This document is an attachment to a solicitation providing a template for offerors to submit historical small business utilization data on relevant past projects. The solicitation is for dry dock saltwater system work for CVN-78 at Norfolk Naval Shipyard in Portsmouth, Virginia from the Department of the Navy Naval Facilities Engineering Command. Offerors must complete the template providing details on a maximum of five past projects, including contract numbers, values, small business subcontracting goals and achievements. Explanations are required for any unmet goals or where no small business subcontracting occurred. The template collects information on total contract values, self-performance values, subcontracting breakdowns by business type and percentages of total and subcontracting values.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
22R2598 0012.pdf PDF
Attachment H - Price Proposal Form_revision 3.docx DOCX document
RM22-0455 Repair Berths 40 41 Site LImits drawings.pdf PDF
22R2598 Amendment 0011.pdf PDF
22R2598 Amendment 0010.pdf PDF
TIF files.pdf PDF
22R2598 Amendment 0009.pdf PDF
Attachment H - Price Proposal Form_revision 2.docx DOCX document
P678 Dry Dock 8 SW System Amendment 0009.docx DOCX document
P678 Dry Dock 8 SW System Amend0008.pdf PDF
22R2598 0008.pdf PDF
DRYDP678-1364315-12858062-2-ES135.pdf PDF
DRYDP678_HZMT-rpt_052021_Final.pdf PDF
DRYDP678-1364315-12858014-2-MS522.pdf PDF
43 15 00.00 22.pdf PDF
22R2598 Amendment 0007.pdf PDF
22R2598 Amendment 0006.pdf PDF
PW DWG 20940_PPI 100.pdf PDF
1364315_AMEND_dwg_PH1_ELECTRICAL.pdf PDF
Attachment I - PIEE Vendor Access Instructions.pdf PDF
1364315_AMEND_dwg_PH2_ELECTRICAL.pdf PDF
YD DWG 165165_PPI 94.pdf PDF
2022-05-03 P678 Dry Dock 8 SW Sytem Amendment 0006.pdf PDF
Attachment H - Price Proposal Form_revision 1.docx DOCX document
DD Assoc DWG NQ515_PPI 100.pdf PDF
22R2598 Amendment 0005.pdf PDF
22R2598 Amendment 0004.pdf PDF
22R2598 Amendment 0003.pdf PDF
22R2598 Site Visit Log.pdf PDF
P678 Site Visit Map.jpg JPG image
22R2598 P-678 Amendment 0002.pdf PDF
22R2598 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment B - SECNAV 5512 Form.pdf PDF
22R2598 P-678 SOLICITATION.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

HISTORICAL SMALL BUSINESS UTILIZATION

N40085-22-R-2598

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment E. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

· Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

· Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

· Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

· Enter dollar values actually subcontracted for each of the categories listed.

· Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

· Complete the “GOAL” column - Enter goals, if applicable.

· If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

· Goals shall be included for standalone contracts when established.

· Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

· If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

· If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

· Explanation is required for each unmet goal.

· Item #1 is to be completed for each Project with unmet goal(s).

· If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), complete the “TO BE COMPLETED AS REQUIRED” under item #2.

· Item #2 is to be addressed for each Project with no small business subcontracting achievement.

· Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

· Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

· Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

· Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

Attachment E – Historical Small Business Utilization, Page 6 of 6

(Rev 2/2022)