This solicitation seeks proposals for a smart energy project at Naval Station Great Lakes in Illinois. The Department of the Navy Naval Facilities Engineering Command is soliciting proposals for work on Project P-828, which involves installing smart energy infrastructure at the base. Proposals are due by the date specified in the solicitation document. All correspondence regarding this solicitation should be directed to the named contracting officer via email. The solicitation provides details on the required scope of work and terms for pricing, response, and award.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Report Submitted to
Jacobs Engineering
FOR
P-828 SMART ENERGY
Manhole Documentation and Conduit Viability
February 12, 2022 www.henkels.com
CENTRAL REGION | 975 CORPORATE BOULEVARD | AURORA, IL 60502 | 630-239-2000
PERFORMANCE has built our business…®
GREAT LAKES RODDING RFP JACOBS ENGINEERING
OWNER PROJECT
Table of Contents
GREAT LAKES NAVAL TRAINING CENTER
NSGL P-828 SMART ENERGY
DUCT RODDING INVESTIGATION FOR JACOBS
TABLE OF CONTENTS
I. PROJECT SUMMARY
II. AS-BUILT MANHOLE SUMMARY
III. MANHOLE AUDITS/REVIEWS
APPENDIX A - EAST CAMPUS FINAL ROUTE MAP
APPENDIX B - WEST CAMPUS FINAL ROUTE MAP
www.henkels.com
CENTRAL REGION | 975 CORPORATE BOULEVARD | AURORA, IL 60502 | 630-239-2000
PERFORMANCE has built our business…®
GREAT LAKES RODDING RFP JACOBS ENGINEERING
OWNER PROJECT
Summary
GREAT LAKES NAVAL TRAINING CENTER NSGL
P-828 SMART ENERGY
DUCT RODDING INVESTIGATION FOR JACOBS
SCOPE:
To proof and rope one existing duct from Building 621 to Building 68 with stops along the way at Buildings 236, 26 and 190 on the East Campus and from a manhole (C300) on the south side of Buckley Road to Building 1506 on the West Campus.
DURATION:
Work began on the Project on 10-22-21 and completed on 11-22-21.
STATUS/RESULTS:
A viable duct route was found from end to end with the following exceptions. These exceptions also noted on the Final Route Plans;
• From MH L254/C254 into Building 621
• From MH L38 to L19/C19. Reroute south to L37 and L34 also blocked.
• From MH L20 into Building 236
• From MH C57 into Building 26. An alternate route was found from MH C55 into Building 26.
• From MH 56A and C56a
• From MH C86 to C100
• From MH L289 to Building 190
• From L149 to C149
• From 149 to 148
• From C125 to C46e
• From C83 to C84 (alternate route found)
• From HHC80b to Building 1506
AS‐BUILT MANHOLE SUMMARY PAGE 1
Conducted on Location MH No.
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
EAST CAMPUS
BLDG 621
2021‐10‐28T16:01:52Z
2210 Paul Jones St North Chicago IL 60088 United States (42.31876864224367, ‐87.8354113185666)
C254 2059355.428 1119205.755 668.387 Yes Water Yes
2021‐10‐28T14:43:26Z
2210 Paul Jones St North Chicago IL 60088 United States (42.31894823281337, ‐87.83613781501083)
L253 2059351.132 1118902.764 665.888 Yes Water
4’ of water 45 mins of pumping
Yes Yes 14” of sludge 8’ 4’ 8’
2021‐10‐28T13:46:17Z
2210 Paul Jones St North Chicago IL 60088 United States (42.31914812482902, ‐87.8362192260235)
C245 2059349.133 1118562.113 657.112 Yes Good No No 6’ 6’ 91”
2021‐10‐22T16:34:45Z
406 Cluverius Ave North Chicago IL 60088 United States (42.31901872890417, ‐87.83640996625871)
L244 2059345.025 1118309.945 653.829 Yes Good No No 6’ 6’ 6’ 9”
2021‐10‐22T14:24:10Z
408–410 Cluverius Ave North Chicago IL 60088 United States (42.31911567311364, ‐87.83704035638601)
L243 2058986.145 1118301.06 654.429 Yes Water
2.5 feet of water with leaves
Yes No 6’ 4’ 7’
2021‐10‐22T17:33:22Z
427–451 Cluverius Ave North Chicago IL 60088 United States (42.31892526410788, ‐87.83850537384637)
L242 2058640.553 1118300.687 653.929 Yes Water Yes No 6’ 6’ 7’ 9”
2021‐10‐26T12:49:30Z
427–451 Cluverius Ave North Chicago IL 60088 United States (42.31894866015796, ‐87.83859951328235)
L241 2058636.838 1118065.475 650.299 Yes Water Yes 4 feet of water
No 7.5’ 6’ 105”
2021‐10‐26T13:36:06Z
1901–2057 Luce Blvd North Chicago IL 60088 United States (42.31866548705677, ‐87.83827579440519)
L240 2058648.537 1117815.06 647.511 Yes Water Yes No 9.5’ 6’ 100”
2021‐10‐26T17:29:22Z 264–268 Clark Ave North Chicago IL 60088 United States (42.316267519517666, ‐87.83885064829502)
L191 2058472.888 1117808.559 647.905 Yes uctural Dama
Walls broke out+ the lids are bent
No No 9’ 4’ 50”
AS‐BUILT MANHOLE SUMMARY PAGE 2
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐10‐26T18:09:51Z
Clark Ave North Chicago IL 60088 United States (42.31603767011239, ‐87.83930063830344)
L38 2058259.242 1117808.036 649.131 Yes Good No No 4’ 5’ 5’
No connection between L38 and C19/L19
2021‐10‐27T15:36:17Z
415 Clark Ave North Chicago IL 60088 United States (42.31612651567438, ‐87.84139607802449)
C19 2058238.645 1117252.942 646.583 Yes Good No No 6’ 4’ 4’
2021‐10‐27T15:19:31Z
2220 Isherwood Ave North Chicago IL 60088 United States (42.31560780351345, ‐87.84133412513212)
L20 2058325.931 1117901.991 674.506 Yes Good No 3” of water No 4’ 4’ 4’
No clear access found between L20 and Bldg 236
2021‐10‐27T16:39:52Z
2331 Isherwood Ave North Chicago IL 60088 United States (42.31463163615663, ‐87.84137810160438)
HH 2057620.262 1117284.776 648.431 Yes Good No No 3’ 3’ 3’
2021‐10‐27T17:21:49Z
326–330 Sampson St North Chicago IL 60088 United States (42.31477068975516, ‐87.83967270341611)
C33 2057584.111 1117821.987 648.884 N/A Water Yes
5’ of water 45 mins of pumping
No 6 50” 7’
2021‐10‐28T18:45:16Z
169–183 Bronson Ave North Chicago IL 60088 United States (42.31453276661819, ‐87.83976143474982)
C31 2057483.599 1117808.903 649.128 Yes Water Yes No
2021‐10‐29T13:27:59Z
36–98 Porter St North Chicago IL 60088 United States (42.3135874607063, ‐87.83949438490703)
C30a 2057240.707 1117824.582 647.525 Yes Water Yes 5’ of water 30 mins of pumping
No 7.5’ 5’ 9’
2021‐10‐29T14:33:33Z
161–167 Dewey Ave North Chicago IL 60088 United States (42.31296760117629, ‐87.83887437156451)
C9 2057588.808 1117665.087 656.853 Yes Water 6’ of water 30 mins of pumping
Yes No 10’ 6’ 8
2021‐10‐29T17:07:06Z
530 Farragut Ave North Chicago IL 60088 United States (42.312462906972776, ‐87.84126709692411)
C10 2056982.402 1117670.301 647.056 Yes Water Yes 3’ of water No 7’ 5’ 8’10”
2021‐10‐29T18:11:54Z
530 Farragut Ave North Chicago IL 60088 United States (42.31213337325106, ‐87.84101613946281)
C53 2056840.983 1117527.549 647.301 Yes Water Yes No 7’ 5’ 9’
AS‐BUILT MANHOLE SUMMARY PAGE 3
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐10‐29T18:13:43Z
530 Farragut Ave North Chicago IL 60088 United States (42.31239882195865, ‐87.84115605735737)
C57 2056755.457 1117526.88 646.466 Yes Good No 2” of water
No 7’ 5’ 9.5
No connection between C57 West to Bldg 26
2021‐11‐11T13:41:58Z HH btwn C55
& C57
2056674.037 1117522.729 649.302 No Good No No 7’ 5:5’ 5.5’
2021‐10‐30T16:33:47Z
160–166 Dewey Ave North Chicago IL 60088 United States (42.31266583948378, ‐87.83903292281005)
C55 2056620.449 1117523.954 646.847 Yes Water 2’ of water Yes No 6’ 6’ 102”
2021‐10‐30T16:37:54Z
356–398 Dewey Ave North Chicago IL 60088 United States (42.31251609274619, ‐87.84057140802052)
C56 2056481.19 1117523.815 647.136 Yes Water
4’ of water 20 mins of pumping
Yes No 7’ 5’ 106”
2021‐10‐30T18:41:27Z
160–166 Dewey Ave North Chicago IL 60088 United States (42.312544336255726, ‐87.83878976493479)
C56a 2056419.525 1117616.235 647.031 Yes Water Yes No 7’ 5’ 7.5
2021‐11‐11T15:44:17Z
158–164 Decatur Ave North Chicago IL 60044 United States (42.31167180298136, ‐87.83976395108881)
56A 2056412.612 1117585.81 647.218 Yes Good No No 5’ 5’ 5’
2021‐11‐01T12:54:57Z
325–359 Decatur Ave North Chicago IL 60044 United States (42.31130721295559, ‐87.8406077957118)
C78 2056235.784 1117672.024 646.473 Yes Good No No 4.5’ 4’ 5’
2021‐11‐01T15:31:04Z
106–110 Barry Rd North Chicago IL 60044 United States (42.31116092355806, ‐87.83965224184624)
C79 2056142.075 1117576.854 644.085 Yes Good No No 4’ 4’ 4’
2021‐11‐01T16:57:29Z
106–110 Barry Rd North Chicago IL 60044 United States (42.311163131982745, ‐87.83962824290991)
JB‐E
(east side of bridge)
2055989.63 1117468.763 623.937 Yes Good
Junction box N/A No 2’ 2 1’
2021‐11‐01T17:07:44Z
176–184 Decatur Ave North Chicago IL 60044 United States (42.31133259927476, ‐87.84088789874161)
JB‐W
(west side of bridge)
2055879.122 1117332.851 656.22 Yes Good N/A
Junction box No 2’ 2’ 1’
AS‐BUILT MANHOLE SUMMARY PAGE 4
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐11‐01T17:17:08Z
616 Barry Rd North Chicago IL 60088 United States (42.30924671777413, ‐87.84422368070449)
C83 2055832.078 1117314.68 639.628 Yes Good No No 4’ 4’ 4’
2021‐11‐01T18:01:21Z
107–115 Barry Rd North Chicago IL 60044 United States (42.310921323425376, ‐87.8402431459729)
C85 2055794.287 1117102.597 648.909 Yes Good No No 4’ 4’ 4’
2021‐11‐01T18:13:35Z
616 Barry Rd North Chicago IL 60088 United States (42.30986807404153, ‐87.84376263986948)
C85a 2055666.177 1117037.512 646.879 Yes Good No No 4’ 4’ 4’
2021‐11‐01T18:24:36Z
616 Barry Rd North Chicago IL 60088 United States (42.30934452177046, ‐87.84363991355858)
C86 2055666.346 1116978.543 647.068 Yes Good No 2” of water
No 4’ 4’ 4’
2021‐11‐22T15:02:33Z
Buckley Rd North Chicago IL 60044 United States (42.30807392886826, ‐87.84500089864285)
99/C99 2055231.031 1116978.631 644.991 Yes Good No No 5’ 4’ 4’
2021‐11‐08T19:01:49Z
190–198 Bassett Ave North Chicago IL 60044 United States (42.30810266283464, ‐87.8444223668269)
C100 2055238.447 1116709.479 647.421 Yes Water Yes No 4’ 4’ 7.5’
Building 190 No connection between Building 190 and L289
SWGR Location Btwn Bldg 190 and L289 SWGR 2054932.006 1116541.261 650.183
2021‐11‐02T12:11:15Z
3068–3096 Sheridan Rd North Chicago IL 60088 United States (42.30724713959559, ‐87.84564963356941)
L289 2054700.505 1116426.296 646.817 Yes Water Yes No 6’ 6’ 93”
2021‐11‐02T13:02:13Z
D St North Chicago IL 60044 United States (42.306670375465586, ‐87.84523909536989)
L288 2054631.232 1116319.74 647.632 Yes Water Yes No 6’ 6’ 101”
2021‐11‐06T12:50:05Z
3000 Sheridan Rd North Chicago IL 60044 United States (42.306868976231215, ‐87.84666034670451)
L160 2054619.707 1116140.568 647.784 Yes Water Yes No 7’ 7’ 7’
2021‐11‐05T16:45:36Z
3000 Sheridan Rd North Chicago IL 60044 United States (42.30674970824731, ‐87.8464488243882)
L159a/C159a 2054472.354 1116117.069 647.295 Yes Good No No 4’ 4’ 4’
AS‐BUILT MANHOLE SUMMARY PAGE 5
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
Across Sheridan
2021‐11‐06T16:38:06Z
3000 Sheridan Rd North Chicago IL 60044 United States (42.306951528393256, ‐87.8467682109212)
D161 2054546.756 1115972.583 649.536 Yes Water Yes No 4’ 4’ 5’
2021‐11‐06T18:09:07Z
Ninth Ave North Chicago IL 60088 United States (42.30668197244708, ‐87.84730153382488)
C162 2054604.659 1115855.736 649.641 Yes Water Yes No 4’ 4’ 8’
2021‐11‐08T13:50:46Z
Ninth Ave North Chicago IL 60088 United States (42.3071760982225, ‐87.84812635990224)
C330 2054631.900 1115737.662 650.041 Yes Water Yes No 6’ 5’ 6’
2021‐11‐08T13:52:20Z
Ninth Ave North Chicago IL 60088 United States (42.30703390548291, ‐87.84878635996543)
C331 2054618.022 1115726.130 652.230 Yes Water Yes No 12’ 6’ 12.5’
Return To East Campus
2021‐11‐05T17:55:59Z
1993–1995 Sheridan Rd North Chicago IL 60088 United States (42.305762614079285, ‐87.84552682166475)
L159 2054472.431 1116223.191 647.926 Yes Good No No 5’ 4’ 5’
21 Dec 2021 11:02 CST
1995 Sheridan Rd North Chicago IL 60044 United States (42.30499841020296, ‐87.84518046072405)
C158 2054470.408 1116319.396 647.983 Yes Water Yes No 7' 4' 7'
2021‐11‐22T20:01:10Z
1995 Sheridan Rd North Chicago IL 60044 United States (42.30518304748325, ‐87.84506178747853)
C156 Yes Good No No 4’ 4’ 4’
21 Dec 2021 11:40 CST
