Attachment E - Price Proposal Form.docx

DOCX document 84 KB Posted

Attached to
N40085-22-R-2691 P-828 SMART ENERGY, NAVAL STATION GREAT LAKES, GREAT LAKES, IL
Solicitation number
N4008522R2691
Issued by

About this file

This price proposal form solicits pricing for a fiber optic cable and communications infrastructure project at Naval Station Great Lakes in Illinois. Offerors must provide unit pricing and extended totals for 49 separate contract line items involving site preparation, various types of cable installation via aerial, trench, and horizontal directional drilling methods, telecommunications equipment provisioning, building renovations, commissioning, and hazardous material abatement. The solicitation also includes 13 optional additional line items and provides estimated amounts for planned furniture and audiovisual modifications. Pricing is requested for the base requirements, two planned modifications, and 13 option items to be evaluated for potential award. The award will be determined by the total price of specific line items, and options may be awarded within 365 days at the proposed prices.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSGL P-828 Smart Energy Complete Project, Work Order Number 1609936 Naval Station Great Lakes - Great Lakes, Illinois

DOCUMENT 00 22 13.00 20 (REV 002)

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14 6/09/22

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum prices for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN 0001 Summary

Item
UNIT
UNIT PRICE
NO. UNITS
Total Price for CLIN

(UNIT PRICE X NO. UNITS)

0001AA
Site Preparations, Mobilization and Demobilization

LS

0001AB
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand

LF

$_______/LF

15,389

0001AC
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit

LF

45,840

0001AD
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)

LF

$_______/LF

1,331

0001AE
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand
0001AF
Utilities – Trenching 2-4” Conduits (1,362 LF of total conduit)
0001AG
Utilities – Trenching 2-4” Conduits, Concrete Encased (112 LF of total conduit)

0001AH

Utilities – Horizontal Directional Drilling 2-4” Conduits(1,678 LF of total conduit)

LF

0001AI
Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit)
LF

$_______/LF

2,866

0001AJ
Utilities - 12 Strand Backbone Fiber Optic Cable Inside Buildings 621,236,26,190,7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)
LS

$_______/LF

1,321

0001AK
Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding
0001AL
New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies
0001AM
SCADA/DDC Network Connectivity & Integration
0001AN
Cyber Security
LS
1
$___________
0001AO
Interior Renovation Bldg 68
LS
1
$___________
0001AP
Total System Commissioning (TSCx)
LS
1
$___________
0001AQ
Communication Maintenance Hole (CMH)
EA
$_______/EA
1
$___________
0001AR
Communication Maintenance Handhole (CHH)

EA

$_______/EA

0001AS
Rodding/Proofing Existing Conduit Pathways

LF

$_______/LF

0001AT
Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)
EA
$_______/EA
17
$___________
0001AU
Pavement Repair – full pavement section
SY
$_______/SY
118
$___________
0001AV
Sidewalk Repair – full pavement section
SY
$_______/SY
32
$___________
0001AW
Coring Existing Concrete Structures
EA
$_______/EA
10
$___________
0001AX
HAZMAT – Removal and Disposal for ALL Buildings
LS
1
$___________
0001AY
HAZMAT – Removal and Disposal of ALL Hazardous Soil

CY

$_______/CY

CLIN 0001 Total

CLIN 0001AA. Lump Sum price for the entire work for P-828 Smart Energy, Complete Project complete with Mobilization, Demobilization and Site Preparations such as site set up, miscellaneous demolition and relocations, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012N and CLIN 0013.

CLIN
DESCRIPTION
UNIT
TOTAL PRICE FOR CLIN 0001AA

0001AA

Site Preparations, Mobilization and Demobilization

CLIN 0001AB. Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial, in accordance with the drawings and specifications, but excluding work described in (CLIN)0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AB

0001AB

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand

15,389

CLIN 0001AC. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- installed in 25,769 LF of Existing Conduit, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AC

0001AC

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit

45,840

CLIN 0001AD. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AD

0001AD

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)

1,331

CLIN 0001AE. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AE

0001AE

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand

CLIN 0001AF. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - Trenching 2-4” Conduits (1,362 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AF

0001AF

Utilities – Trenching 2-4” Conduits (1,362 of total conduit)

CLIN 0001AG. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AG

0001AG

Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit)

CLIN 0001AH. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AH

0001AH

Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit)

CLIN 0001AI. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit) including, but not limited to, conduit, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AI

0001AI

with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit)

2,866

CLIN 0001AJ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as 12 Strand Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)including, but not limited to, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AJ

0001AJ

Utilities - 12 Strand Backbone Fiber Optic Cable – Inside buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)

1,321

CLIN 0001AK. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
DESCRIPTION

UNIT

TOTAL PRICE FOR CLIN 0001AK

0001AK

Utilities - Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018)

CLIN 0001AL. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
TOTAL PRICE FOR CLIN 0001AL

0001AL

Utilities - All New Exterior building penetrations

CLIN 0001AM. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with SCADA/DDC Network Connectivity & Integration in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN

ITEM

UNIT

TOTAL PRICE FOR CLIN 0001AM

0001AJM

SCADA/DDC Network Connectivity & Integration

CLIN 0001AN. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Cyber Security for all control systems subject to the requirement of UFC 04 010 06 and in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0001AN
0001AN
Cyber Security

CLIN 0001AO. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Interior Renovation Bldg 68 in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN

ITEM

UNIT
TOTAL PRICE FOR CLIN 0001AO

0001AO

Renovation Bldg 68

LS
$____________

CLIN 0001AP. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Total Building Commissioning (TBCx)by Third Party to the Bidder in in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0001AP

0001AP

Total System Commissioning (TSCx)

LS
$_____________

CLIN 0001AQ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Maintenance Hole (CMH)in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AQ

0001AQ

Communication Maintenance Hole (CMH)

EA

$_______/EA

CLIN 0001AR. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Handhole (CHH) in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AR

0001AR

Communication Handhole (CHH)

CLIN 0001AS. Price for the entire work for P-828 Smart Energy, Complete Project complete with Rodding/Proofing Existing Conduit Pathways for Alternate Under Ground Route for the Fiber Optic Cable in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AS
0001AS
Rodding Existing Conduit Pathways for Alternate UG Fiber Route

CLIN 0001AT. Price for the entire work for P-828 Smart Energy, Complete Project complete with Wooden Utility Poles, Class 3 in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AT

0001AT

Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)

CLIN 0001AU. Price for the entire work for P-828 Smart Energy, Complete Project complete with Pavement repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AU

0001AU

Pavement repair – full pavement section

SY

$_______/SY

CLIN 0001AV. Price for the entire work for P-828 Smart Energy, Complete Project complete with Sidewalk repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AV

0001AV

Sidewalk repair – full pavement section

SY

$_______/SY

CLIN 0001AW. Price for the entire work for P-828 Smart Energy, Complete Project complete with Coring Existing Concrete Structures in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AW

0001AW

Coring Existing Concrete Structures

EA

CLIN 0001AX. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal for ALL Buildings, in accordance with the drawings and specifications, but excluding work described in in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0001AX

0001AX

HAZMAT – Removal and Disposal for ALL Buildings

LS
$____________

CLIN 0001AY. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal of ALL Hazardous Soil, in accordance with the drawings specifications, but excluding work described in in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW 0001AX, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0001AY

0001AY

HAZMAT – Removal and Disposal of ALL Hazardous Soil

CY

$_______/CY

TOTAL for CLIN 0001( 0001AA-0001AY) $________________

CLIN 0002 PLANNED MODIFICATION 1: Price includes the following:

Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for any new Furniture, Fixtures, and Equipment (FF&E) including all work indicated in the contract documents as Planned Modification Item 1, in accordance with the following schedule:

CLIN
ITEM
GOVERNMENT FF&E ESTIMATE
HAR (NTE 5%)
HAR AMOUNT (GOVT FF&E ESTIMATE x HAR %)
TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0002

(GOVT FF&E ESTIMATE + HAR AMOUNT)

0002
FF&E
$57,000
_____%
$
$

CLIN 0003 PLANNED MODIFICATION 2: Price includes the following:

Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for the Audio/Visual (A/V) including all work indicated in the contract documents as Planned Modification Item 2, in accordance with the following schedule:

CLIN
ITEM
GOVERNMENT A/V ESTIMATE
HAR (NTE 5%)
HAR AMOUNT (GOVT A/V ESTIMATE x HAR %)
TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0003

(GOVT A/V ESTIMATE + HAR AMOUNT)

0003
A/V
$5,000
_____%
$
$

TOTAL for CLIN 0001 + CLIN 0002 + CLIN 0003 $________________

CLIN 0004 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0004

48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits

CLIN 0005 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0005
48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133
LS
$____________

CLIN 0006 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0006
48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123
LS
$____________

CLIN 0007 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 109A, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0007

48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and Utility Pole 109A.

CLIN 0008 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0008

48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A.

CLIN 0009 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK), in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0009

24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK).

CLIN 0010 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank, in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 00010

00010

24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank.

CLIN 0011 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK), in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 00011

00011

24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK).

CLIN 0012 OPTION: Price includes the following:

Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK), in accordance with the drawing and specifications.

CLIN

ITEM
UNIT
TOTAL PRICE FOR CLIN 0012
0012
24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK).

CLIN 0013 – OPTION: Price includes the following:

Item
UNIT
UNIT PRICE
NO. UNITS
Total Price for CLIN

(UNIT PRICE X NO. UNITS)

0013AA
Rodding Existing Conduit Pathways
LF
$_______/LF
500
$___________
0013AB
24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets
EA
$_______/EA
1
$___________
0013AC
2“ Interior Conduit (RMC or IMC)with 24 and/or 48 strand Fiber Optic Cable
LF
$_______/LF
100
$___________
0013AD
1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable
LF
$_______/LF
100
$___________
0013AE
120V 20A Circuit 3#12 Conductors in ¾” conduit
LF
$_______/ LF
100
$___________
0013AF
20A Circuit Breaker
EA
$_______/EA
10
$___________
0013AG
120V 20A Duplex Receptacle
EA
$_______/EA
20
$___________
0013AH
Rock Excavation – trench
CY
$_______/CY
200
$___________
0013AI
Utilities – Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’ of 4” schedule 40 conduit
0013AJ
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles.

LF

$_______/LF

0013AK
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit

LF

$_______/LF

0013AL
Utilities - Trenching Underground – includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable

LF

$_______/LF

0013AM
LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels
EA
$_______/EA
1
$___________
0013AN
Fire Stopping
EA
$_______/EA
10
$___________
0013AO
Smoke Stopping
EA
$_______/EA
10
$___________
0013AP
Ground Busses
EA
$_______/EA
10
$___________
0013AQ
Alternate 48 strand ICS Backbone Fiber Optic Cable Inside Building 1506 – Per Sheet T-102A (Including conduit)

CLIN 0013AA. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Proofing/Rodding Existing Conduit Pathways, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AA

0013AA

Proofing/Rodding Existing Conduit Pathways
LF
$_______/LF
500
$__________

CLIN 0013AB. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AB

0013AB

24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets
LF
$_______/LF
100
$__________

CLIN 0013AC. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AC

0013AC

2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable
LF
$_______/LF
100
$__________

CLIN 0013AD. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AD

0013AD

1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable
LF
$_______/LF
100
$__________

CLIN 0013AE. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 120V 20A Circuit 3#12 Conductors in ¾” conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AE
0013AE
120V 20A Circuit 3#12 Conductors in ¾” rigid conduit

$______/ LF

CLIN 0013AF. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 20A Circuit Breaker, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AF
0013AF
20A Circuit Breaker
EA
$_______/EA
10
$__________

CLIN 0013AG. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 120V 20A Duplex Receptacle, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AG
0013AG
120V 20A Duplex Receptacle
EA
$_______/EA
20
$__________

CLIN 0013AH. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Rock Excavation, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AH
0013AH
Rock Excavation
CY
$_______/CY
200
$__________

CLIN 0013AI. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AI

0013AI

Utilities - Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit

CLIN 0013AJ. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AJ

0013AJ

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic24 and/or 48 strand Cable – Aerial, on existing utility poles

CLIN 0013AK. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AK

0013AK

Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit

CLIN 0013AL. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AL

0013AL

Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable

CLIN 0013AM. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AM

0013AM

LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels

CLIN 0013AN. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Fire Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AN
0013AN
Fire Stopping
EA
$_______/EA

CLIN 0013AO. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Smoke Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AO
0013AO
Smoke Stopping
EA
$_______/EA

CLIN 0013AP. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Ground Buses, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AP
00103AP
Ground Busses
EA
$_______/EA

CLIN 0013AQ. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities - Alternate ICS Backbone Fiber Optic Cable Inside Buildings 1506 - Per Sheet T-102A, in accordance with the drawings and specifications and in accordance with the following schedule:

CLIN
DESCRIPTION
UNIT
UNIT PRICE
NO. UNITS
TOTAL PRICE FOR CLIN 0013AQ

0013AQ

Alternate 48 Strand ICS Backbone Fiber Optic Cable Inside Buildings 1506 – Per Sheet T-102A (Including conduit)

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items 0001AA through 0001AY. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s)

The Government reserves the right to award options to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for options. No provision is made for economic price adjustment. Exercising of the options shall not extend the contract completion date.

Enter Unit prices and Lump Sum in the spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

1.3 PLANNED MODIFICATION BID NOTES

These notes apply to Planned Modification CLINs.

a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

b. Bonding is not required for the design, procurement and installation of FF&E.

c. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

d. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

e.If awarded, the FF&E modification will be awarded at least
six months prior to the contract completion date. A minimum of six
months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E is not available and the Government's award of the modification is in the last six months of

the contract.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

- End of Document -- Document 00 22 13.00 20 Page 6