (LNAPL) gauging occurred on 05 February 2025. LNAPL was detected in monitoring wells 1MW4, 1MW11, and TMW5 at estimated thicknesses of 0.20, 0.05, and 1.9 feet, respectively.
i. LNAPL recovery at 1MW4, 1MW11, and TMW5 was conducted on 05 February 2025. A peristaltic pump was used to recover 0.5, 0.25, and 2.0 gallons of LNAPL, respectively. To date, 74.65-gallons of LNAPL have been removed at the site. A tracking summary sheet is provided as an attachment to this monthly report.
2. Submittals
a. January 2025 Monthly Report - 04 January 2025.
b. Draft Annual Report (2024) – 30 January 2025.
3. Next Month (March 2025) Planned O&MM Activities
c. Next System Maintenance Round is tentatively scheduled for 04 March 2025. This will include:
1. LNAPL gauging and recovery.
d. Address stakeholder comments on Annual Report (2024).
KOMAN Government Solutions, LLC Subsidiary of the Natives of Kodiak
4. Issues and Concerns
e. BSW-01 remains inaccessible due to a partial asphalt patch over the well cover. –
i. Update 05 March 2025. Although inaccessible, air has been turned back on to this well and it is receiving the designed flowrate.
f. BSW-02 remains inaccessible due to a partial asphalt patch over the well cover as denoted in the
June Monthly O&M Report. This well is receiving required flowrate.
g. As indicated in the January 2023 Monthly report, 1MW9 had been destroyed by others during an excavation to repair a main water line. Recommend installing a replacement well as this well serves to monitor concentrations just before they enter the Thames River.
Distribution:
L. Bidder, NSBNL EV P. Schauble, KGS/Trinity
Attachments:
Recorded O&M Observations 05 February 2025 LNAPL Gauging and Recovery Summary Table Weekly System Log February 2025
Please feel free to reach out with any additional questions/concerns.
Sincerely, KOMAN Government Solutions, LLC/Trinity
Russ McCormick, P.G. (NH, FL) Project Manager
(978) 460-9603 - mobile
Table 2 LNAPL Gauging and Recovery
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
6/8/2021 0.87 0.1392 0.50 Bailer 7/8/2021 0.05 0.008 0.50 Bailer 8/5/2021 0.02 0.0032 0.25 Bailer
9/9/2021 ND N/A N/A N/A
10/7/2021 NM N/A N/A N/A
11/18/2021 NM N/A N/A N/A
12/16/2021 NM N/A N/A N/A
1/6/2022 NM N/A N/A N/A
2/15/2022 NM N/A N/A N/A
3/10/2022 0.1 0.016 0.25 Bailer
4/20/2022 NM N/A N/A N/A
5/10/2022 NM N/A N/A N/A
6/13/2022 ND N/A N/A N/A
7/8/2022 NM N/A N/A N/A
8/15/2022 0.07 0.0112 1.00 N/A 9/16/2022 0.05 0.008 1.5 Bailer 10/7/2022 0.2 0.032 1.5 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 0.7 0.112 0.25 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 0.1 0.016 0.50 Bailer
8/10/2023 0.1 0.016 0.50 Bailer
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
2-inch1MW4
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 0.1 0.016 0.50 Peristaltic 1/5/2025 1 0.16 0.50 Peristaltic 2/5/2025 0.2 0.032 0.50 Peristaltic
1.25 4.50 1.00 0.50 1.00 8.25
11/23/2022 0 0 0.5 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 NM N/A N/A N/A
4/12/2023 NM N/A N/A N/A
5/9/2023 NM N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
2-inch1MW10
1MW4 Removed Total CY2025
2-inch1MW4
1MW4 Removed Total CY2022
1MW4 Removed Total CY2024 1MW4 Removed Total CY2023
1MW4 Removed Total CY2021
1MW4 Removed Subtotal
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 ND N/A N/A N/A
1/3/2025 ND N/A N/A N/A
2/5/2025 ND N/A N/A N/A
0.50 0.00 0.00 0.00 0.50
6/8/2021 ND N/A N/A N/A
7/8/2021 ND N/A N/A N/A
8/5/2021 ND N/A N/A N/A
9/9/2021 ND N/A N/A N/A
10/7/2021 0.16 0.0256 1.25 Bailer 11/18/2021 0.56 0.0896 1.5 Bailer 12/16/2021 0.15 0.024 1 Bailer
1/6/2022 ND N/A N/A N/A
2/15/2022 0.02 0.0032 1.25 Bailer 3/10/2022 0.5 0.08 0.5 Bailer 4/20/2022 0.1 0.016 0.5 Bailer 5/10/2022 Only on probe N/A 0.25 Bailer 6/13/2022 0.01 0.0016 0.25 Bailer
7/8/2022 ND N/A N/A N/A
8/15/2022 ND N/A N/A N/A
9/16/2022 0.21 0.0336 2 Bailer 10/7/2022 1.04 0.1664 1 Bailer
11/23/2022 0 0 0.5 Bailer 12/8/2022 0.03 0.0048 0.25 Bailer
2-inch1MW10
1MW10 Removed Total CY2025
2-inch1MW11
1MW10 Removed Subtotal
1MW10 Removed Total CY2022 1MW10 Removed Total CY2023 1MW10 Removed Total CY2024
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
1/11/2023 2.15 0.344 2 Bailer
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 0.9 0.144 1 Bailer
10/12/2023 0.2 0.032 1 Bailer 11/20/2023 0.5 0.08 1 Bailer 12/7/2023 0.3 0.048 0.5 Peristaltic 1/11/2024 0.1 0.016 0.5 Peristaltic
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 0.5 0.08 0.5 Peristaltic 5/16/2024 0.2 0.032 0.5 Peristaltic
11/15/2024 0.01 0.0016 0.15 Peristaltic 12/3/2024 0.1 0.016 0.5 Peristaltic 1/3/2025 0.1 0.016 0.5 Peristaltic 2/5/2025 0.05 0.008 0.25 Peristaltic
3.75 6.50 5.50 2.15 0.75
18.65 6/8/2021 0.9 0.0369 0.5 Bailer 7/8/2021 1.09 0.04469 0.75 Bailer 8/5/2021 1.48 0.06068 0.75 Bailer 9/9/2021 1.34 0.05494 2 Bailer
1MW11 Removed Total CY2025
2-inch1MW11
1-inchTMW5
1MW11 Removed Subtotal
1MW11 Removed Total CY2023 1MW11 Removed Total CY2024
1MW11 Removed Total CY2021 1MW11 Removed Total CY2022
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
10/7/2021 0.71 0.02911 0.75 Bailer 11/18/2021 2.09 0.08569 0.5 Bailer 12/16/2021 1.5 0.0615 1.5 Bailer
1/6/2022 1.39 0.05699 1.5 Bailer 2/15/2022 0.04 0.00164 0.25 Bailer 3/10/2022 0.67 0.02747 1.25 Bailer 4/20/2022 3.00 0.123 1.5 Bailer 5/10/2022 1.85 0.07585 0.75 Bailer 6/13/2022 0.9 0.0369 0.75 Bailer 7/8/2022 0.48 0.01968 1.25 Bailer
8/15/2022 0.52 0.02132 1.5 Bailer
9/16/2022 NM N/A N/A N/A
10/7/2022 2.7 0.1107 1 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 2.85 0.11685 1.5 Bailer 1/11/2023 4.1 0.1681 0.25 Bailer
2/15/2023 NM N/A N/A N/A
3/16/2023 6 0.246 2.0 Peristaltic 4/12/2023 3.8 0.1558 1.5 Bailer/Peristaltic 5/16/2023 NM N/A 1.0 Bailer 6/2/2023 3.7 0.1517 1.5 Bailer 7/5/2023 2 0.082 1.5 Bailer
8/10/2023 1 0.041 1.5 Bailer 9/6/2023 3.8 0.1558 1.0 Bailer
10/12/2023 2.1 0.0861 1.5 Bailer 11/2/2023 2.4 0.0984 N/A* N/A 12/7/2023 2.4 0.0984 1.5 Peristaltic 1/11/2024 5 0.205 2.0 Peristaltic 2/28/2024 9.3 0.3813 2.0 Peristaltic 3/19/2024 7 0.287 2.0 Peristaltic 4/11/2024 4 0.164 1.5 Peristaltic
1-inchTMW5
Summary (2021-2025) Zones 1 and 2, Naval Submarine Base New London
Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
5/16/2024 4 0.164 1.5 Peristaltic 11/15/2024 0.3 0.0123 1.0 Peristaltic 12/3/2024 3.7 0.1517 2.0 Peristaltic 1/3/2025 0.7 0.0287 2.0 Peristaltic 2/5/2025 1.9 0.0779 2.0 Peristaltic
6.75 11.25 13.25 12.00 4.00
47.25
11.75 22.75 19.75 14.65 5.75
74.65
Notes:
* LNAPL recovery did not occur. See monthly report.
LNAPL denotes light non-aqueous phase liquid.
N/A denotes not applicable.
ND dentoes LNAPL was not detected.
NM denotes not measured due in access issues with well.
Only wells with historical LNAPL are shown on the table. Wells that are not shown have not had LNAPL detected.
TMW5 Removed Total CY2025
Cumulative Removed Total CY2024
1-inchTMW5
Cumulative Total Removed
TMW5 Removed Total CY2021
TMW5 Removed Subtotal
TMW5 Removed Total CY2022 TMW5 Removed Total CY2023
Cumulative Removed Total CY2025
TMW5 Removed Total CY2024
Cumulative Removed Total CY2022 Cumulative Removed Total CY2023
Cumulative Removed Total CY2021
| Monthly Progress Summary Report - February 2025 |
| February 2025 Checklist |
| February 2025 Monitoring Well Data |
| February 2025 System Performance |
| LNAPL Gauging and Recovery Summary Table |
File details come from the government source that posted it. Updated .