127–177 Second St North Chicago IL 60044 United States (42.30582117712889, ‐87.84362569180742)
C157 2054468.232 1116575.434 647.243 Yes Water Yes No 7' 4' 7'
2021‐11‐06T14:00:59Z
127–177 Second St North Chicago IL 60044 United States (42.30582311332192, ‐87.84358871619555)
153 2054471.287 1116674.608 647.152 Yes Good No No 4’ 3’ 4’
2021‐11‐06T15:37:31Z
127–177 Second St North Chicago IL 60044 United States (42.30589281412289, ‐87.84363199366895)
Manhole in sidewalk of school connecting manhole C154 and 153
2054461.682 1116656.072 646.67 No Water Yes No 7’ 7’ 8’
No GPS Signal Available in Building
AS‐BUILT MANHOLE SUMMARY PAGE 6
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐11‐02T13:39:49Z
D St North Chicago IL 60088 United States (42.306351251443814, ‐87.84555286658158)
C154 2054645.031 1116672.902 645.982 Yes Water Yes No 6’ 6’ 8’
2021‐11‐02T13:37:33Z
D St North Chicago IL 60044 United States (42.30601842691811, ‐87.84330844962422)
C149 2054645.595 1116950.346 644.882 Yes Water Yes No 8’ 6’ 10’
2021‐11‐02T15:42:15Z
D St North Chicago IL 60044 United States (42.30622875523351, ‐87.84290682994902)
L149 2054639.72 1116950.542 645.072 Yes Water Yes No 8’ 5’ 112”
2021‐11‐02T14:27:31Z
D St North Chicago IL 60044 United States (42.305969202602355, ‐87.84274450791025)
C148 2054612.642 1117225.725 645.005 Yes Water Yes No 12’ 6’ 9.5’
2021‐11‐02T16:39:59Z
224–232 E St North Chicago IL 60044 United States (42.305810819485394, ‐87.83574426985577)
JB1
Under the west side of the bridge
No Good N/A No 44” 44” 23”
2021‐11‐02T16:51:59Z
Fourth St North Chicago IL 60044 United States (42.30798896936143, ‐87.84023023997084)
L143 2054629.503 1117576.967 646.142 Yes Good No No 9’ 3.5’ 5’
2021‐11‐03T13:19:13Z
224–232 E St North Chicago IL 60044 United States (42.306004140421564, ‐87.83559317209888)
C134a 2054633.158 1117749.356 648.011 Yes Good No No 4’ 4’ 6’
2021‐11‐03T12:22:35Z
200–298 Tenth St North Chicago IL 60044 United States (42.305814728969054, ‐87.83536763210851)
C134, connected to
L134
2054632.611 1117908.307 649.102 Yes Water Yes No 3’ 3’ 5’
2021‐11‐04T15:07:19Z
100–198 Ninth St North Chicago IL 60044 United States (42.30663469478865, ‐87.83590446091365)
L134, connected to
C134
2054629.573 1117911.479 649.065 Yes Good No No 4’ 4’ 5’
2021‐11‐04T16:11:41Z
224–232 E St North Chicago IL 60044 United States (42.30591373462444, ‐87.83548119748932)
L133 2054859.81 1117911.379 650.422 Yes Good No No 4’ 4’ 6’
No GPS Signal Available Under Bridge
AS‐BUILT MANHOLE SUMMARY PAGE 7
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐11‐04T17:16:24Z
100–198 Ninth St North Chicago IL 60044 United States (42.30662187112826, ‐87.83621901541554)
L132 2055036.6 1117912.564 650.544 Yes Good No No 4’ 4’ 5’
2021‐11‐04T17:33:30Z
Eighth St North Chicago IL 60044 United States (42.30686823079853, ‐87.83655615052238)
L130 2055273.854 1117914.744 650.266 Yes Good No No
Some sludge on bottom about one inch
7’ 7’ 6.5’
2021‐11‐04T17:56:23Z
43–73 B St North Chicago IL 60044 United States (42.3076754134407, ‐87.8378911192897)
L128b or L127 2055422.252 1117998.229 651.358 No Water Yes No 5’ 5’ 9’
2021‐11‐04T19:25:37Z
Sampson St North Chicago IL 60044 United States (42.30810623162639, ‐87.83848142397589)
L128b right before bridge connecting into the manhole 52’ to the southwest
2055465.452 1118029.638 650.434 No Good No No 4’ 4’ 5’
2021‐11‐05T13:58:55Z
Downes Dr North Chicago IL 60088 United States (42.3104740139269, ‐87.83849129594208)
C126 2055821.424 1118030.442 648.978 Yes Good No No 4’ 4’ 6’
No connection to C124 from L126
2021‐11‐05T14:19:54Z
2730 Sampson Rd North Chicago IL 60088 United States (42.31065756876259, ‐87.83939294152111)
C125 2056171.506 1117849.241 646.877 Yes Good No No 4’ 4’ 5’
No connection to C124 from C125
3 Nov 2021 12:10 CDT
161–167 Dewey Ave North Chicago IL 60088 United States (42.31295907990551, ‐87.83872227562429)
C124 2056272.558 1117900.428 647.083 Yes Water Yes No 4' 3' 4'
No connection to C64e from C124
2021‐11‐03T16:55:45Z
160–166 Dewey Ave North Chicago IL 60088 United States (42.312295481733216, ‐87.83876315118113)
C64e 2056674.706 1117882.811 646.897 Yes Water Yes No 12’ 5’ 8’
2021‐11‐03T14:29:22Z
520 Dewey Ave North Chicago IL 60088 United States (42.31222711247631, ‐87.8362535714388)
C64g 2056684.539 1118456.058 650 Yes Water Yes No 6’ 3.5 7’
AS‐BUILT MANHOLE SUMMARY PAGE 8
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
2021‐11‐03T14:16:12Z
76–94 Decatur Ave North Chicago IL 60088 United States (42.3117446118612, ‐87.83663848198526)
C64h 2056671.307 1119031.706 653.197 Yes Water Yes No
2021‐11‐09T18:58:20Z
315 Decatur Ave North Chicago IL 60088 United States (42.31132091887563, ‐87.83596370330733)
HH
NW Corner of Building 68
2056266.852 1118913.095 655.917 No Good No No 4’ 3’ 3’
AS‐BUILT MANHOLE SUMMARY PAGE 9
Northing
(in US Survey Feet)
Easting (in US Survey
Feet)
Elevation (in US Survey
Feet)
MH Location Consistent with Plan?
MH
Condition at Entry
Opening Comments
Dewatering Required?
Dewatering Notes
Is Cleaning of Dirt
Necessary?
Cleaning Comments
MH
Length
MH
Width
MH
Depth
WEST CAMPUS
2021‐11‐15T14:11:22Z
3120 Illinois St North Chicago IL 60088 United States (42.30793230817717, ‐87.85044716148589)
D34a (connected to C300 thru existing core)
2055303.930 1114666.486 663.680 Yes Water Yes No 9’ 6’ 8.5’
2021‐11‐13T18:25:00Z
1400–1422 Buckley Rd North Chicago IL 60088 United States (42.30869794668213, ‐87.85090317956369)
D87 2055594.979 1114664.134 667.148 Yes Good No No 8’ 6’ 7’
2021‐11‐13T17:04:42Z
Buckley Rd North Chicago IL 60088 United States (42.30890356727109, ‐87.851934414231)
D86 2055727.072 1114753.730 662.715 Yes Water Yes No 8’ 8’ 7’
2021‐11‐13T16:47:18Z
2705 Kansas St North Chicago IL 60088 United States (42.310347005025065, ‐87.85106631277047)
D85 2056030.342 1114709.974 661.849 Yes Water Yes No 8’ 6’ 9’
2021‐11‐13T14:37:49Z
4105 Nautilus Ct North Chicago IL 60088 United States (42.31189917909853, ‐87.85384893156046)
D84 2056332.563 1114706.348 661.721 Yes Water Yes No 8’ 5’ 7’
2021‐11‐13T15:39:49Z
4102 Nautilus Ct North Chicago IL 60088 United States (42.312518096652816, ‐87.8526831372098)
D83 (Connected to C83. Cross over to C83 to continue to
C80)
2056786.932 1114709.761 660.104 Yes Good Yes No 8’ 6’ 8’
2021‐11‐13T13:58:29Z
Ray St North Chicago IL 60088 United States (42.3123863260465, ‐87.85248014416113)
C83 (Connected to D83. Continue to C80)
2056791.804 1114704.990 660.104 Yes Water Yes No 5’ 4’ 6.5’
2021‐11‐15T15:37:01Z
4110 Seawolf Pl North Chicago IL 60088 United States (42.31296150630052, ‐87.85303837687445)
C80 2056936.351 1114716.017 659.592 Yes Water Yes No 6.5’ 5’ 6.5’
2021‐11‐08T17:25:35Z
4118 Shark Ct North Chicago IL 60088 United States (42.3141472709878, ‐87.85289530851496)
C80a 2056982.880 1114994.484 657.466 Yes Good No No 8’ 6’ 9’
2021‐11‐08T16:23:28Z
4114 Skate Ct North Chicago IL 60088 United States (42.31369022494327, ‐87.85336237199286)
HH C80b 2057258.453 1114995.039 655.461 Yes Water Yes Yes Vac truck 5’ 5’ 5’
No connection found into Building 1506
37.5% 0 0
Manhole Documentation and Conduit Viability 28 Oct 2021 / Christopher Sisk Incomplete
Score Failed items Actions
Project P828 to finish need access to building
Customer Jacobs
Conducted on 28 Oct 2021 11:01 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088
United States (42.31876864224367, -
87.8354113185666)
Manhole Number C254
Private & Confidential 1/4
Inspection 37.5%
Manhole Location 66.67%
Has the manhole location been GPS surveyed? N/A
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? No
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 25%
What is the condition of the manhole at the time of opening? Water
Please provide pictures showing the conditions of the manhole at the time of opening.
Is dewatering required? Yes
Is dewatering completed?
Is clearing of dirt necessary?
Are other cleaning requirements needed?
Manhole Dimensions
What is the length of the manhole?
What is the width of the manhole?
What is the depth of the manhole?
Interior Photos of Manhole
Please provide interior photos of the manhole.
Butterfly Diagram
Private & Confidential 2/4
Please annotate the butterfly diagram below.
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Photos of Building and Room (If Applicable)
Where is the building penetration location?
Please provide interior photos of room.
What is the building number?
What is the room number?
Please provide notes if necessary.
Field Determination 0%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed?
Sign Off
Field Engineer
Construction Manager
Private & Confidential 3/4
Appendix
Photo 1
Private & Confidential 4/4
90% 0 0
28 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 28 Oct 2021 09:43 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088
United States (42.31894823281337, -
87.83613781501083)
Manhole Number L253
Private & Confidential 1/7
Inspection 90%
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? No
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 100%
What is the condition of the manhole at the time of opening? Water
4’ of water 45 mins of pumping
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2
Is dewatering required? Yes
Is dewatering completed? Yes
14” of sludge on bottom remaining
Photo 3
Is clearing of dirt necessary? Yes
Private & Confidential 2/7
14” of sludge
Are other cleaning requirements needed? Yes
Please specify other cleaning requirements. Vac truck
Manhole Dimensions
What is the length of the manhole? 8’
What is the width of the manhole? 4’
What is the depth of the manhole? 8’
7’ of head room
Interior Photos of Manhole
Please provide interior photos of the manhole.
No ducts going north
Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9
Photo 10 Photo 11
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Photos of Building and Room (If Applicable)
Where is the building penetration location?
Please provide interior photos of room.
Private & Confidential 3/7
What is the building number?
What is the room number?
Please provide notes if necessary.
Field Determination 100%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
21 going west 23 going east
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 302’ going east 332’ going west
Sign Off
Field Engineer
Chris sisk 28 Oct 2021 10:59 CDT
Construction Manager
Tom Stangel 28 Oct 2021 10:59 CDT
Private & Confidential 4/7
Photo 3
Photo 2
Photo 4
Private & Confidential 5/7
Photo 5
Photo 7
Photo 6
Photo 8
Private & Confidential 6/7
Photo 9
Photo 11
Photo 10
Private & Confidential 7/7
55.56% 0 0
28 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 28 Oct 2021 08:46 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088
United States (42.31914812482902, -
87.8362192260235)
Manhole Number C245
Private & Confidential 1/6
Inspection 55.56%
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? No
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 0%
What is the condition of the manhole at the time of opening? Good
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2 Photo 3
Is dewatering required? No
Photo 4
Is clearing of dirt necessary? No
Are other cleaning requirements needed? No
Manhole Dimensions
Private & Confidential 2/6
What is the length of the manhole? 6’
What is the width of the manhole? 6’
What is the depth of the manhole? 91”
75” of head room
Interior Photos of Manhole
Please provide interior photos of the manhole.
Proofed 23 going east Proofed 11 going west
Photo 5 Photo 6 Photo 7 Photo 8
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Where is the building penetration location?
Please provide interior photos of room.
What is the building number?
What is the room number?
Please provide notes if necessary.
Field Determination 100%
Private & Confidential 3/6
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 332’ going east in 23– 250’ going west in 11
Sign Off
Field Engineer
Chris sisk 28 Oct 2021 09:36 CDT
Construction Manager
Tom Stangel 28 Oct 2021 09:36 CDT
Private & Confidential 4/6
Photo 2
Private & Confidential 5/6
Photo 6
Private & Confidential 6/6
70% 0 0
22 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P 828
Customer Jacobs
Conducted on 22 Oct 2021 11:34 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 406 Cluverius Ave North Chicago IL 60088
United States (42.31901872890417, -
87.83640996625871)
Manhole Number L244
Inspection 70%
Manhole Location 100%
Has the manhole location been GPS surveyed? Yes
Was the North American Vertical Datum of 1988 (NAVD88) used? N/A
Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?
N/A
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 0%
What is the condition of the manhole at the time of opening? Good
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2 Photo 3
Is dewatering required? No
Photo 4
Is clearing of dirt necessary? No
Are other cleaning requirements needed? No
What is the length of the manhole? 6’
What is the width of the manhole? 6’
What is the depth of the manhole? 6’ 9”
Interior Photos of Manhole
Please provide interior photos of the manhole.
Nothing going west
Photo 5 Photo 6 Photo 7
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Where is the building penetration location?
Please provide interior photos of room.
None
What is the building number? None
What is the room number? None
Please provide notes if necessary.
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Only duct going south so far
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 363’ going south 250’ going east
Duct 11 going south Duct 12 going east proofed
Sign Off
Field Engineer
Chris Sisk 22 Oct 2021 11:44 CDT
Construction Manager
Tom Stangel 22 Oct 2021 11:44 CDT
Photo 2
Photo 6
81.82% 0 0
22 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P-828
Customer Jacobs
Conducted on 22 Oct 2021 09:24 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 408–410 Cluverius Ave North Chicago IL 60088
United States (42.31911567311364, -
87.83704035638601)
Manhole Number L243
Inspection 81.82%
Was the North American Vertical Datum of 1988 (NAVD88) used? N/A
Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?
N/A
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 50%
What is the condition of the manhole at the time of opening? Water
2.5 feet of water with leaves
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2
Is dewatering required? Yes
Is dewatering completed? Yes
Are other cleaning requirements needed? No
Manhole Dimensions
What is the length of the manhole? 6’
What is the width of the manhole? 4’
What is the depth of the manhole? 7’
Interior Photos of Manhole
Please provide interior photos of the manhole.
Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9
21 going south 12 going north
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Conduit
Conduit 1
Is this conduit open or used?
Where is the building penetration location?
No rooms
What is the building number? None
What is the room number? None
Please provide notes if necessary.
No building or rooms for this manhole
Field Determination 100%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Proofed with 2” mandrill in duct 12 looking north
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 363’
Sign Off
Field Engineer
Chris Sisk 22 Oct 2021 11:33 CDT
Construction Manager
Tom Stangel 22 Oct 2021 11:34 CDT
Photo 2
Photo 6
72.73% 0 0
22 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 22 Oct 2021 12:33 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 427–451 Cluverius Ave North Chicago IL 60088
United States (42.31892526410788, -
87.83850537384637)
Manhole Number L242
Inspection 72.73%
Manhole Location 75%
Has the manhole location been GPS surveyed? No
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 50%
What is the condition of the manhole at the time of opening? Water
Photo 2 Photo 3
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 4
Is dewatering required? Yes
Are other cleaning requirements needed? No
Manhole Dimensions
What is the length of the manhole? 6’
What is the width of the manhole? 6’
What is the depth of the manhole? 7’ 9”
Interior Photos of Manhole
Please provide interior photos of the manhole.
Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11
Photo 12
Duct 22 going North duct 22 going west
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
None
What is the building number? None
What is the room number? None
Please provide notes if necessary.
Field Determination 100%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 238’ going west 362’ going north
Sign Off
Field Engineer
Chris sisk 22 Oct 2021 13:04 CDT
Construction Manager
Tom Stangel 22 Oct 2021 13:05 CDT
Photo 2
Photo 6
Photo 10
Photo 12
80% 0 0
26 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 26 Oct 2021 07:49 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 427–451 Cluverius Ave North Chicago IL 60088
United States (42.31894866015796, -
87.83859951328235)
Manhole Number L241
Inspection 80%
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1 Photo 2
Manhole Condition 50%
What is the condition of the manhole at the time of opening? Water
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 3 Photo 4
Is dewatering required? Yes
4 feet of water
Is dewatering completed? Yes
Photo 5
What is the length of the manhole? 7.5’
What is the width of the manhole? 6’
What is the depth of the manhole? 105”
7’ of head room
Interior Photos of Manhole
Please provide interior photos of the manhole.
No ducts going south
Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Where is the building penetration location?
None
Please provide interior photos of room.
What is the building number?
N/a
What is the room number?
N/a
Please provide notes if necessary.
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Duct 22 going west Duct 21 going east
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 251’ going west 228’ going East
Sign Off
Field Engineer
Chris sisk 26 Oct 2021 10:26 CDT
Construction Manager
Tom Stangel 26 Oct 2021 10:26 CDT
Photo 2
Photo 6
81.82% 0 0
26 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 26 Oct 2021 08:36 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 1901–2057 Luce Blvd North Chicago IL 60088
United States (42.31866548705677, -
87.83827579440519)
Manhole Number L240
Inspection 81.82%
Was the North American Vertical Datum of 1988 (NAVD88) used? N/A
Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?
N/A
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 50%
What is the condition of the manhole at the time of opening? Water
Please provide pictures showing the conditions of the manhole at the time of opening.
3 feet of water
Photo 2
Is dewatering required? Yes
Are other cleaning requirements needed? No
Manhole Dimensions
What is the length of the manhole? 9.5’
What is the width of the manhole? 6’
What is the depth of the manhole? 100”
80” of head room
Interior Photos of Manhole
Please provide interior photos of the manhole.
Poured package in manhole going north and south
Photo 4 Photo 5 Photo 6 Photo 7 Photo 8
No ducts on the south wall but the package is poured.
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Photos of Building and Room (If Applicable)
Where is the building penetration location?
What is the room number?
Please provide notes if necessary.
Field Determination 100%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
No ducts going south just a package poured through manhole going north and south Someone broke into the package running through the manhole that connects to L191 so I was able to rod the bottom west duct of this package. With the package being poured in concrete I have no way to tell how many ducts are actually in this package
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 253’ going east and 182’ going south
Sign Off
Field Engineer
Chris sisk 26 Oct 2021 10:29 CDT
Construction Manager
Tom Stangel 26 Oct 2021 10:29 CDT
Photo 2
Photo 6
66.67% 0 0
26 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 26 Oct 2021 12:29 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 264–268 Clark Ave North Chicago IL 60088
United States (42.316267519517666, -
87.83885064829502)
Manhole Number L191
Private & Confidential 1/9
Inspection 66.67%
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 0%
What is the condition of the manhole at the time of opening? Structural Damage
Walls broke out+ the lids are bent
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7
Photo 8 Photo 9 Photo 10
Is dewatering required? No
Private & Confidential 2/9
Are other cleaning requirements needed? No
Manhole Dimensions
What is the length of the manhole? 9’
What is the width of the manhole? 4’
What is the depth of the manhole? 50”
Interior Photos of Manhole
Please provide interior photos of the manhole.
Photo 12 Photo 13 Photo 14 Photo 15 Photo 16 Photo 17
Photo 18 Photo 19
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Private & Confidential 3/9
What is the room number?
Please provide notes if necessary.
Field Determination 100%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed? Yes
Is conduit free and clear of obstructions for the P-828 cable? Yes
Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?
Yes
Proofed duct 22 going south and duct 12 going north
Note: Some locations have secondary buildings and will require additional conduit space.
What is the manhole to manhole conduit segment total footage length? 182’ going north 210’ going south
Sign Off
Field Engineer
Chris sisk 26 Oct 2021 13:01 CDT
Construction Manager
Tom Stangel 26 Oct 2021 13:01 CDT
Private & Confidential 4/9
Photo 2
Private & Confidential 5/9
Photo 6
Private & Confidential 6/9
Photo 10
Photo 12
Photo 14
Private & Confidential 7/9
Photo 13
Photo 15
Photo 16
Photo 18
Private & Confidential 8/9
Photo 17
Photo 19
Private & Confidential 9/9
42.86% 0 0
26 Oct 2021 / Christopher Sisk Incomplete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 26 Oct 2021 13:09 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) Clark Ave North Chicago IL 60088
United States (42.31603767011239, -
87.83930063830344)
Manhole Number L38
Inspection 42.86%
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Photo 1
Manhole Condition 0%
What is the condition of the manhole at the time of opening? Good
Please provide pictures showing the conditions of the manhole at the time of opening.
Photo 2
Is dewatering required? No
Photo 3
Is clearing of dirt necessary? No
Are other cleaning requirements needed? No
What is the length of the manhole? 4’
What is the width of the manhole? 5’
What is the depth of the manhole? 5’
Interior Photos of Manhole
Please provide interior photos of the manhole.
Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9
Photo 10 Photo 11
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Where is the building penetration location?
Please provide interior photos of room.
What is the building number?
What is the room number?
Please provide notes if necessary.
Field Determination 0%
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.
Was rodding completed?
Sign Off
Field Engineer
Photo 2
Photo 6
27 Oct 2021 / Christopher Sisk Complete
Score Failed items Actions
Project P828
Customer Jacobs
Conducted on 27 Oct 2021 10:36 CDT
Prepared by Christopher Sisk
Location (Mapping Grade) 415 Clark Ave North Chicago IL 60088
United States (42.31612651567438, -
87.84139607802449)
Manhole Number C19
Was the North American Vertical Datum of 1988 (NAVD88) used? N/A
Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?
N/A
Is the manhole location consistent with the manhole location shown on the drawings?
Yes
Is the manhole accessible to equipment? Yes
Is traffic control necessary? Yes
Exterior Photos of Manhole
Please provide photos of the manhole prior to opening.
Manhole Condition 0%
What is the condition of the manhole at the time of opening? Good
Please provide pictures showing the conditions of the manhole at the time of opening.
Double lid
Photo 1 Photo 2
Is dewatering required? No
Photo 3
Is clearing of dirt necessary? No
Are other cleaning requirements needed? No
What is the length of the manhole? 6’
What is the width of the manhole? 4’
What is the depth of the manhole? 4’
37” of head room
Interior Photos of Manhole
Please provide interior photos of the manhole.
Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9
Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.
Where is the building penetration location?
Please provide interior photos of room.
What is the building number?
What is the room number?
Please provide notes if necessary.
Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.
Note:
a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.
Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.
b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building).