This solicitation seeks proposals for a smart energy project at Naval Station Great Lakes in Illinois. The Department of the Navy Naval Facilities Engineering Command is soliciting proposals for work on Project P-828, which involves installing smart energy infrastructure at the base. Proposals are due by the date specified in the solicitation document. All correspondence regarding this solicitation should be directed to the named contracting officer via email. The solicitation provides details on the required scope of work and terms for pricing, response, and award.

View the file

Other files

File Type Posted
N40085-22-R-2691 Amendment 0007.pdf PDF
N40085-22-R-2691 Amendment 0006.pdf PDF
N40085-22-R-2691 Amendment 0005.pdf PDF
N40085-22-R-2691 Amendment 0004.pdf PDF
SCADA DATABASE FOR P828 8-9-22.xlsx XLSX spreadsheet
2022-04-14 SCADA PLCs.xlsx XLSX spreadsheet
Attachment E - Price Proposal Form_REV1.pdf PDF
SCADA COMPLETE DATABASE 8-9-22.xlsx XLSX spreadsheet
N40085-22-R-2691 Amendment 0003.pdf PDF
N40085-22-R-2691 Amendment 0002.pdf PDF
N40085-22-R-2691 Amendment 0001.pdf PDF
N0085-22-R-2691_1609936spc01of01.pdf PDF
Attachment F- PIEE Vendor Access Instructions.pdf PDF
N40085-22-R-2691_P-828S_1.PDF PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
N40085-22-R-2691_NAVALS_1.PDF PDF
N40085-22-R-2691_TRANSM_1.PDF PDF
Attachment D - Small Business Subcontracting Plan.doc DOC document
Attachment E - Price Proposal Form.docx DOCX document
N40085-22-R-2691_NSGLLU_1.PDF PDF
N40085-22-R-2691_UTILIT_1.PDF PDF
N40085-22-R-2691 P828 Smart Energy Great Lakes IL.pdf PDF
N0085-22-R-2691_1609936dwg01of01.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Report Submitted to

Jacobs Engineering

FOR

P-828 SMART ENERGY

Manhole Documentation and Conduit Viability

February 12, 2022 www.henkels.com

CENTRAL REGION | 975 CORPORATE BOULEVARD | AURORA, IL 60502 | 630-239-2000

PERFORMANCE has built our business…®

GREAT LAKES RODDING RFP JACOBS ENGINEERING

OWNER PROJECT

Table of Contents

GREAT LAKES NAVAL TRAINING CENTER

NSGL P-828 SMART ENERGY

DUCT RODDING INVESTIGATION FOR JACOBS

TABLE OF CONTENTS

I. PROJECT SUMMARY

II. AS-BUILT MANHOLE SUMMARY

III. MANHOLE AUDITS/REVIEWS

APPENDIX A - EAST CAMPUS FINAL ROUTE MAP

APPENDIX B - WEST CAMPUS FINAL ROUTE MAP

www.henkels.com

CENTRAL REGION | 975 CORPORATE BOULEVARD | AURORA, IL 60502 | 630-239-2000

PERFORMANCE has built our business…®

GREAT LAKES RODDING RFP JACOBS ENGINEERING

OWNER PROJECT

Summary

GREAT LAKES NAVAL TRAINING CENTER NSGL

P-828 SMART ENERGY

DUCT RODDING INVESTIGATION FOR JACOBS

SCOPE:

To proof and rope one existing duct from Building 621 to Building 68 with stops along the way at Buildings 236, 26 and 190 on the East Campus and from a manhole (C300) on the south side of Buckley Road to Building 1506 on the West Campus.

DURATION:

Work began on the Project on 10-22-21 and completed on 11-22-21.

STATUS/RESULTS:

A viable duct route was found from end to end with the following exceptions. These exceptions also noted on the Final Route Plans;

• From MH L254/C254 into Building 621

• From MH L38 to L19/C19. Reroute south to L37 and L34 also blocked.

• From MH L20 into Building 236

• From MH C57 into Building 26. An alternate route was found from MH C55 into Building 26.

• From MH 56A and C56a

• From MH C86 to C100

• From MH L289 to Building 190

• From L149 to C149

• From 149 to 148

• From C125 to C46e

• From C83 to C84 (alternate route found)

• From HHC80b to Building 1506

AS‐BUILT MANHOLE SUMMARY PAGE 1

Conducted on Location MH No.

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

EAST CAMPUS

BLDG 621

2021‐10‐28T16:01:52Z

2210 Paul Jones St North Chicago IL 60088 United States (42.31876864224367, ‐87.8354113185666)

C254 2059355.428 1119205.755 668.387 Yes Water Yes

2021‐10‐28T14:43:26Z

2210 Paul Jones St North Chicago IL 60088 United States (42.31894823281337, ‐87.83613781501083)

L253 2059351.132 1118902.764 665.888 Yes Water

4’ of water 45 mins of pumping

Yes Yes 14” of sludge 8’ 4’ 8’

2021‐10‐28T13:46:17Z

2210 Paul Jones St North Chicago IL 60088 United States (42.31914812482902, ‐87.8362192260235)

C245 2059349.133 1118562.113 657.112 Yes Good No No 6’ 6’ 91”

2021‐10‐22T16:34:45Z

406 Cluverius Ave North Chicago IL 60088 United States (42.31901872890417, ‐87.83640996625871)

L244 2059345.025 1118309.945 653.829 Yes Good No No 6’ 6’ 6’ 9”

2021‐10‐22T14:24:10Z

408–410 Cluverius Ave North Chicago IL 60088 United States (42.31911567311364, ‐87.83704035638601)

L243 2058986.145 1118301.06 654.429 Yes Water

2.5 feet of water with leaves

Yes No 6’ 4’ 7’

2021‐10‐22T17:33:22Z

427–451 Cluverius Ave North Chicago IL 60088 United States (42.31892526410788, ‐87.83850537384637)

L242 2058640.553 1118300.687 653.929 Yes Water Yes No 6’ 6’ 7’ 9”

2021‐10‐26T12:49:30Z

427–451 Cluverius Ave North Chicago IL 60088 United States (42.31894866015796, ‐87.83859951328235)

L241 2058636.838 1118065.475 650.299 Yes Water Yes 4 feet of water

No 7.5’ 6’ 105”

2021‐10‐26T13:36:06Z

1901–2057 Luce Blvd North Chicago IL 60088 United States (42.31866548705677, ‐87.83827579440519)

L240 2058648.537 1117815.06 647.511 Yes Water Yes No 9.5’ 6’ 100”

2021‐10‐26T17:29:22Z 264–268 Clark Ave North Chicago IL 60088 United States (42.316267519517666, ‐87.83885064829502)

L191 2058472.888 1117808.559 647.905 Yes uctural Dama

Walls broke out+ the lids are bent

No No 9’ 4’ 50”

AS‐BUILT MANHOLE SUMMARY PAGE 2

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐10‐26T18:09:51Z

Clark Ave North Chicago IL 60088 United States (42.31603767011239, ‐87.83930063830344)

L38 2058259.242 1117808.036 649.131 Yes Good No No 4’ 5’ 5’

No connection between L38 and C19/L19

2021‐10‐27T15:36:17Z

415 Clark Ave North Chicago IL 60088 United States (42.31612651567438, ‐87.84139607802449)

C19 2058238.645 1117252.942 646.583 Yes Good No No 6’ 4’ 4’

2021‐10‐27T15:19:31Z

2220 Isherwood Ave North Chicago IL 60088 United States (42.31560780351345, ‐87.84133412513212)

L20 2058325.931 1117901.991 674.506 Yes Good No 3” of water No 4’ 4’ 4’

No clear access found between L20 and Bldg 236

2021‐10‐27T16:39:52Z

2331 Isherwood Ave North Chicago IL 60088 United States (42.31463163615663, ‐87.84137810160438)

HH 2057620.262 1117284.776 648.431 Yes Good No No 3’ 3’ 3’

2021‐10‐27T17:21:49Z

326–330 Sampson St North Chicago IL 60088 United States (42.31477068975516, ‐87.83967270341611)

C33 2057584.111 1117821.987 648.884 N/A Water Yes

5’ of water 45 mins of pumping

No 6 50” 7’

2021‐10‐28T18:45:16Z

169–183 Bronson Ave North Chicago IL 60088 United States (42.31453276661819, ‐87.83976143474982)

C31 2057483.599 1117808.903 649.128 Yes Water Yes No

2021‐10‐29T13:27:59Z

36–98 Porter St North Chicago IL 60088 United States (42.3135874607063, ‐87.83949438490703)

C30a 2057240.707 1117824.582 647.525 Yes Water Yes 5’ of water 30 mins of pumping

No 7.5’ 5’ 9’

2021‐10‐29T14:33:33Z

161–167 Dewey Ave North Chicago IL 60088 United States (42.31296760117629, ‐87.83887437156451)

C9 2057588.808 1117665.087 656.853 Yes Water 6’ of water 30 mins of pumping

Yes No 10’ 6’ 8

2021‐10‐29T17:07:06Z

530 Farragut Ave North Chicago IL 60088 United States (42.312462906972776, ‐87.84126709692411)

C10 2056982.402 1117670.301 647.056 Yes Water Yes 3’ of water No 7’ 5’ 8’10”

2021‐10‐29T18:11:54Z

530 Farragut Ave North Chicago IL 60088 United States (42.31213337325106, ‐87.84101613946281)

C53 2056840.983 1117527.549 647.301 Yes Water Yes No 7’ 5’ 9’

AS‐BUILT MANHOLE SUMMARY PAGE 3

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐10‐29T18:13:43Z

530 Farragut Ave North Chicago IL 60088 United States (42.31239882195865, ‐87.84115605735737)

C57 2056755.457 1117526.88 646.466 Yes Good No 2” of water

No 7’ 5’ 9.5

No connection between C57 West to Bldg 26

2021‐11‐11T13:41:58Z HH btwn C55

& C57

2056674.037 1117522.729 649.302 No Good No No 7’ 5:5’ 5.5’

2021‐10‐30T16:33:47Z

160–166 Dewey Ave North Chicago IL 60088 United States (42.31266583948378, ‐87.83903292281005)

C55 2056620.449 1117523.954 646.847 Yes Water 2’ of water Yes No 6’ 6’ 102”

2021‐10‐30T16:37:54Z

356–398 Dewey Ave North Chicago IL 60088 United States (42.31251609274619, ‐87.84057140802052)

