Amendment 0010.pdf

PDF 72 KB Posted

Attached to
Dry Dock 2 Complex, Portsmouth Naval Shipyard, Kittery, ME
Solicitation number
N4008521R1225
Issued by

About this file

This document is an amendment to a solicitation for a construction project. The amendment extends the proposal due date from 22 March 2021 to 21 May 2021 for solicitation N4008521R1225, which is for the Dry Dock 2 Complex project at the Portsmouth Naval Shipyard in Kittery, Maine. The Department of the Navy Naval Facilities Engineering Command is the contracting agency. The amendment responds to a request from an offeror for a one week extension to allow time to distribute revised documents to trades and obtain adjusted quotations. No other changes are made to the solicitation.

View the file

Other files

File Type Posted
Attachment G Rev 5 18MAY21.pdf PDF
Amendment 0011.pdf PDF
CD-101.pdf PDF
27 10 00.pdf PDF
S-505.pdf PDF
S-504.pdf PDF
Volume 2 - Architectural.pdf PDF
Attachment G Rev 4 14MAY21.pdf PDF
Volume 2 - E-501.pdf PDF
Volume 3 - Architectural.pdf PDF
C-101.pdf PDF
S-520.pdf PDF
Amendment 0009.pdf PDF
S-533.pdf PDF
C-107.pdf PDF
C-102.pdf PDF
Amended DWGs-PPI 198.pdf PDF
09 90 00.pdf PDF
08 71 00.pdf PDF
Amendment 0008.pdf PDF
A-405 A-407 A-410 A-412 A-413 A-421 A-516.pdf PDF
Attachment G Rev 3 12MAY21.pdf PDF
Appendix A_p.5-6_Tower 6.pdf PDF
Appendix A_p.1-2_Enclosure 8.pdf PDF
Appendix A_p.7-8_Tower 5.pdf PDF
Appendix A_p.3-4_Enclosure 5.pdf PDF
Amendment 0007.pdf PDF
Attachment F Rev 1.2 27APR21.pdf PDF
Amendment 0006.pdf PDF
Vol 2 Mechanical Fan Revisions.pdf PDF
11 14 00.pdf PDF
AMD 05 - 23 05 93.pdf PDF
Volume 3 A-503.pdf PDF
Vol 2 Mechanical - Temp Monitoring.pdf PDF
AMD 05 01 45 00.00 20.pdf PDF
Amendment 0005.pdf PDF
Vol 2 S-550.pdf PDF
Vol 2 S-551.pdf PDF
Price Proposal Form Rev. 1.1 14APR21.pdf PDF
07 91 13.pdf PDF
23 00 00.pdf PDF
Volume 2 A-503.pdf PDF
Vol 3 Electrical and Controls Revisions.pdf PDF
05 05 20.00 27.pdf PDF
Vol 2 Electrical Fan Revisions.pdf PDF
23 05 93 Attachments.pdf PDF
Vol 3 S-515.pdf PDF
01 33 00 DD2 Complex Submittal Register.pdf PDF
Vol 2 Electrical and Controls Revisions.pdf PDF
AMD 05 - 40 95 00.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the proposal due date to 21 May 2021.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R1225

X 9B. DATED (SEE ITEM 11)

22-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-May-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R1225

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

SOLICITATION NO. N40085‐21‐R‐1225

PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

209 5/18/2021 Due to the amendment 9 release of 17 revised or new documents less than 2 days before this substantial bid, we would like to request a 1 week bid extension to allow for time to distribute the changes to multiple trades so they can adjust their quotations appropriately.

See Amendment 0010 10

REFERENCE

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Posted on Amend No.

July 2011

Amendment 0010
Master PPI Log

File details come from the government source that posted it. Updated .