Attachment C - Construction Experience Project Data Sheet.docx
DOCX document 13 KB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598
About this file
This document contains an attachment for collecting construction experience project data to be submitted in response to solicitation N40085-22-R-2598 from the Department of the Navy Naval Facilities Engineering Command. Offerors are asked to provide details on up to five past construction projects, including the contract number, award and completion dates, type of work performed, value of award and final prices, description of relevancy to the requirements of the solicitation, and work self-performed by the offeror. The solicitation is for a saltwater system for Dry Dock 8 at Norfolk Naval Shipyard in Portsmouth, Virginia to support the aircraft carrier CVN-78. Drawings and specifications for the project are available through the provided notice IDs.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information: