This document is a Monthly Progress Summary Report from KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) for June 2025, detailing Operations, Maintenance, and Monitoring (OM&M) of a biosparge system at Naval Submarine Base New London in Groton, Connecticut. The report covers contract N4008523D0073/Task Order N4008524F6461, focusing on Zones 1 and 2 of the site. Key activities in June 2025 included weekly remote system performance checks, an on-site maintenance round on June 10, and light non-aqueous phase liquid (LNAPL) gauging and recovery. Notable observations include a non-functioning flowmeter on BL-101, flow rate issues with well BSW-26, and LNAPL detection in monitoring wells TMW5, 1MW4, and 1MW11, with a total of 0.25, 1.5, and 0.25 gallons of LNAPL recovered, respectively. The cumulative LNAPL removal at the site stands at 82.655 gallons.
The report outlines planned activities for July 2025, including another system maintenance round scheduled for July 8, which will involve LNAPL gauging and recovery, inspecting BSW-26 with a downhole camera, and repairing the BL-101 flowmeter. Ongoing issues include inaccessible wells (BSW-01 and BSW-02) due to asphalt patches, and the previously destroyed monitoring well 1MW9, which the contractor recommends replacing to continue monitoring concentrations before they enter the Thames River. The document includes detailed attachments such as recorded O&M observations, an LNAPL gauging and recovery summary table, and weekly system logs.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOMAN Government Solutions, LLC Phone (508) 366-7442 293 Boston Post Road West, Suite 100 Fax (508) 366-7445 Marlborough, Massachusetts 01752 www.komangs.com
02 July 2025
Mr. Robert Bray NAVFAC Mid-Atlantic
NAVFAC MIDLANT
9324 Virginia Ave Norfolk, VA 23511-3095
RE: Monthly Progress Summary Report – June 2025
Zones 1 and 2 Biosparge System Operations, Maintenance, and Monitoring (OM&M) Naval Submarine Base New London, Groton, CT Contract# N4008523D0073/Task Order# N4008524F6461
Dear Mr. Bray, KOMAN Government Solutions, LLC/Trinity (KGS/Trinity) is pleased to provide this June 2025 Monthly Progress Summary Report, detailing a summary on the Operations, Maintenance, and Monitoring (OM&M) for the biosparge system located in Zone 1 and 2, Naval Submarine Base New London, Groton, CT:
1. OM&M Activities – June 2025
a. Performed weekly remote checks on system performance.
b. On-site system maintenance round was completed on 10 June 2025.
i. KGS/Trinity tech recorded observations.
1. Observations attached.
c. Overall, the system is running as designed.
d. The flowmeter on BL-101 is not working properly.
e. The desired flowrate of 4.0 actual cubic feet per minute (acfm) at BSW-02 to BSW-12 was achieved.
f. The desired flowrate of 3.0 acfm at BSW-13 through BSW-30 was mostly achieved, with the exception at BSW-26. It has now been at least 8 months since this well has not received the flow. There is a new asphalt patch in the vicinity of BSW-26 performed by another contractor. It is suspected that during asphalt paving, damage to the air line may have occurred. Repairing biosparge lines is not part of this contract.
g. Light non-aqueous phase liquid (LNAPL) gauging occurred on 10 June 2025. LNAPL was detected in monitoring well TMW5 at an estimated thickness of 0.21 feet. A sheen was noted on the measuring probe for 1MW4 and 1MW11.
h. LNAPL recovery at 1MW4, 1MW11, and TMW5 was conducted on 10 June 2025. A peristaltic pump was used to recover 0.25, 1.5, and 0.25 gallons of LNAPL, respectively. To date, 82.655-gallons of LNAPL have been removed at the site. A tracking summary sheet is provided as an attachment to this monthly report.
2. Submittals
a. May 2025 Monthly Report - 06 June 2025.
3. Next Month (July 2025) Planned O&MM Activities
b. Next System Maintenance Round is tentatively scheduled for 08 July 2025. This will include:
KOMAN Government Solutions, LLC Subsidiary of the Natives of Kodiak
1. LNAPL gauging and recovery.
c. Inspect BSW-26 with a downhole camera to try and determine why there is no flow.
d. Repair flow meter on BL-101.
4. Issues and Concerns
e. BSW-01 remains inaccessible due to a partial asphalt patch over the well cover.
i. Update 05 June 2025. Although inaccessible, air has been turned back on to this well but may not be getting into this well. Repair of biosparge well substructures are not within the scope of this current contract.
f. BSW-02 remains inaccessible due to a partial asphalt patch over the well cover as denoted in the June Monthly O&M Report. This well is receiving and maintaining the required flowrate.
g. BSW-26 is not receiving flow. It is suspected that the air line may have been damaged during a recent re-paving effort (performed by another contractor). Repair of biosparge substructures is not within the scope of the current contract.
h. As indicated in the January 2023 Monthly report, 1MW9 had been destroyed by others during an excavation to repair a main water line by another contractor. Recommend installing a replacement well as this well serves to monitor concentrations just before they enter the Thames River. Well installations are not within the scope of the current contract.
Distribution:
L. Bidder, NSBNL EV P. Schauble, KGS/Trinity
Attachments:
Recorded O&M Observations 10 June 2025 LNAPL Gauging and Recovery Summary Table (2021-2025) Weekly System Log June 2025
Please feel free to reach out with any additional questions/concerns.
Sincerely, KOMAN Government Solutions, LLC/Trinity
Russ McCormick, P.G. (NH, FL) Project Manager
(978) 460-9603 - mobile
Date
Weather
Operator
Location
MW1-1PD1
1MW1S
1MW2
1MWe
1MWE
1MW7
1MWE
1MW10
1MW11
Notes
TMWe
TMWS
Tme
DO denotes dissolved Gxyger ft denotes feet mg/L denotes micrograms per iter ppmy denotes parts per millian by voiume
LNAPL denotes ight nan-aqueous phase lquid psig denotes pounds per square in gauge
Press Vac (psig)
TOC denotes top of casing
9.00
VOCs denotes volatie organic compounds
0-00
Q.99
"For LNAPL Volumes use the following formulas
VOCs
LNAPL thickness s calaulated by subtracung Depth to LNAPL and Depth to Water measurements.
-inch wcll - LNAPL ickncss (ft) x 0.041 galfi 2-inch well - LNAPL thickncss (f) x 0.16 galf
(ppmv)
0.9 Q
-1
Non CERCLA Zones 1 & 2, LOwer Subbase, OU4 Nava 3ubmartne Base
DO
(mg/L)
4.09 3.7
Monitoring Well Data Sheet Blosparge Treatment System
Depth to
LNAPL
(ft TOC)
New London, Connectlcut
Depth to Water
(t-TOC)
G39
LNAPL
Thickness
(ft)
Sheen l9.g9 10.210)L
Estimated LNAPL Well
Volume (gal)
LNAPL Voume Removed (gal)
Rermoval Method
KGS
Notes onty collect data if no product is in well only collect data if no product is in well
Date Weather:
Operator.
olip/1s
Biosparge Well
BSW1
BSW2
BSW3
BSW4
BSW5
BSW6
BSW7
BSW8
BSW9
BSW10
BSW11
BSW12
BSW13
BSW14
BSW15
FIT-101, Main flow:
FIT-201, Auxiliary flow.
P-101, Pressure:
TI-101, Temperature:
P-102, Pressure:
TI-102, Temperature:
P-201, Pressure:
TI-201, Temperature:
PI-202, Pressure:
TI-202, Temperature:
Time
Pre-cal mg/L:
Pressure
(psig)
H7 538 5% lb15603
|.80
Treatment System Data Sheet Biosparge Treatrment Systern Non-CERCLA Zones 1, Lower Subbase, OU4 Naval Submarine Base
New London, Connecticut
Post-cal mg/L:
(acfm)
(acfm)
(psig) (F) (psig) (°F)
(acfm) Flow
(°F)
DO Model-S/N: Oxyguard Polaris 081063A91A0000
(psig)
(°F) (psig) e47
ID
JySimon
Blosparge Well
BSW16
BSW17
BSW18
PID Model-S/N:
BSW19
Ambient ppm:
BSW20
BSW21
BSW22
BSW23
BSW24
BSW25
BSW26
BSW27
BSW28
BSW29
BL-101, Total Runtime:
BSW30
BL-201, Total Runtime:
TSH/TSL-801, Inside Temp.
BL-101 VFD frequency:
BL-201 VFD fr equency:
FIT-101, (on PLC) total flow:
FIT-201, on PLC total flow:
Time Pressure
Post-cal ppm:
(psig)
5.0
507)7
KS
Flow
(acfm)
3.0
Q.0
2.2
(hours)
(hours)
(°F) (Hz) (Hz)
(cu-ft) Ssr i) bog (inort)
Equipment
Rotary Claw Compressors
Rotary Claw Compressors
Rotary Claw Compressors
Rotary Claw Compressors
Rotary Claw Compressors
Heat Exchangers
Compact Filter Silencers
Rotameters
General Inspection
Electrical
Biosparge and Monitoring Wells
Treatment System Maintenance Log Biosparge Treatment System
Non-CERCLA Zones I, Lower Subbase, O04 Naval Submarine Base
New London, Connecticut
Suggested Maintenance
Check inlet air filter, if necessary, replace
Remove dust and debris from fan and system inlet.
Check the level of synchronizing gear oil, level should be above the middle of the sight glass. If below, the unit is leaking oil and will require repair.
Make sure housing is free from dust and dirt, clean if necessary
Remove acoustic enclosure and clean fan cowlings, fan wheels, ventilation grilles and cooling fans
Replace inlet air filter
Check the inlet scree, clean if necessary
Change synchronizing gear oil
Check that the system is operating correctly
Remove dust and debris from cooling fan and heat exchanger
Remove weather hood and inspect element, clean if needed
Remove fouling and moisture buildup in rotameter when adjusting flow becomes difficult
Visual inspection from compressor inlet to air flow leaving the system. Inspect for leaks, system damage or any items that seem out of place. Repair as needed
Visual inspections of electrical lines for shorts, blown fuses, burnt out lights, or weather damage
Visually inspect biosparge and monitoring wells for broken fittings, damaged well vaults, or wells
Suggested Schedule
Monthly
Every 3 Months
Every 6 Months
Every year
Every 20,000 hours or 6 years, whatever comes first
Monthly
Every 6 months
Inspect Monthly, as needed
Monthly
Monthly
Monthly
KGS
Last Çompleted
M4
LNAPL Gauging and Recovery Summary (2021-2025)
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
6/8/2021 0.87 0.1392 0.50 Bailer 7/8/2021 0.05 0.008 0.50 Bailer 8/5/2021 0.02 0.0032 0.25 Bailer
9/9/2021 ND N/A N/A N/A
10/7/2021 NM N/A N/A N/A
11/18/2021 NM N/A N/A N/A
12/16/2021 NM N/A N/A N/A
1/6/2022 NM N/A N/A N/A
2/15/2022 NM N/A N/A N/A
3/10/2022 0.1 0.016 0.25 Bailer
4/20/2022 NM N/A N/A N/A
5/10/2022 NM N/A N/A N/A
6/13/2022 ND N/A N/A N/A
7/8/2022 NM N/A N/A N/A
8/15/2022 0.07 0.0112 1.00 N/A 9/16/2022 0.05 0.008 1.5 Bailer 10/7/2022 0.2 0.032 1.5 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 0.7 0.112 0.25 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 0.1 0.016 0.50 Bailer
8/10/2023 0.1 0.016 0.50 Bailer
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
2-inch1MW4
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 0.1 0.016 0.50 Peristaltic 1/5/2025 1 0.16 0.50 Peristaltic 2/5/2025 0.2 0.032 0.50 Peristaltic 3/4/2025 0.36 0.0576 0.75 Peristaltic 4/9/2025 ND N/A 0.75 Peristaltic 5/7/2025 sheen N/A 0.50 Peristaltic
6/10/2025 sheen N/A 0.25 Peristaltic 1.25 4.50 1.00 0.50 3.25
10.50 11/23/2022 0 0 0.5 Bailer
1/11/2023 ND N/A N/A N/A
2/15/2023 ND N/A N/A N/A
3/16/2023 NM N/A N/A N/A
4/12/2023 NM N/A N/A N/A
5/9/2023 NM N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 ND N/A N/A N/A
10/12/2023 ND N/A N/A N/A
1MW4 Removed Total CY2025
2-inch1MW10
2-inch1MW4
1MW4 Removed Total CY2022
1MW4 Removed Total CY2024 1MW4 Removed Total CY2023
1MW4 Removed Total CY2021
1MW4 Removed Subtotal
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
11/20/2023 ND N/A N/A N/A
12/7/2023 ND N/A N/A N/A
1/11/2024 ND N/A N/A N/A
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 ND N/A N/A N/A
5/16/2024 ND N/A N/A N/A
11/15/2024 ND N/A N/A N/A
12/3/2024 ND N/A N/A N/A
1/3/2025 ND N/A N/A N/A
2/5/2025 ND N/A N/A N/A
3/4/2025 ND N/A N/A N/A
4/9/2025 ND N/A N/A N/A
5/7/2025 ND N/A N/A N/A
6/10/2025 ND N/A N/A N/A
0.50 0.00 0.00 0.00 0.50
6/8/2021 ND N/A N/A N/A
7/8/2021 ND N/A N/A N/A
8/5/2021 ND N/A N/A N/A
9/9/2021 ND N/A N/A N/A
10/7/2021 0.16 0.0256 1.25 Bailer 11/18/2021 0.56 0.0896 1.5 Bailer 12/16/2021 0.15 0.024 1 Bailer
1/6/2022 ND N/A N/A N/A
2/15/2022 0.02 0.0032 1.25 Bailer 3/10/2022 0.5 0.08 0.5 Bailer 4/20/2022 0.1 0.016 0.5 Bailer
1MW10 Removed Total CY2025
2-inch1MW10
2-inch1MW11
1MW10 Removed Subtotal
1MW10 Removed Total CY2022 1MW10 Removed Total CY2023 1MW10 Removed Total CY2024
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
5/10/2022 Only on probe N/A 0.25 Bailer 6/13/2022 0.01 0.0016 0.25 Bailer
7/8/2022 ND N/A N/A N/A
8/15/2022 ND N/A N/A N/A
9/16/2022 0.21 0.0336 2 Bailer 10/7/2022 1.04 0.1664 1 Bailer
11/23/2022 0 0 0.5 Bailer 12/8/2022 0.03 0.0048 0.25 Bailer 1/11/2023 2.15 0.344 2 Bailer
2/15/2023 ND N/A N/A N/A
3/16/2023 ND N/A N/A N/A
4/12/2023 ND N/A N/A N/A
5/9/2023 ND N/A N/A N/A
6/2/2023 ND N/A N/A N/A
7/5/2023 ND N/A N/A N/A
8/10/2023 ND N/A N/A N/A
9/6/2023 0.9 0.144 1 Bailer
10/12/2023 0.2 0.032 1 Bailer 11/20/2023 0.5 0.08 1 Bailer 12/7/2023 0.3 0.048 0.5 Peristaltic 1/11/2024 0.1 0.016 0.5 Peristaltic
2/8/2024 ND N/A N/A N/A
3/19/2024 ND N/A N/A N/A
4/11/2024 0.5 0.08 0.5 Peristaltic 5/16/2024 0.2 0.032 0.5 Peristaltic
11/15/2024 0.01 0.0016 0.15 Peristaltic 12/3/2024 0.1 0.016 0.5 Peristaltic 1/3/2025 0.1 0.016 0.5 Peristaltic 2/5/2025 0.05 0.008 0.25 Peristaltic 3/4/2025 0.01 0.0016 0.5 Peristaltic
4/9/2025 ND N/A N/A N/A
2-inch1MW11
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
5/7/2025 Sheen N/A 0.5 N/A 6/10/2025 Sheen N/A 1.5 Peristaltic
3.75 6.50 5.50 2.15 3.25
21.15 6/8/2021 0.9 0.0369 0.5 Bailer 7/8/2021 1.09 0.04469 0.75 Bailer 8/5/2021 1.48 0.06068 0.75 Bailer 9/9/2021 1.34 0.05494 2 Bailer
10/7/2021 0.71 0.02911 0.75 Bailer 11/18/2021 2.09 0.08569 0.5 Bailer 12/16/2021 1.5 0.0615 1.5 Bailer
1/6/2022 1.39 0.05699 1.5 Bailer 2/15/2022 0.04 0.00164 0.25 Bailer 3/10/2022 0.67 0.02747 1.25 Bailer 4/20/2022 3.00 0.123 1.5 Bailer 5/10/2022 1.85 0.07585 0.75 Bailer 6/13/2022 0.9 0.0369 0.75 Bailer 7/8/2022 0.48 0.01968 1.25 Bailer
8/15/2022 0.52 0.02132 1.5 Bailer
9/16/2022 NM N/A N/A N/A
10/7/2022 2.7 0.1107 1 Bailer
11/23/2022 NM N/A N/A N/A
12/8/2022 2.85 0.11685 1.5 Bailer 1/11/2023 4.1 0.1681 0.25 Bailer
2/15/2023 NM N/A N/A N/A
3/16/2023 6 0.246 2.0 Peristaltic 4/12/2023 3.8 0.1558 1.5 Bailer/Peristaltic
1MW11 2-inch
1MW11 Removed Subtotal
1-inchTMW5
1MW11 Removed Total CY2023 1MW11 Removed Total CY2024
1MW11 Removed Total CY2021 1MW11 Removed Total CY2022
1MW11 Removed Total CY2025
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
5/16/2023 NM N/A 1.0 Bailer 6/2/2023 3.7 0.1517 1.5 Bailer 7/5/2023 2 0.082 1.5 Bailer
8/10/2023 1 0.041 1.5 Bailer 9/6/2023 3.8 0.1558 1.0 Bailer
10/12/2023 2.1 0.0861 1.5 Bailer 11/2/2023 2.4 0.0984 N/A* N/A 12/7/2023 2.4 0.0984 1.5 Peristaltic 1/11/2024 5 0.205 2.0 Peristaltic 2/28/2024 9.3 0.3813 2.0 Peristaltic 3/19/2024 7 0.287 2.0 Peristaltic 4/11/2024 4 0.164 1.5 Peristaltic 5/16/2024 4 0.164 1.5 Peristaltic
11/15/2024 0.3 0.0123 1.0 Peristaltic 12/3/2024 3.7 0.1517 2.0 Peristaltic 1/3/2025 0.7 0.0287 2.0 Peristaltic 2/5/2025 1.9 0.0779 2.0 Peristaltic 3/4/2025 0.3 0.0123 0.5 Peristaltic 4/9/2025 1.2 0.0492 1.5 Peristaltic 5/7/2025 1.06 0.04346 1.0 Peristaltic
6/10/2025 0.21 0.00861 0.3 Peristaltic 6.75
11.25 13.25 12.00 7.25
50.50
11.75 22.75 19.75 14.65
TMW5 Removed Total CY2021
TMW5 Removed Subtotal
TMW5 Removed Total CY2022 TMW5 Removed Total CY2023 TMW5 Removed Total CY2024
Cumulative Removed Total CY2022 Cumulative Removed Total CY2023
TMW5 Removed Total CY2025
Cumulative Removed Total CY2024
1-inchTMW5
Cumulative Removed Total CY2021
Zones 1 and 2, Naval Submarine Base New London Groton, Connecticut
Well ID Well Diameter Date LNAPL Thickness
(feet) Estimated LNAPL Well Volume
(gallon) LNAPL Volume Removed
(gallon) Removal Method
13.75 82.65
Notes:
* LNAPL recovery did not occur. See monthly report.
LNAPL denotes light non-aqueous phase liquid.
N/A denotes not applicable.
ND dentoes LNAPL was not detected.
NM denotes not measured due in access issues with well.
Only wells with historical LNAPL are shown on the table. Wells that are not shown have not had LNAPL detected.
Cumulative Total Removed Cumulative Removed Total CY2025
NSBNL Biosparge Weekly System Check
Date Time Operator
HE-101
ON/OFF
HE-201
ON/OFF
BL-101
ON/OFF
BL-101
VFD (Hz)
BL-201
ON/OFF
BL-201
VFD (Hz)
FIT-101
(scfm)
FIT-201
(scfm)
FIT-101
Total Flow
(cuFT)
FIT-201
Total Flow
(cuFT)
Alarms / Faults Active
Combined Injection Rate (scfm)
Total Combined Flow Volume (FIT-101 + FIT-
201) (cuFT)
Weekly Injection Flow Vol (cuFT)
Comments 6/6/2025 1040 KA ON ON ON 51 ON 51 60 53 147190668 162867761 113 310,058,429 1,539,563
6/14/2025 917 KA ON ON ON 51 ON 51 NA 55 147538593 163156193 N/A 310,694,786 636,357 6/26/2025 1134 KA ON ON ON 51 ON 51 NA 53 147538593 164285736 Manifold Low flow N/A 311,824,329 1,129,543
MS - Michael Spaulding BrA - Brett Anchukaitis
| Monthly Progress Summary Report - June 2025 |
| Monitoring Well Data Sheet |
| Biosparge Treatment System Log |
| Biosparge Maintenance Log |
| LNAPL Gauging and Recovery Summary (2021-2025) |
| Weekly System Log |
{ "type": "Form", "isBackSide": false }
{ "type": "Document", "isBackSide": false }
{ "type": "Form", "isBackSide": false }
File details come from the government source that posted it. Updated .