This document package contains a job plans spreadsheet attachment and a related federal contract opportunity notice. The spreadsheet attachment includes over 60 standardized preventative maintenance job plans for electrical equipment ranging from low to medium voltage assets. The plans specify tasks, procedures, tests, measurements and acceptance criteria to be followed when performing routine inspections and servicing of circuit breakers, switches, generators, transformers, batteries, and other electrical system components on a recurring basis.

The related federal contract opportunity is a solicitation notice seeking proposals for facility investment services involving electrical maintenance and repair work within the Hampton Roads, Virginia area of responsibility for the Department of the Navy Naval Facilities Engineering Command. The notice does not provide additional details on the scope of work, response timeline or award information.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table Attachment J-1602000-04 Job Plans

TABLE OF CONTENTS

J-1602000-04-01600 METER READING Code 600 Meter Reading Job Plan
J-1602000-04-021293 COLNEC UTILITY - SHIP-TO-SHORE POWER DISTRIBUTION SYSTEM (480 VOLT) - L Job Plan
J-1602000-04-03EDACBL-A Breaker (Air) - LV - ME - 4 Yr PM Job Plan
J-1602000-04-04EDACBL-MY Breaker (Air) - LV - ME - 4 Yr PM Job Plan
J-1602000-04-05EDACBM-MY Breaker (Air) - MV - ME - 4 Yr PM Job Plan
J-1602000-04-06EDASWM-MY Switch (Air) - MV - ME - 4 Yr Job Plan
J-1602000-04-07EDASWM-MY Switch (Air) - MV - ME - 4 Yr PM Job Plan
J-1602000-04-08EDASWMP-4 Switch (Air) - MV - OF - 4 Yr Job Plan
J-1602000-04-09EDATSL-A Switch (Auto Transfer) - LV - Annual Job Plan
J-1602000-04-10EDBATL-A Battery Bank System- LV - Annual PM Job Plan
J-1602000-04-11EDBATL-Q Battery Bank System - LV - Quarterly PM Job Plan
J-1602000-04-12EDBATL-Q-S Battery Bank System - LV - Quarterly PM Job Plan
J-1602000-04-13EDBUBM-4 Bus Structure (Outdoors) - MV - 4 Yr Job Plan
J-1602000-04-14EDCAPM-4 Capacitor Bank - MV - 4 Yr Job Plan
J-1602000-04-15EDCOUM-2 Coupler - MV - 2 Yr Job Plan
J-1602000-04-16EDEWHN-S Eyewash Station (Self Contained) - Semi-Annual Job Plan
J-1602000-04-17EDGCBM-4 Breaker (SF6) - MV - FS - 4 Yr Job Plan
J-1602000-04-18EDGCBM-M Breaker (SF6) - MV - FS - Monthly Job plan
J-1602000-04-19EDGENL-3-C Generator (Customer Owned) - LV - 3 Year Job Plan
J-1602000-04-20EDGENL-A-C-N Generator (Customer Owned), LV - Annual Job Plan
J-1602000-04-21EDGENL-B-C Generator (Customer Owned) - LV - Biweekly Job Plan
J-1602000-04-22EDGENL-M-Q-C Generator (Customer Owned) - LV - Monthly - Quarterly - Semi Annual Job Plan
J-1602000-04-23EDGENL-M-U Generator (Utility Owned) - LV - Monthly Job Plan
J-1602000-04-24EDGENM-3-ECIP Generator (ECIP) - MV - 3 Year Job Plan
J-1602000-04-25EDGENM-A-ECIP Generator (ECIP) - MV - Annual Job Plan
J-1602000-04-26EDGENM-B-ECIP Generator (ECIP) - MV - BiWeekly Job Plan
J-1602000-04-27EDGENM-M-ECIP Generator (ECIP) - MV - Monthly Job Plan
J-1602000-04-28EDGSWM-Q Switch (SF6) - MV - ME - Quarterly Job Plan
J-1602000-04-29EDIRSM-A IR Survey - MV - Annual Job Plan
J-1602000-04-30EDOCBM-4 Breaker (Oil) - MV - FS - 4 Yr Job Plan
J-1602000-04-31EDOCBM-M Breaker (Oil) - MV - FS - Monthly Job Plan
J-1602000-04-32EDOCBM-MY Breaker (Oil) - MV - ME - 4 Yr Job Plan
J-1602000-04-33EDOSWM-MY Switch (Oil) - MV - ME - 4 Yr PM Job Plan
J-1602000-04-34EDRESM-4 Resistor (Grounding) - MV - 4 Yr Job Plan
J-1602000-04-35EDRLY25-3 Relay (Sync. Check) - LV - 3 Yr Job Plan
J-1602000-04-36EDRLY27-3 Relay (Under Voltage) - LV - 3 Yr Job Plan
J-1602000-04-37EDRLY32-3 Relay (Reverse Power) - LV - 3 Yr Job Plan
J-1602000-04-38EDRLY51-3 Relay (Over Current) - LV - 3 Yr PM Job Plan
J-1602000-04-39EDRLY67-3 Relay (Directional Over Current) - LV - 3 Yr PM Job Plan
J-1602000-04-40EDRLY81U-3 Relay (Under Frequency) - LV - 3 Yr Job Plan
J-1602000-04-41EDRLY85L-3 Relay (Pilot Wire) - LV - 3 Yr Job Plan
J-1602000-04-42EDRLY87B-3 Relay (Bus Differential) - LV - 3 Yr PM Job Plan
J-1602000-04-43EDRLY87G-3 Relay (Generator Differential) - LV - 3 Yr Job Plan
J-1602000-04-44EDRLY87T-3 Relay (Transformer Differential) - LV - 3 Yr Job Plan
J-1602000-04-45EDRWL-W Runway Lighting, Weekly Job Plan
J-1602000-04-46EDSUBM-M Substation - MV - Monthly - Annual PM Job Plan
J-1602000-04-47EDSWGL-MY Switchgear - LV - 4 Yr PM Job Plan
J-1602000-04-48EDSWGM-MY Switchgear - MV - 4 Yr PM Job Plan
J-1602000-04-49EDTCRM-2 Tap Changer (Load) - MV - 2 Yr PM Job Plan
J-1602000-04-50EDTCRM-4 Tap Changer (Load) - MV - 4 Yr Job Plan
J-1602000-04-51EDTNKN-D Tank Inspection, Daily Visual Job Plan
J-1602000-04-52EDTNKN-W Tank Inspection, Weekly Job Plan
J-1602000-04-53EDVCBM-MY Breaker (Vac.) - MV - ME - 4 Yr PM Job Plan
J-1602000-04-54EDXFMM-4 Transformer (Dry Type) - MV - 4 Yr PM Job Plan
J-1602000-04-55EDXFMM-MY Transformer (Liquid Type) - MV - 4 Yr Job Plan
J-1602000-04-56EDXFMMP-4 Power Transformer (Liquid Type) - MV - 4 Yr PM Job Plan
J-1602000-04-57TL01 TRAFFIC LGHTS (Q) Job Plan
J-1602000-04-58UEM-26-ML-EM-5 Microprocessor Based Relay - 5 Yr Job Plan Revised
J-1602000-04-59UEM-26-ML-EM-5 Microprocessor Based Relay - 5 Yr Job Plan
J-1602000-04-60UEM-28-LANT-A UEM, Shore Power Box Job Plan
J-1602000-04-61UEM-36-ML-EH-A Liquid Immersed Transformer Job Plan

J-1602000-04-01

ATTACHMENT J-16020000-04-01
600 METER READING Code 600 Meter Reading Job PlanBack to Table
SequenceTaskDescription
10Follow all applicable SOPs and Safety Instructions
20Review STOP safety cards
25Obtain meter book/s from appropriate person and begin reading route per schedule.
30Perform quick visual inspection for proper operation, if not, furnish info for work order.
35RECORD DATE METER IS READ, WITH YOUR INITIALS, ON METER SHEET
40This is a monthly work order.
45The Meters are to be read during the Week listed at the top of the Meter Reading Sheets

and returned to the Billing Analyst by the following Monday

50DO NOT CHARGE to this work order after the month it was issued.
60DO NOT READ METERS IN ANY FLAG QUARTERS AREA PRIOR TO 0900.

J-1602000-04-02

ATTACHMENT J-16020000-04-02
1293 COLNEC UTILITY - SHIP-TO-SHORE POWER DISTRIBUTION SYSTEM (480 VOLT) - L Job PlanBack to Table
SequenceTaskDescription
10CABLE (POWER)
20Inspect condition of all exposed sections of power cabling in-between switchgear and receptacle pedestal. Verify in good condition.
30Inspect condition of all exposed sections of conduit in-between switchgear and receptacle pedestal. Verify in good condition.
40Inspect power conductors for proper support, orderly arrangement, proper sag and adequate insulation.
50Verify cable support structure to be in good condition and properly grounded.
60Inspect power conductors for insulation damage, signs of arcing and hot spots.
70CONTROL
80Inspect all control wiring in-between switchgear and receptacle pedestal.

Verify all functions of the control circuits operate properly.

90 Verify all indicating lights and pushbuttons are present, in good condition and fully operational.

100 Verify shunt trip device for all receptacles are present, in good condition and fully operational.

110PEDESTALS
120Inspect receptacle pedestal for dirt, rust, corrosion and physical

damage.

130 Inspect gasketing and associated components for all control station pushbuttons, indicating lights and receptacle heads.

140 Inspect all control wiring within receptacle pedestal for loose connections; charred, broken or wet insulation.

150 Inspect area around receptacle pedestals for area dirt and debris as well as for proper drainage. Clean area around pedestals.

160 Inspect pedestals for proper anchorage, alignment and grounding.

Verify proper grounding.

170CABLES (PORTABLE)
180Inspect all portable power cables for damaged insulation and

connectors, arcing and evidence of overheating.

190 Inspect portable power cable plugs (pigtails) for physical damage, overall condition and proper connection alignment.

200 Verify all portable power cables are neatly trained and/or properly stored.

210GENERAL
220Physically actuate all controls and any shunt trip devices.
230Check circuit breakers for condition as described in PM requirements

for "Low Voltage Air Circuit Breakers."

240 Verify all components are in their proper position/configuration for normal electrical operation.

J-1602000-04-03

ATTACHMENT J-16020000-04-03
EDACBL-A Breaker (Air) - LV - ME - 4 Yr PM Job PlanBack to Table
SequenceTaskDescription
0Review your Stop Observation card prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
30Follow Interim Entry Requirements for the electrical facility you

will be entering.

40Communicate with the ROC concerning the work to be performed.
50Follow Danger Hold tag, voltage testing, and grounding procedures

as outlilned in SOP PWBL.001 Rev C.

60 Reference NETA MTS- 97, Section 7.6.1.2 Circuit Breakers:

Low voltage, Power should be available.

70 Reference NFPA 70B 18-10.2.5 Low Voltage Power Circuit Breaker Testing should be available.

80 Reference PWC 216 - 013 Rev A, Circuit Breaker Calibration procedures, shall be available on the job site.

90 Reference Manufacturer's Instruction Manual should be available on the job site.

100 Breakers shall be PM'ed and calibrated by breaker number and not by circuit number.

110 Ensure breaker is in proper cubicle. Breakers found in the wrong cubicle shall be swapped back to their proper location.

120 Electrically "Close" and "Trip" the breaker several times to insure all devices are working properly.

130 Manually "Close" and "Trip" the breaker several times to insure it works properly.

140 Inspect tripping mechanism for freedom of movement and reliability to open breaker contacts.

150Inspect closing mechanism for quick and positive action.
160Inspect position indicators for proper operation.
170Inspect arc chutes for broken parts and missing arc splitters.
180Inspect arc chutes for amount of metal spatter and burning on

exterior surfaces.

190 Inspect main contacts visually for pitting, depression, and overheating.

200 Inspect arcing contacts visually for pitting, depression, and overheating.

210 Verilfy that all current limiting fuses are 1200 amps or higher (Shore Power Stations Only) 220 Verify with a micro-ohmmeter producing at least 10 amps, that all current limiting fuses are less than 1 ohm.

230Verify that all current limiter resistance readings are within 50% of the lowest value.
240Verify that all breaker trip unit settings are set according to the

substation breaker specification sheet.

250 Perform A "Secondary Injection Test" Of The Trip Unit Documenting The Following Test Results:

260 Long Time Delay Pickup: A Phase ______amps, B Phase ______amps, C Phase ______amps.

270 Long Time Delay Test: A Phase ______secs, B Phase ______secs, C Phase ______secs.

280 Short Time Delay Pickup: A Phase______amps, B Phase ______amps, C Phase ______amps.

290 Short Time Delay Test: A Phase ______secs, B Phase ______secs, C Phase ______secs.

300 Instantaneous Pickup: A Phase ______amps, B Phase ______amps, C Phase ______amps.

310Ground Pickup: Pickup ______amps.
320Ground Time Delay Time ______secs.
330Actuator Test: _____________
340Breaker Tester Serial Number ____________

Calibration Due Date __________ 350 Evaluate all test results are within the acceptance criteria of substation breaker specification sheet.

360 Verify again that all breaker trip settings are set according to the substation breaker specification sheet.

370Report all discrepancies to your supervisor for corrective action.
380Check the "Repair Work Order Required" box on the last page of this

workorder if any discrepancies remain. State the discrepancy.

390 Follow proper Danger Hold tag and ground removal procedures as outlined in SOP 600EH.001.

400 Notify the ROC when work is complete.

J-1602000-04-04

ATTACHMENT J-16020000-04-04
EDACBL-MY Breaker (Air) - LV - ME - 4 Yr PM Job PlanBack to Table
SequenceTaskDescription
0Review your Stop Observation card prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
30Follow Interim Entry Requirements for the electrical facility you

will be entering.

40Communicate with the ROC concerning the work to be performed.
50Follow Danger Hold tag, voltage testing, and grounding procedures

as outlilned in SOP PWBL.001 Rev C.

60 Reference NETA MTS- 97, Section 7.6.1.2 Circuit Breakers: Low voltage, Power should be available.

70 Reference NFPA 70B 18-10.2.5 Low Voltage Power Circuit Breaker Testing should be available.

80 Reference PWC 216 - 013 Rev A, Circuit Breaker Calibration procedures, shall be available on the job site.

90 Reference Manufacturer's Instruction Manual should be available on the job site.

100 Breakers shall be PM'ed and calibrated by breaker number and not by circuit number.

110 Ensure breaker is in proper cubicle. Breakers found in the wrong cubicle shall be swapped back to their proper location.

120 Electrically "Close" and "Trip" the breaker several times to insure all devices are working properly.

130 Manually "Close" and "Trip" the breaker several times to insure it works properly.

140 Inspect tripping mechanism for freedom of movement and reliability to open breaker contacts.

150Inspect closing mechanism for quick and positive action.
160Inspect position indicators for proper operation.
170Inspect arc chutes for broken parts and missing arc splitters.
180Inspect arc chutes for amount of metal spatter and burning on exterior surfaces.
190Inspect main contacts visually for pitting, depression, and overheating.
200Inspect arcing contacts visually for pitting, depression, and

overheating.

210 Verilfy that all current limiting fuses are 1200 amps or higher (Shore Power Stations Only) 220 Verify with a micro-ohmmeter producing at least 10 amps, that all current limiting fuses are less than 1 ohm.

230 Verify that all current limiter resistance readings are within 50% of the lowest value.

240 Verify that all breaker trip unit settings are set according to the substation breaker specification sheet.

250 Perform A "Secondary Injection Test" Of The Trip Unit Documenting The Following Test Results:

260 Long Time Delay Pickup: A Phase ______amps, B Phase ______amps, C Phase ______amps.

270 Long Time Delay Test: A Phase ______secs, B Phase ______secs, C Phase ______secs.

280 Short Time Delay Pickup: A Phase______amps, B Phase ______amps, C Phase ______amps.

290 Short Time Delay Test: A Phase ______secs, B Phase ______secs, C Phase ______secs.

300 Instantaneous Pickup: A Phase ______amps, B Phase ______amps, C Phase ______amps.

310Ground Pickup: Pickup ______amps.
320Ground Time Delay Time ______secs.
330Actuator Test: _____________
340Breaker Tester Serial Number ____________

Calibration Due Date __________ 350 Evaluate all test results are within the acceptance criteria of substation breaker specification sheet.

360 Verify again that all breaker trip settings are set according to the substation breaker specification sheet.

370Report all discrepancies to your supervisor for corrective action.
380Check the "Repair Work Order Required" box on the last page

of this workorder if any discrepancies remain. State the discrepancy.

390 Follow proper Danger Hold tag and ground removal procedures as outlined in SOP 600EH.001.

400 Notify the ROC when work is complete.

J-1602000-04-05

ATTACHMENT J-16020000-04-05
EDACBM-MY Breaker (Air) - MV - ME - 4 Yr PM Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
50Follow proper Danger Hold tag, voltage testing, and grounding procedures as

outlined in SOP PWBL.001 Rev C.

60[Reference latest edition of NETA MTS
70Reference latest edition of NFPA 70B
80Reference Manufacturer's Instruction Manual
90Verify that all maintenance devices are available for servicing and operating the breaker.
100Electrically test the breaker's operating mechanism utilizing a test station or a patch

cord to energize the controls.

110Test closing mechanism for quick and positive action.
120Test tripping mechanism for freedom of movement and reliability to open breaker

contacts.

130Test shunt trip device for freedom of movement.
140Test interlocks and safety devices for proper opeation.
150Verify proper operation of the spring charging motor.
160Inspect moving parts and linkages for freedom of movement.
170Lubricate all moving and sliding surfaces as recommended by manufacturer with either manufacuturer's recommended lubricant or turbine oil only.
180Inspect position indicators and operations counter for proper operation.
190Disconnect breaker from test station or patch cord in order to perform further

inspections.

200Inspect auxiliary wiring for general condition and tightness of terminal screws.
210Inspect closing (x and y) relays for contact erosion.
220Inspect closing and trip coils for general condition and evidence of overheating.
230Inspect spring charging motor for oil leaks.
240Inspect main contacts for pitting, spring pressure, overheating, alignment, overtravel,

or wipe.

250Inspect arcing contacts for alignment, overtravel, or wipe, and for arc erosion.
260Inspect arc chutes for broken parts and missing arc splitters.
270Inspect arc chutes for amount of metal spatter and burning on interior surfaces.
280Inspect arc chutes for clean snuffer screens.
290Measure blow-out coil circuit resistance.

Resistance A phase____________milliohms B phase____________milliohms C phase____________milliohms 300 Inspect tightness of all bolted electrical connection with a torque wrench in accordance with manufacturer's instructions.

310 Inspect insulators and insulating materials for cracks, breaks, corona tracking, and overheating.

320Inspect primary disconnect finger clusters for proper adjustment and spring pressure.
330Inspect secondary disconnect contacts for proper alignment and spring pressure.
340Inspect breaker and auxiliary devices and make necessary repairs.
350Lubricate primary disconnect fingers clusters and secondary disconnect contacts as

per manufacturer's instructions.

360Perform a contact resistance test closed breaker pole contact.
370A Pole____________micro-ohms,

B Pole ____________micro-ohms, C Pole____________micro-ohms

380Evaluate contact resistance test results in accordance with manufacturer's specifications.
390Perform insulation resistance tests pole to pole, pole to ground, and across open poles

according to NETA MTS 2001 Table 100.1 400 Utilize NETA MTS for test voltage, temperature correction to 20 degrees C, and evaluation data.

410 A to B ________Meg-ohms.

B to C ________Meg-ohms.

A to C ________Meg-ohms.

420 A to G ________Meg-ohms.

B to G ________Meg-ohms.

C to G ________Meg-ohms 430 A Pole ________Meg-ohms B Pole ________Meg-ohms.

C Pole ________Meg-ohms 440 Inspect the physical and mechanical condition of the breaker's cubicle. Wire brush and paint as needed.

450Ensure that the cubicle shutter works properly by closing when the breaker is removed.
460Inspect for proper cell fit of breaker and sufficient clearance from wiring and components.
470Inspect load cable insulation for physical damage and evidence of overheating and tracking.
480Inspect visible compression applied connectors for correct cable match and indentation.
490Ensure that all insulators, bushings and pot heads are free from cracks and chips.
500Verify tightness of all visible electrical connections with a torque wrench in accordance

with NETA MTS-2001 Table 10.12.

510Ensure that all penetrations are closed to prevent rodent entry.
520Replace all missing nuts/bolts in cubicle covers.
530Perform the following tests with the breaker in the "test" position.
540Trip and close breaker with the control switch.
550Trip breaker by operating each of its overcurrent relays.
560Verify that the indicator lights are operating properly denoting red for closed and green for open .
570Verify trip-free and antipump function.
580Report all discrepancies to your supervisor for corrective action.
590Follow proper ground and Danger Hold tag removal procedures as outlined in SOP

PWBL.001 Rev C.

600Follow Switching Orders and communicate with the ROC to re-energize the equipment.
610Record Degradation Index.

J-1602000-04-06

ATTACHMENT J-16020000-04-06
EDASWM-MY Switch (Air) - MV - ME - 4 Yr Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
50Follow Danger Hold tag, voltage testing, and grounding procedures as outlined in SOP

PWBL.001 Rev C.

60Reference latest edition of NETA MTS
70Reference latest edition of NFPA 70B
80Reference Manufacturer's Instruction Manual
90Inspect switch enclosure for damage or deterioration. Prime and paint as needed.
100Inspect interior of switch enclosure. Clean switch. Remove all dirt, dust, and debris.
110Inspect anchorage, alignment, and case grounding of switch. Ensure tight connections.
120Replace missing / deteriorated bolts and gaskets in switch covers.
130Inspect cable insulation for damage, dirt, deterioration, tracking, and signs of overheating.
140Verify tightness of accessible bolted electrical connections with a torque wrench in

accordance with NETA MTS-2007 Table 100.12.

150Inspect switching mechanism for missing or loose components and for proper operation .
160Inspect the moving contact drive rod link (insulated operating arm) for cracks and defects.

Replace defective parts.

170Test all electrical and mechanical interlock systems for correct operation and sequencing.
180Verify correct blade alignment, blade penetration, travel stops, and mechanical operation.
190Ensure all blade contacts are free from burns, pits, and excessive damage.
200Verify that expulsion limiting devices are in place on all holders having expulsion type

elements.

210Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.
220Verify appropriate contact lubrication of moving current carry parts in accordance with

manufacturer's instructions.

230 Verify appropriate lubrication on moving and sliding surfaces in accordance with manufacturer's instructions.

240 Verify operation of all strip heaters.

Total heater current ____________amps.

250Inspect each fuse holder for adequate support and contact.
260Verify that fuse size and type correspond to drawings.

Fuse size ____________amps.

Fuse type ________________.

270Measure the resistance of each fuse.
280A Phase ____________Ohms.

B Phase ____________Ohms.

C Phase ____________Ohms.

290Perform a contact resistance test across each switchblade.
300A Phase ____________Microohms.

B Phase ____________ Microohms.

C Phase ____________Microohms.

310 Evaluate contact resistance reading. Readings should be similiar to adjacent phases and less than 500 micro-ohms.

320 Perform insulation resistance tests pole to pole, pole to ground (switch closed) and across poles (switch open).

330 Utilize NETA MTS for test voltage, temperature correction to 20 degrees C, and evaluation data.

340 A to B ____________Megohms.

B to C ____________Megohms.

A to C ____________Megohms.

350 Open A Pole ____________Megohms.

Open B Pole ____________ Megohms.

Open C Pole ____________Megohms 360 Open A Pole ____________Megohms.

Open B Pole ____________ Megohms.

Open C Pole ____________Megohms

370Report all discrepancies to your supervisor and site engineering for corrective action.
380Follow Danger Hold tag and ground removal procedures as outlined in SOP PWBL.001

Rev C.

390 Record Degradation Index.

J-1602000-04-07

ATTACHMENT J-16020000-04-07
EDASWM-MY Switch (Air) - MV - ME - 4 Yr PM Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
50Follow proper Danger Hold tag, voltage testing, and grounding procedures as outlined in SOP PWBL.001 Rev C.
60Reference latest edition of NETA MTS
70Reference latest edition of NFPA 70B
80Reference Manufacturer's Instruction Manual
90Verify that all maintenance devices are available for servicing and operating the breaker.
100Electrically test the breaker's operating mechanism utilizing a test station or a patch cord to

energize the controls.

110Test closing mechanism for quick and positive action.
120Test tripping mechanism for freedom of movement and reliability to open breaker contacts.
130Test shunt trip device for freedom of movement.
140Test interlocks and safety devices for proper opeation.
150Verify proper operation of the spring charging motor.
160Inspect moving parts and linkages for freedom of movement.
170Lubricate all moving and sliding surfaces as recommended by manufacturer with either

manufacuturer's recommended lubricant or turbine oil only.

180Inspect position indicators and operations counter for proper operation.
190Disconnect breaker from test station or patch cord in order to perform further inspections.
200Inspect auxiliary wiring for general condition and tightness of terminal screws.
210Inspect closing (x and y) relays for contact erosion.
220Inspect closing and trip coils for general condition and evidence of overheating.
230Inspect spring charging motor for oil leaks.
240Inspect main contacts for pitting, spring pressure, overheating, alignment, overtravel, or wipe.
250Inspect arcing contacts for alignment, overtravel, or wipe, and for arc erosion.
260Inspect arc chutes for broken parts and missing arc splitters.
270Inspect arc chutes for amount of metal spatter and burning on interior surfaces.
280Inspect arc chutes for clean snuffer screens.
290Measure blow-out coil circuit resistance. Resistance

A phase____________milliohms B phase____________milliohms C phase____________milliohms

300Inspect tightness of all bolted electrical connection with a torque wrench in accordance with manufacturer's instructions.
310Inspect insulators and insulating materials for cracks, breaks, corona tracking, and overheating.
320Inspect primary disconnect finger clusters for proper adjustment and spring pressure.
330Inspect secondary disconnect contacts for proper alignment and spring pressure.
340Inspect breaker and auxiliary devices and make necessary repairs.
350Lubricate primary disconnect fingers clusters and secondary disconnect contacts as per manufacturer's instructions.
360Perform a contact resistance test closed breaker pole contact.
370A Pole____________micro-ohms,

B Pole ____________micro-ohms, C Pole____________micro-ohms

380Evaluate contact resistance test results in accordance with manufacturer's specifications.
390Perform insulation resistance tests pole to pole, pole to ground, and across open poles according

to NETA MTS 2001 Table 100.1 400 Utilize NETA MTS for test voltage, temperature correction to 20 degrees C, and evaluation data.

410 A to B ________Meg-ohms.

B to C ________Meg-ohms.

A to C ________Meg-ohms.

420 A to G ________Meg-ohms.

B to G ________Meg-ohms.

C to G ________Meg-ohms 430 A Pole ________Meg-ohms B Pole ________Meg-ohms.

C Pole ________Meg-ohms 440 Inspect the physical and mechanical condition of the breaker's cubicle. Wire brush and paint as needed.

450Ensure that the cubicle shutter works properly by closing when the breaker is removed.
460Inspect for proper cell fit of breaker and sufficient clearance from wiring and components.
470Inspect load cable insulation for physical damage and evidence of overheating and tracking.
480Inspect visible compression applied connectors for correct cable match and indentation.
490Ensure that all insulators, bushings and pot heads are free from cracks and chips.
500Verify tightness of all visible electrical connections with a torque wrench in accordance with NETA MTS-2001 Table 10.12.
510Ensure that all penetrations are closed to prevent rodent entry.
520Replace all missing nuts/bolts in cubicle covers.
530Perform the following tests with the breaker in the "test" position.
540Trip and close breaker with the control switch.
550Trip breaker by operating each of its overcurrent relays.
560Verify that the indicator lights are operating properly denoting red for closed and green for open .
570Verify trip-free and antipump function.
580Report all discrepancies to your supervisor for corrective action.
590Follow proper ground and Danger Hold tag removal procedures as outlined in SOP PWBL.001

Rev C.

600Follow Switching Orders and communicate with the ROC to re-energize the equipment.
610Record Degradation Index.

J-1602000-04-08

ATTACHMENT J-16020000-04-08
EDASWMP-4 Switch (Air) - MV - OF - 4 Yr Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
50Follow Danger Hold tag, voltage testing, and grounding procedures as outlined in SOP PWBL.001 Rev C.
60Reference latest edition of NETA MTS
70Reference latest edition of NFPA 70B
80Reference Manufacturer's Instruction Manual.
90Inspect the overall physical and mechanical condition of the switch and it's structure. Note and/or repair discrepancies.
100Verify that the equipment grounding is properly installed. Check connections for tightness, corrosion,

and damage.

110 Verify tightness of all assessible electrical connections with a torque wrench in accordance with NETA MTS-97 Table 10.12.

120Clean contact surfaces as recommended by the manufacturer's instructions.
130Lubricate moving current-carrying parts in accordance with the manufacturer's instruction.
140Lubricate mechanical moving and sliding surfaces in accordance with the manufacturer's instructions.
150Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and mechanical operation.
160Perform mechanical operator tests in accordance with the manufacturer's instructions, if applicable.
170Verify correct operation and adjustment of motor operator limit switches and mechanical interlock, if

applilcable.

180Inspect all insulators chips, cracks, and tracking. Clean all insulators.
190Perform a contact resistance test of each switch pole (switch closed).
200A Phase _____micro-ohms.

B Phase _____micro-ohms.

C Phase _____micro-ohms.

210 Evaluate resistance test results in accordance with manufacturer's specification or by comparison with similiar switches.

220Perform insulation resistance tests on each pole phase-to-ground (switch closed).
230Utilize NETA MTS for test voltage, temperature correction to 20

degrees C, and evaluation data.

240 A Pole to Ground _____Meg-ohms.

B Pole to Ground _____Meg-ohms.

C Pole to Ground _____Meg-ohms.

250Report all discrepancies to your supervisor for corrective action.
260Follow proper Danger Hold tag and ground removal procedures as outlined in SOP PWBL.001 Rev C.
280Record Degradation Index.

J-1602000-04-09

ATTACHMENT J-16020000-04-09
EDATSL-A Switch (Auto Transfer) - LV - Annual Job PlanBack to Table
SequenceTaskDescription
0Review your Stop Observation checklist card prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
30Follow Interim Entry Requirements for the electrical facility you are going to be entering.
40Communicate with the ROC concerning the work to be performed.
50Reference Manufacturer's Instruction Manual should be available on the job site.
60Open cabinet door and visually examine switch for any adnormalities.
70Secure cabinet door.
80Place load transfer switch in the "Test" position.
90Verify that the switch transfers to the emergency source and that the emergency source

indicator light glows.

100Place the load transfer switch back in the "Auto" position.
110Verify that the switch transfers back to the normal source and that the normal source indicator

light glows.

120Report all discrepancies to your supervisor for corrective action.
130Communicate with the ROC that all work is complete.

J-1602000-04-10

ATTACHMENT J-16020000-04-10
EDBATL-A Battery Bank System- LV - Annual PM Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
50Reference latest edition of NETA MTS.
60Reference latest edition of NFPA 70B.
70Reference Manufacturer's Instruction Manual.
80Verify existence of suitable eyewash equipment.
90Verify ventilation of battery room or enclosure.
100Verify adequacy of battery support racks, mounting anchorage, and clearances.
110Inspect batteries for physical damage and deterioration.
120Verify proper electrolyte level of each battery in accordance with manufacturer's instruction. Add as required.
130Inspect terminals for corrosion. Clean corroded/oxidized terminals and apply an oxide inhibitor.
140Measure the resistance of all bolted connections with a low reistance ohmmeter. Highest _____ohms . Lowest _____ ohms.
150Evaluate the test results by comparison with other bolted connection resistance values.
160Measure the electrolyte specific gravity and temperature of each cell (Lead Acid Batteries Only). Document results below.
170Evaluate electrolyte specific gravity and temperature in accordance with manufacturer's

recommended values.

180MEASURE
190Battery Bank Capacity _____%.
200Reconnect the battery charger and the DC load to the battery bank.
210Place the batteries on a equalizing charge until they are fully recharged.
220Leave the batteries on a float charge.
230Report any discrepanices (such as identified weak cells) to your supervisor.
240Record Degradation Index.

J-1602000-04-11

ATTACHMENT J-16020000-04-11
EDBATL-Q Battery Bank System - LV - Quarterly PM Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
50Verify existence of suitable eyewash equipment.
60Record expiration date of eyewash solution: ____________________
70Verify that the date on the eyewash solution is current and will not expire in the next three months.
80Verify that the eyewash equipment is in good condition.
90Verify ventilation of battery room or enclosure is working properly.
100Verify adequacy of battery support racks, mounting anchorage, and clearances.
110Inspect batteries for physical damage and deterioration.
120Inspect battery terminals for corrosion.
130Disassemble and clean any corroded / oxidized terminals. Apply an oxide inhibitor when reassembling.
140Measure the voltage of each cell with the charger in float mode.
150Cell voltage readings on a fully charged lead acid battery will be 2.25 volts per cell.
160Record highest and lowest cell voltage readings. ____________ highest ____________ lowest
170Verify that cell voltages are within 0.05 volts of each other.
180If cell voltages are out of tolerance, continue with PM and equalize the battery bank in step 390.
190Measure total battery voltage with the charger in Float mode. ____________VDC
200A 60 cell battery bank should float at 135 +/- 3 VDC. A 24 cell bank should float at 54 +/- 2 VDC.
210Evaluate the float voltage reading to ensure it is within the specification.
220De-energize the charger to make physical inspections of the charger.
230Inspect the physical condition of the chargers cabinet and its components.
240Inspect the charger for burn marks, loose connections, melted insulation, leaking components, etc.
250Clean the charger to allow unobstructed air flow for cooling of heat sinks and components.
260Measure the specific gravity and temperature in each cell of the battery bank.
270Fully charged lead acid batteries should have a specific gravity of approximately 1.20 at 76 degrees F.
280Specific gravity will decrease with a decrease in temperature and increase with a temperature increase.
290Record the highest and lowest specific gravity readings. ____________ Highest

____________ Lowest

300Specific gravity readings should not vary more than 0.05 between cells.
310If any specific gravity reading is below 1.15, continue with PM and equalize the battery bank in

step 390.

320Record highest and lowest cell temperature readings. ____________ Highest ____________ Lowest
330Temperature readings should not vary more than 3 degrees F between cells.
340Add distilled water to each battery to bring the electrolyte level to the upper level mark on each cell.
350Measure total battery voltage with the charger off. ____________ VDC
360Energize the charger to make operational checks.
370Verify the ammeter is working properly.
380Verify that total battery voltage is higher than the voltage measured in step 350 above.
390If any battery failed the cell voltage or specific gravity tests, equalize the battery bank for 4 hours.
400Was it necessary to equalize this battery bank? YES NO
430Report any deficiencies to your supervisor and site engineering.
440Record Degradation Index.

J-1602000-04-12

ATTACHMENT J-16020000-04-12
EDBATL-Q-S Battery Bank System - LV - Quarterly PM Job PlanBack to Table
SequenceTaskDescription
0Review your Stop Observation card prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures. SOP 622HVE001
30Follow Interim Entry Requirements for the electrical facility you are going to entering.
40Communicate with the ROC concerning the work to be performed.
100Inspect batteries for physical damage and deterioration.
110Inspect battery terminals for corrosion.
120Disassemble and clean any corroded / oxidized terminals. Apply an oxide inhibitor when reassembling.
130De-energize the charger to make physical inspections of the charger.
140Inspect the physical condition of the charger's cabinet and its components.
150Inspect the charger for burn marks, loose connections, melted insulation, leaking components, etc.
160Clean the charger to allow unobstructed air flow for cooling of heat sinks and components.
240Measure total battery voltage with the charger off. ____________ VDC
250Energize the charger to make operational checks.
260Verify that the ammeter is working properly.
290Record highest and lowest individual battery voltage readings. ____________ highest

____________ lowest

300Verify that battery voltages are within 1 volt of each other.
310Measure total battery voltage with the charger in "float' mode. ____________VDC
320A battery bank should float at 54 +/- 2 VDC.
330Evaluate the float voltage readings to ensure they are within specifications.
340Communicate with the ROC that work is complete.
350Contact the production controller to complete the work order.
360Contact the production controller to obtain repair work orders if needed.

J-1602000-04-13

ATTACHMENT J-16020000-04-13
EDBUBM-4 Bus Structure (Outdoors) - MV - 4 Yr Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
30Perform thermographic survey of all connections while energized and under load.
40Follow Switching Orders and communicate with the ROC to

de-energize the equipment.

50 Follow Danger Hold tag, voltage testing, and grounding procedures as outlilned in SOP PWBL.001 Rev C.

60Reference latest edition of NETA MTS.
70Reference Manufacturer's Instruction Manual.
80Inspect the bolted electrical connections of the bus for signs of overheating.
90Inspect the support structure of the bus for defects such as cracked welds.
100Inspect surge arrestors for physical and mechanical condition. Make repairs as needed.
110Verify that the ground lead on each surge arrestor is individually attached to a ground bus or ground electrode.
120Inspect potential and service transformers for physical condition and mechanical condition. Make repairs

as needed.

130 Inspect all bus, surge arrestor, and transformer insulators for physical damage such as tracking and chipped porcelain.

140Clean all bus, surge arrestor, and transformer insulators with lint free rags and approved insulator cleaner.
150Verify tightness of assessible electrical connections with a torque wrench in accordance with NETA MTS.
160Perform resistance measurements through all bolted electrical connections of the bus with a low

resistance ohmmeter.

170Evaluate resistance test values by comparison with resistance values of similiar connections.
180Perform insulation resistance tests on each bus phase to ground with the other phases grounded.
190Utilize NETA MTS for test voltage, temperature correction to 20 degrees C, and evaluation data.
200A Phase to Ground _____Meg-ohms.

B Phase to Ground _____ Meg-ohms.

C Phase to Ground ______Meg-ohms.

210Report all discrepancies to your supervisor for corrective action.
220Follow proper Danger Hold tag and ground removal procedures as outlined in SOP PWBL.001 Rev C.
230Follow Switching Orders and communicate with the ROC to re-energize the equipment.
240Record Degradation Index.

J-1602000-04-14

ATTACHMENT J-16020000-04-14
EDCAPM-4 Capacitor Bank - MV - 4 Yr Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
40Follow Switching Orders and communicate with the ROC to de-energize the equipment.
50Allow the capacitor bank to discharge for 5 minutes prior to beginning voltage testing and grounding

procedures.

60Follow Danger Hold tag, voltage testing, and grounding procedures as outlilned in SOP PWBL.001 Rev C.
70Reference latest edition of NETA MTS.
80Reference latest edition of NFPA 70B.
90Reference Manufacturer's Instruction Manual.
100Inspect each capacitor for leaks, bulges, or discoloration.
110Inspect for blown fuses or fuse links. Replace as needed.
120Clean capacitor case, insulating bushings, and dirty / corroded connections.
130Verify tightness of all electrical connections with a torque wrench in accordance with the manufacturer's specifications.
140Inspect capacitors for correct mounting and required clearances.
150Measure the capacitance of all terminal combinations.
160Actual Capacitance ______Farads.

Nameplate Capacitance ______Farads.

170Report all discrepancies to your supervisor for corrective action.
180Follow proper Danger Hold tag and ground removal procedures as outlined in SOP PWBL.001 Rev C.
190Follow Switching Orders and communicate with the ROC to re-energize the equipment.
200Record Degradation Index.

J-1602000-04-15

ATTACHMENT J-16020000-04-15
EDCOUM-2 Coupler - MV - 2 Yr Job PlanBack to Table
SequenceTaskDescription
0Review your Stop Observation card prior to beginning the job.
10Perform a job brief with all employees involved in the job.
20Follow applicable SOP/JHA procedures.
30Follow Interim Entry Requirements for the electrical facility you are going to be entering.
40Follow Switching Orders and communicate with the ROC to

de-energize the equipment.

50Follow Danger Hold tag, voltage testing, and grounding procedures as outlined in SOP 600EH.001.
60Reference Manufacturer's Instruction Manual should be available on the job site.
70Inspect the receptacle for physical damage such as cracks, moisture, corrosion, and deterioration.
80Inspect the receptacle for electrical damage such as overheating and tracking.
90Thoroughly clean the receptacle both externally and internally.
100Inspect for missing hardware and parts. Replace as needed.
110Verify proper equipment grounding of all covers, brackets, and frame.
120Perform a resistance test of ground pin to ground using a low resistance ohmmeter. Test results

must be less than 0.25 ohms.

130Perform a insulation resistance test phase-to-phase and phase-to- ground.
140Utilize NETA MTS-97 Table 10.1 and 10.14 for test voltage, temperature correction to

20 degrees C, and evaluation data.

150 A Phase to B Phase ______Meg-ohms, B Phase to C Phase ______Meg-ohms, C Phase to A Phase ______Meg-ohms.

160 A Phase to Ground ______Meg-ohms, B Phase to Ground ______Meg-ohms, C Phase to Ground ______Meg-ohms.

170Report all discrepancies to your supervisor for corrective action.
180Follow proper Danger Hold tag and ground removal procedures as outlined in SOP 600EH.001.
190Follow Switching Orders and communicate with the ROC to re-energize the equipment.

J-1602000-04-16

ATTACHMENT J-16020000-04-16
EDEWHN-S Eyewash Station (Self Contained) - Semi-Annual Job PlanBack to Table
SequenceTaskDescription
0Review Stop Observation checklist card prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow Interim Entry Requirements for the electrical facility you are going to be entering.
30Ensure that access to the eyewash station is not blocked in any way.
40Activate eyewash station and verify correct operation.
50Remove existing water in eyewash station.
60Clean eyewash station externally and internally (if needed).
70Refill eyewash station with fresh water to the correct level.
80Add a anti-bacterial additive to the water in proportions as recommended by the additive manufacturer.
90Maintain a service data information record at the eyewash station.

J-1602000-04-17

ATTACHMENT J-16020000-04-17
EDGCBM-4 Breaker (SF6) - MV - FS - 4 Yr Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
40Follow Switching Orders and communicate with the ROC to de-energize the equipment and it's controls.
50Follow Danger Hold tag, voltage testing, and grounding procedures as outlilned in SOP PWBL.001 Rev C.
60Reference latest edition of NETA MTS.
70Reference latest edition of NFPA 70B.
80Reference Manufacturer's Instruction Manual.
90Inspect the physical condition of the breaker tank and control compartment. Wire brush and paint as

needed.

100Inspect anchorage, alignment, and grounding of the tank.
110Inspect bushings for chips, cracks, and tracking. Clean bushings.
115Verify tightness of all assessible electrical connections with a torque wrench in accordance with

NETA MTS 97 Table 10.12.

120Inspect the control compartment door for proper closure and sealing. Make repairs as needed.
130Verify that control compartment lights and heater are working. Clean compartment.
140Inspect compartment components and wiring for tightness, damage, and signs of moisture.
145Verify correct SF6 gas pressure in accordance with manufacturer's instructions. Locate/repair leaks

and recharge as needed.

150Manufacturer's Recommended SF6 Gas Pressure ______PSI.
155Breaker's Actual SF6 Gas Pressure ______PSI.
160Verify correct operation of all SF6 gas pressure alarms and cutouts.
170Inspect and verify adjustments of mechanism in accordance with the manufacturer's instructions
175Lubricate all pins, moving surfaces, and sliding surfaces in accordance with the manufacturer's

instructions.

180Slow close/open breaker and check for binding.
190Perform all mechanical operation tests /checks on the operating mechanism in accordance with

the manufacturer's instruction.

200Perform a contact resistance test of each breaker pole (breaker closed)
210A Pole _____micro-ohms,

B Pole _____micro-ohms, C Pole _____micro-ohms

215Evaluate contact resistance test results in accordance with manufacturer's specifications.
220Perform insulation resistance test pole-to-pole and pole-to-ground (breaker closed), and across

poles (breaker opened).

225Utilize NETA MTS for test voltage, temperature correction to 20 degrees C, and evaluation data.
230A Pole to B Pole _____Megohms,

B Pole to C Pole _____Megohms, C Pole to A Pole _____Megohms.

240 A Pole to Ground_____Megohms, B Pole to Ground_____Megohms, C Pole to Ground _____Megohms.

250 Across A Pole _____Megohms, Across B Pole _____Megohms, Across C Pole _____Megohms.

260Perform a circuit breaker time travel analysis to determine the following:
270Breaker Closing Velocity _____ft/sec,

Overtravel ______inches, Rebound ______inches, Breaker Tripping Veleocity ______ft/sec.

280Evaluate time travel analysis results in accordance with the manufacturer's specifications.
290Verify trip, close, trip free, and anti-pump funtions.
300Trip breaker by its emergency trip
310Trip breaker by operation of each protective device. Do not include protective relays that will trip

other equipment.

320Inspect position indicator, indicator lights, and operations counter for proper operation.
330Verify proper operation of the spring charging motor.
340Report all discrepancies to your supervisor for corrective action.
350Follow proper Danger Hold tag and ground removal procedures as outlined in SOP PWBL.001 Rev C.
360Follow Switching Orders and communicate with the ROC to re-energize the equipment and it's controls.
370Record Degradation Index.

J-1602000-04-18

ATTACHMENT J-16020000-04-18
EDGCBM-M Breaker (SF6) - MV - FS - Monthly Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
40Reference Manufacturer's Instruction Manual.
50Inspect the control compartment door for proper closure and sealing. Make repairs as needed.
60Verify that control compartment lights and heater are working. Re-lamp, if necessary.
70Clean operating mechanism compartment.
80Verify correct SF6 gas pressure in accordance with manufacturer's instructions.
90Record Manufacturer's Recommended SF6 Gas Pressure ______PSI.
100Contact the production controller to complete the work order.
110Contact the production controller to obtain repair work orders if needed.
120Record Breaker's Actual SF6 Gas Pressure ______PSI.
130Record Degradation Index.

J-1602000-04-19

ATTACHMENT J-16020000-04-19
EDGENL-3-C Generator (Customer Owned) - LV - 3 Year Job PlanBack to Table
SequenceTaskDescription
0Perform ORM prior to beginning the job.
10Perform job brief with all employees involved in the job.
20Follow all applicable SOP/JHA procedures.
40Reference Manufacturer's Instruction Manual.
45Perform all O&M per manufacturer's recommendations. Do not change emission related engine setting unless manufacturer specified.
60Follow Danger Hold tag, voltage testing, and grounding procedures as outlilned in SOP PWBL.001

Rev C.

70Switch the diesel generator system from the "Auto" to the "Off" mode.
80Secure power to the battery charger and disconnect the diesel battery / batteries as added

protection while performing maintenance.

90Secure power to the jacket water heaters, block heaters, and battery heaters.

This is the start of the file's text. The full file is on GovTribe.