This document is an amendment to a solicitation for the relocation of an underwater electromagnetic measurement system at the Naval Submarine Base in New London, Connecticut. The amendment provides responses to pre-proposal inquiries regarding test pile requirements, pile installation methods, floating dock guide pile wall thickness specifications, and the need for temporary piles. No test piles are required, and the contractor will determine the means and methods for pile installation according to the contract plans and specifications. The guide piles are specified as 12-inch Schedule 80 steel pipes with a nominal 0.5-inch wall thickness. Temporary piles are not a requirement for the pile installation plan.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Attachment I - Price Proposal Form_Updated.docx DOCX document
Amendment 0007.pdf PDF
P-1097 Range House Pictures 1-13.pdf PDF
No.58_9611502 - SDN 8887.pdf PDF
Amendment 0006.pdf PDF
GFI02_NLON_UEMMS_Type_6_Upgrade_Final_As-build_Drawings.pdf PDF
08-290620.15_S-103 TOWER BASE.pdf PDF
Schedule of Special Inspections.pdf PDF
GFI01_Type 3 Drawing Set.pdf PDF
23-290620.15_S-505 LADDER details.pdf PDF
Amendment 0005.pdf PDF
DWG_DEMO_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
DWG_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Site Visit Log.pdf PDF
Amendment 0001.pdf PDF
N4008523R2516 Solicitation P-1097.pdf PDF
Approved_1640322dwg02of02_NewWork.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment I - Price Proposal Form.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment J - Fort Trumbull Map.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Approved_1640322spc01of01.pdf PDF
Attachment H - 20207889 TOY modification approval letter Signed.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Approved_1640322dwg01of02_Demo.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-23-R-2516: Relocate Underw ater Electromagnetic Measurement System, Naval Submarine Base New London, New London, CT.

Contract POC: Leslie Moore, Email: leslie.c.moore11.civ@us.navy.mil

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Feb-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008523R2516

X 9B. DATED (SEE ITEM 11)

08-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Feb-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2516

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

This Amendment 0002 is issued to incorporate the following:

1. Provide responses to Pre-Proposal Inquiries (PPIs)

1. Responses to Pre-Proposal Inquiries (PPIs)

Question No.

Reference Question Government Response

Page Section Para.

Spec 31

62 16.13 -

1.4 1.4.1

Referencing specification - The section describes hiring a 3rd party geotechnical consultant to observe test pile installation. Please clarify if any test piles are required for this installation. It is not apparent on the drawings.

Test piles are not required, the means and methods for pile installation will be determined by contractor, all in accordance with the plans and specs.

Spec 31

62 16.13 -

2.3 2.3.2

Referencing specification - The section describes using fixes leads to drive battered piles. Please confirm this is not applicable for this particular project as the piles are being inserted into the jacket legs.

Leads are not required. The means and methods for pile installation will be determined by contractor, all in accordance with the plans and specs.

6 Drawings

Is the wall thickness of the 12" floating dock guide piles specified?

We don't see it called out in the drawings.

The guide piles are 12" Sch 80 (0.5" thick nominal wall)

Drawings, G-002

Notes under "Possible Construction Sequence" describe the use of temporary piles to support the base frame. The design appears to be for a mud mat design using the corrugated metal decking. Are the temporary piles a requirement?

The temporary piles are not a requirement, the means and methods for the pile installation plan will be determined by contractor, all in accordance with the plans and specs.

(End of Summary of Changes)