Attachment H - 20207889 TOY modification approval letter Signed.pdf

PDF 599 KB Posted

Attached to
P-1097, Relocate Underwater Electromagnetic Measurement System for the Magnetic Silencing Facility at Naval Submarine Base New London, New London, Connecticut
Solicitation number
N4008523R2516
Issued by

About this file

This letter approves a request for modification to an existing Water Quality Certificate and Federal Consistency Concurrence for an underwater electromagnetic measurement system project. The Navy requested approval to allow removal and installation of the system during the previously restricted February 1st through September 30th seasonal closure period in order to complete the work prior to an adjacent dredging project by Electric Boat. Based on consultation with the DEEP Fisheries Division, the modified work scope is not expected to adversely impact winter flounder or diadromous fish spawning and is approved as a de minimis change, with all other license terms and conditions remaining in effect. The related federal solicitation is for relocating the underwater electromagnetic measurement system at the Magnetic Silencing Facility at Naval Submarine Base New London, Connecticut.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Attachment I - Price Proposal Form_Updated.docx DOCX document
Amendment 0007.pdf PDF
P-1097 Range House Pictures 1-13.pdf PDF
No.58_9611502 - SDN 8887.pdf PDF
Amendment 0006.pdf PDF
GFI02_NLON_UEMMS_Type_6_Upgrade_Final_As-build_Drawings.pdf PDF
08-290620.15_S-103 TOWER BASE.pdf PDF
Schedule of Special Inspections.pdf PDF
GFI01_Type 3 Drawing Set.pdf PDF
23-290620.15_S-505 LADDER details.pdf PDF
Amendment 0005.pdf PDF
DWG_DEMO_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
DWG_P-1097 RELOCATE UEMMS Final for Solicitation_01182023_Orig.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Site Visit Log.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
N4008523R2516 Solicitation P-1097.pdf PDF
Approved_1640322dwg02of02_NewWork.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment I - Price Proposal Form.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment J - Fort Trumbull Map.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Approved_1640322spc01of01.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Approved_1640322dwg01of02_Demo.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

79 Elm Street • Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer

Date: __________________

Michael Brown, Environmental Division Director Department of the Navy, Naval Submarine Base New London (SUBASENLON) PWD ENV. DIV., Box 400 439 Tautog Avenue, Room 104 Groton, CT 06349

RE: Request for Modification Water Quality Certificate & Federal Consistency Concurrence #202007889-WQC & 202007200-FCC Underwater Electromagnetic Measurement System New London & Groton

We are in receipt of an email dated March 4, 2022 from Jane Urban requesting approval to allow for the authorized removal and installation of the underwater electromagnetic measurement system (“UEMMS”) within the previously identified February 1st through September 30th seasonal closure period as required by Terms and Conditions #3 of the captioned license. As you are aware, this condition establishes a seasonal restriction to protect winter flounder and diadromous finfish located within the Thames River. Ms.

Urban’s email indicated that the Navy’s authorized work needs to be completed prior to the commencement of authorized dredging in the immediate vicinity of the existing UEMMS system to conducted by Electric Boat. As noted in the original application materials, the installation methodology included using a jet-plow with jetting arms and diver-assisted means which is anticipated to result in minimal turbidity. Based on a May 4, 2022 conversation with DEEP Fisheries Division, the authorized work can occur within the aforementioned time of year restriction and is not anticipated to result in long-term adverse impacts to spawning winter flounder and diadromous finfish.

Based on a review of the file and the information provided, the requested modifications are hereby approved as a de minimis change.

All other terms and conditions of the above-referenced authorization shall remain in full force and effect.

May 4, 2022 mailto:micheal.grzywinski@ct.gov mailto:michael.j.brown644.civ@us.navy.mil mailto:jane.m.urban.civ@us.navy.mil mailto:bruce.williams@ct.gov mailto:David.Carey@ct.gov mailto:harbormaster@cityofgroton-ct.gov mailto:crockerd64@gmail.com

File details come from the government source that posted it. Updated .