About this file

This solicitation requests proposals for facility investment services for electrical maintenance and repair services at various Navy installations in the Hampton Roads, Virginia area of responsibility. Services include recurring and non-recurring electrical work, maintenance, repair, and project support. Proposals are due by 2:00 PM on April 20, 2023. The contract will have a one-year base period and four one-year options exercisable at the Government's discretion. The solicitation identifies required contract line item pricing, reporting requirements, quality control standards, and other terms. Offerors must follow submission instructions and meet administrative and technical requirements, including applicable wage standards and small business participation goals. The Naval Facilities Engineering Command will administer the award.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 20 Apr 2023

X

A X B X C

D

EX

X G F 67 - 84

85 - 93 X H 94 - 103 laura.e.thomas4@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 103

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40085 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and no hand carried proposals conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

LAURA E. THOMAS 757-341-1624

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 14

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

15 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

16 - 19 20 - 31

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 32 - 35 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 36 - 38 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

39 - 64

PART II - CONTRACT CLAUSES

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

65 - 66

6. REQUISITION/PURCHASE NO.

5911565

5. DATE ISSUED

21 Mar 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008523R2630

Section A - Solicitation/Contract Form

COVER SHEET

COMMANDER

NAVAL FACILITIES ENGINEERING SYSTEM COMMAND

MID-ATLANTIC DIVISION

CONTRACTING CORE

NORFOLK, VIRGINIA 23511-3095

NOTICE: NAVFAC SPECIFICATION

Proposals to be submitted by 2:00P.M. No. 05-23-2630

By Commercial Carrier Only to: RFP NUMBER N40085-23-R-2630 CDR Mid-Atlantic Division Naval Facilities Engineering System Command Facility Support Contract Building Z-140, Suite 216 9324 Virginia Avenue Norfolk, Virginia 23511-3095

N40085-23-R-2630

FACILITY INVESTMENT SERVICES FOR ELECTRICAL MAINTENANCE AND

REPAIR SERVICES HAMPTON ROADS AOR

NOTICE

All inquiries concerning any phase of the specification, prior to the proposal due date shall be submitted electronically, Attn: Laura Thomas, laura.e.thomas21.civ@us.navy.mil

Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-S1 rating in accordance with the provisions of DPAS Regulation 1 and/or DMS Regulation 1.

Section B - Supplies or Services and Prices

GENERAL INFORMATION

B.1 Contract Title: Facility investment Services for Electrical Maintenance and Repair

Services at Norfolk Naval Station, Naval Air Station Oceana, Joint Expeditionary Base Little Creek-Fort Story, Naval Weapon Station, Yorktown, and Norfolk Naval Shipyard, Portsmouth, and Other Areas of Responsibility (AOR)

B.2 Type of Contract: This is a Facilities Support, Indefinite Delivery/Indefinite Quantity Contract with Recurring and Non-Recurring Services as noted in Section L, Instructions, Conditions, and Notices to Offeror.

B.3 Minimum Guarantee: The Recurring Price portion of the base year only is the minimum guarantee for this contract.

B.4 Set-Aside: This requirement is being offered as full and open.

B.5 NAICS Code: The NAICS Code assigned to this procurement is 561210 with a small business size standard of $47,000,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM .

B.6 Wage Determination (Service)/Wage Decision (Construction): Labor Standards (formerly

Service Contract Act (SCA), and Construction Wage Rate (formerly Davis-Bacon Act (DBA) wages are included in this solicitation. Refer to Section J, Attachments.

Labor Standards formerly SCA (Wage Determination No. # 2015-4341) shall be used for wage rates and fringe benefits for FSC services.

Wage Rate Requirements Construction (General Decision Number: VA20230160) shall be used for construction wage rates and fringe for services not included under the SCA Wage Determination.

WAGE RATE REQUIREMENTS CONSTRUCTION IN FACILITY SUPPORT

CONTRACTS INCLUDING CONSTRUCTION

This contract contains only one Wage Rate Requirement Construction General Decision which shall be in effect for the life of the contract. The contractor may include in the offered price for the option years any increase needed for wages or benefits for construction work under the contract. The contractor warrants that the prices in the option years of this contract do not include any allowance for any contingency to cover increased cost for which adjustment is provided under FAR clause 52.217- 43, Fair Labor Standards Act and Service Contract Act - Price Adjustment. Offerors are required to segregate Davis-Bacon hours and wages and SCA hours and wages in the payroll records.

B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.

B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option

Periods and one (1) six month Option, not to exceed a total of sixty-six (66) months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.

B.9 Period of Performance: The period of performance will be determined at the time of award.

B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs

0001 through 0012 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).

B.11 Contract Line Items and Contract Exhibit Line Items

a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.

c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007, 0009, and 0011) and the Schedule of Non-Recurring Work (CLIN 0002, 0004, 0006, 0008, 0010, and 0012) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, Inspection of Services – Fixed Price, Section E.

B.12 Unit Price Adjustments In Option Periods

This contract incorporates the Service Contract Act (SCA) and the Wage Rates- Construction. The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract. Unit prices will ONLY be adjusted for the Service Contract Act (SCA) wage increases in accordance with FAR Clauses 52.222- 43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of his proposal, that the price does not include any contingency for future wage increases with the exception of Wage Rates-Construction.

B.13 Indefinite Quantity Individual Contract Line Item Quantities

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.14 Unit Prices For Labor

a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Quantity Work.

b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Quantity Work” accomplished in the time period shown.

c. The Contractor shall enter, in the unit price proposal space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (I.e. bucket truck, lifting equipment, staging, etc.), profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.

B.15 Period Of Performance – Less than One Year

Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.

B.16 Government Purchase Card

Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving

GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)

This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.

B.18 Incorporation of Technical Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order:

(i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.19 Request For Proposals (RFP) Information/Clarification Questions

Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, either by email to laura.e.thomas21.civ@us.navy.mil and leearjetta.w.hamilton.civ@us.navy.mil. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.20 Request for Proposal (RFP) Files:

Solicitations are posted to the Contract Opportunities website (https://www.sam.gov) as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.

B.21 Solicitation

This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.

B.22 Notice to Offerors:

Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:

CLINS ELINs CLINs ELINs 0001 A001 through A006 0007 D001 through D006 0002 A700 through A710 0008 D700 through D710 0003 B001 through B006 0009 E001 through E006 0004 B700 through B710 0010 E700 through E710 0005 C001 through C006 0011 F001 through F006 0006 C700 through C710 0012 F700 through F710

B.23 DBIDS INFORMATION:

Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into

DBIDS.

DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html .

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

Submitting Your Proposal

Proposals should be sent via a commercial carrier, such as Federal Express, and shall be addressed to:

NAVFAC MIDLANT

Attn: Laura Thomas 9324 Virginia Avenue Building Z-140, Room 216 Norfolk, Virginia 23511

Proposals that are hand carried or mailed via United States Post office will NOT be accepted.

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED Each

BASE YEAR- RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

FOB: Destination

PURCHASE REQUEST NUMBER: 5911565

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED Each

BASE YEAR- NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Each

OPTION OPTION YEAR 1 - RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED Each

OPTION OPTION YEAR 1 - NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED Each

OPTION OPTION YEAR 2 - RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0006 UNDEFINED Each

OPTION OPTION YEAR 2 - NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0007 UNDEFINED Each

OPTION OPTION YEAR 3 - RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0008 UNDEFINED Each

OPTION OPTION YEAR 3 - NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0009 UNDEFINED Each

OPTION OPTION YEAR 4 - RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0010 UNDEFINED Each

OPTION OPTION YEAR 4 - NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform the services described in the Performance Work Statement.

UNIT UNIT PRICE MAX AMOUNT

0011 UNDEFINED Each

OPTION OPTION YEAR 5 - RECURRING WORK

FFP

Provide all labor, management, supervision, tools, materials and equipment and other items necessary to perform the services described in the Peformance Work Statement

UNIT UNIT PRICE MAX AMOUNT

0012 UNDEFINED Each

OPTION OPTION YEAR 5 - NON-RECURRING WORK

FFP

Provide all labor, management, supervision, tools, materials and equipment and other items necessary to perform the services described in the Peformance Work Statement

Section C - Descriptions and Specifications

SPECIFICATIONS

The following Annexes are provided as attachment “N4008523R2630 Section C Annexes”:

Annex 1, General Information Annex 2, Management and Admnistration Annex 15, Facility Support Annex 16, Electrical

This is a performance-based contract which incorporates performance-based specifications by references as if they were fully set forth herein.

