This price proposal form solicits fixed unit prices and lump sum bids for various telecommunications, fiber optic cabling, electrical, and construction line items required for the P-828 Smart Energy project at Naval Station Great Lakes in Great Lakes, Illinois. Key requirements include installation of fiber optic cable underground, aerial, and within existing conduit; trenching and directional drilling for conduit; interior fiber installation and telecom services in multiple buildings; SCADA/DDC integration; renovation of one building; commissioning; and hazardous material removal. The solicitation also includes optional additional locations and services that may be awarded. Pricing is requested for base requirements, two planned modifications, and thirteen options. Bids are due by the date specified in solicitation number N40085-22-R-2691 issued by the Department of the Navy for this work. Award will be made based on the total price of specified line items for base requirements and any exercised options.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSGL P-828 Smart Energy Complete Project, Work Order Number 1609936 Naval Station Great Lakes - Great Lakes, Illinois
Document 00 22 13.00 20 Page 1
DOCUMENT 00 22 13.00 20 (REV 002)
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14 6/09/22
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum prices for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001 Summary
Item UNIT UNIT PRICE NO. UNITS Total Price for
CLIN
(UNIT PRICE X NO.
UNITS)
0001AA Site Preparations, Mobilization and Demobilization
LS
0001AB Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)
– Aerial 14,717’ of 48 strand & 672’ of 24 strand
LF
$_______/LF
15,389
0001AC Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit
45,840
0001AD Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)
1,331
0001AE Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand
0001AF Utilities – Trenching 2- 4” Conduits (1,362 LF of total conduit)
Document 00 22 13.00 20 Page 2
(UNIT PRICE X NO.
UNITS)
0001AG Utilities – Trenching 2-
4” Conduits, Concrete Encased (112 LF of total conduit)
0001AH
Utilities – Horizontal Directional Drilling 2- 4” Conduits(1,678 LF of total conduit)
0001AI Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit)
2,866
0001AJ Utilities - 12 Strand Backbone Fiber Optic Cable Inside Buildings 621,236,26,190,7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)
1,321
0001AK Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding
0001AL New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies
0001AM SCADA/DDC Network Connectivity & Integration
0001AN Cyber Security LS 1 $___________
Document 00 22 13.00 20 Page 3
0001AO Interior Renovation Bldg
LS 1 $___________
0001AP Total System Commissioning (TSCx)
LS 1 $___________
0001AQ Communication Maintenance Hole (CMH)
EA $_______/EA 1 $___________
0001AR Communication Maintenance Handhole
(CHH)
EA
$_______/EA
0001AS Rodding/Proofing Existing Conduit Pathways
0001AT Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)
EA $_______/EA 17 $___________
0001AU Pavement Repair – full pavement section
SY $_______/SY 118 $___________
0001AV Sidewalk Repair – full pavement section
SY $_______/SY 32 $___________
0001AW Coring Existing Concrete Structures
EA $_______/EA 10 $___________
0001AX HAZMAT – Removal and Disposal for ALL Buildings
LS 1 $___________
0001AY HAZMAT – Removal and Disposal of ALL Hazardous Soil
CY
$_______/CY
CLIN 0001 Total
CLIN 0001AA. Lump Sum price for the entire work for P-828 Smart Energy, Complete
Project complete with Mobilization, Demobilization and Site Preparations such as site set up, miscellaneous demolition and relocations, in accordance with the drawings and specifications, but excluding work described in Contract Line Item
(CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ ,
0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT,
0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN
0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012N and CLIN 0013.
CLIN DESCRIPTION UNIT TOTAL PRICE FOR CLIN
0001AA
0001AA
Site Preparations, Mobilization and Demobilization
CLIN 0001AB. Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial, in accordance with the drawings and specifications, but excluding work described in (CLIN)0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN
0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012
Document 00 22 13.00 20 Page 4
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN
0001AB
0001AB
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand
15,389
CLIN 0001AC. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- installed in 25,769 LF of Existing Conduit, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AC
0001AC
strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) -installed in 25,769 LF of
45,840
CLIN 0001AD. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AD
0001AD
strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)
1,331
CLIN 0001AE. Price for the entire work for P-828 Smart Energy, Complete Project
(only)for Horizontal Directional Drilling, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
Document 00 22 13.00 20 Page 5
0001AE
0001AE
strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand
CLIN 0001AF. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - Trenching 2-4” Conduits (1,362 of total conduit), in accordance with the drawings and specifications but excluding work described in
CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI,0001AJ ,
0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT
0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN
0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012
and CLIN 0013.
0001AF
0001AF
Utilities – Trenching 2-4” Conduits (1,362 of total
CLIN 0001AG. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AG
0001AG
Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total
CLIN 0001AH. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total
CLIN 0001AI. Price for the entire work for P-828 Smart Energy, Complete Project
Document 00 22 13.00 20 Page 6
Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit) including, but not limited to, conduit, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN
0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AI
0001AI
with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including
2,866
CLIN 0001AJ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as 12 Strand Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)including, but not limited to, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN
0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AJ
0001AJ
Utilities - 12 Strand Backbone Fiber Optic Cable
– Inside buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)
1,321
CLIN 0001AK. Lump Sum Price for the entire work for P-828 Smart Energy, Complete
Project complete with Utilities such as Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN
0012 and CLIN 0013.
Document 00 22 13.00 20 Page 7
CLIN DESCRIPTION
UNIT
TOTAL PRICE FOR CLIN
0001AK
0001AK
Utilities - Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018)
CLIN 0001AL. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies in accordance with the drawings and specifications but excluding work described in
CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,
0001AJ, 0001AK, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT
0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN
0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012
and CLIN 0013.
CLIN DESCRIPTION UNIT TOTAL PRICE FOR CLIN
0001AL
0001AL
Utilities - All New Exterior building penetrations
CLIN 0001AM. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with SCADA/DDC Network Connectivity & Integration in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
ITEM
UNIT
TOTAL PRICE FOR CLIN
0001AM
0001AJM
SCADA/DDC Network Connectivity & Integration
CLIN 0001AN. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Cyber Security for all control systems subject to the requirement of UFC 04 010 06 and in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, ITEM UNIT TOTAL PRICE FOR CLIN
0001AN
0001AN Cyber Security
Document 00 22 13.00 20 Page 8
CLIN 0001AO. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Interior Renovation Bldg 68 in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, ITEM UNIT TOTAL PRICE FOR CLIN
0001AO
0001AO
Renovation Bldg 68
LS $____________
CLIN 0001AP. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Total Building Commissioning (TBCx)by Third Party to the Bidder in in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN
0012 and CLIN 0013.
ITEM UNIT TOTAL PRICE FOR
CLIN 0001AP
0001AP
Total System Commissioning (TSCx)
LS $_____________
CLIN 0001AQ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Maintenance Hole (CMH)in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AQ
0001AQ
Communication Maintenance Hole (CMH)
CLIN 0001AR. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Handhole (CHH) in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AR
Communication Handhole
(CHH)
Document 00 22 13.00 20 Page 9
CLIN 0001AS. Price for the entire work for P-828 Smart Energy, Complete Project complete with Rodding/Proofing Existing Conduit Pathways for Alternate Under Ground Route for the Fiber Optic Cable in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN
0001AS
0001AS Rodding Existing Conduit Pathways for Alternate UG Fiber Route
CLIN 0001AT. Price for the entire work for P-828 Smart Energy, Complete Project complete with Wooden Utility Poles, Class 3 in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AT
0001AT
Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)
CLIN 0001AU. Price for the entire work for P-828 Smart Energy, Complete Project complete with Pavement repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AU
0001AU
Pavement repair – full pavement section
SY
$_______/SY
CLIN 0001AV. Price for the entire work for P-828 Smart Energy, Complete Project complete with Sidewalk repair in accordance with the drawings and specifications, Document 00 22 13.00 20 Page 10 but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AV
0001AV
Sidewalk repair – full pavement section
SY
$_______/SY
CLIN 0001AW. Price for the entire work for P-828 Smart Energy, Complete Project complete with Coring Existing Concrete Structures in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN
0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
0001AW
0001AW
Coring Existing Concrete Structures
CLIN 0001AX. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal for ALL Buildings, in accordance with the drawings and specifications, but excluding work described in in
CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,
0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS,
0001AT, 0001AU, 0001AV, 0001AW, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN
0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012
CLIN 0001AX
0001AX
HAZMAT – Removal and Disposal for ALL Buildings
CLIN 0001AY. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal of ALL Hazardous Soil, in accordance with the drawings specifications, but excluding work described in in
CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,
0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS,
0001AT, 0001AU, 0001AV, 0001AW 0001AX, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and
CLIN 0013.
Document 00 22 13.00 20 Page 11
0001AY
0001AY
HAZMAT – Removal and Disposal of ALL Hazardous Soil
CY
$_______/CY
TOTAL for CLIN 0001( 0001AA-0001AY) $________________
CLIN 0002 PLANNED MODIFICATION 1: Price includes the following:
Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for any new Furniture, Fixtures, and Equipment (FF&E) including all work indicated in the contract documents as Planned Modification Item 1, in accordance with the following schedule:
CLIN ITEM GOVERNMENT FF&E
ESTIMATE
HAR (NTE
5%)
HAR AMOUNT (GOVT
FF&E ESTIMATE x
HAR %)
TOTAL FF&E ESTIMATED AMOUNT FOR
CLIN 0002
(GOVT FF&E ESTIMATE + HAR
AMOUNT)
0002 FF&E $57,000 _____% $ $
CLIN 0003 PLANNED MODIFICATION 2: Price includes the following:
Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for the Audio/Visual (A/V) including all work indicated in the contract documents as Planned Modification Item 2, in accordance with the following schedule:
CLIN ITEM GOVERNMENT A/V
ESTIMATE
HAR (NTE
5%)
HAR AMOUNT (GOVT
A/V ESTIMATE x
HAR %)
TOTAL FF&E ESTIMATED AMOUNT FOR
CLIN 0003
(GOVT A/V ESTIMATE + HAR
AMOUNT)
0003 A/V $5,000 _____% $ $
TOTAL for CLIN 0001 + CLIN 0002 + CLIN 0003 $________________
CLIN 0004 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from
Document 00 22 13.00 20 Page 12 the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits, in accordance with the drawing and specifications.
CLIN 0004
48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes
CHH505, CHH506, CHH507, CHH508,
Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits
CLIN 0005 OPTION: Price includes the following:
complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133, in accordance with the drawing and specifications.
CLIN 0005
for Aerial installation between the Existing Utility Poles 123 and 133
CLIN 0006 OPTION: Price includes the following:
complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123, in accordance with the drawing and specifications.
CLIN 0006
Existing Utility Poles 122 and 123
CLIN 0007 OPTION: Price includes the following:
Document 00 22 13.00 20 Page 13 complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 109A, in accordance with the drawing
CLIN 0007
Existing Utility Poles 122 and Utility Pole 109A.
CLIN 0008 OPTION: Price includes the following:
complete with 48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A, in accordance with the drawing and specifications.
CLIN 0008
48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A.
CLIN 0009 OPTION: Price includes the following:
complete with 24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK), in accordance with the drawing
Document 00 22 13.00 20 Page 14
CLIN 0009
24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in
CLIN 0001AK).
CLIN 0010 OPTION: Price includes the following:
complete with 24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank, in accordance with the drawing and specifications.
CLIN 00010
00010
24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank.
CLIN 0011 OPTION: Price includes the following:
complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK), in accordance with the drawing
CLIN 00011
00011
24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services
Document 00 22 13.00 20 Page 15 inside building 7101/02 (as noted in CLIN
0001AK).
CLIN 0012 OPTION: Price includes the following:
complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK), in accordance with the drawing
CLIN 0012
0012 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN
0001AK).
CLIN 0013 – OPTION: Price includes the following:
(UNIT PRICE X
NO. UNITS)
0013AA Rodding Existing Conduit Pathways
LF $_______/LF 500 $___________
0013AB 24-PORT SFP PORT FIBER
OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets
EA $_______/EA 1 $___________
0013AC 2“ Interior Conduit (RMC or IMC)with 24 and/or 48 strand Fiber Optic Cable
LF $_______/LF 100 $___________
0013AD 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable
LF $_______/LF 100 $___________
0013AE 120V 20A Circuit 3#12 Conductors in ¾” conduit
LF $_______/ LF 100 $___________
0013AF 20A Circuit Breaker EA $_______/EA 10 $___________
0013AG 120V 20A Duplex Receptacle
EA $_______/EA 20 $___________
0013AH Rock Excavation – trench CY $_______/CY 200 $___________
Document 00 22 13.00 20 Page 16
0013AI Utilities – Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’ of 4” schedule 40 conduit
0013AJ Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles.
0013AK Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit
0013AL Utilities - Trenching Underground – includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable
0013AM LAN BASE NETWORK SWITCH
for DDC-SCADA Network Panels
EA $_______/EA 1 $___________
0013AN Fire Stopping EA $_______/EA 10 $___________
0013AO Smoke Stopping EA $_______/EA 10 $___________
0013AP Ground Busses EA $_______/EA 10 $___________
0013AQ Alternate 48 strand ICS Backbone Fiber Optic Cable Inside Building 1506 – Per Sheet T-102A (Including conduit)
CLIN 0013AA. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Proofing/Rodding Existing Conduit Pathways, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AA
0013AA
Proofing/Rodding Existing Conduit Pathways
LF $_______/LF
500 $__________
CLIN 0013AB. Price for providing work in connection with the procurement and required for 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS
Document 00 22 13.00 20 Page 17
Duplex LC Transceiver Modules for Communication Cabinets, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE
FOR CLIN
0013AB
0013AB
24-PORT SFP PORT FIBER
OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets
LFEA $_______/LFEA
100 $__________
CLIN 0013AC. Price for providing work in connection with the procurement and required for 2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AC
0013AC
2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable
CLIN 0013AD. Price for providing work in connection with the procurement and required for 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AD
0013AD
1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable
CLIN 0013AE. Price for providing work in connection with the procurement and required for 120V 20A Circuit 3#12 Conductors in ¾” conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AE
0013AE 120V 20A Circuit 3#12 Conductors in ¾” rigid conduit
$______/ LF
CLIN 0013AF. Price for providing work in connection with the procurement and required for 20A Circuit Breaker, in accordance with the drawings and specifications and in accordance with the following schedule:
Document 00 22 13.00 20 Page 18
CLIN 0013AF
0013AF 20A Circuit Breaker EA $_______/EA
10 $__________
CLIN 0013AG. Price for providing work in connection with the procurement and required for 120V 20A Duplex Receptacle, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AG
0013AG 120V 20A Duplex Receptacle EA $_______/EA
20 $__________
CLIN 0013AH. Price for providing work in connection with the procurement and required for Rock Excavation, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AH
0013AH Rock Excavation CY $_______/CY
200 $__________
CLIN 0013AI. Price for providing work in connection with the procurement and required for Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AI
0013AI
Utilities - Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit
CLIN 0013AJ. Price for providing work in connection with the procurement and required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AJ
0013AJ
strand ICS Backbone Fiber Optic24 and/or 48 strand
Document 00 22 13.00 20 Page 19
CLIN 0013AJ
Cable – Aerial, on existing utility poles
CLIN 0013AK. Price for providing work in connection with the procurement and required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AK
0013AK
strand ICS Backbone Fiber Optic Cable – Installed in
CLIN 0013AL. Price for providing work in connection with the procurement and required for Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AL
0013AL
Utilities - Trenching Underground, includes 2- 4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable
CLIN 0013AM. Price for providing work in connection with the procurement and required for LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AM
0013AM
LAN BASE NETWORK SWITCH
for DDC-SCADA Network Panels
CLIN 0013AN. Price for providing work in connection with the procurement and required for Fire Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:
Document 00 22 13.00 20 Page 20
CLIN 0013AN
0013AN Fire Stopping EA $_______/EA
CLIN 0013AO. Price for providing work in connection with the procurement and required for Smoke Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AO
0013AO Smoke Stopping EA $_______/EA
CLIN 0013AP. Price for providing work in connection with the procurement and required for Ground Buses, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN DESCRIPTION UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0013AP
00103AP Ground Busses EA $_______/EA
CLIN 0013AQ. Price for providing work in connection with the procurement and required for Utilities - Alternate ICS Backbone Fiber Optic Cable Inside Buildings 1506 - Per Sheet T-102A, in accordance with the drawings and specifications and in accordance with the following schedule:
CLIN 0013AQ
0013AQ
Alternate 48 Strand ICS Backbone Fiber Optic Cable Inside Buildings 1506 – Per Sheet T-102A (Including conduit)
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA through 0001AY. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s)
Document 00 22 13.00 20 Page 21
The Government reserves the right to award options to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for options. No provision is made for economic price adjustment. Exercising of the options shall not extend the contract completion date.
Enter Unit prices and Lump Sum in the spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
1.3 PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification CLINs.
a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.
b. Bonding is not required for the design, procurement and installation of FF&E.
c. Offerors may propose a Handling and Administration Rate (HAR) for the
FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.
d. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.
e. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the
FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification.
No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time
Document 00 22 13.00 20 Page 22 for the FF&E is not available and the Government's award of the modification is in the last six months of the contract.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
- End of Document --