J-1602000-01 to -03 Electrical.xlsx
XLSX spreadsheet 50 KB Posted
- Solicitation number
- N4008523R2630
About this file
This document package includes technical specifications for electrical equipment at various Navy facilities in Hampton Roads, Virginia, as well as the related solicitation for electrical maintenance and repair services. Key equipment listed across eight Navy substations includes transformers, circuit breakers, switchgear, control panels, batteries, capacitors, bus structures, instrumentation, and protective relays. The solicitation seeks offers for facility investment services including preventative maintenance, repair, and emergency services for this electrical distribution equipment. The Naval Facilities Engineering Command is the contracting agency. Offerors should have experience servicing medium and high voltage electrical systems of the types described in the technical specifications. The period of performance and pricing terms are not specified in this pre-solicitation document package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008523R2630 AMENDMENT 0007.pdf | ||
| N4008523R2630 AMENDMENT 0006.pdf | ||
| N4008523R2630 AMENDMENT 0005.pdf | ||
| AMENDMENT 0004 SITE VISIT 4.20.23.pdf | ||
| N4008523R2630 AMENDMENT 0004.pdf | ||
| N4008523R2630 AMENDMENT 0003.pdf | ||
| AMENDMENT 0003 SITE VISIT ISO N4008523R2630 REDACTED.pdf | ||
| N4008523R2630 Section C Annexes REV1.pdf | ||
| N008523R2630 Amendment 0002.pdf | ||
| N008523R2630 Amendment 0001.pdf | ||
| N4008523R2630.pdf | ||
| J-0200000-06 SERVICE PROVIDER INFORMATION.xlsx | XLSX spreadsheet | |
| J-0200000-04 Invoice Form.xlsx | XLSX spreadsheet | |
| J-0200000-13 Utility Elect Maint ELINs.xlsx | XLSX spreadsheet | |
| J-0200000-07 ASSET INFORMATION.xlsx | XLSX spreadsheet | |
| N4008523R2630 Section C Annexes.pdf | ||
| N4008523R2630 Section J Annexes.pdf | ||
| J-0200000-08 ASSET SPECIFICATION.xlsx | XLSX spreadsheet | |
| J-1602000-04 Job Plans.xlsx | XLSX spreadsheet | |
| J-0200000-09 CHARACTERISTIC METER READING INFO.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table
SECTION J ANNEX 1602000 ATTACHMENTS
TABLE OF CONTENTS
| J-1602000-01 | Definitions and Acronyms |
| J-1602000-02 | References and Technical Documents |
| J-1602000-03-01 | Equipment Listing for Substation Navy North |
| J-1602000-03-02 | Equipment Listing for Substation Navy South |
| J-1602000-03-03 | Equipment Listing for Substation P1 |
| J-1602000-03-04 | Equipment Listing for Substation NB (A104) |
| J-1602000-03-05 | Equipment Listing for Substation NAS (T45) |
| J-1602000-03-06 | Equipment Listing for Substation NR (LP172) |
| J-1602000-03-07 | Equipment Listing for Substation D&S (CEP96) |
| J-1602000-03-08 | Equipment Listing for Substation H |
| J-1602000-04 | Job Plans |
J-1602000-01
| ATTACHMENT J-1602000-01 | ||
| DEFINITIONS AND ACRONYMS | Back to Table | |
| DEFINITION | DESCRIPTION | |
| CRANE, CATEGORY 1 | Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes. | |
| CRANE, CATEGORY 2 & 3 | Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Over head traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds. | |
| CRANE, CATEGORY 4 | Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes. | |
| EQUIPMENT, COLLATERAL | Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. | |
| EQUIPMENT, INSTALLED | Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. | |
| EQUIPMENT, PERSONAL PROPERTY | Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed. | |
| FACILITIES LIFE CYCLE | A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. | |
| FACILITIES MAINTENANCE MANAGEMENT | The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” | |
| HIGH VOLTAGE TRANSMISSION | Transmission of electrical loads greater than 69 kilovolts (KV). | |
| LIFE-CYCLE COSTS | A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. | |
| LOW VOLTAGE DISTRIBUTION | Distribution of electrical loads less than or equal to 600 volts (V). | |
| MAINTENANCE, PREVENTIVE | Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements. | |
| MANAGEMENT INFORMATION SYSTEMS-MAINTENANCE | A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance. | |
| MEDIUM VOLTAGE DISTRIBUTION | Distribution of electrical loads ranging from greater than 600 V up to and including 69 KV. | |
| REPAIR | Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. | |
| REPLACEMENT | Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. | |
| RESTORATION | Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. | |
| SUSTAINMENT | Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. | |
| SERVICE ORDER | Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for other non-recurring work that is too small to be planned and estimated. |
The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.
| SERVICE ORDER CYCLE | Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order. |
| SERVICE ORDER, EMERGENCY | Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems. |
| SERVICE ORDER, MAJOR | Major Service Order is defined as Emergency, Urgent, or Routine that has a limit of liability which is considerably higher than the aforementioned service order types. |
| SERVICE ORDER, URGENT | Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system. |
| SERVICE ORDER, ROUTINE | Routine is defined as any work requirement within the defined LOL that does not qualify as emergency or urgent. |
| WEIGHT HANDLING EQUIPMENT (WHE) | Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE. |
| Acronym | Title |
| AC | Alternating Current (electricity) |
| ANSI | American National Standards Institute |
| EPA | Environmental Protection Agency |
| FI | Facility Investment |
| FMS | Facilities Management System |
| HAZMAT | Hazardous Material |
| HAZWASTE | Hazardous Waste |
| NAVFAC | Naval Facilities Engineering Command |
| NEC | National Electrical Code |
| NFPA | National Fire Protection Association |
| OEM | Original Equipment Manufacturer |
| PM | Preventative Maintenance |
| RPIE | Real Property Inventory Equipment |
| SRM | Sustainment, Restoration and Modernization |
| UFC | Unified Facilities Criteria |
J-1602000-02
| ATTACHMENT J-1602000-02 | ||
| REFERENCES AND TECHNICAL DOCUMENTS | Back to Table | |
| 16 U.S.C. 1531 et seq. | Endangered Species Act | |
| 42 U.S.C. 4321 et seq., | National Environmental Policy Act (NEPA) | |
| 42 U.S.C. 6901 et seq. | Resource Conservation and Recovery Act (RCRA) | |
| MO-209 | Engineering Criteria | |
| NAVFAC MO-200 | Facilities Engineering Electrical Exterior Facilities | |
| NAVFAC MO-307 | Corrosion Control | |
| NAVFAC MO-321 | Facilities Management | |
| NAVFAC P-307 | Management of Weight Handling Equipment | |
| NEESA 20.2-028B | PCB Program Management Guide | |
| OPNAVINST 5090.1 | Navy Environmental and Natural Resources Program Manual | |
| OPNAVINST 5100.23 Series | Navy Safety and Occupational Health Manual | |
| OPNAVINST 5100.8 Series | Navy Safety and Occupational Health (NAVOSH) Program | |
| OPNAVINST 5530.14 | Physical Security and Loss Prevention Manual | |
| UFC 3-501-01 | Electrical Engineering | |
| UFC 3-550-01 | Exterior Electrical Power Distribution | |
| UFC 3-560-01 | Electrical Safety |
J-1602000-03-01
| ATTACHMENT J-16020000-03-01 | ||||
| Equipment Listing for Substation Navy North | Back to Table | |||
| Item Description | M1 | M2 | Notes | |
| Battery System, Lead-acid | 1 | |||
| Battery System, Nickel-cadmium | ||||
| Capacitor bank | ||||
| Circuit Breaker: 38kV, 1200Amps, Vacuum | 8 | 8 | ||
| Circuit Breaker: 38kV, 2000Amps, Vacuum | 3 | 2 | ||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | ||||
| Instrument Transformer: CT | 60 | 60 | ||
| Instrument Transformer: PT | 3, 16 | 3,16 | 3 PTs are for bus voltage, each circuit breaker cubicle has 2 voltage sensing PTs on the bus stab for the cable connections for synchronization | |
| Grounding Resistor: | ||||
| Solid State Relay: Bus Protection | 2 | 2 | ||
| Microprocessor Relay: Feeder Protection | 9 | 9 | ||
| Microprocessor Relay: Bus Protection | ||||
| Microprocessor Relay: Transformer Protection | ||||
| Switch, Loadbreak | ||||
| Switchgear Enclosure | 13 | 13 | ||
| Transformer, Station Service | 1 | 1 | ||
| Transformer, Power | ||||
| Load Tap Changer: | ||||
| Transformer, Control Power | 1 | 1 | ||
| Outdoor Bus Structure | ||||
| Automatic Transfer Switch | ||||
| Motor Operated Bus Switch | ||||
| Panelboard: AC | 1 | |||
| Panelboard: DC | 1 | |||
| Control Relay: Circuit Breaker Open and Close | 11 | 10 | ||
| Lockout relay | 2 | 2 | ||
| Switch, Air Fused | ||||
| Control Relay: Motor Operator Switch Open and Close | ||||
| Circuit Breaker: 15kV, Air | ||||
| Paralleling Relay | 16 | 16 | ||
| Circuit Breaker: Air, Low-Voltage Power | ||||
| Electromechanical Relay: Bus Protection | ||||
| Electromechanical Relay: Time Overcurrent | ||||
| Electromechanical Relay: Transformer Protection | ||||
| Circuit Breaker: 5kV, Air | ||||
| Uninterruptible Power Systems | ||||
| Surge Arresters | 6 | 6 | ||
| Electromechanical Relay: Synchronism Check | ||||
| Electromechanical Relay: Directional Overcurrent | ||||
| Electromechanical Relay: Voltage Restraint Overcurrent | ||||
| Electromechanical Relay: Over/Under Frequency | ||||
| Electromechanical Relay: Generator Differential | ||||
| Electromechanical Relay: Under voltage | ||||
| Electromechanical Relay: Directional Power |
J-1602000-03-02
| ATTACHMENT J-16020000-03-02 | ||||
| Equipment Listing for Substation Navy South | Back to Table | |||
| Item Description | M1 | M2 | Notes | |
| Battery System, Lead-acid | 1 | |||
| Battery System, Nickel-cadmium | ||||
| Capacitor bank | ||||
| Circuit Breaker: 38kV, 1200Amps, Vacuum | 8 | 8 | ||
| Circuit Breaker: 38kV, 2000Amps, Vacuum | 3 | 2 | ||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | ||||
| Instrument Transformer: CT | 60 | 60 | ||
| Instrument Transformer: PT | 3, 16 | 3,16 | 3 PTs are for bus voltage, each circuit breaker cubicle has 2 voltage sensing PTs on the bus stab for the cable connections for synchronization | |
| Grounding Resistor: | ||||
| Solid State Relay: Bus Protection | 2 | 2 | ||
| Microprocessor Relay: Feeder Protection | 9 | 9 | ||
| Microprocessor Relay: Bus Protection | ||||
| Microprocessor Relay: Transformer Protection | ||||
| Switch, Loadbreak | ||||
| Switchgear Enclosure | 13 | 13 | ||
| Transformer, Station Service | 1 | 1 | ||
| Transformer, Power | ||||
| Load Tap Changer: | ||||
| Transformer, Control Power | 1 | 1 | ||
| Outdoor Bus Structure | ||||
| Automatic Transfer Switch | ||||
| Motor Operated Bus Switch | ||||
| Panelboard: AC | 1 | |||
| Panelboard: DC | 1 | |||
| Control Relay: Circuit Breaker Open and Close | 11 | 10 | ||
| Lockout relay | 2 | 2 | ||
| Switch, Air Fused | ||||
| Control Relay: Motor Operator Switch Open and Close | ||||
| Circuit Breaker: 15kV, Air | ||||
| Paralleling Relay | 16 | 16 | ||
| Circuit Breaker: Air, Low-Voltage Power | ||||
| Electromechanical Relay: Bus Protection | ||||
| Electromechanical Relay: Time Overcurrent | ||||
| Electromechanical Relay: Transformer Protection | ||||
| Circuit Breaker: 5kV, Air | ||||
| Uninterruptible Power Systems | ||||
| Surge Arresters | 6 | 6 | ||
| Electromechanical Relay: Synchronism Check | ||||
| Electromechanical Relay: Directional Overcurrent | ||||
| Electromechanical Relay: Voltage Restraint Overcurrent | ||||
| Electromechanical Relay: Over/Under Frequency | ||||
| Electromechanical Relay: Generator Differential | ||||
| Electromechanical Relay: Under voltage | ||||
| Electromechanical Relay: Directional Power |
J-1602000-03-03
| ATTACHMENT J-16020000-03-03 | ||||
| Equipment Listing for Substation P1 | Back to Table | |||
| Item Description | M1 | M2 | Notes | |
| Grounding Resistor: | ||||
| Switchgear Enclosure | ||||
| Transformer, Station Service | ||||
| Transformer, Power | ||||
| Transformer, Control Power | ||||
| Switch, Loadbreak | ||||
| Switch, Air Fused | ||||
| Circuit Breaker: Air, Low-Voltage Power | ||||
| Circuit Breaker: 15kV, Air | 16 | |||
| Circuit Breaker: 5kV, Air | ||||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | ||||
| Circuit Breaker: 15kV, 2000Amps, Vacuum | ||||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | ||||
| Solid State Relay: Bus Protection | ||||
| Control Relay: Circuit Breaker Open and Close | ||||
| Lockout relay | ||||
| Control Relay: Motor Operator Switch Open and Close | ||||
| Paralleling Relay | ||||
| Electromechanical Relay: Bus Protection | ||||
| Electromechanical Relay: Time Overcurrent | 16 | |||
| Electromechanical Relay: Transformer Protection | ||||
| Electromechanical Relay: Synchronism Check | 13 | |||
| Electromechanical Relay: Directional Overcurrent | 16 | |||
| Electromechanical Relay: Voltage Restraint Overcurrent | 27 | |||
| Electromechanical Relay: Over/Under Frequency | 5 | |||
| Electromechanical Relay: Generator Differential | 15 | |||
| Electromechanical Relay: Under voltage | 9 | |||
| Electromechanical Relay: Directional Power | 5 | |||
| Microprocessor Relay: Feeder Protection | ||||
| Microprocessor Relay: Bus Protection | ||||
| Microprocessor Relay: Transformer Protection | ||||
| Instrument Transformer: CT | ||||
| Instrument Transformer: PT | ||||
| Load Tap Changer: | ||||
| Surge Arresters | ||||
| Capacitor bank | ||||
| Outdoor Bus Structure | ||||
| Motor Operated Bus Switch | ||||
| Uninterruptible Power Systems | ||||
| Automatic Transfer Switch | ||||
| Panelboard: AC | ||||
| Panelboard: DC | ||||
| Battery System, Nickel-cadmium | ||||
| Battery System, Lead-acid | 1 |
J-1602000-03-04
| ATTACHMENT J-16020000-03-04 | |||||
| Equipment Listing for Substation NB (A104) | Back to Table | ||||
| Item Description | NB1 | NB2 | NB35 | Notes | |
| Battery System, Lead-acid | |||||
| Battery System, Nickel-cadmium | 1 | In Control House 1 | |||
| Capacitor bank | 0 | ||||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | 6 | 6 | |||
| Circuit Breaker: 15kV, 2000Amps, Vacuum | 2 | 2 | |||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | 7 | ||||
| Instrument Transformer: CT | 51 | 51 | 28 | NB35 CTs are in the bushings of the SF6 circuit breaker | |
| Instrument Transformer: PT | 3, 14 | 3, 14 | 6 | 3 PTs are in the 11.5kV switchgear lineups, NB1 and NB2, for bus voltage while the feeder circuit breaker cubicles have 2 PTs mounted on the cable termination part of the bus for synchronization | |
| Grounding Resistor: | 1 | 1 | NB1 is mounted on Transformer, NETA has no PM | ||
| Solid State Relay: Bus Protection | 2 | 1 | |||
| Microprocessor Relay: Feeder Protection | 8 | 8 | 7 | ||
| Microprocessor Relay: Bus Protection | 2 | ||||
| Microprocessor Relay: Transformer Protection | 1 | 1 | |||
| Switch, Loadbreak | 1 | 1 | 14 | ||
| Switchgear Enclosure | 11 | 11 | |||
| Transformer, Station Service | 0 | Serviced by Control Power Transformers | |||
| Transformer, Power | 1 | 1 | |||
| Load Tap Changer: | 1 | 1 | Integral to Transformer | ||
| Transformer, Control Power | 1 | 1 | Provides Station Service | ||
| Outdoor Bus Structure | 2 | ||||
| Automatic Transfer Switch | 1 | 1 | |||
| Motor Operated Bus Switch | 1 | ||||
| Panelboard: AC | 2 | 1 | One AC Panelboard is in Control House 1 | ||
| Panelboard: DC | 1 | In Control House 1 | |||
| Control Relay: Circuit Breaker Open and Close | 8 | 8 | |||
| Lockout relay | 2 | 2 | 2 | Transformer Lockout Realy is in the control house | |
| Switch, Air Fused | |||||
| Control Relay: Motor Operator Switch Open and Close | 1 | ||||
| Circuit Breaker: 15kV, Air | |||||
| Paralleling Relay | 8 | 8 | |||
| Circuit Breaker: Air, Low-Voltage Power | |||||
| Electromechanical Relay: Bus Protection | |||||
| Electromechanical Relay: Time Overcurrent | |||||
| Electromechanical Relay: Transformer Protection | |||||
| Circuit Breaker: 5kV, Air | |||||
| Uninterruptible Power Systems | |||||
| Surge Arresters | |||||
| Electromechanical Relay: Synchronism Check | |||||
| Electromechanical Relay: Directional Overcurrent | |||||
| Electromechanical Relay: Voltage Restraint Overcurrent | |||||
| Electromechanical Relay: Over/Under Frequency | |||||
| Electromechanical Relay: Generator Differential | |||||
| Electromechanical Relay: Under voltage | |||||
| Electromechanical Relay: Directional Power |
J-1602000-03-05
| ATTACHMENT J-16020000-03-05 | |||||
| Equipment Listing for Substation NAS (T45) | Back to Table | ||||
| Item Description | NAS1 | NAS2 | NAS 351 | NAS352 | |
| Battery System, Lead-acid | 1 | 1 | |||
| Battery System, Nickel-cadmium | |||||
| Capacitor bank | |||||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | 7 | ||||
| Circuit Breaker: 15kV, 2000Amps, Vacuum | 2 | ||||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | 6 | 4 | |||
| Instrument Transformer: CT | 60 | 24 | 16 | ||
| Instrument Transformer: PT | 21 | 6 | 6 | ||
| Grounding Resistor: | 1 | 1 | |||
| Solid State Relay: Bus Protection | |||||
| Microprocessor Relay: Feeder Protection | 9 | 8 | 6 | 4 | |
| Microprocessor Relay: Bus Protection | 1 | 1 | 2 | ||
| Microprocessor Relay: Transformer Protection | 1 | 1 | |||
| Switch, Loadbreak | 12 | 8 | |||
| Switch, Loadbreak | 12 | 8 | |||
| Switchgear Enclosure | 13 | 11 | |||
| Transformer, Station Service | 1 | 1 | |||
| Transformer, Power | 1 | 1 | |||
| Load Tap Changer: | 1 | 1 | |||
| Transformer, Control Power | 1 | ||||
| Outdoor Bus Structure | 2 | 1 | |||
| Automatic Transfer Switch | 1 | 1 | |||
| Motor Operated Bus Switch | 1 | ||||
| Panelboard: AC | 2 | 1 | |||
| Panelboard: DC | 2 | 1 | |||
| Control Relay: Circuit Breaker Open and Close | |||||
| Lockout relay | 2 | 1 | 1 | 1 | |
| Switch, Air Fused | 2 | 2 | |||
| Control: Motor Operator Switch Remote Open and Close | 1 | ||||
| Circuit Breaker: 15kV, Air | 8 | ||||
| Paralleling Relay | 8 | ||||
| Circuit Breaker: Air, Low-Voltage Power | |||||
| Electromechanical Relay: Bus Protection | |||||
| Electromechanical Relay: Time Overcurrent | |||||
| Electromechanical Relay: Transformer Protection | |||||
| Circuit Breaker: 5kV, Air | |||||
| Uninterruptible Power Systems | |||||
| Surge Arresters | |||||
| Electromechanical Relay: Synchronism Check | |||||
| Electromechanical Relay: Directional Overcurrent | |||||
| Electromechanical Relay: Voltage Restraint Overcurrent | |||||
| Electromechanical Relay: Over/Under Frequency | |||||
| Electromechanical Relay: Generator Differential | |||||
| Electromechanical Relay: Under voltage | |||||
| Electromechanical Relay: Directional Power |
J-1602000-03-06
| ATTACHMENT J-16020000-03-06 | |||
| Equipment Listing for Substation NR (LP172) | Back to Table | ||
| Item Description | NR | NR35 | |
| Battery System, Lead-acid | 1 | ||
| Battery System, Nickel-cadmium | |||
| Capacitor bank | |||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | 7 | ||
| Circuit Breaker: 15kV, 2000Amps, Vacuum | 1 | ||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | 5 | ||
| Instrument Transformer: CT | 20 | ||
| Instrument Transformer: PT | 3 | ||
| Grounding Resistor: | 1 | ||
| Solid State Relay: Bus Protection | |||
| Microprocessor Relay: Feeder Protection | 8 | 5 | |
| Microprocessor Relay: Bus Protection | 1 | 1 | |
| Microprocessor Relay: Transformer Protection | 1 | ||
| Switch, Loadbreak | 12 | ||
| Switchgear Enclosure | 10 | ||
| Transformer, Station Service | 1 | 1 | |
| Transformer, Power | 1 | ||
| Load Tap Changer: | 1 | ||
| Transformer, Control Power | |||
| Outdoor Bus Structure | 1 | ||
| Automatic Transfer Switch | |||
| Motor Operated Bus Switch | |||
| Panelboard: AC | 2 | 1 | |
| Panelboard: DC | 1 | 1 | |
| Control Relay: Circuit Breaker Open and Close | |||
| Lockout relay | 1 | 2 | |
| Switch, Air Fused | 2 | ||
| Control: Motor Operator Switch Remote Open and Close | |||
| Circuit Breaker: 15kV, Air | |||
| Paralleling Relay | 8 | ||
| Circuit Breaker: Air, Low-Voltage Power | |||
| Electromechanical Relay: Bus Protection | |||
| Electromechanical Relay: Time Overcurrent | |||
| Circuit Breaker: 5kV, Air | |||
| Uninterruptible Power Systems | |||
| Surge Arresters | |||
| Electromechanical Relay: Synchronism Check | |||
| Electromechanical Relay: Directional Overcurrent | |||
| Electromechanical Relay: Voltage Restraint Overcurrent | |||
| Electromechanical Relay: Over/Under Frequency | |||
| Electromechanical Relay: Generator Differential | |||
| Electromechanical Relay: Under voltage | |||
| Electromechanical Relay: Directional Power |
J-1602000-03-07
| ATTACHMENT J-16020000-03-07 | ||
| Equipment Listing for Substation D&S (CEP96) | Back to Table | |
| Item Description | D&S1 | |
| Battery System, Lead-acid | 1 | |
| Battery System, Nickel-cadmium | ||
| Capacitor bank | ||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | 7 | |
| Circuit Breaker: 15kV, 2000Amps, Vacuum | 2 | |
| Circuit Breaker: 38kV, 1200 Amps, SF6 | ||
| Instrument Transformer: CT | 60 | |
| Instrument Transformer: PT | 21 | |
| Grounding Resistor: | 1 | |
| Solid State Relay: Bus Protection | ||
| Microprocessor Relay: Feeder Protection | 9 | |
| Microprocessor Relay: Bus Protection | 1 | |
| Microprocessor Relay: Transformer Protection | 1 | |
| Switch, Loadbreak | ||
| Switchgear Enclosure | 13 | |
| Transformer, Station Service | 1 | |
| Transformer, Power | 1 | |
| Load Tap Changer: | 1 | |
| Transformer, Control Power | ||
| Outdoor Bus Structure | ||
| Automatic Transfer Switch | 1 | |
| Motor Operated Bus Switch | ||
| Panelboard: AC | 2 | |
| Panelboard: DC | 2 | |
| Control Relay: Circuit Breaker Open and Close | ||
| Lockout relay | 2 | |
| Switch, Air Fused | ||
| Control Relay: Motor Operator Switch Open and Close | ||
| Circuit Breaker: 15kV, Air | ||
| Paralleling Relay | 8 | |
| Circuit Breaker: Air, Low-Voltage Power | ||
| Electromechanical Relay: Bus Protection | ||
| Electromechanical Relay: Time Overcurrent | ||
| Electromechanical Relay: Transformer Protection | ||
| Circuit Breaker: 5kV, Air | ||
| Uninterruptible Power Systems | ||
| Surge Arresters | ||
| Electromechanical Relay: Synchronism Check | ||
| Electromechanical Relay: Directional Overcurrent | ||
| Electromechanical Relay: Voltage Restraint Overcurrent | ||
| Electromechanical Relay: Over/Under Frequency | ||
| Electromechanical Relay: Generator Differential | ||
| Electromechanical Relay: Under voltage | ||
| Electromechanical Relay: Directional Power |
J-1602000-03-08
| ATTACHMENT J-16020000-03-08 | ||
| Equipment Listing for Substation H | Back to Table | |
| Item Description | H | |
| Battery System, Lead-acid | ||
| Battery System, Nickel-cadmium | ||
| Capacitor bank | ||
| Circuit Breaker: 15kV, 1200Amps, Vacuum | ||
| Circuit Breaker: 15kV, 2000Amps, Vacuum | ||
| Circuit Breaker: 38kV, 1200 Amps, SF6 | ||
| Instrument Transformer: CT | ||
| Instrument Transformer: PT | 6 | |
| Grounding Resistor: | ||
| Solid State Relay: Bus Protection | ||
| Microprocessor Relay: Feeder Protection | ||
| Microprocessor Relay: Bus Protection | ||
| Microprocessor Relay: Transformer Protection | ||
| Switch, Loadbreak | ||
| Switchgear Enclosure | ||
| Transformer, Station Service | ||
| Transformer, Power | 1 | |
| Load Tap Changer: | ||
| Transformer, Control Power | 1 | |
| Outdoor Bus Structure | ||
| Automatic Transfer Switch | ||
| Motor Operated Bus Switch | ||
| Panelboard: AC | ||
| Panelboard: DC | ||
| Control Relay: Circuit Breaker Open and Close | ||
| Lockout relay | ||
| Switch, Air Fused | ||
| Control Relay: Motor Operator Switch Open and Close | ||
| Circuit Breaker: 15kV, Air | 2 | |
| Paralleling Relay | ||
| Circuit Breaker: Air, Low-Voltage Power | ||
| Electromechanical Relay: Bus Protection | ||
| Electromechanical Relay: Time Overcurrent | 24 | |
| Electromechanical Relay: Transformer Protection | 3 | |
| Circuit Breaker: 5kV, Air | 5 | |
| Uninterruptible Power Systems | ||
| Surge Arresters | ||
| Electromechanical Relay: Synchronism Check | ||
| Electromechanical Relay: Directional Overcurrent | ||
| Electromechanical Relay: Voltage Restraint Overcurrent | ||
| Electromechanical Relay: Over/Under Frequency | ||
| Electromechanical Relay: Generator Differential | ||
| Electromechanical Relay: Under voltage | ||
| Electromechanical Relay: Directional Power |
J-1602000-04
| ATTACHMENT J-16020000-04 | ||
| Job Plans | Back to Table | |
| See EXCEL SPREADSHEET ATTACHMENT J-16020000-04 |