Attachment E - Price Proposal Form_REV1.pdf

PDF 259 KB Posted

Attached to
N40085-22-R-2691 P-828 SMART ENERGY, NAVAL STATION GREAT LAKES, GREAT LAKES, IL
Solicitation number
N4008522R2691
Issued by

About this file

This price proposal form solicits fixed unit prices and lump sum bids for various telecommunications, fiber optic cabling, electrical, and construction line items required for the P-828 Smart Energy project at Naval Station Great Lakes in Great Lakes, Illinois. Key requirements include installation of fiber optic cable underground, aerial, and within existing conduit; trenching and directional drilling for conduit; interior fiber installation and telecom services in multiple buildings; SCADA/DDC integration; renovation of one building; commissioning; and hazardous material removal. The solicitation also includes optional additional locations and services that may be awarded. Pricing is requested for base requirements, two planned modifications, and thirteen options. Bids are due by the date specified in solicitation number N40085-22-R-2691 issued by the Department of the Navy for this work. Award will be made based on the total price of specified line items for base requirements and any exercised options.

View the file

Other files

File Type Posted
N40085-22-R-2691 Amendment 0007.pdf PDF
N40085-22-R-2691 Amendment 0006.pdf PDF
N40085-22-R-2691 Amendment 0005.pdf PDF
N40085-22-R-2691 Amendment 0004.pdf PDF
SCADA DATABASE FOR P828 8-9-22.xlsx XLSX spreadsheet
2022-04-14 SCADA PLCs.xlsx XLSX spreadsheet
SCADA COMPLETE DATABASE 8-9-22.xlsx XLSX spreadsheet
N40085-22-R-2691 Amendment 0003.pdf PDF
N40085-22-R-2691 Amendment 0002.pdf PDF
N40085-22-R-2691 Amendment 0001.pdf PDF
N0085-22-R-2691_1609936spc01of01.pdf PDF
Attachment F- PIEE Vendor Access Instructions.pdf PDF
N40085-22-R-2691_P-828S_1.PDF PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
N40085-22-R-2691_RODDIN_1.PDF PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
N40085-22-R-2691_NAVALS_1.PDF PDF
N40085-22-R-2691_TRANSM_1.PDF PDF
Attachment D - Small Business Subcontracting Plan.doc DOC document
Attachment E - Price Proposal Form.docx DOCX document
N40085-22-R-2691_NSGLLU_1.PDF PDF
N40085-22-R-2691_UTILIT_1.PDF PDF
N40085-22-R-2691 P828 Smart Energy Great Lakes IL.pdf PDF
N0085-22-R-2691_1609936dwg01of01.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSGL P-828 Smart Energy Complete Project, Work Order Number 1609936 Naval Station Great Lakes - Great Lakes, Illinois

Document 00 22 13.00 20 Page 1

DOCUMENT 00 22 13.00 20 (REV 002)

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14 6/09/22

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum prices for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN 0001 Summary

Item UNIT UNIT PRICE NO. UNITS Total Price for

CLIN

(UNIT PRICE X NO.

UNITS)

0001AA Site Preparations, Mobilization and Demobilization

LS

0001AB Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)

– Aerial 14,717’ of 48 strand & 672’ of 24 strand

LF

$_______/LF

15,389

0001AC Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit

45,840

0001AD Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)

1,331

0001AE Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand

0001AF Utilities – Trenching 2- 4” Conduits (1,362 LF of total conduit)

Document 00 22 13.00 20 Page 2

(UNIT PRICE X NO.

UNITS)

0001AG Utilities – Trenching 2-

4” Conduits, Concrete Encased (112 LF of total conduit)

0001AH

Utilities – Horizontal Directional Drilling 2- 4” Conduits(1,678 LF of total conduit)

0001AI Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit)

2,866

0001AJ Utilities - 12 Strand Backbone Fiber Optic Cable Inside Buildings 621,236,26,190,7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)

1,321

0001AK Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding

0001AL New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies

0001AM SCADA/DDC Network Connectivity & Integration

0001AN Cyber Security LS 1 $___________

Document 00 22 13.00 20 Page 3

0001AO Interior Renovation Bldg

LS 1 $___________

0001AP Total System Commissioning (TSCx)

LS 1 $___________

0001AQ Communication Maintenance Hole (CMH)

EA $_______/EA 1 $___________

0001AR Communication Maintenance Handhole

(CHH)

EA

$_______/EA

0001AS Rodding/Proofing Existing Conduit Pathways

0001AT Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)

EA $_______/EA 17 $___________

0001AU Pavement Repair – full pavement section

SY $_______/SY 118 $___________

0001AV Sidewalk Repair – full pavement section

SY $_______/SY 32 $___________

0001AW Coring Existing Concrete Structures

EA $_______/EA 10 $___________

0001AX HAZMAT – Removal and Disposal for ALL Buildings

LS 1 $___________

0001AY HAZMAT – Removal and Disposal of ALL Hazardous Soil

CY

$_______/CY

CLIN 0001 Total

CLIN 0001AA. Lump Sum price for the entire work for P-828 Smart Energy, Complete

Project complete with Mobilization, Demobilization and Site Preparations such as site set up, miscellaneous demolition and relocations, in accordance with the drawings and specifications, but excluding work described in Contract Line Item

(CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ ,

0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT,

0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN

0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012N and CLIN 0013.

CLIN DESCRIPTION UNIT TOTAL PRICE FOR CLIN

0001AA

0001AA

Site Preparations, Mobilization and Demobilization

CLIN 0001AB. Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial, in accordance with the drawings and specifications, but excluding work described in (CLIN)0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN

0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012

Document 00 22 13.00 20 Page 4

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN

0001AB

0001AB

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand

15,389

CLIN 0001AC. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- installed in 25,769 LF of Existing Conduit, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AC

0001AC

strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) -installed in 25,769 LF of

45,840

CLIN 0001AD. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AD

0001AD

strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)

1,331

CLIN 0001AE. Price for the entire work for P-828 Smart Energy, Complete Project

(only)for Horizontal Directional Drilling, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

Document 00 22 13.00 20 Page 5

0001AE

0001AE

strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand

CLIN 0001AF. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - Trenching 2-4” Conduits (1,362 of total conduit), in accordance with the drawings and specifications but excluding work described in

CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI,0001AJ ,

0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT

0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN

0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012

and CLIN 0013.

0001AF

0001AF

Utilities – Trenching 2-4” Conduits (1,362 of total

CLIN 0001AG. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AG

0001AG

Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total

CLIN 0001AH. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total

CLIN 0001AI. Price for the entire work for P-828 Smart Energy, Complete Project

Document 00 22 13.00 20 Page 6

Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit) including, but not limited to, conduit, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN

0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AI

0001AI

with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including

2,866

CLIN 0001AJ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as 12 Strand Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)including, but not limited to, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN

0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AJ

0001AJ

Utilities - 12 Strand Backbone Fiber Optic Cable

– Inside buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)

1,321

CLIN 0001AK. Lump Sum Price for the entire work for P-828 Smart Energy, Complete

Project complete with Utilities such as Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN

0012 and CLIN 0013.

Document 00 22 13.00 20 Page 7

CLIN DESCRIPTION

UNIT

TOTAL PRICE FOR CLIN

0001AK

0001AK

Utilities - Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018)

CLIN 0001AL. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies in accordance with the drawings and specifications but excluding work described in

CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,

0001AJ, 0001AK, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT

0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN

0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012

and CLIN 0013.

CLIN DESCRIPTION UNIT TOTAL PRICE FOR CLIN

0001AL

0001AL

Utilities - All New Exterior building penetrations

CLIN 0001AM. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with SCADA/DDC Network Connectivity & Integration in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

ITEM

UNIT

TOTAL PRICE FOR CLIN

0001AM

0001AJM

SCADA/DDC Network Connectivity & Integration

CLIN 0001AN. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Cyber Security for all control systems subject to the requirement of UFC 04 010 06 and in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, ITEM UNIT TOTAL PRICE FOR CLIN

0001AN

0001AN Cyber Security

Document 00 22 13.00 20 Page 8

CLIN 0001AO. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Interior Renovation Bldg 68 in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, ITEM UNIT TOTAL PRICE FOR CLIN

0001AO

0001AO

Renovation Bldg 68

LS $____________

CLIN 0001AP. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Total Building Commissioning (TBCx)by Third Party to the Bidder in in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN

0012 and CLIN 0013.

ITEM UNIT TOTAL PRICE FOR

CLIN 0001AP

0001AP

Total System Commissioning (TSCx)

LS $_____________

CLIN 0001AQ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Maintenance Hole (CMH)in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AQ

0001AQ

Communication Maintenance Hole (CMH)

CLIN 0001AR. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Handhole (CHH) in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AR

Communication Handhole

(CHH)

Document 00 22 13.00 20 Page 9

CLIN 0001AS. Price for the entire work for P-828 Smart Energy, Complete Project complete with Rodding/Proofing Existing Conduit Pathways for Alternate Under Ground Route for the Fiber Optic Cable in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN

0001AS

0001AS Rodding Existing Conduit Pathways for Alternate UG Fiber Route

CLIN 0001AT. Price for the entire work for P-828 Smart Energy, Complete Project complete with Wooden Utility Poles, Class 3 in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AT

0001AT

Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)

CLIN 0001AU. Price for the entire work for P-828 Smart Energy, Complete Project complete with Pavement repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AU

0001AU

Pavement repair – full pavement section

SY

$_______/SY

CLIN 0001AV. Price for the entire work for P-828 Smart Energy, Complete Project complete with Sidewalk repair in accordance with the drawings and specifications, Document 00 22 13.00 20 Page 10 but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AV

0001AV

Sidewalk repair – full pavement section

SY

$_______/SY

CLIN 0001AW. Price for the entire work for P-828 Smart Energy, Complete Project complete with Coring Existing Concrete Structures in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

0001AW

0001AW

Coring Existing Concrete Structures

CLIN 0001AX. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal for ALL Buildings, in accordance with the drawings and specifications, but excluding work described in in

CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,

0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS,

0001AT, 0001AU, 0001AV, 0001AW, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN

0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012

CLIN 0001AX

0001AX

HAZMAT – Removal and Disposal for ALL Buildings

CLIN 0001AY. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal of ALL Hazardous Soil, in accordance with the drawings specifications, but excluding work described in in

CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,

0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS,

0001AT, 0001AU, 0001AV, 0001AW 0001AX, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and

CLIN 0013.

Document 00 22 13.00 20 Page 11

0001AY

0001AY

HAZMAT – Removal and Disposal of ALL Hazardous Soil

CY

$_______/CY

TOTAL for CLIN 0001( 0001AA-0001AY) $________________

CLIN 0002 PLANNED MODIFICATION 1: Price includes the following:

Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for any new Furniture, Fixtures, and Equipment (FF&E) including all work indicated in the contract documents as Planned Modification Item 1, in accordance with the following schedule:

CLIN ITEM GOVERNMENT FF&E

ESTIMATE

HAR (NTE

5%)

HAR AMOUNT (GOVT

FF&E ESTIMATE x

HAR %)

TOTAL FF&E ESTIMATED AMOUNT FOR

CLIN 0002

(GOVT FF&E ESTIMATE + HAR

AMOUNT)

0002 FF&E $57,000 _____% $ $

CLIN 0003 PLANNED MODIFICATION 2: Price includes the following:

Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for the Audio/Visual (A/V) including all work indicated in the contract documents as Planned Modification Item 2, in accordance with the following schedule:

CLIN ITEM GOVERNMENT A/V

ESTIMATE

HAR (NTE

5%)

HAR AMOUNT (GOVT

A/V ESTIMATE x

HAR %)

TOTAL FF&E ESTIMATED AMOUNT FOR

CLIN 0003

(GOVT A/V ESTIMATE + HAR

AMOUNT)

0003 A/V $5,000 _____% $ $

TOTAL for CLIN 0001 + CLIN 0002 + CLIN 0003 $________________

CLIN 0004 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from

Document 00 22 13.00 20 Page 12 the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits, in accordance with the drawing and specifications.

CLIN 0004

48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes

CHH505, CHH506, CHH507, CHH508,

Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits

CLIN 0005 OPTION: Price includes the following:

complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133, in accordance with the drawing and specifications.

CLIN 0005

for Aerial installation between the Existing Utility Poles 123 and 133

CLIN 0006 OPTION: Price includes the following:

complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123, in accordance with the drawing and specifications.

CLIN 0006

Existing Utility Poles 122 and 123

CLIN 0007 OPTION: Price includes the following:

Document 00 22 13.00 20 Page 13 complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 109A, in accordance with the drawing

CLIN 0007

Existing Utility Poles 122 and Utility Pole 109A.

CLIN 0008 OPTION: Price includes the following:

complete with 48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A, in accordance with the drawing and specifications.

CLIN 0008

48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A.

CLIN 0009 OPTION: Price includes the following:

complete with 24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK), in accordance with the drawing

Document 00 22 13.00 20 Page 14

CLIN 0009

24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in

CLIN 0001AK).

CLIN 0010 OPTION: Price includes the following:

complete with 24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank, in accordance with the drawing and specifications.

CLIN 00010

00010

24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank.

CLIN 0011 OPTION: Price includes the following:

complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK), in accordance with the drawing

CLIN 00011

00011

24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services

Document 00 22 13.00 20 Page 15 inside building 7101/02 (as noted in CLIN

0001AK).

CLIN 0012 OPTION: Price includes the following:

complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK), in accordance with the drawing

CLIN 0012

0012 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN

0001AK).

CLIN 0013 – OPTION: Price includes the following:

(UNIT PRICE X

NO. UNITS)

0013AA Rodding Existing Conduit Pathways

LF $_______/LF 500 $___________

0013AB 24-PORT SFP PORT FIBER

OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets

EA $_______/EA 1 $___________

0013AC 2“ Interior Conduit (RMC or IMC)with 24 and/or 48 strand Fiber Optic Cable

LF $_______/LF 100 $___________

0013AD 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable

LF $_______/LF 100 $___________

0013AE 120V 20A Circuit 3#12 Conductors in ¾” conduit

LF $_______/ LF 100 $___________

0013AF 20A Circuit Breaker EA $_______/EA 10 $___________

0013AG 120V 20A Duplex Receptacle

EA $_______/EA 20 $___________

0013AH Rock Excavation – trench CY $_______/CY 200 $___________

Document 00 22 13.00 20 Page 16

0013AI Utilities – Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’ of 4” schedule 40 conduit

0013AJ Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles.

0013AK Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit

0013AL Utilities - Trenching Underground – includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable

0013AM LAN BASE NETWORK SWITCH

for DDC-SCADA Network Panels

EA $_______/EA 1 $___________

0013AN Fire Stopping EA $_______/EA 10 $___________

0013AO Smoke Stopping EA $_______/EA 10 $___________

0013AP Ground Busses EA $_______/EA 10 $___________

0013AQ Alternate 48 strand ICS Backbone Fiber Optic Cable Inside Building 1506 – Per Sheet T-102A (Including conduit)

CLIN 0013AA. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Proofing/Rodding Existing Conduit Pathways, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AA

0013AA

Proofing/Rodding Existing Conduit Pathways

LF $_______/LF

500 $__________

CLIN 0013AB. Price for providing work in connection with the procurement and required for 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS

Document 00 22 13.00 20 Page 17

Duplex LC Transceiver Modules for Communication Cabinets, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE

FOR CLIN

0013AB

0013AB

24-PORT SFP PORT FIBER

OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets

LFEA $_______/LFEA

100 $__________

CLIN 0013AC. Price for providing work in connection with the procurement and required for 2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AC

0013AC

2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable

CLIN 0013AD. Price for providing work in connection with the procurement and required for 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AD

0013AD

1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable

CLIN 0013AE. Price for providing work in connection with the procurement and required for 120V 20A Circuit 3#12 Conductors in ¾” conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AE

0013AE 120V 20A Circuit 3#12 Conductors in ¾” rigid conduit

$______/ LF

CLIN 0013AF. Price for providing work in connection with the procurement and required for 20A Circuit Breaker, in accordance with the drawings and specifications and in accordance with the following schedule:

Document 00 22 13.00 20 Page 18

CLIN 0013AF

0013AF 20A Circuit Breaker EA $_______/EA

10 $__________

CLIN 0013AG. Price for providing work in connection with the procurement and required for 120V 20A Duplex Receptacle, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AG

0013AG 120V 20A Duplex Receptacle EA $_______/EA

20 $__________

CLIN 0013AH. Price for providing work in connection with the procurement and required for Rock Excavation, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AH

0013AH Rock Excavation CY $_______/CY

200 $__________

CLIN 0013AI. Price for providing work in connection with the procurement and required for Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AI

0013AI

Utilities - Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit

CLIN 0013AJ. Price for providing work in connection with the procurement and required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AJ

0013AJ

strand ICS Backbone Fiber Optic24 and/or 48 strand

Document 00 22 13.00 20 Page 19

CLIN 0013AJ

Cable – Aerial, on existing utility poles

CLIN 0013AK. Price for providing work in connection with the procurement and required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AK

0013AK

strand ICS Backbone Fiber Optic Cable – Installed in

CLIN 0013AL. Price for providing work in connection with the procurement and required for Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AL

0013AL

Utilities - Trenching Underground, includes 2- 4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable

CLIN 0013AM. Price for providing work in connection with the procurement and required for LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AM

0013AM

LAN BASE NETWORK SWITCH

for DDC-SCADA Network Panels

CLIN 0013AN. Price for providing work in connection with the procurement and required for Fire Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:

Document 00 22 13.00 20 Page 20

CLIN 0013AN

0013AN Fire Stopping EA $_______/EA

CLIN 0013AO. Price for providing work in connection with the procurement and required for Smoke Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AO

0013AO Smoke Stopping EA $_______/EA

CLIN 0013AP. Price for providing work in connection with the procurement and required for Ground Buses, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0013AP

00103AP Ground Busses EA $_______/EA

CLIN 0013AQ. Price for providing work in connection with the procurement and required for Utilities - Alternate ICS Backbone Fiber Optic Cable Inside Buildings 1506 - Per Sheet T-102A, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN 0013AQ

0013AQ

Alternate 48 Strand ICS Backbone Fiber Optic Cable Inside Buildings 1506 – Per Sheet T-102A (Including conduit)

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items 0001AA through 0001AY. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s)

Document 00 22 13.00 20 Page 21

The Government reserves the right to award options to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for options. No provision is made for economic price adjustment. Exercising of the options shall not extend the contract completion date.

Enter Unit prices and Lump Sum in the spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

1.3 PLANNED MODIFICATION BID NOTES

These notes apply to Planned Modification CLINs.

a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

b. Bonding is not required for the design, procurement and installation of FF&E.

c. Offerors may propose a Handling and Administration Rate (HAR) for the

FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

d. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

e. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the

FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification.

No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time

Document 00 22 13.00 20 Page 22 for the FF&E is not available and the Government's award of the modification is in the last six months of the contract.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

- End of Document --

PART 1 GENERAL
1.1 CONTRACT LINE ITEMS

PART 3 EXECUTION

File details come from the government source that posted it. Updated .