This price proposal form solicits pricing for a fiber optic cable and communications infrastructure project at Naval Station Great Lakes in Illinois. Offerors must provide unit pricing and extended totals for 49 separate contract line items involving site preparation, various types of cable installation via aerial, trench, and horizontal directional drilling methods, telecommunications equipment provisioning, building renovations, commissioning, and hazardous material abatement. The solicitation also includes 13 optional additional line items and provides estimated amounts for planned furniture and audiovisual modifications. Pricing is requested for the base requirements, two planned modifications, and 13 option items to be evaluated for potential award. The award will be determined by the total price of specific line items, and options may be awarded within 365 days at the proposed prices.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSGL P-828 Smart Energy Complete Project, Work Order Number 1609936 Naval Station Great Lakes - Great Lakes, Illinois
DOCUMENT 00 22 13.00 20 (REV 002)
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14 6/09/22
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum prices for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001 Summary
| Item |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| Total Price for CLIN |
(UNIT PRICE X NO. UNITS)
| 0001AA |
| Site Preparations, Mobilization and Demobilization |
LS
| 0001AB |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand |
LF
$_______/LF
15,389
| 0001AC |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit |
LF
45,840
| 0001AD |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand) |
LF
$_______/LF
1,331
| 0001AE |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand |
| 0001AF |
| Utilities – Trenching 2-4” Conduits (1,362 LF of total conduit) |
| 0001AG |
| Utilities – Trenching 2-4” Conduits, Concrete Encased (112 LF of total conduit) |
0001AH
Utilities – Horizontal Directional Drilling 2-4” Conduits(1,678 LF of total conduit)
LF
| 0001AI |
| Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit) |
| LF |
$_______/LF
2,866
| 0001AJ |
| Utilities - 12 Strand Backbone Fiber Optic Cable Inside Buildings 621,236,26,190,7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit) |
| LS |
$_______/LF
1,321
| 0001AK |
| Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding |
| 0001AL |
| New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies |
| 0001AM |
| SCADA/DDC Network Connectivity & Integration |
| 0001AN |
| Cyber Security |
| LS |
| 1 |
| $___________ |
| 0001AO |
| Interior Renovation Bldg 68 |
| LS |
| 1 |
| $___________ |
| 0001AP |
| Total System Commissioning (TSCx) |
| LS |
| 1 |
| $___________ |
| 0001AQ |
| Communication Maintenance Hole (CMH) |
| EA |
| $_______/EA |
| 1 |
| $___________ |
| 0001AR |
| Communication Maintenance Handhole (CHH) |
EA
$_______/EA
| 0001AS |
| Rodding/Proofing Existing Conduit Pathways |
LF
$_______/LF
| 0001AT |
| Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles) |
| EA |
| $_______/EA |
| 17 |
| $___________ |
| 0001AU |
| Pavement Repair – full pavement section |
| SY |
| $_______/SY |
| 118 |
| $___________ |
| 0001AV |
| Sidewalk Repair – full pavement section |
| SY |
| $_______/SY |
| 32 |
| $___________ |
| 0001AW |
| Coring Existing Concrete Structures |
| EA |
| $_______/EA |
| 10 |
| $___________ |
| 0001AX |
| HAZMAT – Removal and Disposal for ALL Buildings |
| LS |
| 1 |
| $___________ |
| 0001AY |
| HAZMAT – Removal and Disposal of ALL Hazardous Soil |
CY
$_______/CY
CLIN 0001 Total
CLIN 0001AA. Lump Sum price for the entire work for P-828 Smart Energy, Complete Project complete with Mobilization, Demobilization and Site Preparations such as site set up, miscellaneous demolition and relocations, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012N and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| TOTAL PRICE FOR CLIN 0001AA |
0001AA
Site Preparations, Mobilization and Demobilization
CLIN 0001AB. Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial, in accordance with the drawings and specifications, but excluding work described in (CLIN)0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AB |
0001AB
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) – Aerial 14,717’ of 48 strand & 672’ of 24 strand
15,389
CLIN 0001AC. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- installed in 25,769 LF of Existing Conduit, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AC |
0001AC
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)- (45,563’ of 48 strand & 277’ of 24 strand) - installed in 25,769 LF of Existing Conduit
45,840
CLIN 0001AD. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AD |
0001AD
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only) for Trench installation (1,023’ of 48 strand & 308’ of 24 strand)
1,331
CLIN 0001AE. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling, in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AE |
0001AE
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable (only)for Horizontal Directional Drilling - 668’ of 48 strand & 0’ of 24 strand
| CLIN 0001AF. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - Trenching 2-4” Conduits (1,362 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013. |
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AF |
0001AF
Utilities – Trenching 2-4” Conduits (1,362 of total conduit)
CLIN 0001AG. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AH, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AG |
0001AG
Utilities – Trenching 2-4” Conduits, Concrete Encased(112 of total conduit)
CLIN 0001AH. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit), in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI,0001AJ , 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AH |
0001AH
Utilities – Horizontal Directional Drilling 2-4” Conduits((1,678 of total conduit)
CLIN 0001AI. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit) including, but not limited to, conduit, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AI |
0001AI
with Utilities - 24 and/or 48 strand ICS Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 (Including conduit)
2,866
CLIN 0001AJ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as 12 Strand Backbone Fiber Optic Cable Inside Buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)including, but not limited to, support and termination in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AJ |
0001AJ
Utilities - 12 Strand Backbone Fiber Optic Cable – Inside buildings 621, 236, 26, 190, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018 to DDC/SCADA controls (Including Conduit)
1,321
| CLIN 0001AK. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018) including, but not limited to, equipment, outfitting, terminations, interior wall penetrations, testing, power, and grounding in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013. |
| CLIN |
| DESCRIPTION |
UNIT
TOTAL PRICE FOR CLIN 0001AK
0001AK
Utilities - Telecom service at the following Building’s communication rooms (621, 236, 26, 190, 68, 7260, R20, 7811, 1506, 3114A, F10, A450, 3504, and 2018)
CLIN 0001AL. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Utilities such as New Exterior building penetrations for buildings 236, 190, 1506, 3114A, F10, 3504, and 2018)including, but not limited to, pull boxes at exterior walls and vertical conduit mast assemblies in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| TOTAL PRICE FOR CLIN 0001AL |
0001AL
Utilities - All New Exterior building penetrations
CLIN 0001AM. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with SCADA/DDC Network Connectivity & Integration in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
ITEM
UNIT
TOTAL PRICE FOR CLIN 0001AM
0001AJM
SCADA/DDC Network Connectivity & Integration
CLIN 0001AN. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Cyber Security for all control systems subject to the requirement of UFC 04 010 06 and in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0001AN |
| 0001AN |
| Cyber Security |
CLIN 0001AO. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Interior Renovation Bldg 68 in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
ITEM
| UNIT |
| TOTAL PRICE FOR CLIN 0001AO |
0001AO
Renovation Bldg 68
| LS |
| $____________ |
CLIN 0001AP. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with Total Building Commissioning (TBCx)by Third Party to the Bidder in in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AQ, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0001AP |
0001AP
Total System Commissioning (TSCx)
| LS |
| $_____________ |
CLIN 0001AQ. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Maintenance Hole (CMH)in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AR, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AQ |
0001AQ
Communication Maintenance Hole (CMH)
EA
$_______/EA
CLIN 0001AR. Price for the entire work for P-828 Smart Energy, Complete Project complete with Communication Handhole (CHH) in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AS, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AR |
0001AR
Communication Handhole (CHH)
CLIN 0001AS. Price for the entire work for P-828 Smart Energy, Complete Project complete with Rodding/Proofing Existing Conduit Pathways for Alternate Under Ground Route for the Fiber Optic Cable in accordance with the drawings and specifications but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AT 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AS |
| 0001AS |
| Rodding Existing Conduit Pathways for Alternate UG Fiber Route |
CLIN 0001AT. Price for the entire work for P-828 Smart Energy, Complete Project complete with Wooden Utility Poles, Class 3 in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AU, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AT |
0001AT
Wooden Utility Poles, Class 3 (15–30’poles and 2-35’ poles)
CLIN 0001AU. Price for the entire work for P-828 Smart Energy, Complete Project complete with Pavement repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AV, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AU |
0001AU
Pavement repair – full pavement section
SY
$_______/SY
CLIN 0001AV. Price for the entire work for P-828 Smart Energy, Complete Project complete with Sidewalk repair in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AW, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AV |
0001AV
Sidewalk repair – full pavement section
SY
$_______/SY
CLIN 0001AW. Price for the entire work for P-828 Smart Energy, Complete Project complete with Coring Existing Concrete Structures in accordance with the drawings and specifications, but excluding work described in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AX, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AW |
0001AW
Coring Existing Concrete Structures
EA
CLIN 0001AX. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal for ALL Buildings, in accordance with the drawings and specifications, but excluding work described in in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW, 0001AY, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0001AX |
0001AX
HAZMAT – Removal and Disposal for ALL Buildings
| LS |
| $____________ |
CLIN 0001AY. Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with HAZMAT Removal and Disposal of ALL Hazardous Soil, in accordance with the drawings specifications, but excluding work described in in CLIN)0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, 0001AN, 0001AO, 0001AP, 0001AQ, 0001AR, 0001AS, 0001AT, 0001AU, 0001AV, 0001AW 0001AX, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010 CLIN 0011, CLIN 0012 and CLIN 0013.
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AY |
0001AY
HAZMAT – Removal and Disposal of ALL Hazardous Soil
CY
$_______/CY
TOTAL for CLIN 0001( 0001AA-0001AY) $________________
CLIN 0002 PLANNED MODIFICATION 1: Price includes the following:
Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for any new Furniture, Fixtures, and Equipment (FF&E) including all work indicated in the contract documents as Planned Modification Item 1, in accordance with the following schedule:
| CLIN |
| ITEM |
| GOVERNMENT FF&E ESTIMATE |
| HAR (NTE 5%) |
| HAR AMOUNT (GOVT FF&E ESTIMATE x HAR %) |
| TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0002 |
(GOVT FF&E ESTIMATE + HAR AMOUNT)
| 0002 |
| FF&E |
| $57,000 |
| _____% |
| $ |
| $ |
CLIN 0003 PLANNED MODIFICATION 2: Price includes the following:
Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for the Audio/Visual (A/V) including all work indicated in the contract documents as Planned Modification Item 2, in accordance with the following schedule:
| CLIN |
| ITEM |
| GOVERNMENT A/V ESTIMATE |
| HAR (NTE 5%) |
| HAR AMOUNT (GOVT A/V ESTIMATE x HAR %) |
| TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0003 |
(GOVT A/V ESTIMATE + HAR AMOUNT)
| 0003 |
| A/V |
| $5,000 |
| _____% |
| $ |
| $ |
TOTAL for CLIN 0001 + CLIN 0002 + CLIN 0003 $________________
CLIN 0004 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0004 |
48 strand ICS Backbone Fiber Optic Cable from Building 1506 to the existing utility pole 133, including the interior cable inside Building 1506 (from the new patch panel outbound to the north, approx. 222’), the installation of utility pole 81H, Communication Handholes CHH505, CHH506, CHH507, CHH508, Horizontal Directional Drilling (HDD) between communication Handholes CHH505, CHH506 and CHH507, and all corresponding conduits
CLIN 0005 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0005 |
| 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 123 and 133 |
| LS |
| $____________ |
CLIN 0006 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0006 |
| 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 123 |
| LS |
| $____________ |
CLIN 0007 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and 109A, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0007 |
48 strand ICS Backbone Fiber Optic Cable for Aerial installation between the Existing Utility Poles 122 and Utility Pole 109A.
CLIN 0008 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0008 |
48 strand Fiber Optic Cable (only)between building 1912 and building 3114A, including all telecom services inside building 1912 (as noted in CLIN 0001AK), utility pole 109A, aerial installation from building 1912 to utility pole 100, HDD from utility pole 100 to CHH 509, CHH 509, trenching from CHH 509 to existing utility pole 99, aerial installation from existing utility pole 99 to existing utility pole 93, from existing utility pole 93 to building 3114A.
CLIN 0009 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK), in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0009 |
24 strand Fiber Optic Cable installations between building 1912 and building 3303, including aerial installation from building 1912 to utility pole 100, cable installation between utility pole 100 and utility pole 99 (assume HDD, trenching and CHH 509 are installed per CLIN 0008 OPTION), aerial installation from existing utility pole 99 to the utility pole 95J, five (5) utility poles (95F to 95J), trenching from utility pole 95J to (and including)the fiber patch panel assembly at building 3303(as noted in CLIN 0001AK).
CLIN 0010 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank, in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 00010 |
00010
24 strand Fiber Optic Cable for aerial and trenching installations between building 3114A and the VA Water Tank, including the installation of CHH 511 and CHH 512, and the fiber patch panel assembly at the VA Water Tank.
CLIN 0011 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK), in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 00011 |
00011
24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7101/02, including the installation of all telecom services inside building 7101/02 (as noted in CLIN 0001AK).
CLIN 0012 OPTION: Price includes the following:
Lump Sum Price for the entire work for P-828 Smart Energy, Complete Project complete with 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK), in accordance with the drawing and specifications.
CLIN
| ITEM |
| UNIT |
| TOTAL PRICE FOR CLIN 0012 |
| 0012 |
| 24 strand Fiber Optic Cable inside existing conduit between building 7260 and building 7111/12, including the installation of all telecom services inside building 7111/12 (as noted in CLIN 0001AK). |
CLIN 0013 – OPTION: Price includes the following:
| Item |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| Total Price for CLIN |
(UNIT PRICE X NO. UNITS)
| 0013AA |
| Rodding Existing Conduit Pathways |
| LF |
| $_______/LF |
| 500 |
| $___________ |
| 0013AB |
| 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets |
| EA |
| $_______/EA |
| 1 |
| $___________ |
| 0013AC |
| 2“ Interior Conduit (RMC or IMC)with 24 and/or 48 strand Fiber Optic Cable |
| LF |
| $_______/LF |
| 100 |
| $___________ |
| 0013AD |
| 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable |
| LF |
| $_______/LF |
| 100 |
| $___________ |
| 0013AE |
| 120V 20A Circuit 3#12 Conductors in ¾” conduit |
| LF |
| $_______/ LF |
| 100 |
| $___________ |
| 0013AF |
| 20A Circuit Breaker |
| EA |
| $_______/EA |
| 10 |
| $___________ |
| 0013AG |
| 120V 20A Duplex Receptacle |
| EA |
| $_______/EA |
| 20 |
| $___________ |
| 0013AH |
| Rock Excavation – trench |
| CY |
| $_______/CY |
| 200 |
| $___________ |
| 0013AI |
| Utilities – Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’ of 4” schedule 40 conduit |
| 0013AJ |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles. |
LF
$_______/LF
| 0013AK |
| Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit |
LF
$_______/LF
| 0013AL |
| Utilities - Trenching Underground – includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable |
LF
$_______/LF
| 0013AM |
| LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels |
| EA |
| $_______/EA |
| 1 |
| $___________ |
| 0013AN |
| Fire Stopping |
| EA |
| $_______/EA |
| 10 |
| $___________ |
| 0013AO |
| Smoke Stopping |
| EA |
| $_______/EA |
| 10 |
| $___________ |
| 0013AP |
| Ground Busses |
| EA |
| $_______/EA |
| 10 |
| $___________ |
| 0013AQ |
| Alternate 48 strand ICS Backbone Fiber Optic Cable Inside Building 1506 – Per Sheet T-102A (Including conduit) |
CLIN 0013AA. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Proofing/Rodding Existing Conduit Pathways, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AA |
0013AA
| Proofing/Rodding Existing Conduit Pathways |
| LF |
| $_______/LF |
| 500 |
| $__________ |
CLIN 0013AB. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AB |
0013AB
| 24-PORT SFP PORT FIBER OPTIC SWITCH with power supply and 24 1GBPS Duplex LC Transceiver Modules for Communication Cabinets |
| LF |
| $_______/LF |
| 100 |
| $__________ |
CLIN 0013AC. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AC |
0013AC
| 2“ Interior Conduit (RMC or IMC) with 24 and/or 48 strand Fiber Optic Cable |
| LF |
| $_______/LF |
| 100 |
| $__________ |
CLIN 0013AD. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AD |
0013AD
| 1“ Interior Conduit (RMC or IMC) with 12 strand Fiber Optic Cable |
| LF |
| $_______/LF |
| 100 |
| $__________ |
CLIN 0013AE. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 120V 20A Circuit 3#12 Conductors in ¾” conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AE |
| 0013AE |
| 120V 20A Circuit 3#12 Conductors in ¾” rigid conduit |
$______/ LF
CLIN 0013AF. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 20A Circuit Breaker, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AF |
| 0013AF |
| 20A Circuit Breaker |
| EA |
| $_______/EA |
| 10 |
| $__________ |
CLIN 0013AG. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for 120V 20A Duplex Receptacle, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AG |
| 0013AG |
| 120V 20A Duplex Receptacle |
| EA |
| $_______/EA |
| 20 |
| $__________ |
CLIN 0013AH. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Rock Excavation, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AH |
| 0013AH |
| Rock Excavation |
| CY |
| $_______/CY |
| 200 |
| $__________ |
CLIN 0013AI. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 strand ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AI |
0013AI
Utilities - Horizontal Directional Drilling Underground(UG) – includes 100’ of 24 and/or 48 ICS Backbone Fiber Optic Cable and 200’of 4” schedule 40 conduit
CLIN 0013AJ. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Aerial, on existing utility poles, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AJ |
0013AJ
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic24 and/or 48 strand Cable – Aerial, on existing utility poles
CLIN 0013AK. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AK |
0013AK
Utilities – 24 and/or 48 strand ICS Backbone Fiber Optic Cable – Installed in Existing Conduit
CLIN 0013AL. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AL |
0013AL
Utilities - Trenching Underground, includes 2-4” Conduits (300’ of 4” schedule 40 Conduit) with 24 and/or 48 strand ICS Backbone Fiber Optic Cable
CLIN 0013AM. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AM |
0013AM
LAN BASE NETWORK SWITCH for DDC-SCADA Network Panels
CLIN 0013AN. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Fire Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AN |
| 0013AN |
| Fire Stopping |
| EA |
| $_______/EA |
CLIN 0013AO. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Smoke Stopping, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AO |
| 0013AO |
| Smoke Stopping |
| EA |
| $_______/EA |
CLIN 0013AP. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Ground Buses, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AP |
| 00103AP |
| Ground Busses |
| EA |
| $_______/EA |
CLIN 0013AQ. Price for providing work in connection with the procurement and installation, all labor, material, equipment, transportation, and supervision required for Utilities - Alternate ICS Backbone Fiber Optic Cable Inside Buildings 1506 - Per Sheet T-102A, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0013AQ |
0013AQ
Alternate 48 Strand ICS Backbone Fiber Optic Cable Inside Buildings 1506 – Per Sheet T-102A (Including conduit)
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA through 0001AY. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s)
The Government reserves the right to award options to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for options. No provision is made for economic price adjustment. Exercising of the options shall not extend the contract completion date.
Enter Unit prices and Lump Sum in the spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
1.3 PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification CLINs.
a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.
b. Bonding is not required for the design, procurement and installation of FF&E.
c. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.
d. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.
| e. | If awarded, the FF&E modification will be awarded at least |
| six months prior to the contract completion date. A minimum of six | |
| months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E is not available and the Government's award of the modification is in the last six months of |
the contract.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
- End of Document -- Document 00 22 13.00 20 Page 6