CLAUSES INCORPORATED BY FULL TEXT

C.2 Reporting Requirements. A detailed report allocating value of work/quantities performed by Contract Line Items CLINs)/Sub-Line Items (SLINs) identified in the schedule and any accompanying Exhibits with Exhibit Line Items (ELINs) is to be submitted monthly, including all Firm Fixed Price (FFP) and Indefinite Quantity (IQ) Work items completed. The Contracting Officer shall be notified when 75% of any IQ Line Item (CLIN/SLIN/ELIN) is reached.

C.3

Government Purchase Card Program. The contractor shall accept orders placed by authorized GPC users. The Government Purchase Card is a purchasing instrument issued through a commercial bank to a Government Agency to facilitate micro purchases. A micro purchase is any order for supplies in the amount of $10,000.00 or less, services of $2,500.00 or less, or order for construction services of $2,000.00 or less. The Contractor processes micro purchases under the GPC program exactly as they would process a charge by an individual using a personal credit card.

a. Limitation of GPC Pricing for IQ Work: The Contractor shall be required to offer IQ pre-priced line item services to authorized Government personnel when they are ordering the work directly via the Government Purchase Card Program. The Contractor shall be required to offer the pre-priced IQ line item services, at the same prices in accordance with the schedule of pricing information, Section B and Exhibits (if any). Contractor is responsible for tracking quantities and reporting total used each month and year to date to the Contracting Officer by the fifth day of each month. See Section H for additional details.

C.4

ADDITIONAL REPORTING REQUIREMENTS (Enterprise-wide Contractor Manpower Reporting Application (ECMRA). The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractor via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://sam.gov/.

Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://sam.gov/.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government 0007 N/A N/A N/A Government 0008 N/A N/A N/A Government 0009 N/A N/A N/A Government 0010 N/A N/A N/A Government 0011 N/A N/A N/A Government 0012 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-15 Certificate of Conformance APR 1984

52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(a) Definitions. "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.

(End of clause)

E.l ACCEPTANCE

The performance and quality of work delivered by the contractor, including services rendered and any documentation or written material compiled shall be subject to inspection, review, and acceptance by the Government.

E.2 CONTRACTOR QUALITY CONTROL (QC)

a. The Contractor shall establish and maintain a Quality Control Program in accordance with the FAR 52.246-4, "INSPECTION OF SERVICES - FIXED PRICE" clause, Section E, to ensure that the work performed under the contract conforms to the contract requirements. The Contractor shall submit to the Contracting Officer, a Quality Control Plan (QCP) for approval 15 calendar days after award of the contract. A general description of the Contractor's Quality Control (QC) program shall be available for Government review during the preaward survey.

b. The Contractor's QCP shall provide top Contractor management with an effective and efficient means of identifying and correcting problems throughout the entire scope of operations.

c. The QCP shall include:

(1) A description of the Contractor's quality control system. The system must cover all contract services, specify work to be inspected on either a schedule or unscheduled basis, and describe how inspections are to be conducted.

(2) The name(s) and qualifications of the individual(s) responsible for performing the quality control inspections, and the extend of their authority.

(3) Provisions for recording the results of inspections and for recording corrective action taken.

(4) Provisions to update and revise the QCP during the performance of the contract.

d. A file of all Quality Control inspections both performed and scheduled, inspection results, and dates and details of corrective actions taken shall be maintained by the Contractor through the term of this contract. The file shall be the property of the Government and made available to the Contracting Officer during regular working hours. The file shall be turned over to completion/termination of the contract.

E.3 GOVERNMENT QUALITY ASSURANCE (QA)

In accordance with the FAR 52.246-4, "INSPECTION OF SERVICES - FIXED PRICE" clause, Section E, each phase of the services rendered under this contract is subject to Government inspection, during the Contractor's operations and after completion of the tasks. The Government's Quality Assurance Surveillance Program is not a substitute for Quality Control by the Contractor. All findings of unsatisfactory or non-performed work will be administered in accordance with the "CONSEQUENCES OF CONTRACTOR'S FAILURE TO PERFORM REQUIRED SERVICES" clause, Section E. All costs associated with rework are the responsibility of the Contractor. The Government reserves the right to choose the inspection methods to be used in implementing its Quality Assurance Program and to vary the inspection methods utilized during the work, without notice to the Contractor.

E.4 PERFORMANCE EVALUATION MEETINGS

a. The Contractor shall meet with the Government's representative monthly during the first 3 months of the contract. Thereafter, meetings will be as often as necessary at the discretion of the Contracting Officer, but not less than quarterly. A mutual effort will be made to resolve all problems identified. The written minutes of these meetings, prepared by the Government, shall be signed by the Contractor's representative and the Government's representative. Should the Contractor not concur with the minutes, the Contractor shall state, in writing, to the Contracting Officer any areas of disagreement within 3 calendar days.

E.5 Government Performance Assessment

In accordance with FAR 52.246-4, INSPECTION OF SERVICES - FIXED PRICE clause, Section E, each phase of services rendered under this contract is subject to Government inspection, during the Contractor’s operations and after completion of the tasks. The Government will employ a variety of inspection methods and frequencies in order to assess the degree to which all service deliverables conform to contract performance standards. The Government may vary these inspection methods/frequencies as dictated by actual performance status. The results of all inspections will be documented and submitted to the Government Performance Assessment Board for periodic review, as set forth in the Government’s Performance Assessment Plan.

The Government’s Performance Assessment Plan is not a substitute for Contractor quality control.

Government Performance Assessment Representatives will regularly assess deliverables for conformance to contract performance objectives and standards. If a performance inconsistency is apparent in the basic service deliverable (e.g., sightly appearance of improved grounds), inspection will then be focused on component elements of the deliverable (e.g., mowing, edging). For any non-conformances identified at this level, assessment may then include review of Contractor material representations (e.g., Quality Management System).

Performance assessments will be used as input into any Award Option and/or Award/Incentive Fee decisions, the performance documentation requirements of FAR 42.15, and to substantiate any findings of nonconforming services in accordance with FAR 52.246-4.

Government performance assessment will also address any risks associated with future service deliverables.

Current performance status, process outputs, trend data, and the material representations of the Contractor’s technical proposal will all be considered as necessary in determining the likelihood of achieving required performance outcomes for deliverables that are not yet completed.

In the event the Government performance assessment indicates a high risk of future non-conforming services outcomes, the Contractor will be required to take pre-emptive/corrective action. The Contractor may receive reduced/negative performance evaluations until such time as quality control is restored and performance risks are mitigated.

Any non-conforming deliverables will be identified during periodic performance assessment meetings, and form the basis for price reduction or other consideration in accordance with FAR 52.246-4. Any such adjustments will be processed by the Contracting Officer and result in a formal contract modification.

Section F - Deliveries or Performance

DELIVERIES AND PERFORMANCE

Section F – 0200000 Management and Administration

DELIVERABLES

Annex/ Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.2.1.2

N/A Request to Work Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day.

KO and

COR

2 As required

0200000/ 2.3.1

N/A Sign-in Sheets and Minutes for Review and Comments

Within two working days.

KO, COR

and all attendees

2 As required

0200000/ 2.3.1

N/A Sign-in Sheets and Minutes Final Revision

Within two working days.

KO, COR

and all attendees

2 As required

0200000/ 2.3.4

N/A Permits and Licenses

Before work commences and as requested by the KO.

KO and

COR

2 As specified

0200000/ 2.3.5

N/A Certificate of Insurance

At least 30 calendar days prior to start of contract performance.

KO and

COR

2 As specified

0200000/ 2.3.5

N/A Written Notice of cancellation or material change in policy coverage

At least 30 calendar days prior to cancellation or material change in policy coverage

KO and

COR

2 As required

0200000/ 2.6.1

N/A Plans of Action and Milestones (POA&Ms)

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO,

COR, and Command Security Manager

3 As required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.6.1

N/A Cybersecurity Incident

Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours

KO,

COR, and Command Security Manager

3 As required

0200000/ 2.6.4

N/A Scheduling and Work Status Updates

Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours

KO and

COR

2 As Specified

0200000/ 2.6.5

N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.

KO and

COR

2 Monthly

0200000/ 2.6.5

N/A Notification of any Difficulty in Scheduling Work

By the end of each workday

KO and

COR

2 As required

0200000/ 2.6.6

N/A Status of Deliverables

Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours

KO and

COR

2 As required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.6.7

N/A Service Interruptions

At least five working days in advance

KO and

COR

2 As required

0200000/ 2.6.8.2

N/A Sample Delimited Flat-file

By the end of each workday

KO or a representa tive designate d by the

KO

1 Daily

0200000/ 2.6.8.2

N/A Asset and Specification Data

When an asset is repaired, replaced, installed, or otherwise affected

KO or a representa tive designate d by the

KO

1 As required

0200000/ 2.6.8.3

N/A List of personnel requiring access to Government’s Maximo

Within 30 calendar days prior to contract start.

KO and

COR

2 As specified

0200000/ 2.6.9.1

N/A Quality Management Plan

At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.

KO and

COR

2 As specified

0200000/ 2.6.9.2

N/A QC Inspection File

Within five calendar days of completion/ termination of the contract.

KO and

COR

2 As specified

0200000/ 2.6.9.3

N/A Contractor Quality Inspection and Surveillance Report

First work day of each month.

KO and

COR

2 Monthly

0200000/ 2.6.10

N/A Property Management Plan

At least 30 calendar days prior to start of contract performance.

KO and

2 As specified

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.7.1

N/A List of Key Personnel and Qualifications

At least 30 calendar days prior to start of contract performance.

KO and

COR

2 As specified

0200000/ 2.7.1

N/A Organizational Chart

At least 15 calendar days prior to start of contract performance.

KO and

COR

2 As specified

0200000/ 2.7.2.6

N/A Proof of Legal Residency

Prior to be admitted to site of work.

KO and

COR

2 As specified

0200000/ 2.7.3

N/A Service Contract Reporting (SCR)

No later than 31 October.

KO and

COR

2 Annually for labor executed during the period of performance during each Government fiscal year

(FY)

0200000/ 2.8.1

N/A Employee List Upon request. KO and

COR

2 As required

0200000/ 2.8.8

N/A Personnel Security Investigation (PSI), Fingerprint Card (FD87), and

OF-306

Declaration for Federal Employment

Prior to employee access to sensitive unclassified information.

KO,

COR, and Security Manager

3 As required

0200000/ 2.8.9

N/A List of Personnel Requiring Access to and the Justification for Their Access to Government IT, OT, and FRCS

Prior to employee access to sensitive unclassified information.

KO,

COR, and Security Manager

3 As required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.9.3

N/A Accident Prevention Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO and

COR

2 Prior to starting work and when conditions change.

0200000/ 2.9.4

N/A Activity Hazard Analysis

Together with the Accident Prevention Plan and for changes.

KO and

COR

2 As specified

0200000/ 2.9.5

N/A Compliance Plans, Programs, and Procedures

Together with the Accident Prevention Plan and for changes.

KO and

COR

2 As specified

0200000/ 2.9.5.6

N/A Periodic inspection of the energy control procedure report

Within 30 calendar days after annual inspection.

KO and

COR

2 Annually

0200000/ 2.9.7

N/A NAVFAC

Contractor Incident Reporting System (CIRS)

Within five calendar days of accident.

KO and

COR

2 As required

0200000/ 2.9.7

N/A Weight Handling Equipment Accident Report

Within 15 working days of accident.

KO and

COR

2 As required

0200000/ 2.9.7

N/A Crane and Rigging Gear Near Miss Report

Within 15 working days of accident.

KO and

COR

2 As required

0200000/ 2.9.9

N/A Monthly On-Site Labor Report

First work day of each month.

KO and

COR

2 Monthly

0200000/ 2.9.10

N/A OSHA Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation.

KO and

COR

2 As required

0200000/ 2.9.11

N/A Safety Inspection and Monitoring Report

Upon request. KO and

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.9.12

N/A Safety Certifications

At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.

KO and

COR

2 As specified

0200000/ 2.10

N/A EMS Goals and Policy Measurement Information

Upon request. KO and

COR

2 As required

0200000/ 2.10.1.1

N/A Water Conservation Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO and

COR

2 As specified

0200000/ 2.10.2

N/A Environmental Protection Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and

COR

2 As specified

0200000/ 2.10.2.1

N/A Sampling Plan Prior to each sampling event

KO and

COR

2 As required

0200000/ 2.10.2.1

N/A Laboratory Analysis

Within 24 hours after receipt of laboratory analysis

KO and

COR

2 As required

0200000/ 2.10.2.3

N/A Spill Report Within 48 hours of spill occurrence

KO and

COR

2 As required

0200000/ 2.10.2.4

N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report

At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.

KO and

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.10.2.4

N/A Contractor Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO and

COR

2 Annually

0200000/ 2.10.2.7

N/A Asbestos Containing Material (ACM)

Written notification within 24 hours of discovery

KO and

COR

2 As specified

0200000/ 2.10.3

N/A Sustainable Procurement and Practices Plan

At least 15 calendar days prior to start of contract performance and within 15 calendar days after exercised option periods.

KO and

COR

2 Annually

0200000/ 2.10.3

N/A Sustainable Delivery of Services Report

Within five calendar days after each contract period.

KO and

COR

2 Annually

0200000/ 2.10.3.2

N/A Recovered Material Certification

As specified KO and

COR

2 When a product containing recovered materials is equal to or better than the original and could be used.

0200000/ 2.11

N/A Mission Essential Contractor Services Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and

COR

2 As Required

0200000/ 2.11

N/A Mission Critical/Mission Essential Personnel

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.12

N/A Technical Library Table of Contents

Within 15 calendar days after contract start and within seven calendar days of changes

KO and

COR

2 As specified

0200000/ 2.14.1

N/A Recurring Work Proposals

Within five calendar days following receipt of request

KO and

COR

2 As required

0200000/ 2.14.2

N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude

Within two hours of identification

KO and

COR

2 As required

0200000/ 2.15.1.1

N/A Non-Recurring Work Quantities Ordered via FedMall

By the fifth day of the following month

KO and

COR

2 Monthly

0200000/ 2.15.2.1

N/A Non-Recurring Work Proposals

Within two working days following receipt of request

KO and

1501000 – Facility Management

SECTION F: DELIVERIES OR PERFORMANCE

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

1501000/ 3.1

N/A Utility Condition Assessment Reports

Within the first 10 days in the month after the 365 day period

COR/KO 2 Annually

1501000/ 3.1.1

N/A MAXIMO Asset Changes Report

Within 10 calendar days after asset

COR/KO 2 When there is a change with the asset change identification

1602000 – Electrical Power Generation, Transmission and Distribution

SECTION F: DELIVERIES OR PERFORMANCE

Annex/Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

1602000 / 3 N/A Monthly Maintenance

Summary Report

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1602000 / 3 N/A Monthly Report of Service Requests, Recurring Work and Non-

Recurring Work Scheduled but not

Completed

First work day of each month

KO/COR 2 Monthly

1602000 / 3.1 N/A Monthly Summary of

Completed and Unaccomplished Service Orders

First work day of each month

KO/COR 2 Monthly

1602000 / 3.2 N/A Preventative Maintenance and

Program Plan

30 calendar days after contract award

KO/COR 2 Annually

1602000 / 3.2 N/A Monthly Preventative Maintenance

Schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1602000 / 3.2 N/A Monthly Unaccomplished

Maintenance Report

Five work days prior to the beginning of each month

KO/COR 2 Monthly

Annex/Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

1602000 / 3.2 N/A Monthly Repair Status Report

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1602000 / 3.2 N/A Monthly Summary of

Maintenance and Repair

Accomplished

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1602000 / 3.2.1 N/A Monthly Transformer Testing and Maintenance

Report

Fifth work day of month following performance of work

KO/COR 2 Monthly

1602000 / 3.2.2 N/A Monthly Transformer On-

Load Tap Changer

Dissolved Gases Analysis Report

Fifth work day of month following performance of work

KO/COR 2 Monthly

1602000 / 3.2.3 N/A Monthly Electromechanical

Relay Report

Fifth work day of month following performance of work

KO/COR 2 Monthly

1602000 / 3.2.4 N/A Monthly High Voltage SF-6

Breakers Report

Fifth work day of month following performance of work

KO/COR 2 Monthly

1602000 / 3.2.5 N/A Thermal Imaging Report

Fifth work day of month following performance of work

KO/COR 2 Monthly

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

0006 N/A N/A N/A N/A

0007 N/A N/A N/A N/A

0008 N/A N/A N/A N/A

0009 N/A N/A N/A N/A

0010 N/A N/A N/A N/A

0011 N/A N/A N/A N/A

0012 N/A N/A N/A N/A

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either--

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--

(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;

provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(a) If the performance of all or any part of the work of this contract is delayed or interrupted (1) by an act of the Contracting Officer in the administration of this contract that is not expressly or impliedly authorized by this contract, or (2) by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by the delay or interruption and the contract shall be modified in writing accordingly. Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption. However, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.

(b) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .