About this file

This document contains a price proposal form and supplementary instructions to offerors for a federal contract solicitation. The solicitation is for project P-1097 to relocate an underwater electromagnetic measurement system for the Magnetic Silencing Facility at Naval Submarine Base New London in Connecticut. Offerors must provide lump sum pricing for the base work in CLIN 0001 and optional demolition work in CLIN 0002. The base work must be completed by June 24, 2024, while the demolition work has start, above mudline completion, and below mudline completion dates of May 15, 2024, July 15, 2024, and August 30, 2024 respectively. The contract duration will be extended by 67 days if the demolition option is exercised. Award will be made on CLIN 0001, with the government reserving the right to also award CLIN 0002 at the proposed price. Pricing must be provided for both CLINs for the proposal to be considered.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Attachment I - Price Proposal Form_Updated.docx DOCX document
Amendment 0007.pdf PDF
P-1097 Range House Pictures 1-13.pdf PDF
No.58_9611502 - SDN 8887.pdf PDF
Amendment 0006.pdf PDF
GFI02_NLON_UEMMS_Type_6_Upgrade_Final_As-build_Drawings.pdf PDF
08-290620.15_S-103 TOWER BASE.pdf PDF
Schedule of Special Inspections.pdf PDF
GFI01_Type 3 Drawing Set.pdf PDF
23-290620.15_S-505 LADDER details.pdf PDF
Amendment 0005.pdf PDF
DWG_DEMO_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
DWG_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Site Visit Log.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
N4008523R2516 Solicitation P-1097.pdf PDF
Approved_1640322dwg02of02_NewWork.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment J - Fort Trumbull Map.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Approved_1640322spc01of01.pdf PDF
Attachment H - 20207889 TOY modification approval letter Signed.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Approved_1640322dwg01of02_Demo.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1097 – Relocate UEMMS 1640322

PRICE PROPOSAL FORM – P-1097

CLIN QUANTITY UNIT TOTAL PRICE

0001 1 Lump Sum $_______________

CLIN QUANTITY UNIT TOTAL PRICE

0002 1 Lump Sum $_______________

TOTAL FOR CLIN 0001 and CLIN 0002 $_______________

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN Description Quantity Unit Total Price for

CLIN 0001

Price for the entire work for MILCON P-1097 in accordance with the drawings and specifications, but excluding work described in Contract Line Items (CLIN) 0002.

1 Lump Sum

CLIN 0002 will only be performed at the direction of the Contracting Officer.

CLIN 0002 – BID OPTION. Price includes the following:

CLIN Description Quantity Unit Total Price for

CLIN 0002

0002 Price for the demolition work, in accordance with the drawings and specifications. 1 Lump Sum

If Option is exercised, an additional 67 calendar days will be added to the contract completion date.

1.2 GENERAL BID NOTES

a. The Contractors schedule and bids must reflect the following contractually required milestone dates:

Phase 1 - Construction:

i. All New Construction Complete (tower, transformer, cable, etc.): 6/24/24

NOTE: (365-day duration from award, end date will improve or extend depending on actual award date)

Phase 2 – Demolition (Bid Option):

i. Demolition Start: 5/15/2024

ii. Above Mudline Demo Complete: 7/15/2024. Work includes, but is not limited to the following:

a. DCS Tower

b. Pilings above mudline

NOTE: Upon completion of the above-the-mudline demolition work, the Contractor must be prepared to stop work and vacate his personnel and equipment from the site within 48 hours of notification by the Contracting Officer’s representative: the Construction Manager (CM). For bidding purposes, expect that the duration of this stoppage will last no more than 1 (8 hour) work day.

iii. Below Mudline Demo Complete: 8/30/2024. Work includes, but is not limited to the following:

a. Pilings below mudline

b. Retrieval of sensors

c. Cut up of cables

d. Retrieval of cut cable pieces

b. Award will be made on Contract Line Item 0001. Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

c. The Government reserves the unilateral right to award CLIN 0002 to the Contractor at the proposed price at the time of contract award. A firm fixed proposed price is required for CLIN 0002. No provision is made for economic price adjustment. Award of CLIN 0002 extends the contract completion date by the number of calendar days indicated.

d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option.

e. Failure to enter a price for any CLIN will be result in a proposal being rejected as unacceptable.

f. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

g. If CLIN 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

-- End of Document --