N40085-22-R-2691 Amendment 0005.pdf

PDF 185 KB Posted

Attached to
N40085-22-R-2691 P-828 SMART ENERGY, NAVAL STATION GREAT LAKES, GREAT LAKES, IL
Solicitation number
N4008522R2691
Issued by

About this file

This document is an amendment to a solicitation for construction services. The amendment extends the period of performance for contract N40085-22-R-2691 from 480 to 720 days to complete renovations for a smart energy project at Naval Station Great Lakes in Illinois. The Navy Facilities Engineering Command issued the solicitation and is seeking offers due by August 18th, 2022 for electrical upgrades and energy efficiency improvements at the facility.

View the file

Other files

File Type Posted
N40085-22-R-2691 Amendment 0007.pdf PDF
N40085-22-R-2691 Amendment 0006.pdf PDF
N40085-22-R-2691 Amendment 0004.pdf PDF
SCADA DATABASE FOR P828 8-9-22.xlsx XLSX spreadsheet
2022-04-14 SCADA PLCs.xlsx XLSX spreadsheet
Attachment E - Price Proposal Form_REV1.pdf PDF
SCADA COMPLETE DATABASE 8-9-22.xlsx XLSX spreadsheet
N40085-22-R-2691 Amendment 0003.pdf PDF
N40085-22-R-2691 Amendment 0002.pdf PDF
N40085-22-R-2691 Amendment 0001.pdf PDF
N0085-22-R-2691_1609936spc01of01.pdf PDF
Attachment F- PIEE Vendor Access Instructions.pdf PDF
N40085-22-R-2691_P-828S_1.PDF PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
N40085-22-R-2691_RODDIN_1.PDF PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
N40085-22-R-2691_NAVALS_1.PDF PDF
N40085-22-R-2691_TRANSM_1.PDF PDF
Attachment D - Small Business Subcontracting Plan.doc DOC document
Attachment E - Price Proposal Form.docx DOCX document
N40085-22-R-2691_NSGLLU_1.PDF PDF
N40085-22-R-2691_UTILIT_1.PDF PDF
N40085-22-R-2691 P828 Smart Energy Great Lakes IL.pdf PDF
N0085-22-R-2691_1609936dwg01of01.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-22-R-2691 P-828 SMART ENERGY, NAVAL STATION GREAT LAKES, GREAT LAKES, IL

Contract POC: Michelle Corsino, Email: michelle.a.corsino.civ@us.navy.mil; Phone: 757-341-0216

Secondary POC: Amanda Bricker, Email: amanda.l.bricker.civ@us.navy.mil; Phone: 757-341-2074

SEE SF 30 BLOCK 14 CONTINUATION PAGE.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522R2691

X 9B. DATED (SEE ITEM 11)

18-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2691

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of Amendment 0005 is to change the time of completion.

1. Time of Completion The contractor shall begin performance within 15 calendar days and complete it within 720 calendar days after receiving award.

SECTION 00010 - SOLICITATION CONTRACT FORM

The contractor period of performance end date has increased by 240 days from 480 days to 720 days.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 720 days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .