About this file

This document is an amendment to a solicitation for the relocation of an underwater electromagnetic measurement system at the Naval Submarine Base New London in Connecticut. The amendment provides revised specifications and drawings, responses to pre-proposal inquiries, and additional as-built drawings and details. Products and services required include the relocation of the existing system to a new tower, demolition and removal of the existing tower and piles, and installation of new piles and a tower. The start date for demolition is May 15, 2024 and the milestone date for completion of the new construction is June 24, 2024. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Attachment I - Price Proposal Form_Updated.docx DOCX document
Amendment 0007.pdf PDF
P-1097 Range House Pictures 1-13.pdf PDF
No.58_9611502 - SDN 8887.pdf PDF
Amendment 0006.pdf PDF
GFI02_NLON_UEMMS_Type_6_Upgrade_Final_As-build_Drawings.pdf PDF
08-290620.15_S-103 TOWER BASE.pdf PDF
Schedule of Special Inspections.pdf PDF
GFI01_Type 3 Drawing Set.pdf PDF
23-290620.15_S-505 LADDER details.pdf PDF
DWG_DEMO_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
DWG_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Site Visit Log.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
N4008523R2516 Solicitation P-1097.pdf PDF
Approved_1640322dwg02of02_NewWork.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment I - Price Proposal Form.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment J - Fort Trumbull Map.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Approved_1640322spc01of01.pdf PDF
Attachment H - 20207889 TOY modification approval letter Signed.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Approved_1640322dwg01of02_Demo.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-23-R-2516: Relocate Underw ater Electromagnetic Measurement System, Naval Submarine Base New London, New London, CT.

Contract POC: Leslie Moore, Email: leslie.c.moore11.civ@us.navy.mil

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Mar-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008523R2516

X 9B. DATED (SEE ITEM 11)

08-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Mar-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2516

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

This Amendment 0005 is issued to incorporate the following:

1. Continuation sheet to update specifications and drawings

2. Provide responses to Pre-Proposal Inquiries (PPIs)

3. Provide “As-Builts” (attached separately)

a. GFI01_Type 3 Drawing Set

b. GFI02_NLON_UEMMS_Type_6_Upgrade_Final_As-build_Drawings

4. Provide “Unflattened Drawings” (attached separately)

a. DWG_DEMO_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig

b. DWG_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig

5. Provide “Anode Detail” (attached separately)

a. 08-290620.15_S-103 TOWER BASE

b. 23-290620.15_S-505 LADDER details

6. Provide “Schedule of Special Inspections” (attached separately)

1. CONTINUATION SHEET

Drawing Revisions

The following drawing is to be revised as of March 16, 2023 and accompany this Design Revision:

NAVFAC Dsg. No.: General 10009531 (G-002) Title: Drawing Index and General Notes Change: In design criteria, 5th line above the bottom, change 175 KIPs to 230 KIPS

Specification Revisions

SECTION 01 50 00

Delete Para. 3.6.1 – This paragraph is for projects on the base, is not applicable, and will be deleted.

SECTION 01 45 00.00

Delete Para. 1.5.8

2. Responses to Pre-Proposal Inquiries (PPIs)

Question No.

Reference Question Government Response

Page Section Para.

8 Drawing Package

Page C-

Do the two existing duct banks that we install the new cables (Active & Spare) have any pre-placed messenger lines or similar provisions?

Assume that they are not marked.

Please see As-Built attachments labeled

1. GFI01_Type 3 Drawing Set 2.

GFI02_NLON_UEMMS_Type_6_Upgra de_Final_As-build_Drawings

11 Drawing Package/Sp

ec. 31 62 16.13

Specs

1.4.2 Note on drawing G-002 says piles

are to be driven to an ultimate capacity of 175 kips. Specification 31 62 16.13, paragraph 1.4.2 says piles are to be driven to obtain a bearing capacity of not less than 230 kips. Please clarify which is correct.

The piles are to be driven to an ultimate capacity of 230 kips. Please see Amendment Continuation Page.

14 Specificati on 01 45 35 page 1 1.2 Specification section states that a statement of special inspections and schedule of special inspections are included as an attachment to this specification. We have not been able to locate this schedule. Please provide.

Please see attachment labeled

1. SCHEDULE OF SPECIAL

INSPECTIONS

15 Specificati on 01 50 00

Page 9 3.6.1 First sentence says to provide the facility within the construction area at the designated site. We have not seen where a site or location is designated for a field office. Please specify where this is.

Paragraph 3.6.1, is not applicable to this contract. Please see Amendment Continuation Page.

There isn’t any space or location set aside for a contractor field office. It is presumed, but not required, that the contractor will have an office on a barge at the work site.

There is no requirement to provide an office for government use during the contract.

16 Specificati on 01 50 00

Page 9 3.6.1 Does section 3.6.1 intended to describe what is required for the Contractor's field office, or is the office being described to be provided to the government for government use during the project?

Paragraph 3.6.1, is not applicable to this contract. Please see Amendment Continuation Page.

There isn’t any space or location set aside for a contractor field office. It is presumed, but not required, that the contractor will have an office on a barge at the work site.

There is no requirement to provide an office for government use during the contract.

19 Drawing Package - Demo Set

G-002 Under the "Summary of Work" section, there are numerous references to original as-built drawings being available upon request. Please provide all as-built information regarding the existing structure. Of particular interest is whether the annular space between the foundation structure pipe sleeve and the driven pipe pile is grouted, whether the driven pipe pile is filled with concrete or grout, the dimensions and thicknesses of the top concrete deck and any weight

Please see As-Built attachments labeled

1. GFI01_Type 3 Drawing Set 2.

GFI02_NLON_UEMMS_Type_6_Upgra de_Final_As-build_Drawings information for the building on top and how it is connected to the concrete deck.

21 Specificati on 26 08 00

Page 2 3.1 There is reference to a specification 33 71 02 Underground Electrical Distribution but this does not appear to be included in the specification documents. Would you please provide?

All medium voltage cable testing is covered under Section 26 20 00. Section 33 71 02 is not applicable and thus was not included in the specifications.

24 Drawings Are you able to provide the native 3-D files and PDF version of drawings that can be imported CAD? The current drawing set is either scanned or flattened and is not importable to CAD.

Please see Unflattened Drawing attachments labeled

1. DWG_DEMO_P-1097 RELOCATE

UEMMS Final for Solicitation_01182023_Orig

2. DWG_P-1097 RELOCATE UEMMS

Final for Solicitation_01182023_Orig

29 S-108 13 34 19 1.6.1 The sample building shown on drawing S-108 is a prefabricated building. These buildings are usually fabricated in a factory setting. You have included specification section 13-34-19 Metal Building Systems. This specification is for field fabricated buildings. Can the specification be changed to include Prefabricated Buildings? Where the structure would be fabricated in a factory.

The Navy does not have an active pre-fabricated specification, only 13 34 19 Metal Building Systems, but factory-assembled structures that meet the requirements of 13 34 19 can be submitted for review and acceptance.

31 Specificati on 01 45

00.00

1.5.8 An underwater Dive QAQC team is

required to monitor underwater activities. Please clarify specifically what scopes of work they are to inspect and frequency? Are they required to simply inspect the DCS structure upon completion. We assume they don't need to be on site the entire time. Also, if required to also inspect the cable installation that is being jetted into the ground there isn't anything for them to inspect. Please confirm.

Section 1.5.8 will be deleted. Please see Amendment Continuation Page.

34 Section 01 50 00

Page 9 3.6.1 Section says "Provide and maintain administrative field office facilities within the construction area at the designated site." Will the government be providing space in Fort Trumbull Park or elsewhere as the designated site? Are we allowed to setup an office trailer and park at Fort Trumbull park visitor center?

Paragraph 3.6.1, is not applicable to this contract. Please see Amendment Continuation Page.

No space will be provided at Fort Trumbull or elsewhere. No office trailer will be allowed at Fort Trumbull. No office of any kind is required for the government.

Based on previous projects of this type, expectation is that the contractor may want an office on a barge at the work site.

Progress meeting locations will be arranged by the Construction Manager.

35 Drawings - New Work

S-103 West Elevati on

West Elevation Detail on Drawing S-103 references Detail A1 on drawing S-505 for the details of the anode connection. Drawing S-505 does not have a Detail A1 nor any details on the anode connection.

Please provide this detail.

The contractor should assume That 2 - 6" long C3x6 channel will be welded to the structure, for each anode, with a 3/16 fillet weld. The anode will then be bolted to the channel. The weld should be coated but there must be an electrical connection between the anode and the channel.

Please see Anode Detail attachments labeled

1. 08-290620.15_S-103 TOWER BASE

2. 23-290620.15_S-505 LADDER details

38 2 of 7 Drawing G-002 Note 4 under "Summary of Work" states that the original construction drawings and as-builts are available upon request.

Please provide the original construction drawings and the as-builts.

Please see As-Built attachments labeled

1. GFI01_Type 3 Drawing Set 2.

GFI02_NLON_UEMMS_Type_6_Upgra de_Final_As-build_Drawings

40 N4008523 R2516, Page 42 of

52.211-12 a LD scheduile section 52.211-12 appears to dictate that above water sections of pile must be removed prior to 7/15/2024 and then piles below water by 8/30/24 and there is a 1 day break between. Are piles allowed to be removed below mudline prior to the 7/15/2024 date and prior to the 1 day break? If not, please confirm that the sequence of demolition would require the piles to be cut at mudline and that the section of pile below mudline must be removed seperately from the section of pile above mudline.

Yes.

41 Specificati on 01 57 20

Page 2 1.2.1 In addition to an earlier question about the Protected Species Observer requirements, please specify how many observers are required and where they need to be stationed (on the vessel doing the work or some distance away from the work on a boat).

The contractor shall determine the appropriate number of Protected Species Observers (PSO) to adequately monitor the work zone and zones of influence to ensure that the project can be completed without any takes of marine mammals.

For prior projects at SUBASE, a minimum of three PSOs were deployed with one PSO located on land to monitor the work zone and two located on a boat in order to monitor the zones of influence.

The marine mammal monitoring work plan shall detail the contractor’s proposed approach. Refer to the response to RFI #18 for additional details regarding the marine mammal monitoring plan.

51 1 01 14 00 1.1.b. Referenced specification states that the DCS Tower will remain in operation during construction and the Contractor must conduct his operations so as to cause the least possible interference. The Milestone 1 date for new construction being complete is 6/24/2024 and the start of demolition as 5/15/2024. Please clarify this discrepancy of the demolition date being before the completion of the new tower. Is the demolition allowed to start prior to completing the new construction?

Demolition has to start by 5/15/2024. It is allowed to start before completion of the new construction

57 01 45 35 Special Inspections specifications references that the Schedule of Special Inspections (SSI) is attached at the end of the section. Please provide these or clarify that Special Inspections are not required.

Please see attachment labeled

1. SCHEDULE OF SPECIAL

INSPECTIONS

(End of Summary of Changes)