This hazardous materials survey report and related federal contract opportunity identify asbestos-containing materials, lead-based paint, and heavy metal impacts at the Great Lakes Naval Training Center in Great Lakes, Illinois. The survey found ceiling tiles, mastic, and floor tiles containing chrysotile asbestos in buildings 3114A and 621. Additionally, one exterior wall of building 1912 was found to contain lead-based paint above regulatory limits. The federal contract opportunity is a solicitation for the P-828 SMART ENERGY project at the Naval Station Great Lakes seeking energy efficiency upgrades. The Navy is the contracting agency, with responses due to Michelle Corsino by the listed solicitation number and date. The project scope involves renovations that will impact surveyed materials.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H A Z A R D O U S M A T E R I A L S U R V E Y
R E P O R T
EDI – EXCEL L E NCE , DE DICATIO N & IN NO VATI O N
(312) 345-1400 • www.envdesigni.com
LIMITED ASBESTOS AND PAINT SURVEY
AT
GREAT LAKES NAVAL TRAINING CENTER
P-828 SMART ENERGY PROJECT
GREAT LAKES, ILLINOIS
PREPARED BY:
Environmental Design International inc.
33 West Monroe Street, Suite 1825 Chicago, Illinois 60656
(312) 345-1400
(312) 345-0529 (fax) www.envdesigni.com
PREPARED FOR:
Jacobs 7501 North Broadway St. Louis, Missouri 63102
EDI Project #: 1584.011.01
Date of Report: December 17, 2020
Revision 2: February 21, 2022
(312) 345-1400 • www.envdesigni.com
33 W. Monroe St., Suite 1825 Chicago, Illinois 60656 phone: 312.345.1400 fax: 312.345.0529 www.envdesigni.com
December 17, 2020
Revision 1, April 13, 2021 Revision 2, February 21, 2022
Mr. Jeff Farah, Sr. Project Manager Jacobs 7501 North Broadway St. Louis, Missouri 63102
Re: Professional Environmental Services
P-828 Smart Energy Great Lakes Naval Training Center Great Lakes, Illinois
Dear Mr. Farah:
Enclosed please find the hazardous material survey and assessment report for the above-referenced project property, prepared by Environmental Design International inc. (EDI).
EDI performed the environmental survey to identify and sample suspect asbestos-containing materials (ACM) and lead–based paint (LBP) for the P-828 Smart Energy Great Lakes Naval Training Center (GLNTC) in Great Lakes, Illinois. The survey was completed on December 1 and 2, 2020. On March 30 and 31, 2021, EDI performed the environmental survey to identify and sample suspect painted surfaces to include Cadmium (Cd) and Hexavalent Chromium (CrVI) analysis. On February 8 and 9, 2022 EDI performed the environmental survey to identify additional ACM, LBP, Cd and CrVI impacted by the project as defined by Client and is not a comprehensive survey of the complete facilities. The results of the survey are provided in this report.
Please feel free to contact Jose Aguilera at 773-559-0422 or jaguilera@envdesigni.com with any comments or questions regarding EDI’s investigation and this report.
Sincerely, Environmental Design International Inc.
Jose Aguilera Felix R. Moran, PE Project Manager Department Manager, Industrial Hygiene
Asbestos and Paint Survey P-828 Smart Energy Project
Great Lakes Naval Training Center
Revision 2
(312) 345-1400 • WWW .EN VDE SIGN I .COM
i
Table of Contents Page
1.0 Introduction
1.1 Scope of Work
2.0 Asbestos Survey
2.1 ACM Survey Methodology
2.2 Asbestos Results
2.3 Applicable Regulations
3.0 Limited Lead Based Paint Survey
3.1 Limited LBP, Cd and CrVI Survey Methodology
3.2 LBP, Cd and CrVI Survey Results
3.4 Recommendations
3.5 Applicable Regulations and Guidelines
4.0 Findings and Recommendations
4.1 Asbestos Building Survey
4.2 Paint Building Survey
5.0 Limitations
6.0 Definitions
Appendices
Appendix A: Asbestos Laboratory Results, Laboratory Certification and Chain-of-Custody Appendix B: Paint Survey Laboratory Results, Laboratory Certification and Chain-of-Custody Appendix C: EDI Employee Certifications Appendix D: Photographic Log Appendix E: Drawings of Asbestos Sample Locations Appendix F: Drawing of Paint Chip Sample Locations
Great Lakes Naval Training Center i i
Executive Summary
Environmental Design International inc. (EDI) was retained by Jacobs to provide an ACM and LBP survey of the Great Lakes Naval Training Center located in Great Lakes, Illinois.
The survey was performed on December 1 and 2, 2020 by Mr. Jose Aguilera, Illinois Department of Public Health (IDPH) license #100-10088, IDPH lead risk assessor license #009320 with assistance from Mr. Anthony Spalla, a sampling technician. On March 30 and 31, 2021, Mr. Jose Aguilera performed the environmental survey to identify, and sample suspect painted surfaces to include Cadmium (Cd) and Hexavalent Chromium (CrVI) analysis. On February 8 and 9, 2022 Mr. Jose Aguilera performed the environmental survey to identify additional ACM, LBP, Cd and CrVI impacted by the project. The surveys were conducted for the P-828 Smart Energy Project.
EDI performed a visual survey of building materials, and collected representative samples of homogeneous suspect ACM, in accordance with EPA requirements, guidelines and standard industry practices. The samples were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for bulk analysis.
Based on the bulk sample laboratory analysis, the following suspect materials were reported to contain asbestos:
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
3114A M-1-2 Mastic Fair Interior Wall 5.2-5.5%
Chrysotile
3114A M-1-3 Mastic Fair Interior Wall 5.2-5.5%
Chrysotile
621 CT-621-1-1
2’x2’ Ceiling
Tile Fair Room 109
1-5% Chrysotile
621 CT-621-1-2
2’x2’ Ceiling
Tile Fair Room 107
1-5% Chrysotile
621 CT-621-1-3
2’x2’ Ceiling
Tile Fair Room 125
1-5% Chrysotile
Great Lakes Naval Training Center i i i
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
621 FT-621-1-1
12”x12” Multilayer Floor Tile and Associated
Mastic
Fair Room 109 1-10%
Every attempt was made to thoroughly evaluate and assess the presence and condition of suspect ACM throughout the building impacted by renovation activities. Any suspect ACM identified during renovation that is not specifically listed in this report should be assumed positive until it can be thoroughly evaluated, assessed, sampled, and analyzed prior to disturbance, in accordance with applicable regulatory standards.
Paint Survey
The presence of painted surfaces was evaluated in the areas included as part of the P-828 Smart Energy project. EDI performed paint assessment and survey, including sampling of select surfaces that may be impacted by planned renovation activities to identify LBP, Cd and CrVI.
EDI utilized paint chip collection and laboratory analysis, for selected surfaces/components throughout the proposed renovation area. Nine (9) Representative sampling areas (RSAs), consisting of similar components with similar paint color and application based on the age and era of construction, were defined, and sampled for LBP. Six (6) RSAs were defined and sampled for Cd and CrVI. The limited paint survey was focused to determine surfaces/components that may require special handling during renovation.
Based on the laboratory results analysis, one (1) of the RSAs tested surfaces were reported to contain lead above the EPA/HUD regulatory limit of 0.5% or 5000 parts per million (ppm) by weight. Paint containing greater than 0.0%, but less than 0.5% and 0-2 ppm are considered lead containing paint and are regulated by OSHA. One of the samples collected was reported as lead containing paint.
The following table lists the suspect LBP materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
1912 PC-1
Wall White Cinder
Block Exterior
Wall <0.0079
1912 PC-2 Wall Teal Cinder Block
Interior Wall
<0.0085
68 PC-3 Wall Teal Drywall Tech Room
<0.0088
2018 PC-4 Wall Beige Cinder Block
Interior Wall
<0.0081
Great Lakes Naval Training Center iv
Building Number
Sample Number
Component Color Substrate Location Results (% By
Weight)
1506 PC-5 Wall Beige Cinder Block
Interior
<0.0054
Sample Number
Component Color Substrate Location Results (ppm By Weight)
7260 Pb-7260-1 Wall White Drywall Interior
Wall 91*
7111 Pb-7111-1 Wall White Cinder Block
Interior Wall < 84*
7101 Pb-7101 I-Beam White Fire
Proofing IT Room
< 100*
26 Pb-26 Wall Blue Drywall Basement
Mechanical Room 006
17000**
*Laboratory reports are in mg/Kg which is the same as PPM. Bolded sample results are considered lead containing.
**Sample reported above EPA/HUD regulatory level.
Based on the laboratory results analysis, none of the tested surfaces were reported to contain cadmium or chromium above the regulatory limit of 0.1% by weight. Paint containing greater than 0.0%, but less than 0.1% are considered cadmium or chromium containing paint and are regulated by OSHA.
The following table lists the suspect Cd containing materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
26 CD-26-1 Wall Blue Drywall Basement
Mechanical Room 006
0.0027
68 CD-68-1 Wall Teal Drywall Tech Room ND 7260 CD-7260-1 Wall White Drywall Interior Wall ND
1506 CD-1506-1 Wall Beige Cinder Block
Interior wall
ND
7111 CD-7111-1 Wall White Cinder Block
Interior Wall
ND
7101 CD-7101-1 I-Beam White Fire
Proofing IT Room
ND
*Laboratory reports are in mg/Kg converted to percent by weight. Bolded sample results are considered Cadmium containing.
ND - Not Detected at the Reporting Limit.
Great Lakes Naval Training Center v
The following table lists the suspect CrVI containing materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
26 CR-26-1 Wall Blue Drywall Basement
Mechanical Room 006
0.0017
68 CR-68-1 Wall Teal Drywall Tech Room ND 7260 CR-7260-1 Wall White Drywall Interior Wall ND
1506 CR-1506-1 Wall Beige Cinder Block
Interior wall
ND
7111 CR-7111-1 Wall White Cinder Block
Interior Wall
ND
7101 CR-7101 I-Beam White Fire
Proofing IT Room
ND
*Laboratory reports are in mg/Kg converted to percent by weight. Bolded sample results are considered Hexavalent Chromium VI containing.
Great Lakes Naval Training Center
1.0 Introduction
Environmental Design International inc. (EDI) was retained by Jacobs to provide an ACM and LBP survey of the Great Lakes Naval Training Center located in Great Lakes, Illinois. The survey was performed on December 1 and 2, 2020 by Mr. Jose Aguilera, Illinois Department of Public Health (IDPH) license #100-10088, IDPH lead risk assessor license #009320 with assistance from Mr. Anthony Spalla, a sampling technician. On March 30 and 31, 2021, Mr.
Jose Aguilera performed the environmental survey to identify and sample suspect painted surfaces to include Cadmium (Cd) and Hexavalent Chromium (CrVI) analysis. On February 8 and 9, 2022 Mr. Jose Aguilera performed the environmental survey to identify additional ACM, LBP, Cd and CrVI impacted by the project. The surveys were conducted for the P-828 Smart Energy Project.
1.1 Scope of Work
EDI completed a hazardous material survey of the designated rooms in the buildings to identify suspect asbestos-containing materials (ACM) and painted surfaces for LBP, Cd and CrVI.
Buildings with existing usable penetrations did not require sampling.
ACM Survey
EDI performed a building visual survey to identify suspect ACM. The ACM survey services were performed in accordance with the requirements established in the National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations (40 CFR Part 61, subpart M). All bulk samples collected as part of an asbestos survey were collected by IDPH-licensed asbestos inspector and analyzed by National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory, see Appendix A - Asbestos Laboratory Results, Laboratory Certification and Chain-of-Custody.
Visual inspection and physical assessment of accessible areas.
Collection and analysis of bulk materials samples from representative sampling areas.
Preparation of a final report that includes a suspect ACM sample log and employee licenses and certifications.
LBP, Cadmium and Chromium Survey
EDI performed a limited LBP survey, including sampling of select surfaces that may be impacted by project activities. EDI collected paint chip samples of representative suspect painted components. EDI’s LBP survey was consistent with the U.S. Department of Housing and Urban Development (HUD) guidelines. The Cadmium and Chromium survey was completed utilizing the same procedures that are consistent with the U.S. Department of Housing and Urban Development (HUD) guidelines. Representative sampling areas (RSAs), consisting of similar components with similar paint color and application, were defined and tested. The survey included the following activities:
Great Lakes Naval Training Center
Visual inspection and physical assessment of accessible areas.
Collection and analysis of paint chip samples from representative sampling areas.
Preparation of a final report that includes a lead sample log and employee licenses and certifications.
All paint chip samples collected as part of a limited lead-based paint survey were collected by IDPH-licensed lead risk assessor inspector and analyzed by National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory; see Appendix B Lead Paint Chip Laboratory Results, Laboratory Certification and Chain-of-Custody. Samples were analyzed following EPA Method SW-846, 3050B, 7000B, SW6020A SW7196A and SW3060A (flame atomic absorption spectroscopy). Refer to Appendix B for paint results.
Great Lakes Naval Training Center
2.0 Asbestos Survey
2.1 ACM Survey Methodology
EDI staff performed a visual inspection to identify suspect ACM in accessible areas of the survey area. Ninety-Four (94) bulk samples of suspect ACM were collected, representing nineteen (19) different homogeneous sampling areas (HSAs). Some samples consist of layered materials; each layer is analyzed separately if present. HSAs are areas containing materials that are similar in color, texture, and general appearance, and which appear to have been uniformly installed during the same time in the same building. The ACM survey was performed in accordance with the United States Environmental Protection Agency (USEPA) Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials (USEPA 560/5085-030a, October 1985). Employee licenses and certifications are presented in Appendix C.
Bulk samples of suspect ACM were collected using wet sampling methods with a coring device or a sample cutter, as appropriate, to collect a cross-section of the suspect ACM. Sample collection tools were decontaminated after each sample by washing with soap and water and dried by disposable towels to avoid cross contamination.
Bulk ACM samples were placed into clean unused bags marked with a unique sample identification number. For each sample, the identification number, brief material description, location, condition, and estimated quantity of suspect ACM were recorded on a bulk sample log sheet.
Chain-of-Custody (COC) procedures were followed for the ACM survey. These procedures provide a written tracking mechanism that lists the person responsible for the sample from collection to delivery to the laboratory. Sample identification numbers, sample locations, and material descriptions were recorded on the chain-of-custody forms.
Samples were analyzed by International Asbestos Testing Laboratories of Mt. Laurel, New Jersey (IATL), and STAT Analysis Corporation both a National Voluntary Laboratory Accreditation Program (NVLAP) accredited asbestos laboratories. Laboratory accreditations are provided in Appendix A. Samples were analyzed by polarized light microscopy (PLM) supplemented with dispersion staining. PLM is an USEPA-approved method that utilizes a light microscope equipped with polarized filters (USEPA Method 600/R-93/116).
Great Lakes Naval Training Center
2.2 Asbestos Results
The following buildings did not have suspect asbestos containing materials. In addition, buildings with existing usable penetrations did not require sampling.
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
R20 N/A Metal Structure
Fair Support Shed Interior and Exterior Walls
Non-Suspect
F10 N/A Metal Structure
Fair Support Shed Interior and Exterior Walls
Non-Suspect
A450 N/A Metal Structure
Fair Support Shed Interior and Exterior Walls
Non-Suspect
The following suspect asbestos containing materials were identified and sampled:
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
DW-26-1-1 Drywall Fair Basement Mechanical Room 006
ND
DW-26-1-2 Drywall Fair
Mechanical Room 006
DW-26-1-3 Drywall Fair
Mechanical Room 006
DW-26-2-1 Drywall Fair
IT Room
DW-26-2-2 Drywall Fair
IT Room
DW-26-2-3 Drywall Fair
IT Room
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
621 CT-621-1-1
2’x2’ Ceiling
Tile Fair Room 109
1-5% Chrysotile
621 CT-621-1-2
2’x2’ Ceiling
Tile Fair Room 107
1-5% Chrysotile
621 CT-621-1-3
2’x2’ Ceiling
Tile Fair Room 125
1-5% Chrysotile
621 FT-621--1-1
12”x12” Multilayer
Floor Tile and Associated
Mastic
Fair Room 109 1-10%
DW-1-1 Drywall Fair Tech Room ND
DW-1-2 Drywall Fair Tech Room ND
DW-1-3 Drywall Fair Tech Room ND
MRTR-1-1 Mortar Fair Exterior
Wall
ND
68 MRTR-1-1 Mortar Fair Exterior
Wall
ND
68 MRTR-1-1 Mortar Fair Exterior
Wall
ND
68 CT-68-1-1
2’x2’ Ceiling
Tile Fair
Tech/Server Room
ND
68 CT-68-1-2
2’x2’ Ceiling
Tile Fair
Open Office Area
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
68 CT-68-1-2
2’x2’ Ceiling
Tile Fair
Open Office Area
ND
7811 MRTR-2-1 Mortar Fair Interior Wall ND
7811 MRTR-2-2 Mortar Fair Interior Wall ND
7811 MRTR-2-3 Mortar Fair Interior Wall ND
7811 MRTR-3-1 Mortar Fair Exterior
Wall
ND
7811 MRTR-3-2 Mortar Fair Exterior
Wall
ND
7811 MRTR-3-3 Mortar Fair Exterior
Wall
ND
2018 MRTR-4-1 Mortar Fair Exterior
Wall
ND
2018 MRTR-4-2 Mortar Fair Exterior
Wall
ND
2018 MRTR-4-3 Mortar Fair Exterior
Wall
ND
2018 MRTR-5-1 Mortar Fair Interior Wall ND
2018 MRTR-5-2 Mortar Fair Interior Wall ND
2018 MRTR-5-3 Mortar Fair Interior Wall ND
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
3114A M-1-1 Mastic Fair Interior Wall ND
3114A M-1-2 Mastic Fair Interior Wall 5.2-5.5%
Chrysotile
3114A M-1-3 Mastic Fair Interior Wall 5.2-5.5%
Chrysotile
3114A DW-2-1
Drywall System
Fair Interior Wall ND
3114A DW-2-1
Drywall System
Fair Interior Wall ND
3114A DW-2-1
Drywall System
Fair Interior Wall ND
3114A MRTR-6-1 Mortar Fair Exterior
Wall
ND
3114A MRTR-6-2 Mortar Fair Exterior
Wall
ND
3114A MRTR-6-3 Mortar Fair Exterior
Wall
ND
1912 MRTR-7-1 Mortar Fair
Exterior Wall same cinder block as Interior
Wall
ND
1912 MRTR-7-2 Mortar Fair
Exterior Wall same cinder block as Interior
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
1912 MRTR-7-3 Mortar Fair
Exterior Wall same cinder block as Interior
Wall
ND
3504 MRTR-8-1 Mortar Fair Exterior
Wall
ND
3504 MRTR-8-2 Mortar Fair Exterior
Wall
ND
3504 MRTR-8-3 Mortar Fair Exterior
Wall
ND
1506 MRTR-9-1 Mortar Fair Exterior
Wall
ND
1506 MRTR-9-2 Mortar Fair Exterior
Wall
ND
1506 MRTR-9-3 Mortar Fair Exterior
Wall
ND
1506 MRTR-10-1 Mortar Fair Interior Wall ND
1506 MRTR-10-2 Mortar Fair Interior Wall ND
1506 MRTR-10-3 Mortar Fair Interior Wall ND
1506 CT-1506-1-1
2’x2’ Ceiling
Tile Fair Break Room ND
1506 CT-1506-1-2
2’x2’ Ceiling
Tile Fair
West Vestibule
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
1506 CT-1506-1-3
2’x2’ Ceiling
Tile Fair Hallway ND
1506 CT-1506-2-1
2’x4’ Ceiling
Tile Fair
Receiving Room 129
ND
1506 CT-1506-2-2
2’x4’ Ceiling
Tile Fair
Receiving Room 129
ND
1506 CT-1506-2-3
2’x4’ Ceiling
Tile Fair
Server Room 118
ND
190 MRTR-11-1 Mortar Fair Exterior
Wall
ND
190 MRTR-11-2 Mortar Fair Exterior
Wall
ND
190 MRTR-11-3 Mortar Fair Exterior
Wall
ND
190 MB-1-1 Black Sealant Fair Exterior
Wall
ND
190 MB-1-1 Black Sealant Fair Exterior
Wall
ND
190 MB-1-1 Black Sealant Fair Exterior
Wall
ND
190 MRTR-2-1 Mortar Fair Interior Wall ND
190 MRTR-2-2 Mortar Fair Interior Wall ND
190 MRTR-2-3 Mortar Fair Interior Wall ND
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
190 CT-190-1-1
2’x2’ Ceiling
Tile Fair
By Room
ND
190 CT-190-1-2
2’x2’ Ceiling
Tile Fair
By Room
ND
190 CT-190-1-3
2’x2’ Ceiling
Tile Fair
By Room
ND
190 CT-190-2-1
2’x4’ Ceiling
Tile Fair
223A Classrooms
ND
190 CT-190-2-2
2’x4’ Ceiling
Tile Fair
223A Classrooms
ND
190 CT-190-2-3
2’x4’ Ceiling
Tile Fair
223A Classrooms
ND
7101 MRTR-7101-1 Mortar Fair Interior Wall ND
7101 MRTR-7101-2 Mortar Fair Interior Wall ND
7101 MRTR-7101-3 Mortar Fair Interior Wall ND
7101 SOFP-1-1
Sprayed-on Fire Proofing
Fair I-Beam ND
7101 SOFP-1-2
Sprayed-on Fire Proofing
Fair I-Beam ND
7101 SOFP-1-3
Sprayed-on Fire Proofing
Fair I-Beam ND
7260 SOFP-7260-1-1
Sprayed-on Fire Proofing
Fair Basement Mechanical
Room
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
7260 SOFP-7260-1-2
Sprayed-on Fire Proofing
Fair By Room
ND
7260 SOFP-7260-1-3
Sprayed-on Fire Proofing
Fair Hallway 1st
Floor
ND
7260 DW-7260-1-1 Drywall Fair Interior Wall ND
7260 DW-7260-1-2 Drywall Fair Interior Wall ND
7260 DW-7260-1-3 Drywall Fair Interior Wall ND
7111 MRTR-7111-1 Mortar Fair Interior Wall ND
7111 MRTR-7111-2 Mortar Fair Interior Wall ND
7111 MRTR-7111-3 Mortar Fair Interior Wall ND
236 MRTR-236-1 Mortar Fair Interior Wall ND
236 MRTR-236-2 Mortar Fair Interior Wall ND
236 MRTR-236-3 Mortar Fair Interior Wall ND
236 CT-236-1-1
2’x2’ Ceiling
Tile Fair Room 160 ND
236 CT-236-1-2
2’x2’ Ceiling
Tile Fair Room 150 ND
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
236 CT-236-1-3
2’x2’ Ceiling
Tile Fair
North Vestibule
ND= Non-Detect
According to the AHERA Model Accreditation Plan, non-suspect material such as fiberglass, foam rubber, and plastics do not warrant sampling. Two of the suspect materials collected were reported as ACM. In addition, buildings with existing usable penetrations did not require sampling.
2.3 Applicable Regulations
EPA's National Emission Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61, Subpart M) defines asbestos-containing material (ACM) as any material with analysis reported as greater than 1% asbestos. Additionally, EPA NESHAP categorizes asbestos-containing thermal system insulation (TSI) and sprayed-on or troweled-on asbestos as regulated ACM (RACM). Miscellaneous materials (floor tile and floor tile mastic) are classified as Category I Non-Friable Asbestos; and transite material is classified as Category II Non-Friable Asbestos unless the material is made friable during demolition. Friable ACM is material that can be crumbled, pulverized, or reduced to a powder by hand. NESHAP requires at least ten working days’ notification prior to any renovation or demolition activity that will disturb greater than 160 square feet or 260 linear feet of ACM materials. ACM removed during abatement must be disposed of at a landfill approved by the EPA to receive asbestos wastes.
The Occupational Safety and Health Administration (OSHA) recognizes occupational exposure potential to any material that contains any quantity of asbestos that will be impacted during construction. OSHA’s Construction Industry Standard (29 CFR 1926.1101) categorizes the removal of asbestos containing materials by “class” of material. Specific requirements for the removal of OSHA classified materials include, but are not limited to, regulated work areas, air monitoring, engineering controls, work practices, personal protective equipment, notification, and training.
The U.S. Department of Transportation (DOT) requires special procedures for packaging, labeling, and transportation of asbestos wastes to disposal facilities. Other regulations may apply depending upon the contractor’s means and methods.
Great Lakes Naval Training Center
3.0 Limited Lead Based Paint Survey
3.1 Limited LBP, Cd and CrVI Survey Methodology
EDI staff performed a limited visual survey of the building to identify representative painted surfaces for LBP testing. Employee certifications are presented in Appendix C. The limited LBP, Cd and CrVI survey was conducted following a modified and limited sampling plan based on the U.S. Department of Housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (1995 and 1997 Revision). The limited LBP survey was conducted by a certified and licensed lead inspector/risk assessor. Paint chip collection was used for this survey.
Samples were placed into clean unused sample containers marked with a unique sample identification number. For each sample, the identification number, brief material description, location, condition, and estimated quantity of representative paint was recorded on a bulk sample log sheet. Chain-of-Custody (COC) procedures were followed for the lead survey.
These procedures provide a written tracking mechanism that lists the person responsible for the sample from collection to delivery to the laboratory. Sample identification numbers, sample locations, and material descriptions were recorded on the chain-of-custody forms. COC forms are provided in Appendix B.
EDI submitted paint chip samples to International Asbestos Testing Laboratories (IATL), in Mt Laurel, New Jersey. IATL and STAT Analysis Corporation are accredited through the Environmental Lead Laboratory Accreditation Program (ELLAP). Samples were analyzed following EPA Method SW-846, 3050B, 7000B, SW6020A SW7196A and SW3060A (flame atomic absorption spectroscopy). Refer to Appendix B for paint results.
3.2 LBP, Cd and CrVI Survey Results
The following buildings did not have suspect LBP, Cd and CrVI surfaces. In addition, buildings with existing usable penetrations did not require sampling.
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
R20 N/A
Non- Painted Metal
Structure
Fair Support Shed Interior and
Exterior Walls Non-Suspect
F10 N/A
Non- Painted Metal
Structure
Fair Support Shed Interior and
Exterior Walls Non-Suspect
A450 N/A
Non- Painted Metal
Structure
Fair Support Shed Interior and
Exterior Walls Non-Suspect
Great Lakes Naval Training Center
Building Number
Sample Number
Material Description
Material Condition
Material Location
Laboratory Results
190 N/A
Non- Painted Cinder Block
Fair Interior Walls Non-Suspect
7811 N/A
Non- Painted Cinder Block
Fair Interior Walls Non-Suspect
The following table lists the suspect LBP materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
1912 PC-1
Wall White Cinder
Block Exterior
Wall <0.0079
1912 PC-2 Wall Teal Cinder Block
Interior Wall
<0.0085
68 PC-3 Wall Teal Drywall Tech Room
<0.0088
2018 PC-4 Wall Beige Cinder Block
Interior Wall
<0.0081
1506 PC-5 Wall Beige Cinder Block
Interior
<0.0054
Sample Number
Component Color Substrate Location Results (ppm By Weight)
7260 Pb-7260-1 Wall White Drywall Interior
Wall 91*
7111 Pb-7111-1 Wall White Cinder Block
Interior Wall < 84*
7101 Pb-7101 I-Beam White Fire
Proofing IT Room
< 100*
26 Pb-26-1 Wall Blue Drywall Basement
Mechanical Room 006
17000**
*Laboratory reports are in mg/Kg which is the same as PPM. Bolded sample results are considered lead containing.
**Sample reported above EPA/HUD regulatory level.
Based on the laboratory results analysis, one (1) of the RSAs tested surfaces were reported to contain lead above the EPA/HUD regulatory limit of 0.5% or 5000 parts per million (ppm) by weight. Paint containing greater than 0.0%, but less than 0.5% and 0-2 ppm are considered lead
Great Lakes Naval Training Center containing paint and are regulated by OSHA. One of the samples collected was reported as lead containing paint.
The following table lists the suspect Cd containing materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
26 CD-26-1 Wall Blue Drywall Basement
Mechanical Room 006
0.0027
68 CD-68-1 Wall Teal Drywall Tech Room ND 7260 CD-7260-1 Wall White Drywall Interior Wall ND
1506 CD-1506-1 Wall Beige Cinder Block
Interior wall
ND
7111 CD-7111-1 Wall White Cinder Block
Interior Wall
ND
7101 CD-7101-1 I-Beam White Fire
Proofing IT Room
ND
*Laboratory reports are in mg/Kg converted to percent by weight. Bolded sample results are considered Cadmium containing.
The following table lists the suspect CrVI containing materials identified during the survey.
Sample Number
Component Color Substrate Location Results (% By
Weight)
26 CR-26-1 Wall Blue Drywall Basement
Mechanical Room 006
0.0017
68 CR-68-1 Wall Teal Drywall Tech Room ND 7260 CR-7260-1 Wall White Drywall Interior Wall ND
1506 CR-1506-1 Wall Beige Cinder Block
Interior wall
ND
7111 CR-7111-1 Wall White Cinder Block
Interior Wall
ND
7101 CR-7101 I-Beam White Fire
Proofing IT Room
ND
*Laboratory reports are in mg/Kg converted to percent by weight. Bolded sample results are considered Hexavalent Chromium VI containing.
Based on the laboratory results analysis, none of the tested surfaces were reported to contain cadmium or chromium above the regulatory limit of 0.1% by weight. Paint containing greater than 0.0%, but less than 0.1% are considered cadmium or chromium containing paint and are regulated by OSHA.
Great Lakes Naval Training Center
3.4 Recommendations
Recommended Response Action
The following response actions would be recommended in the event LBP is discovered in the work areas:
Interim Controls – Interim controls temporarily reduce exposure to lead-based paint hazards through repairs, painting, maintenance, special cleaning, occupant protection measures, clearance, and education programs. Interim control methods require safe practices and include:
Paint stabilization – all deteriorated lead-based paint on exterior and interior surfaces must be stabilized through repairs, safe paint removal and repainting.
Treatment for friction and impact surfaces – If abraded lead-based paint is found and associated dust lead levels exceed or are presumed to exceed acceptable levels, the condition creating friction or impact with surfaces with lead-based paint such as those that rub, bind or crush must be corrected.
Treatment for chewable surfaces – If a child under age six has chewed surfaces known or presumed to contain lead-based paint, these surfaces must be enclosed or coated so they are impenetrable.
Lead-contaminated dust control – All horizontal surfaces that are rough, pitted or porous such as bare floors, stairs, window sills, and window troughs must be covered with a smooth cleanable covering or coating such as metal coil stock, plastic polyurethane or linoleum. Carpeting must be vacuumed, or rugs must be removed and vacuumed on both sides. Vacuuming must be done using HEPA vacuums or equivalent.
Lead-contaminated soil control – If bare soil is lead-contaminated, interim controls that may be used include impermanent surface coverings such as gravel, bark and sod as well as land use controls such as fencing, landscaping and warning signs.
Abatement – Abatement permanently removes or controls lead-based paint and lead-based paint hazards by removing lead-based paint and its dust, or permanently encapsulation or enclosing the lead-based pain, replacing components with lead-based paint and removing or permanently covering lead contaminated soil. Encapsulation and enclosure require ongoing maintenance to check their effectiveness.
3.5 Applicable Regulations and Guidelines
The HUD guidelines cover topics such as lead-based paint inspections/risk assessments, abatement options and methods, worker protection, occupant protection, cleanup, clearance, and waste disposal. Except for those parts pertaining exclusively to housing, the guidelines can be used as resource information and methodologies for identifying and abating lead-based paint hazards in buildings.
Great Lakes Naval Training Center
Illinois Administrative Code 845 (Title 77, Chapter I, and Subchapter P, Part 845) defines lead abatement/mitigation as the remediation of a lead hazard so that the lead bearing substance does not pose an immediate health hazard to humans. A lead hazard is deemed to have been mitigated if the following conditions have been met:
The surface that is the source of lead is no longer in a condition that produces a hazardous level of leaded chips, flakes, dust or any other form of leaded substances that can be ingested or inhaled by humans; or
The leaded surface is not accessible to children, the surface coating is covered or the access to the leaded surface is otherwise prevented.
According to the Illinois Resource Conservation and Recovery Act (35 IAC 721), and IEPAs Information Statement on the Removal of Lead-Based Paint, workers handling LBP coated building materials must be protected from exposure following OSHA regulations.
USDOT and IDOT require lead-based paint waste to be properly containerized and transported by a licensed waste hauler.
Great Lakes Naval Training Center
4.0 Findings and Recommendations
4.1 Asbestos Building Survey
EPA regulation establishes that material with greater than one percent asbestos is considered regulated. Based on laboratory analysis of the samples collected in accordance with the survey methodology, the following materials will need to be abated if they are disturbed during renovation and/or demolition activities:
Black Mastic on Walls Building 3114A.
Prior to renovation of the building, ACM that will be disturbed must be abated by a licensed contractor using licensed supervisors and workers, according to applicable federal, state and local regulations.
Every attempt was made to thoroughly evaluate and assess the presence and condition of suspect ACM throughout the building impacted by renovation activities. Any suspect ACM identified during renovation that is not specifically listed in this report should be assumed positive until it can be thoroughly evaluated, assessed, sampled, and analyzed prior to disturbance, in accordance with applicable regulatory standards.
4.2 Paint Building Survey
Based on the laboratory results analysis, one (1) of the RSAs tested surfaces were reported to contain lead above the EPA/HUD regulatory limit of 0.5% or 5000 parts per million (ppm) by weight. Paint containing greater than 0.0%, but less than 0.5% and 0-2 ppm are considered lead containing paint and are regulated by OSHA. One of the samples collected was reported as lead containing paint.
Based on the laboratory results analysis, none of the tested surfaces were reported to contain cadmium or chromium above the regulatory limit of 0.1% by weight. Paint containing greater than 0.0%, but less than 0.1% are considered cadmium or chromium containing paint and are regulated by OSHA.
If additional suspect coated surfaces are identified during the renovation, those materials should be assumed to be positive for LBP, Cd and CrVI until they can be assessed, sampled, and analyzed by an ELLAP accredited laboratory.
Great Lakes Naval Training Center
5.0 Limitations
This report is based solely on the scope of work provided and the assumptions identified in this survey. Any new information that becomes available concerning the subject sites should be provided to EDI so that our evaluations, conclusions, and recommendations may be revised and modified accordingly. All materials tested are assumed homogeneous throughout the proposed individual, building renovation areas. EDI staff walked the site area with building representatives to identify accessible areas to be included in the survey. Every attempt was made to thoroughly evaluate and assess the presence and condition of suspect asbestos and lead containing materials. Suspect materials may exist within inaccessible areas. Any suspect material identified during renovation or demolition that is not specifically listed herein should be assumed positive until thoroughly assessed, sampled and analyzed prior to disturbance, in accordance with applicable regulatory standards.
The findings and conclusions in this report are not specific certainties; rather they are probabilities based on professional judgment concerning the significance of the data collected.
EDI claims to represent only the specific findings documented herein and does not claim knowledge of conditions beyond the scope of the survey.
The surveys were conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the environmental profession under similar conditions. No other warranty or guarantee, express or implied, is included or intended in this Report or otherwise.
This report is intended for the use of the client, subject to the terms and conditions of EDI's Scope of Services and Fees for Professional Services Agreement.
Great Lakes Naval Training Center
6.0 Definitions
The following definitions are intended to provide the reader with a better understanding of the terminology used in this report.
Asbestos The general name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure, are incombustible in air, and are separable into fibers.
Asbestos includes the asbesti-form varieties of chrysotile (serpentine); crocidolite (riebeckite);
amosite (cummingtonite-frunertie); anthophyllite; and actinolite.
Asbestos-Containing Material Asbestos contain materials (ACM) are materials that are found to contain greater than one percent by weight asbestos content as determined by polarized light microscopy (PLM) analysis.
Accessible Areas An accessible area of the building is any area that the survey team is permitted to inspect and that can be inspected without the disassembly of complicated mechanical or rigid structural components of the building. Examples of accessible areas of the building are interior floors, walls, ceilings, areas above suspended ceilings, return air shafts (normally), mechanical piping exteriors, and equipment exteriors, etc.
Damaged material A “damaged” material contains a few water stains or less than one-tenth of insulation with missing jackets and/or crushed insulation or water stains, gouges, punctures, or mars on surface up to one-tenth of the insulation if the damage is evenly distributed or up to one-quarter if the damage is localized.
Inaccessible Areas An inaccessible area is any area where inspection access is not permitted or requires a considerable amount of mechanical or structural disassembly to inspect. Inaccessible areas normally only investigated prior to renovation or demolition activities. Examples of inaccessible areas are pipe chases behind solid walls, mechanically encased insulation, crawlspaces or unsafe areas.
Friable Material A material, that when dry, may be crumbled, pulverized or reduced to powder by hand pressure is a friable material. Examples of friable materials include pipe insulation, boiler or tank insulation, or sprayed-on fireproofing.
Non-friable Material A material, that when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure. Non-friable materials may become friable through damage or deterioration. Examples of non-friable materials include intact floor tile, transite building panels, or well-maintained roofing materials.
Homogeneous Area
Great Lakes Naval Training Center
A homogeneous area is defined as a group of materials that is uniform in texture and appearance, was stalled at one time, and is likely to consist of more than one type or formation of material.
Significantly Damaged Material A “significantly damaged” material contains missing jackets on at least one-tenth of the piping or equipment and/or is crushed, heavily gouged, or punctured insulation on at least one-tenth of pipe runs/rises, boilers, tanks, ducts, etc., if the damage is evenly distributed or one-quarter of the damage is localized.