C56 2056481.19 1117523.815 647.136 Yes Water

4’ of water 20 mins of pumping

Yes No 7’ 5’ 106”

2021‐10‐30T18:41:27Z

160–166 Dewey Ave North Chicago IL 60088 United States (42.312544336255726, ‐87.83878976493479)

C56a 2056419.525 1117616.235 647.031 Yes Water Yes No 7’ 5’ 7.5

2021‐11‐11T15:44:17Z

158–164 Decatur Ave North Chicago IL 60044 United States (42.31167180298136, ‐87.83976395108881)

56A 2056412.612 1117585.81 647.218 Yes Good No No 5’ 5’ 5’

2021‐11‐01T12:54:57Z

325–359 Decatur Ave North Chicago IL 60044 United States (42.31130721295559, ‐87.8406077957118)

C78 2056235.784 1117672.024 646.473 Yes Good No No 4.5’ 4’ 5’

2021‐11‐01T15:31:04Z

106–110 Barry Rd North Chicago IL 60044 United States (42.31116092355806, ‐87.83965224184624)

C79 2056142.075 1117576.854 644.085 Yes Good No No 4’ 4’ 4’

2021‐11‐01T16:57:29Z

106–110 Barry Rd North Chicago IL 60044 United States (42.311163131982745, ‐87.83962824290991)

JB‐E

(east side of bridge)

2055989.63 1117468.763 623.937 Yes Good

Junction box N/A No 2’ 2 1’

2021‐11‐01T17:07:44Z

176–184 Decatur Ave North Chicago IL 60044 United States (42.31133259927476, ‐87.84088789874161)

JB‐W

(west side of bridge)

2055879.122 1117332.851 656.22 Yes Good N/A

Junction box No 2’ 2’ 1’

AS‐BUILT MANHOLE SUMMARY PAGE 4

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐11‐01T17:17:08Z

616 Barry Rd North Chicago IL 60088 United States (42.30924671777413, ‐87.84422368070449)

C83 2055832.078 1117314.68 639.628 Yes Good No No 4’ 4’ 4’

2021‐11‐01T18:01:21Z

107–115 Barry Rd North Chicago IL 60044 United States (42.310921323425376, ‐87.8402431459729)

C85 2055794.287 1117102.597 648.909 Yes Good No No 4’ 4’ 4’

2021‐11‐01T18:13:35Z

616 Barry Rd North Chicago IL 60088 United States (42.30986807404153, ‐87.84376263986948)

C85a 2055666.177 1117037.512 646.879 Yes Good No No 4’ 4’ 4’

2021‐11‐01T18:24:36Z

616 Barry Rd North Chicago IL 60088 United States (42.30934452177046, ‐87.84363991355858)

C86 2055666.346 1116978.543 647.068 Yes Good No 2” of water

No 4’ 4’ 4’

2021‐11‐22T15:02:33Z

Buckley Rd North Chicago IL 60044 United States (42.30807392886826, ‐87.84500089864285)

99/C99 2055231.031 1116978.631 644.991 Yes Good No No 5’ 4’ 4’

2021‐11‐08T19:01:49Z

190–198 Bassett Ave North Chicago IL 60044 United States (42.30810266283464, ‐87.8444223668269)

C100 2055238.447 1116709.479 647.421 Yes Water Yes No 4’ 4’ 7.5’

Building 190 No connection between Building 190 and L289

SWGR Location Btwn Bldg 190 and L289 SWGR 2054932.006 1116541.261 650.183

2021‐11‐02T12:11:15Z

3068–3096 Sheridan Rd North Chicago IL 60088 United States (42.30724713959559, ‐87.84564963356941)

L289 2054700.505 1116426.296 646.817 Yes Water Yes No 6’ 6’ 93”

2021‐11‐02T13:02:13Z

D St North Chicago IL 60044 United States (42.306670375465586, ‐87.84523909536989)

L288 2054631.232 1116319.74 647.632 Yes Water Yes No 6’ 6’ 101”

2021‐11‐06T12:50:05Z

3000 Sheridan Rd North Chicago IL 60044 United States (42.306868976231215, ‐87.84666034670451)

L160 2054619.707 1116140.568 647.784 Yes Water Yes No 7’ 7’ 7’

2021‐11‐05T16:45:36Z

3000 Sheridan Rd North Chicago IL 60044 United States (42.30674970824731, ‐87.8464488243882)

L159a/C159a 2054472.354 1116117.069 647.295 Yes Good No No 4’ 4’ 4’

AS‐BUILT MANHOLE SUMMARY PAGE 5

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

Across Sheridan

2021‐11‐06T16:38:06Z

3000 Sheridan Rd North Chicago IL 60044 United States (42.306951528393256, ‐87.8467682109212)

D161 2054546.756 1115972.583 649.536 Yes Water Yes No 4’ 4’ 5’

2021‐11‐06T18:09:07Z

Ninth Ave North Chicago IL 60088 United States (42.30668197244708, ‐87.84730153382488)

C162 2054604.659 1115855.736 649.641 Yes Water Yes No 4’ 4’ 8’

2021‐11‐08T13:50:46Z

Ninth Ave North Chicago IL 60088 United States (42.3071760982225, ‐87.84812635990224)

C330 2054631.900 1115737.662 650.041 Yes Water Yes No 6’ 5’ 6’

2021‐11‐08T13:52:20Z

Ninth Ave North Chicago IL 60088 United States (42.30703390548291, ‐87.84878635996543)

C331 2054618.022 1115726.130 652.230 Yes Water Yes No 12’ 6’ 12.5’

Return To East Campus

2021‐11‐05T17:55:59Z

1993–1995 Sheridan Rd North Chicago IL 60088 United States (42.305762614079285, ‐87.84552682166475)

L159 2054472.431 1116223.191 647.926 Yes Good No No 5’ 4’ 5’

21 Dec 2021 11:02 CST

1995 Sheridan Rd North Chicago IL 60044 United States (42.30499841020296, ‐87.84518046072405)

C158 2054470.408 1116319.396 647.983 Yes Water Yes No 7' 4' 7'

2021‐11‐22T20:01:10Z

1995 Sheridan Rd North Chicago IL 60044 United States (42.30518304748325, ‐87.84506178747853)

C156 Yes Good No No 4’ 4’ 4’

21 Dec 2021 11:40 CST

127–177 Second St North Chicago IL 60044 United States (42.30582117712889, ‐87.84362569180742)

C157 2054468.232 1116575.434 647.243 Yes Water Yes No 7' 4' 7'

2021‐11‐06T14:00:59Z

127–177 Second St North Chicago IL 60044 United States (42.30582311332192, ‐87.84358871619555)

153 2054471.287 1116674.608 647.152 Yes Good No No 4’ 3’ 4’

2021‐11‐06T15:37:31Z

127–177 Second St North Chicago IL 60044 United States (42.30589281412289, ‐87.84363199366895)

Manhole in sidewalk of school connecting manhole C154 and 153

2054461.682 1116656.072 646.67 No Water Yes No 7’ 7’ 8’

No GPS Signal Available in Building

AS‐BUILT MANHOLE SUMMARY PAGE 6

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐11‐02T13:39:49Z

D St North Chicago IL 60088 United States (42.306351251443814, ‐87.84555286658158)

C154 2054645.031 1116672.902 645.982 Yes Water Yes No 6’ 6’ 8’

2021‐11‐02T13:37:33Z

D St North Chicago IL 60044 United States (42.30601842691811, ‐87.84330844962422)

C149 2054645.595 1116950.346 644.882 Yes Water Yes No 8’ 6’ 10’

2021‐11‐02T15:42:15Z

D St North Chicago IL 60044 United States (42.30622875523351, ‐87.84290682994902)

L149 2054639.72 1116950.542 645.072 Yes Water Yes No 8’ 5’ 112”

2021‐11‐02T14:27:31Z

D St North Chicago IL 60044 United States (42.305969202602355, ‐87.84274450791025)

C148 2054612.642 1117225.725 645.005 Yes Water Yes No 12’ 6’ 9.5’

2021‐11‐02T16:39:59Z

224–232 E St North Chicago IL 60044 United States (42.305810819485394, ‐87.83574426985577)

JB1

Under the west side of the bridge

No Good N/A No 44” 44” 23”

2021‐11‐02T16:51:59Z

Fourth St North Chicago IL 60044 United States (42.30798896936143, ‐87.84023023997084)

L143 2054629.503 1117576.967 646.142 Yes Good No No 9’ 3.5’ 5’

2021‐11‐03T13:19:13Z

224–232 E St North Chicago IL 60044 United States (42.306004140421564, ‐87.83559317209888)

C134a 2054633.158 1117749.356 648.011 Yes Good No No 4’ 4’ 6’

2021‐11‐03T12:22:35Z

200–298 Tenth St North Chicago IL 60044 United States (42.305814728969054, ‐87.83536763210851)

C134, connected to

L134

2054632.611 1117908.307 649.102 Yes Water Yes No 3’ 3’ 5’

2021‐11‐04T15:07:19Z

100–198 Ninth St North Chicago IL 60044 United States (42.30663469478865, ‐87.83590446091365)

L134, connected to

C134

2054629.573 1117911.479 649.065 Yes Good No No 4’ 4’ 5’

2021‐11‐04T16:11:41Z

224–232 E St North Chicago IL 60044 United States (42.30591373462444, ‐87.83548119748932)

L133 2054859.81 1117911.379 650.422 Yes Good No No 4’ 4’ 6’

No GPS Signal Available Under Bridge

AS‐BUILT MANHOLE SUMMARY PAGE 7

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐11‐04T17:16:24Z

100–198 Ninth St North Chicago IL 60044 United States (42.30662187112826, ‐87.83621901541554)

L132 2055036.6 1117912.564 650.544 Yes Good No No 4’ 4’ 5’

2021‐11‐04T17:33:30Z

Eighth St North Chicago IL 60044 United States (42.30686823079853, ‐87.83655615052238)

L130 2055273.854 1117914.744 650.266 Yes Good No No

Some sludge on bottom about one inch

7’ 7’ 6.5’

2021‐11‐04T17:56:23Z

43–73 B St North Chicago IL 60044 United States (42.3076754134407, ‐87.8378911192897)

L128b or L127 2055422.252 1117998.229 651.358 No Water Yes No 5’ 5’ 9’

2021‐11‐04T19:25:37Z

Sampson St North Chicago IL 60044 United States (42.30810623162639, ‐87.83848142397589)

L128b right before bridge connecting into the manhole 52’ to the southwest

2055465.452 1118029.638 650.434 No Good No No 4’ 4’ 5’

2021‐11‐05T13:58:55Z

Downes Dr North Chicago IL 60088 United States (42.3104740139269, ‐87.83849129594208)

C126 2055821.424 1118030.442 648.978 Yes Good No No 4’ 4’ 6’

No connection to C124 from L126

2021‐11‐05T14:19:54Z

2730 Sampson Rd North Chicago IL 60088 United States (42.31065756876259, ‐87.83939294152111)

C125 2056171.506 1117849.241 646.877 Yes Good No No 4’ 4’ 5’

No connection to C124 from C125

3 Nov 2021 12:10 CDT

161–167 Dewey Ave North Chicago IL 60088 United States (42.31295907990551, ‐87.83872227562429)

C124 2056272.558 1117900.428 647.083 Yes Water Yes No 4' 3' 4'

No connection to C64e from C124

2021‐11‐03T16:55:45Z

160–166 Dewey Ave North Chicago IL 60088 United States (42.312295481733216, ‐87.83876315118113)

C64e 2056674.706 1117882.811 646.897 Yes Water Yes No 12’ 5’ 8’

2021‐11‐03T14:29:22Z

520 Dewey Ave North Chicago IL 60088 United States (42.31222711247631, ‐87.8362535714388)

C64g 2056684.539 1118456.058 650 Yes Water Yes No 6’ 3.5 7’

AS‐BUILT MANHOLE SUMMARY PAGE 8

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

2021‐11‐03T14:16:12Z

76–94 Decatur Ave North Chicago IL 60088 United States (42.3117446118612, ‐87.83663848198526)

C64h 2056671.307 1119031.706 653.197 Yes Water Yes No

2021‐11‐09T18:58:20Z

315 Decatur Ave North Chicago IL 60088 United States (42.31132091887563, ‐87.83596370330733)

HH

NW Corner of Building 68

2056266.852 1118913.095 655.917 No Good No No 4’ 3’ 3’

AS‐BUILT MANHOLE SUMMARY PAGE 9

Northing

(in US Survey Feet)

Easting (in US Survey

Feet)

Elevation (in US Survey

Feet)

MH Location Consistent with Plan?

MH

Condition at Entry

Opening Comments

Dewatering Required?

Dewatering Notes

Is Cleaning of Dirt

Necessary?

Cleaning Comments

MH

Length

MH

Width

MH

Depth

WEST CAMPUS

2021‐11‐15T14:11:22Z

3120 Illinois St North Chicago IL 60088 United States (42.30793230817717, ‐87.85044716148589)

D34a (connected to C300 thru existing core)

2055303.930 1114666.486 663.680 Yes Water Yes No 9’ 6’ 8.5’

2021‐11‐13T18:25:00Z

1400–1422 Buckley Rd North Chicago IL 60088 United States (42.30869794668213, ‐87.85090317956369)

D87 2055594.979 1114664.134 667.148 Yes Good No No 8’ 6’ 7’

2021‐11‐13T17:04:42Z

Buckley Rd North Chicago IL 60088 United States (42.30890356727109, ‐87.851934414231)

D86 2055727.072 1114753.730 662.715 Yes Water Yes No 8’ 8’ 7’

2021‐11‐13T16:47:18Z

2705 Kansas St North Chicago IL 60088 United States (42.310347005025065, ‐87.85106631277047)

D85 2056030.342 1114709.974 661.849 Yes Water Yes No 8’ 6’ 9’

2021‐11‐13T14:37:49Z

4105 Nautilus Ct North Chicago IL 60088 United States (42.31189917909853, ‐87.85384893156046)

D84 2056332.563 1114706.348 661.721 Yes Water Yes No 8’ 5’ 7’

2021‐11‐13T15:39:49Z

4102 Nautilus Ct North Chicago IL 60088 United States (42.312518096652816, ‐87.8526831372098)

D83 (Connected to C83. Cross over to C83 to continue to

C80)

2056786.932 1114709.761 660.104 Yes Good Yes No 8’ 6’ 8’

2021‐11‐13T13:58:29Z

Ray St North Chicago IL 60088 United States (42.3123863260465, ‐87.85248014416113)

C83 (Connected to D83. Continue to C80)

2056791.804 1114704.990 660.104 Yes Water Yes No 5’ 4’ 6.5’

2021‐11‐15T15:37:01Z

4110 Seawolf Pl North Chicago IL 60088 United States (42.31296150630052, ‐87.85303837687445)

C80 2056936.351 1114716.017 659.592 Yes Water Yes No 6.5’ 5’ 6.5’

2021‐11‐08T17:25:35Z

4118 Shark Ct North Chicago IL 60088 United States (42.3141472709878, ‐87.85289530851496)

C80a 2056982.880 1114994.484 657.466 Yes Good No No 8’ 6’ 9’

2021‐11‐08T16:23:28Z

4114 Skate Ct North Chicago IL 60088 United States (42.31369022494327, ‐87.85336237199286)

HH C80b 2057258.453 1114995.039 655.461 Yes Water Yes Yes Vac truck 5’ 5’ 5’

No connection found into Building 1506

37.5% 0 0

Manhole Documentation and Conduit Viability 28 Oct 2021 / Christopher Sisk Incomplete

Score Failed items Actions

Project P828 to finish need access to building

Customer Jacobs

Conducted on 28 Oct 2021 11:01 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088

United States (42.31876864224367, -

87.8354113185666)

Manhole Number C254

Private & Confidential 1/4

Inspection 37.5%

Manhole Location 66.67%

Has the manhole location been GPS surveyed? N/A

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? No

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 25%

What is the condition of the manhole at the time of opening? Water

Please provide pictures showing the conditions of the manhole at the time of opening.

Is dewatering required? Yes

Is dewatering completed?

Is clearing of dirt necessary?

Are other cleaning requirements needed?

Manhole Dimensions

What is the length of the manhole?

What is the width of the manhole?

What is the depth of the manhole?

Interior Photos of Manhole

Please provide interior photos of the manhole.

Butterfly Diagram

Private & Confidential 2/4

Please annotate the butterfly diagram below.

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Photos of Building and Room (If Applicable)

Where is the building penetration location?

Please provide interior photos of room.

What is the building number?

What is the room number?

Please provide notes if necessary.

Field Determination 0%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed?

Sign Off

Field Engineer

Construction Manager

Private & Confidential 3/4

Appendix

Photo 1

Private & Confidential 4/4

90% 0 0

28 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 28 Oct 2021 09:43 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088

United States (42.31894823281337, -

87.83613781501083)

Manhole Number L253

Private & Confidential 1/7

Inspection 90%

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? No

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 100%

What is the condition of the manhole at the time of opening? Water

4’ of water 45 mins of pumping

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2

Is dewatering required? Yes

Is dewatering completed? Yes

14” of sludge on bottom remaining

Photo 3

Is clearing of dirt necessary? Yes

Private & Confidential 2/7

14” of sludge

Are other cleaning requirements needed? Yes

Please specify other cleaning requirements. Vac truck

Manhole Dimensions

What is the length of the manhole? 8’

What is the width of the manhole? 4’

What is the depth of the manhole? 8’

7’ of head room

Interior Photos of Manhole

Please provide interior photos of the manhole.

No ducts going north

Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9

Photo 10 Photo 11

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Photos of Building and Room (If Applicable)

Where is the building penetration location?

Please provide interior photos of room.

Private & Confidential 3/7

What is the building number?

What is the room number?

Please provide notes if necessary.

Field Determination 100%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

21 going west 23 going east

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 302’ going east 332’ going west

Sign Off

Field Engineer

Chris sisk 28 Oct 2021 10:59 CDT

Construction Manager

Tom Stangel 28 Oct 2021 10:59 CDT

Private & Confidential 4/7

Photo 3

Photo 2

Photo 4

Private & Confidential 5/7

Photo 5

Photo 7

Photo 6

Photo 8

Private & Confidential 6/7

Photo 9

Photo 11

Photo 10

Private & Confidential 7/7

55.56% 0 0

28 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 28 Oct 2021 08:46 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 2210 Paul Jones St North Chicago IL 60088

United States (42.31914812482902, -

87.8362192260235)

Manhole Number C245

Private & Confidential 1/6

Inspection 55.56%

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? No

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 0%

What is the condition of the manhole at the time of opening? Good

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2 Photo 3

Is dewatering required? No

Photo 4

Is clearing of dirt necessary? No

Are other cleaning requirements needed? No

Manhole Dimensions

Private & Confidential 2/6

What is the length of the manhole? 6’

What is the width of the manhole? 6’

What is the depth of the manhole? 91”

75” of head room

Interior Photos of Manhole

Please provide interior photos of the manhole.

Proofed 23 going east Proofed 11 going west

Photo 5 Photo 6 Photo 7 Photo 8

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Where is the building penetration location?

Please provide interior photos of room.

What is the building number?

What is the room number?

Please provide notes if necessary.

Field Determination 100%

Private & Confidential 3/6

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 332’ going east in 23– 250’ going west in 11

Sign Off

Field Engineer

Chris sisk 28 Oct 2021 09:36 CDT

Construction Manager

Tom Stangel 28 Oct 2021 09:36 CDT

Private & Confidential 4/6

Photo 2

Private & Confidential 5/6

Photo 6

Private & Confidential 6/6

70% 0 0

22 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P 828

Customer Jacobs

Conducted on 22 Oct 2021 11:34 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 406 Cluverius Ave North Chicago IL 60088

United States (42.31901872890417, -

87.83640996625871)

Manhole Number L244

Inspection 70%

Manhole Location 100%

Has the manhole location been GPS surveyed? Yes

Was the North American Vertical Datum of 1988 (NAVD88) used? N/A

Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?

N/A

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 0%

What is the condition of the manhole at the time of opening? Good

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2 Photo 3

Is dewatering required? No

Photo 4

Is clearing of dirt necessary? No

Are other cleaning requirements needed? No

What is the length of the manhole? 6’

What is the width of the manhole? 6’

What is the depth of the manhole? 6’ 9”

Interior Photos of Manhole

Please provide interior photos of the manhole.

Nothing going west

Photo 5 Photo 6 Photo 7

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Where is the building penetration location?

Please provide interior photos of room.

None

What is the building number? None

What is the room number? None

Please provide notes if necessary.

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Only duct going south so far

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 363’ going south 250’ going east

Duct 11 going south Duct 12 going east proofed

Sign Off

Field Engineer

Chris Sisk 22 Oct 2021 11:44 CDT

Construction Manager

Tom Stangel 22 Oct 2021 11:44 CDT

Photo 2

Photo 6

81.82% 0 0

22 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P-828

Customer Jacobs

Conducted on 22 Oct 2021 09:24 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 408–410 Cluverius Ave North Chicago IL 60088

United States (42.31911567311364, -

87.83704035638601)

Manhole Number L243

Inspection 81.82%

Was the North American Vertical Datum of 1988 (NAVD88) used? N/A

Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?

N/A

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 50%

What is the condition of the manhole at the time of opening? Water

2.5 feet of water with leaves

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2

Is dewatering required? Yes

Is dewatering completed? Yes

Are other cleaning requirements needed? No

Manhole Dimensions

What is the length of the manhole? 6’

What is the width of the manhole? 4’

What is the depth of the manhole? 7’

Interior Photos of Manhole

Please provide interior photos of the manhole.

Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9

21 going south 12 going north

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Conduit

Conduit 1

Is this conduit open or used?

Where is the building penetration location?

No rooms

What is the building number? None

What is the room number? None

Please provide notes if necessary.

No building or rooms for this manhole

Field Determination 100%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Proofed with 2” mandrill in duct 12 looking north

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 363’

Sign Off

Field Engineer

Chris Sisk 22 Oct 2021 11:33 CDT

Construction Manager

Tom Stangel 22 Oct 2021 11:34 CDT

Photo 2

Photo 6

72.73% 0 0

22 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 22 Oct 2021 12:33 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 427–451 Cluverius Ave North Chicago IL 60088

United States (42.31892526410788, -

87.83850537384637)

Manhole Number L242

Inspection 72.73%

Manhole Location 75%

Has the manhole location been GPS surveyed? No

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 50%

What is the condition of the manhole at the time of opening? Water

Photo 2 Photo 3

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 4

Is dewatering required? Yes

Are other cleaning requirements needed? No

Manhole Dimensions

What is the length of the manhole? 6’

What is the width of the manhole? 6’

What is the depth of the manhole? 7’ 9”

Interior Photos of Manhole

Please provide interior photos of the manhole.

Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11

Photo 12

Duct 22 going North duct 22 going west

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

None

What is the building number? None

What is the room number? None

Please provide notes if necessary.

Field Determination 100%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 238’ going west 362’ going north

Sign Off

Field Engineer

Chris sisk 22 Oct 2021 13:04 CDT

Construction Manager

Tom Stangel 22 Oct 2021 13:05 CDT

Photo 2

Photo 6

Photo 10

Photo 12

80% 0 0

26 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 26 Oct 2021 07:49 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 427–451 Cluverius Ave North Chicago IL 60088

United States (42.31894866015796, -

87.83859951328235)

Manhole Number L241

Inspection 80%

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1 Photo 2

Manhole Condition 50%

What is the condition of the manhole at the time of opening? Water

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 3 Photo 4

Is dewatering required? Yes

4 feet of water

Is dewatering completed? Yes

Photo 5

What is the length of the manhole? 7.5’

What is the width of the manhole? 6’

What is the depth of the manhole? 105”

7’ of head room

Interior Photos of Manhole

Please provide interior photos of the manhole.

No ducts going south

Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Where is the building penetration location?

None

Please provide interior photos of room.

What is the building number?

N/a

What is the room number?

N/a

Please provide notes if necessary.

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Duct 22 going west Duct 21 going east

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 251’ going west 228’ going East

Sign Off

Field Engineer

Chris sisk 26 Oct 2021 10:26 CDT

Construction Manager

Tom Stangel 26 Oct 2021 10:26 CDT

Photo 2

Photo 6

81.82% 0 0

26 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 26 Oct 2021 08:36 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 1901–2057 Luce Blvd North Chicago IL 60088

United States (42.31866548705677, -

87.83827579440519)

Manhole Number L240

Inspection 81.82%

Was the North American Vertical Datum of 1988 (NAVD88) used? N/A

Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?

N/A

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 50%

What is the condition of the manhole at the time of opening? Water

Please provide pictures showing the conditions of the manhole at the time of opening.

3 feet of water

Photo 2

Is dewatering required? Yes

Are other cleaning requirements needed? No

Manhole Dimensions

What is the length of the manhole? 9.5’

What is the width of the manhole? 6’

What is the depth of the manhole? 100”

80” of head room

Interior Photos of Manhole

Please provide interior photos of the manhole.

Poured package in manhole going north and south

Photo 4 Photo 5 Photo 6 Photo 7 Photo 8

No ducts on the south wall but the package is poured.

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Photos of Building and Room (If Applicable)

Where is the building penetration location?

What is the room number?

Please provide notes if necessary.

Field Determination 100%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

No ducts going south just a package poured through manhole going north and south Someone broke into the package running through the manhole that connects to L191 so I was able to rod the bottom west duct of this package. With the package being poured in concrete I have no way to tell how many ducts are actually in this package

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 253’ going east and 182’ going south

Sign Off

Field Engineer

Chris sisk 26 Oct 2021 10:29 CDT

Construction Manager

Tom Stangel 26 Oct 2021 10:29 CDT

Photo 2

Photo 6

66.67% 0 0

26 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 26 Oct 2021 12:29 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 264–268 Clark Ave North Chicago IL 60088

United States (42.316267519517666, -

87.83885064829502)

Manhole Number L191

Private & Confidential 1/9

Inspection 66.67%

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 0%

What is the condition of the manhole at the time of opening? Structural Damage

Walls broke out+ the lids are bent

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7

Photo 8 Photo 9 Photo 10

Is dewatering required? No

Private & Confidential 2/9

Are other cleaning requirements needed? No

Manhole Dimensions

What is the length of the manhole? 9’

What is the width of the manhole? 4’

What is the depth of the manhole? 50”

Interior Photos of Manhole

Please provide interior photos of the manhole.

Photo 12 Photo 13 Photo 14 Photo 15 Photo 16 Photo 17

Photo 18 Photo 19

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Private & Confidential 3/9

What is the room number?

Please provide notes if necessary.

Field Determination 100%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed? Yes

Is conduit free and clear of obstructions for the P-828 cable? Yes

Was "mule tape" (Neptco WP1800P/3000 or equal) placed, with sequential footage markings, in the conduit with 25' length in each manhole?

Yes

Proofed duct 22 going south and duct 12 going north

Note: Some locations have secondary buildings and will require additional conduit space.

What is the manhole to manhole conduit segment total footage length? 182’ going north 210’ going south

Sign Off

Field Engineer

Chris sisk 26 Oct 2021 13:01 CDT

Construction Manager

Tom Stangel 26 Oct 2021 13:01 CDT

Private & Confidential 4/9

Photo 2

Private & Confidential 5/9

Photo 6

Private & Confidential 6/9

Photo 10

Photo 12

Photo 14

Private & Confidential 7/9

Photo 13

Photo 15

Photo 16

Photo 18

Private & Confidential 8/9

Photo 17

Photo 19

Private & Confidential 9/9

42.86% 0 0

26 Oct 2021 / Christopher Sisk Incomplete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 26 Oct 2021 13:09 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) Clark Ave North Chicago IL 60088

United States (42.31603767011239, -

87.83930063830344)

Manhole Number L38

Inspection 42.86%

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Photo 1

Manhole Condition 0%

What is the condition of the manhole at the time of opening? Good

Please provide pictures showing the conditions of the manhole at the time of opening.

Photo 2

Is dewatering required? No

Photo 3

Is clearing of dirt necessary? No

Are other cleaning requirements needed? No

What is the length of the manhole? 4’

What is the width of the manhole? 5’

What is the depth of the manhole? 5’

Interior Photos of Manhole

Please provide interior photos of the manhole.

Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9

Photo 10 Photo 11

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Where is the building penetration location?

Please provide interior photos of room.

What is the building number?

What is the room number?

Please provide notes if necessary.

Field Determination 0%

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building). The drawing legend on each of the attached drawings identifies the areas/runs that need more than one accessible conduit.

Was rodding completed?

Sign Off

Field Engineer

Photo 2

Photo 6

27 Oct 2021 / Christopher Sisk Complete

Score Failed items Actions

Project P828

Customer Jacobs

Conducted on 27 Oct 2021 10:36 CDT

Prepared by Christopher Sisk

Location (Mapping Grade) 415 Clark Ave North Chicago IL 60088

United States (42.31612651567438, -

87.84139607802449)

Manhole Number C19

Was the North American Vertical Datum of 1988 (NAVD88) used? N/A

Was the Illinois State Plane Coordinate System - East Zone North American Datum of 1983 (NAD83) used?

N/A

Is the manhole location consistent with the manhole location shown on the drawings?

Yes

Is the manhole accessible to equipment? Yes

Is traffic control necessary? Yes

Exterior Photos of Manhole

Please provide photos of the manhole prior to opening.

Manhole Condition 0%

What is the condition of the manhole at the time of opening? Good

Please provide pictures showing the conditions of the manhole at the time of opening.

Double lid

Photo 1 Photo 2

Is dewatering required? No

Photo 3

Is clearing of dirt necessary? No

Are other cleaning requirements needed? No

What is the length of the manhole? 6’

What is the width of the manhole? 4’

What is the depth of the manhole? 4’

37” of head room

Interior Photos of Manhole

Please provide interior photos of the manhole.

Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9

Note: Please do not forget to annotate the sizes of individual conduits. Number each of the conduit on the diagram.

Where is the building penetration location?

Please provide interior photos of room.

What is the building number?

What is the room number?

Please provide notes if necessary.

Choose the conduit that will best serve the placement of the proposed cable for the future P-828 cable placement (48 stand fiber). The best choice of conduit would be an open conduit and lowest in the stack of conduits.

Note:

a) The overall intent is to determine if one conduit is clear from manhole to manhole span along the P-828 alignment.

Once you find a clear conduit that has capacity for the proposed fiber optic cable, there is no need to inspect additional conduits per run.

b) The exception to item "a" above is that in a few areas more than one conduit is needed between MH to MH (or from MH to building).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .