Amendment 0013.pdf

PDF 530 KB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598
Issued by

About this file

This amendment modifies a solicitation for construction services. The solicitation is seeking proposals for a saltwater system project at Dry Dock 8 for the aircraft carrier CVN-78 at the Norfolk Naval Shipyard in Portsmouth, Virginia. The amendment updates the evaluation criteria for Factor 1 on corporate experience. Specifically, it increases the minimum project value from $25 million to $75 million for one of the references and provides greater detail on the required scope and complexity of past projects submitted. They must demonstrate experience with cast-in-place and pre-cast concrete work, installation of steel and timber piles, excavation and reconstruction of pumpwells, as well as industrial utility systems including civil, mechanical, electrical and pumping systems. Offerors must use the attached form to submit details on up to five past projects and their responses are due by the amended date specified in the solicitation.

The Department of the Navy, Naval Facilities Engineering Command, Mid-Atlantic is issuing this solicitation.

View the file

Other files

File Type Posted
22R2598 0012.pdf PDF
Attachment H - Price Proposal Form_revision 3.docx DOCX document
RM22-0455 Repair Berths 40 41 Site LImits drawings.pdf PDF
22R2598 Amendment 0011.pdf PDF
22R2598 Amendment 0010.pdf PDF
TIF files.pdf PDF
22R2598 Amendment 0009.pdf PDF
Attachment H - Price Proposal Form_revision 2.docx DOCX document
P678 Dry Dock 8 SW System Amendment 0009.docx DOCX document
P678 Dry Dock 8 SW System Amend0008.pdf PDF
22R2598 0008.pdf PDF
DRYDP678-1364315-12858062-2-ES135.pdf PDF
DRYDP678_HZMT-rpt_052021_Final.pdf PDF
DRYDP678-1364315-12858014-2-MS522.pdf PDF
43 15 00.00 22.pdf PDF
22R2598 Amendment 0007.pdf PDF
22R2598 Amendment 0006.pdf PDF
PW DWG 20940_PPI 100.pdf PDF
1364315_AMEND_dwg_PH1_ELECTRICAL.pdf PDF
Attachment I - PIEE Vendor Access Instructions.pdf PDF
1364315_AMEND_dwg_PH2_ELECTRICAL.pdf PDF
YD DWG 165165_PPI 94.pdf PDF
2022-05-03 P678 Dry Dock 8 SW Sytem Amendment 0006.pdf PDF
Attachment H - Price Proposal Form_revision 1.docx DOCX document
DD Assoc DWG NQ515_PPI 100.pdf PDF
22R2598 Amendment 0005.pdf PDF
22R2598 Amendment 0004.pdf PDF
22R2598 Amendment 0003.pdf PDF
22R2598 Site Visit Log.pdf PDF
P678 Site Visit Map.jpg JPG image
22R2598 P-678 Amendment 0002.pdf PDF
22R2598 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment B - SECNAV 5512 Form.pdf PDF
22R2598 P-678 SOLICITATION.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008522R2598 P678 DRY DOCK 8 SALTWATER SYSTEM FOR CVN-78, NORFOLK NAVAL SHIPYARD, PORTSMOUTH VA

This amendment is issued to:

1.Update Evaluation Factors For Aw ard; Factor 1- Corporate Experience

See continuation pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008522R2598

X 9B. DATED (SEE ITEM 11)

29-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2598

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0013

Evaluation Factors For Award

(1) Factor 1, Corporate Experience (changes denoted in red)

(i) Solicitation Submittal Requirements:

The offeror shall submit the following information:

Submit a minimum of two (2) up to a maximum of five (5) construction projects performed by the Offeror that best demonstrates the Offeror’s relevant experience (projects similar in size, scope, and complexity to this project). Projects submitted for the offeror shall have been completed within the past fifteen (15) years from the date of issuance of this RFP or be at least 75% complete by the date of issuance of the RFP. Projects that are not at least 75% complete as of the date of issuance of this RFP will be considered “Not Relevant”. Additionally, Projects completed more than fifteen (15) years prior to the date of issuance of this RFP will be considered “Not Relevant.”

For purposes of this procurement, relevant projects are further defined as:

Size: A final construction cost of $25,000,000 or greater. At least one project shall be $75,000,000 or greater.

Scope: New construction, performed in a marine environment, that demonstrates experience with cast-in-place concrete work and/or pre-cast concrete work. Individual projects do not need to demonstrate experience with both types of concrete work, but submitted projects must collectively demonstrate experience with both types of work.

Complexity: Collectively, submitted projects must demonstrate experience with all of below elements of work:

a) Installation of steel pipe piles, cofferdam construction with dewatering, and either micropiles OR timber piles.

b) Excavation and reconstruction work in pumpwells.

c) Heavy industrial utility distribution systems including:

1) Civil (e.g., fire protection water, water supply and return systems when located below grade);

2) Mechanical (e.g., fire protection water, water supply and return systems when located above grade or in utility tunnels);

3) Electrical (e.g., installation of medium voltage site power distribution systems including underground duct banks, feeders, and pad mounted switches);

d) Structural and site upgrades including equipment pads with pile foundations;

e) Installation of industrial pumps and pumping systems;

f) Construction of water pump stations (e.g., water intakes, back-up power, and pile foundations)

Ensure that project descriptions clearly address how each project meets the scope and complexity requirements as delineated above, and provides the final construction cost. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor. The absence of one project that has a $75,000,000 or greater final construction cost that also meets the scope and complexity requirements will result in a rating of UNACCEPTABLE for this Factor.

Experience of proposed subcontractors will not be considered. Furthermore, the offeror’s experience as a subcontractor will not be considered.

A project is defined as a construction project performed under a single task order or contract.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. The submission of a multiple award and/or indefinite delivery/indefinite quantity type contract as a whole will be considered Not Relevant.

The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided pages (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).

If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Experience submitted for one of the Offeror’s Joint Venture members while the Joint Venture member was a member in a different Joint Venture entity may be submitted to demonstrate relevant project experience. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) total projects.

If the Offeror is proposing as a single corporate entity (i.e. not as a Joint Venture), the Offeror may submit relevant project experience it performed as a partner in a previous Joint Venture.

Offerors are still limited to a total of five (5) projects.

If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .