This document contains 113 pre-award questions and answers related to a federal solicitation for construction of a Dry Dock 2 Complex at the Portsmouth Naval Shipyard in Kittery, Maine. The solicitation seeks construction of new buildings and enclosures to support dry dock operations, including a dockside complex and shipside complex. Key details include requirements for structural steel, concrete foundations, HVAC systems, electrical systems, coatings, and testing to prevent water infiltration. Subcontractor quotes and additional time were requested to support proposal requirements. Clarification was provided on materials, finishes, and connection details for items like handrails, roofing, and equipment mounting. Anchor testing procedures and drydock floor preparations were also addressed.

View the file

Other files

File Type Posted
Attachment G Rev 5 18MAY21.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
CD-101.pdf PDF
27 10 00.pdf PDF
S-505.pdf PDF
S-504.pdf PDF
Volume 2 - Architectural.pdf PDF
Attachment G Rev 4 14MAY21.pdf PDF
Volume 2 - E-501.pdf PDF
Volume 3 - Architectural.pdf PDF
C-101.pdf PDF
S-520.pdf PDF
Amendment 0009.pdf PDF
S-533.pdf PDF
C-107.pdf PDF
C-102.pdf PDF
Amended DWGs-PPI 198.pdf PDF
09 90 00.pdf PDF
08 71 00.pdf PDF
Amendment 0008.pdf PDF
A-405 A-407 A-410 A-412 A-413 A-421 A-516.pdf PDF
Attachment G Rev 3 12MAY21.pdf PDF
Appendix A_p.5-6_Tower 6.pdf PDF
Appendix A_p.1-2_Enclosure 8.pdf PDF
Appendix A_p.7-8_Tower 5.pdf PDF
Appendix A_p.3-4_Enclosure 5.pdf PDF
Amendment 0007.pdf PDF
Attachment F Rev 1.2 27APR21.pdf PDF
Amendment 0006.pdf PDF
Vol 2 Mechanical Fan Revisions.pdf PDF
11 14 00.pdf PDF
AMD 05 - 23 05 93.pdf PDF
Volume 3 A-503.pdf PDF
Vol 2 Mechanical - Temp Monitoring.pdf PDF
AMD 05 01 45 00.00 20.pdf PDF
Vol 2 S-550.pdf PDF
Vol 2 S-551.pdf PDF
Price Proposal Form Rev. 1.1 14APR21.pdf PDF
07 91 13.pdf PDF
23 00 00.pdf PDF
Volume 2 A-503.pdf PDF
Vol 3 Electrical and Controls Revisions.pdf PDF
05 05 20.00 27.pdf PDF
Vol 2 Electrical Fan Revisions.pdf PDF
23 05 93 Attachments.pdf PDF
Vol 3 S-515.pdf PDF
01 33 00 DD2 Complex Submittal Register.pdf PDF
Vol 2 Electrical and Controls Revisions.pdf PDF
AMD 05 - 40 95 00.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide draw ing and specification updates, provide an updated price proposal form and extend the proposal due date. See SF30 Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R1225

X 9B. DATED (SEE ITEM 11)

22-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Apr-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R1225

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to provide drawing and specification updates, provide an updated price proposal form and extend the proposal due date to 19 May 2021:

CONTINUATION SHEET (Drawing and Specification Edits)

Volume 2 – Dockside Complex:

NAVFAC Dwg. Nos. are revised as of April 5, 2021. These revised drawings accompany this amendment.

On NAVFAC Dwg. No. 12839205 (S-550) Clarified movable roof detail C1.

On NAVFAC Dwg. No. 12839206 (S-551) Added detail for vertical side seal at ridge (B2) and clarified dimensions on C1.

On NAVFAC Dwg. No. 12839289 (A-503) Clarified movable roof details B4, C2, and C4.

On NAVFAC Dwg. No. 12839328 (M-102) Added temp sensor in north enclosure.

On NAVFAC Dwg. No. 12839357 (M-601) Increased F-1, F-2, and F-3 to 60 HP motors.

On NAVFAC Dwg. No. 12839363 (M-704) Added temperature monitor to points list in Enclosure 8.

On NAVFAC Dwg. No. 12839365 (M-706) Added temperature monitors to schematics.

On NAVFAC Dwg. No. 12839387 (EP-102) Added remote temperature display to exterior of vestibule 010.

On NAVFAC Dwg. No. 12839392 (EP-107) Clarifications for F-2 motor increase.

On NAVFAC Dwg. No. 12839393 (EP-108) Clarifications for F-1 motor increase.

On NAVFAC Dwg. No. 12839431 (E-501) One-Line diagram updates for F-1, F-2, and F-3 fan size increase.

On NAVFAC Dwg. No. 12839443 (E-601) Panel schedule updates for F-1 fan size increase.

On NAVFAC Dwg. No. 12839444 (E-602) Panel schedule updates for F-2 and F-3 fan size increase.

On NAVFAC Dwg. No. 12839449 (IC-101) Added remote temperature display to schematic.

On NAVFAC Dwg. No. 12839452 (IC-104) Added space temperature sensors to wiring diagram.

On NAVFAC Dwg. No. 12839454 (IC-200) Added detail for remote temperature display (C3)

On NAVFAC Dwg. No. 12839459 (IC-205) Added detail for remote temperature display (B3).

Volume 3 – Shipside Complex:

NAVFAC Dwg. Nos. are revised as of April 5, 2021. These revised drawings accompany this amendment.

On NAVFAC Dwg. No. 12839549 (S-515) Added detail for vertical side seal at ridge (A4) and movable roof ridge detail (C4) and clarified details A1, A2, and B5.

On NAVFAC Dwg. No. 12839596 (A-503) Clarified movable roof details B4, C2, and C4.

On NAVFAC Dwg. No. 12839637 (EP-102) Added remote temperature display to exterior of enclosure and clarified portable connections on exterior.

On NAVFAC Dwg. No. 12839645 (E-201) Added remote temperature display to exterior of enclosure.

On NAVFAC Dwg. No. 12839659 (IC-101) Added temperature display to schematic.

On NAVFAC Dwg. No. 12839661 (IC-200) Added detail for remote temperature display (C3)

On NAVFAC Dwg. No. 12839666 (IC-205) Added detail for remote temperature display (B3).

Specifications:

The following specification sections are revised as of April 5, 2021. These revised specifications accompany this amendment.

Specification 01 33 00 – Submittal Register Submittal register updates for submittal revisions included in specifications summarized in sections below.

Specification 01 45 00 00 20 Added special inspections to para 1.8.1. Clarified requirements for QC meetings in para 1.9. Clarified requirement in 1.10.1(j). Added requirement to 1.10.1 (l). Clarified requirements for additional preparatory and initial meetings in para 1.10.1, 1.10.2 and 1.10.4. Replaced A/E, NAVFAC, owner with Contracting Officer Representative's field reports in para 1.15.4.

Specification 05 05 20.00 27 Specification added to project.

Specification 07 91 13 Clarified hardness in 2.3A and 2.3B.

Specification 11 14 00 Clarified J&A for turnstile product listed and no other products will be accepted.

Specification 23 00 00

• Description for 1.2.1.2 Diagrams includes Diagrams and Charts in the submittal description and submittal list in para 1.3

• Updates to service labeling in 1.2.2

• Adds Tubings and Fittings Product Submittal, para 1.4,

• Clarification for anchor bolts in para 2.5

• Seal class clarified in para 2.7.1

• Duct transition clarification in para 2.7.1.2 (j)

• Removed duplicate para in 2.7.1.2.

• Clarified requirement in flexible duct connectors in para 2.7.1.5

• Clarified requirement for dampers and actuators in para 2.7.2 (b)

• Added tubings and fittings submittal in para 2.7.4 (b)

• Clarified requirement for registers and grilles in para 2.7.5.2

• Revised formatting and merged requirements previously included in spec for split system air conditioner in para

2.9 (moved from para 2.12.4)

• Clarified requirements for installation in para 3.2.

• Clarified training requirements in para 3.12.2

Specification 23 05 93 Including Attachments

• Clarified work description requirements in para 1.3

• Clarified work schedule requirements and included calibration certificates in para 1.6.3 (and 3.4.1.(a))

• Clarified requirements in para 3.3.2 to report in look ahead schedule

• Clarified requirements in para 3.3.3 (b), (g), (g3), (n)

• Clarified requirements in para 3.3.5 (c), (d), (g)

• Clarified requirements in para 3.3.6, 3.3.7, 3.3.8, and 3.3.9.1

• Clarified requirements for HVAC skid n 3.4.3.3.

• Corrected spelling in para 3.4.5.1

• Clarified requirement for downward airflow testing in para 3.4.5.1.1

• Clarified requirement for TAB Acceptance in para 3.4.10

• Clarified requirements in Appendix A 1(h), 5(a),

• 23 05 93 Attachments

• Clarified code year for ASME AG-1-2019

• Clarified calculation on page 3 and page 5 of Level 4 - DALT Procedure for Pressure Decay Test Method

Specification 40 95 00 Added submittals and requirements for the remote temperature display screen and the remote temperature display control panel.

(End of Summary of Changes)

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

45 4/5/2021 09 51 00 2.2.1, 2.2.1.7 & 2.The acoustical ceilings specifications mentions a concealed grid system in 2.2.1. In paragraph 2.2.1.7 it calls for a square edge and a kerfed and rabbeted joint in 2.2.1.8. Is the intent to provide a square edge tile that does or does not conceal the grid?

The design intent is to provide a tile that does not conceal the grid.

46 4/5/2021 08 71 00 Part 2 The description reads that no water intrusion of any type will be accepted but spec section 08 11 13 paragraph 2.7.1 states air leakage not to exceed 0.5 cubic feet per minute. Is the expectation to have a double door system similar to a vestibule having the first door be the barrier against weather and the second door be the air sealing door? Please advise.

Any water leakage within the complex, including at the doors will not be acceptable. There is no double system, per contract documents.

47 4/5/2021 4 08 33 23 2.1.2.1 Please provide further clarification regarding the water and air infiltration requirements for the overhead doors. It is not possible to achieve the listed requirements in the specifications. The best that can be provided is a face of wall mounted coiling door meeting ASHRAE 90.1, 2015 IECC.

Any water leakage within the complex, including at the overhead doors will not be acceptable. Air Leakage can not exceed 0.5 cubic feet per minute of air per square foot of overhead door area when tested in accordance with ASTM E283.

48 4/5/2021 07 05 23 Section 07 05 23 “WATER TESTING FOR INFILTRATION” calls for water spray testing of the exterior envelope in accordance with AAMA 501.2, "Quality Assurance and Water Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems". Section 07 05 23 article 2.1 requires joints to be testing including “panels joints, top edge, penetrations, base detail, corners, overhead doors, personnel doors, removable hatch covers, passageway/building interfaces, penetrations of structural, electrical, mechanical, and other components” (sic). AAMA 501.2 calls for spray testing of joints at 5‐foot intervals for 5 minutes. Under the AAMA standard, the west elevation of the Dockside Complex alone, which has approximately 3000 lineal feet of panel joints, will require 50 hours of continuous water spray testing.

The NAVFAC standard is typically to require a Whole Building Air Tightness Test in accordance with ASTM E 779 "Standard Test Method for Determining Air Leakage Rate by Fan Pressurization".

Verify that AAMA 501.2 will be used to test all panel joints on the exterior envelope of the buildings.

Specifcation 07 05 23 is for water infirlation an not air leakage.

AAMA 501.2 will be the standard for testing against water infiltration. No water intrustion will be acceptbale within the buildings at any locations, including but not limited to panels joints, top edge, penetrations, base detail, corners, overhead doors, personnel doors, removable hatch covers, passageway/building interfaces, penetrations of structural, electrical, mechanical, and other components.

Question No. Date Received REFERENCE QUESTION Response

Response Provided

July 2011

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

49 4/5/2021 3 Vol 1 Dwgs Note 2 Note 2 on G‐101/Vol 1 states that "interim movements and placements may be required to avoid lifting the enclosures over any permanent equipment or temporary equipment, fences, enclosures, etc". If there are obstacles that need to be accommodated (moved, lifted over, etc) the means and methods required could be significantly impacted. Please advise/confirm that there is a route with suitable clearance for wheeled transport of structures from erection location to dry dock 2, or if not, what accommodations need to be accounted for in our pricing.

The clearances at the CIA gates will need to be coordinated with the proposed transport unit utilized.

50 4/5/2021 3 Vol 1 Dwgs On G‐101/Vol 1, there is a square‐hatched area that indicates Construction Area along Berth 6. The hatched area does not extend to the Enclosure 5/7 construction area. Is the intended route for transporting the structures from the construction area down the Emergency Access way through the gate by building 400 then along Berth 6 or is it down the Main Road/Fire Lane (John Paul Jones Ave) turning at the hatched "Pathway for Movement" then along Berth 6?

Intended route is along berth 6 along the portal crane track.

Berth 6 phase 2 completion anticipated by end of 2022.

51 4/5/2021 3 Vol 1 Dwgs On G‐101/Vol 1, please advise what the surface and subsurface conditions are for the ground in the area that Enclosures 5/7 are to be erected.

Surface conditions are pavement, thickness is not known.

Subsurface conditions are not available. Contractor can coordinate geotech and test pits for subsurface conditions in support of the means and methods for constructing Enclosures 5 and 7.

52 4/5/2021 3 Vol 1 Dwgs On G‐101/Vol 1, please advise what the grades and/or ground slopes are on the route that Enclosures 5/7 are to be transported along.

The intended route is along the length of the portal crane track from Berth 6 to DD#2. Grades and slopes are minimal as the Enclosure 5/7 construction area is located outside the portal crane maintenance spur, 53 4/5/2021 Vol 3 Dwgs S‐002/Notes 2 and 3, indicate interior handrail to be stainless steel and exterior to be anodized aluminum.

Handrail around floor openings in the interior of Enclosure 7 shown on S‐102 and S‐103 refers to D1/S‐ 507 and B5/S‐507 respectively. This detail indicates handrail to be aluminum. Please clarify what is required around openings in the interior of Enclosure 7.

All hand‐ and guardrail for Vol 3/Shipside is to be constructed from aluminum.

54 4/5/2021 52 Vol 3 Dwgs B5/S‐507 indicates stainless steel handrail sleeves with stainless steel toe board fit between sleeves and seal welded to carbon steel floor plate. Please confirm that toeboard does not require to be painted after field welding.

Interior guardrails and pockets may be left uncoated.

Appropriate cleaning of spatter or scorching is expected to provide a clean installed product.

55 4/5/2021 52 Vol 3 Dwgs D3/S‐507 shows toeboard welded to aluminum rail post. Please indicate material required for toeboard in this location (Enclosure 7, around lower level floor opening)

Aluminum kick plate should be used where welded to aluminum.

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

56 4/5/2021 52 Vol 3 Dwgs B5/S‐507 and D2/S‐507 show stainless steel rail pockets shop welded to carbon steel structural framing. Are the stainless pockets intended to be blasted and painted along with the steel members they are welded to?

Interior guardrails and pockets may be left uncoated. Exterior guardrails and pockets should be blasted and painted.

57 4/5/2021 52 Vol 3 Dwgs Does B1/S‐507 typical rail field splice intended for splicing anodized aluminum rail, or would mechanical joints be preferred? Since field welds will not be anodized is there any additional treatment required for the welds?

Mechanical joints may be proposed if cleanliness and captivation objective is achieved. No additional treatment of welds is anticipated.

58 4/5/2021 05 50 13 Specification does not indicate what grade of stainless steel is required for handrail. Please indicate if 304 or 316 is required.

316L is to be used for railings within towers per Vol 2 S‐001. 304 may be utilized for sockets on shipside complex.

59 4/5/2021 Price Proposal Form CLIN 0001AE Hazardous Soils are typically disposed of by the Ton, Unit of Measure on this CLIN is by the Cubic Yard.

Please confirm this unit of measure is correct.

CY is to be utilized for quantities generated 5

60 4/5/2021 Price Proposal Form CLIN 0001AE Does this CLIN just cover the cost of handling and storing hazardous soils until they are turned over to the Government at Building 357 in the Government furnished container?

CLIN 0001AE, CLIN 00016 covers costs of handling, safety plans (HASP), documentation, on‐site stockpiling, and re‐handling material into the government provided containers or trucks.

The CLIN should anticipate government being able to provide transportation for 80 CY Haz Soils per week from the project site. The phrasing "at 357" is misleading, projects of this size typically require the Haz Soils to not leave the site and be loaded directly onto the government provided transportation at the project site.

61 4/5/2021 22 00 57 19.00 22 3.13.2 Are hazardous soil disposal fees to be included in the unit price for this CLIN?

No 5

62 4/5/2021 22 00 57 19.00 22 3.13.2 This paragraph speaks to containers for hazardous soils being supplied by the Government. It says that containers will be turned over to the Government at Building 357. Who is responsible for the soil disposal fees?

Government is responsible for the soil disposal fees. Hazardous soils shall not leave the project site. ("at 357" may not be the most accurate phrasing) Contractor is responsible for loading soils into the government provided containers or trucks for transport and disposal by the government.

63 4/5/2021 72 Volume 1 Dwgs Please provide specification for light Pole & Fixture shown on Volume 1 Drawing ES402 Note 1.

Match light fixture and pole to existing. Existing fixture is Lithonia D‐Series Size 2 on a 20ft square pole.

64 4/5/2021 Volume 2 Dwgs Drawing E102, note 1 indicates that the concrete encased electrode is to be #6; however drawing E503, detail A2 appears to indicate #3/0. Please clarify which is correct.

#3/0 AWG is correct. 5

65 4/5/2021 323 Volume 2 Dwgs Could two individual details be provided for the grounding indicated on drawing E503, detail A2, one showing the requirements for the Concrete Encased Electrode connection and the other showing requirements for the connection to ground rods?

Provided detail show all requirements. Connection between concrete encased electrode and building steel shall be #3/0 AWG. Connection between grounidng rod and building steel shall be #6 AWG. PVC sleeves can be shared or separate sleeves provided as required.

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

66 4/5/2021 57 & 80 Volume 1 Dwgs Drawing ES505, detail indicates #4/0 for the grounding electrode conductor connected to the reinforcing bar;

however drawing S501, Detail A3 indicates a #4. Please clarify which is correct.

#4/0 AWG is correct. 5

67 4/5/2021 72 Volume 1 Dwgs Drawing ES402, Note3 indicates to bond new fence per civil details. Please provide Fence grounding details .

See C‐503 detail A2. In addition, extend exiting bare copper #4 AWG around base of fence as shown on ES‐402.

68 4/6/2021 If duct interiors are wiped clean after fabrication, open ends sealed and maintained after cleaning, seals only removed to accommodate installation, and final wipe clean at time of installation, is any further cleaning required once the systems are installed.

No, unless visual and spot wipe down inspection finds visible dirt on a white cloth.

69 4/6/2021 Once duct systems are assembled, DALT’d, insulated and ready for start up who and how is the duct cleanliness determined.

Borescope inspections shall be performed by the contractor to inspect the interior of duct for visible mill scale and construction debris. Provide access to all duct areas. Borescope videos shall be provided to PNSY inspectors for approval.

70 4/6/2021 What is the cleanliness measurable standard that determines pass/fail cleanliness. Regardless of extent of cleanliness care, unless installation area’s are treated as clean room environments, once a seal is removed to install, airbourne dust will get inside the duct.

PNSY Inspectors will inspect interior of duct for visible mill scale and construction debris. This inspection will use a lint free white cloth to spot check interior of duct / equipment cleaniness. The extent of inspection will up to 100%. Provide access to all duct interior spaces on an as‐requested basis.

71 4/6/2021 Should cleanliness be accepted prior to DALT, positive pressure DALT’s will introduce fine dust in the system depending on construction activities around area being DALT’d since the test fan draws unfiltered air from the surrounding area to pressurize system. Duct interior will have condensation inside due to temperature changes throughout the day. Condensation has a tendency to collect fine dust, and when dried, creates a dirt/dust spot in the duct.

The cleanliness inspections will be conducted prior to DALT, to avoid breaking tested DALT tested sections. The Test Fans should use filter air. Changes in humidity due to environment are acceptable. This requirement is geared to remove mill scale and foreign material that collects in the the duct during construction.

72 4/6/2021 After the test at origin for the shipside ventilation skid, is the intent to disassemble all required components to “wipe clean”, which then will require additional DALT’s or multiple in service test joints. Please note, test at origin will pull in outside air which will have airbourne dirt, dust, pollen, etc. Temp filter media rolls maximize at Merv 8 which is less than 30% efficient for standard airbourne contaminants, or is the intent to install a HEPA filter rack on the intake air to maintain cleanliness.

The recipt inspection of the shipside and dockside ventilation equipment should be visually inspected at the point of assembly in to the system. The contractor is responsible to meet the same cleanliness standard. "This inspection will use a lint free white cloth to spot check interior of duct / equipment cleaniness. The extent of inspection will be up to 100%".

73 4/6/2021 For all areas where the exterior wall is pinned on ledge, please verify the level of cleanliness required prior to placement.

Preparation consistent with spec section 31 23 00.00 22 Paragraph 3.3.3

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

74 4/6/2021 The micropile pile cap details indicate that the anchors are supposed to be incorporated directly between the top plate of the pile cap and the building steel anchors.

Given the pile locations carry a different horizontal tolerance than building steel, please conform this direct connection detail is required.

Alternate means for developing pile capacity in tension to the column anchor rods may be demonstrated.

75 4/7/2021 Does the concrete foundation work (as described in Volume 1 drawings)for the Dockside Complex go into CLIN 0001AB‐2 even though the CLIN description is for work 5' outside of the structure?

Refer to PPI #43 5

76 4/7/2021 Due to the complexity of the project and proposal requirements, we would like to request a minimum of a one month extension of the bid date and PPI submission deadlines to allow more time for subcontractors and vendors to provide quotes.

The government will allow for an extension until 5/19/19. 5

77 4/7/2021 S101 TO S104 In plan volume 1, the dockside complex foundation and slab plans S‐101 to S‐104 have matchlines that are drawn on both sides of column line 6.2, approximately a 4' difference in location. Can corrected plans be reissued? This also seems to occur in the volume 2 architectural, structural and fire protection drawings.

Information is consistent on plans. Matchline location on sheets is a CAD convention, shifted so as not to obscure information near the line on either plan.

78 4/7/2021 1, 62, 10 Vol 3 Dwgs Exterior stair shown on S‐103 refers to D1/S‐517 where handrail is indicated to be aluminum. Note 3/A‐401 indicates handrail to be stainless steel. Please clarify material type required for handrail.

Exterior handrail for Vol. 3 to be aluminum as shown on D1/S‐ 517.

79 4/7/2021 120 Vol 3 Dwgs On A‐605, the Paint Schedule for Shipside Complex indicates exterior exposed guardrails to be aluminum (which would be anodized) and painted. Please clarify if all handrail/guardrail on exterior of Shipside Complex is to be aluminum and painted.

Correct. All exterior Shipside guard‐ and handrails should be painted aluminum. All interior rails can be left bare after anodizing.

80 4/7/2021 205 Vol 2 Dwgs On A‐601, the Paint Schedule for Dockside Complex indicates exterior exposed guardrails to be carbon steel and painted. Please clarify if all handrail/guardrail on exterior of Dockside Complex is to be carbon steel and painted.

Per A‐601, Paint Schedule, exterior guardrails in Vol. 2 to be painted and carbon steel.

81 4/7/2021 166 Vol 2 Dwgs Sec A5/A‐410 indicates handrail to be painted. Note 3 on same drawing indicates handrail to be stainless steel. Please clarify material type and finish required.

Exterior handrail and guard rails to be carbon steel and painted per A‐601, Paint schedule, of Vol. 2

82 4/7/2021 171 Vol 2 Dwgs Note 6/A‐415 indicates "stair finish" to be stainless. Is stainless required for treads, risers, stringers, and/or landing members?

Stair finish to be stainless steel, all components. 5

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

83 4/7/2021 11 33 40 00 3.8.3.1 This paragraph says "When leakage exceeds the maximum amount specified correct the source of excess leakage" There is no maximum amount of leakage in specification 33 40 00. Please clarify.

RCP is intended to be constructed with water tight joints. In order to verify that the joints are water tight they must be tested. ASTM C 1103 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines Summary:

The individual joint tester is used at each joint to verify the integrity of every joint as the product is being installed. The apparatus is centered over each joint. The sealing bladders are inflated, and the joint is pressurized to 3.5 psig. Once the test is begun the pressure is required to remain above 2.5 psi for at least 5 seconds.The intent of this test is to identify installation problems as they are occur so they can be corrected.

84 4/7/2021 11 33 40 00 3.8.3 RCP pipe is not manufactured or designed to be low pressure tested or hydrostatic water tested. Please confirm that RCP pipe will not require these tests.

RCP is intended to be constructed with water tight joints. In order to verify that the joints are water tight they must be tested. ASTM C 1103 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines Summary:

The individual joint tester is used at each joint to verify the integrity of every joint as the product is being installed. The apparatus is centered over each joint. The sealing bladders are inflated, and the joint is pressurized to 3.5 psig. Once the test is begun the pressure is required to remain above 2.5 psi for at least 5 seconds.The intent of this test is to identify installation problems as they are occur so they can be corrected.

85 4/7/2021 Price Proposal Form Currently, the following CLINs are believed to include a portion of the costs for spec section 07 05 23 Water Testing for Infiltration: 0001AA‐2; 0004A; 0004B;

0004C; & 0011. Please confirm if this is correct, or if the costs should be carried in different CLINs.

Confirm, CLIN 0007 also includes IMP which will need to be tested.

86 4/7/2021 105 Vol 3 Dwgs Details A3 & A5/A‐501 indicate 16" wide EPDM. Spec section 07 91 13 item 2.3.B states 18" wide EPDM.

Please clarify.

Volume 3 ‐ EPDM skirt to be 16" tall. 5

87 4/7/2021 112 Vol 3 Dwgs Details C5 & D2/A‐508 indicate self‐adhering EPDM Roofing Membrane. Please provide a specification section for the self‐adhering EPDM Roofing Membrane material.

See 07 60 00, 2.1.7. 5

88 4/7/2021 112 Vol 3 Dwgs Details A2, A5, & C5 /A‐508 indicate Tapered Rigid Insulation. Spec section 07 21 13 item 2.1 states that 07 21 13 is specifically for under slab and foundation wall insulation only. Please provide a specification section for the Tapered Rigid Insulation material.

07 21 13 can be used for tapered rigid insulation. 5

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

89 4/7/2021 1 07 05 23 1.2 ASTM E779 is a blower door test that quantifies leakage through a completed building envelope. This test needs to be performed after the building envelope is complete, including wall panels & seals, doors & seals, retractable roof & seals, and all other penetrations sealed. Access into/out of the building would not be possible during testing. Is the intention of the testing specification to perform this test after the building envelope is 100% complete and sealed?

The tests to be performed are summarized in para 2.1 of the specification. Blower door tests are not required in para 2.1

90 4/7/2021 4 07 05 23 2.1 AAMA 501.2 utilizes a single nozzle water spray for visual observation of water leakage at fixed glazing.

The test is not intended to be used for opaque walls, operable doors, windows, etc. This test could be used for diagnostic purposes only on these buildings, but it would not be an official test. This diagnostic test could be performed throughout the construction period as portions of the building envelope are completed.

1. Is it the intention of the testing spec to have this test performed for diagnostic purposes only?

2. Is it the intention of the testing spec to have this test performed either incrementally as portions of the building envelope are completed or after the building envelope is 100% completed and sealed?

3. Is it the intention of the testing spec to have this test performed on every single envelope penetration or on a sampling of envelope penetrations?

1. The intent of the testing spec., is to ensure adequare measures are taken to ensure there will be ZERO (0) water infiltration within the building. No water intrusion will be acceptable.

2. See 07 05 23, 3.1

3. See 07 05 23, 2.1.

91 4/7/2021 205 Vol 2 Dwgs Sheet A‐601 the floor finish is listed heavy duty vinyl at room number 113, 105, 111, 108, 205, 211, 206, 208, 305, 311 & 411 but the remarks state stainless steel diamond plate treads and landings. Please clarify.

Floor finish to be per A‐601, finish schedule. Stair Finish to be per paint schedule and finish schedule remarks on A‐601.

92 4/7/2021 112, 205 Vol 2 Dwgs Sheet A‐102 Keynote #7 calls for concrete floor with a trowel finish in Stair B 011 "Ground Level" and Sheet A‐ 601 floor finish calls for concrete trowel finish but the remarks on A‐601 state stainless steel diamond plate treads and landings. Please clarify.

Floor finish to be per A‐601, finish schedule. Stair Finish to be per paint schedule and finish schedule remarks on A‐601.

93 4/7/2021 205 Vol 2 Dwgs Sheet A‐601 the floor finish is listed epoxy at room number 004, 005, 011 & 013 at Enclosure 4 & 8 but the remarks state stainless steel diamond plate treads and landings. Please clarify.

Floor finish to be per A‐601, finish schedule. Stair Finish to be per paint schedule and finish schedule remarks on A‐601.

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

94 4/7/2021 163 Vol 2 Dwgs On Sheet A‐407 it is clear that Stair "A" & Stairs at Tower 5/6 receives 1/2" Plascore ceilings and at the underside of the stringers. Is the intent at Stair "B" to have ceilings & stringers exposed?

See RCPS and Finish schedule on A‐601 for clarity on Stair B Finish.

95 4/7/2021 For enclosure 6 mechanical equipment, please clarify the intent for securing/mounting the HVAC equipment.

Assumption is any structural modifications to support new equipment will be provided by the structural contractor and coordinated with the mechanical in regards to layout and size.

The Filter Housings and Coil Casings will be supported on existing structure. Filter Housing and Coil Casing shall provide minimum of 6" clearance, see Section 23 74 00 Page 17, 2.2.2 c.

96 4/7/2021 223 Vol 2 Dwgs For the rooftop equipment mounted on the level 3 roof per drawing M‐107, please advise as to the intent to secure equipment to the roof.

a. Structural drawings S‐105 and S‐513 detail duct supports by structural coordinated with the mechanical.

b. Structural drawing S‐105 note 3 indicates support framing for what appears to be related to the coil casing.

c. In general, please advise as to the intent for securing/mounting the HVAC equipment to the roof. If structural framing is required, it is assumed it will be provided by the structural contractor and coordinated with the mechanical in regards to layout and size.

Structural support of ducts and equipment on roof is shown schematically, it is anticipated that duct routing and supports may differ in field, and should conform to the design intent shown (support types, blocking/framing under posts etc) but not necessarily in the location or quantity shown. This coordination is anticipated to be performed by the contractor.

97 4/7/2021 17, 120 Vol 3 Dwgs Note 15/S‐001 indicates all ladders to be aluminum. On A‐605, the Paint Schedule for Shipside Complex indicates ladders to be carbon steel and painted.

Please clarify if all Shipside Complex are to be aluminum and anodized and not painted.

Shipside complex ladders are intended to be painted anodized aluminum.

98 4/7/2021 Since availability of stainless steel rolled shapes can be difficult/impossible (both domestically and non‐ domestically), please confirm it is acceptable to substitute shapes formed from bent plate or built up by welding (IAW AWS D1.6 or factory laser welded per

ASTM A1069‐19).

Shapes may be formed from welded, built up plates to match geometric properties of the shapes indicated.

99 4/7/2021 76, 78 Vol 3 Dwgs Note 1 on S‐901 and Note 3 on S‐903 says to remove bridge crane prior to lifting enclosure 5. Is the bridge crane to be re‐installed in enclosure 5 at the storage location or where is it to be stored?

Bridge crane is to be reinstalled in Enclosure 5 at the storage location.

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

100 4/7/2021 77‐79 Vol 3 Dwgs Are the shackles and slings shown on the Shipside Complex Rigging Plans being provided to the Owner at the end of the contract? If so, will the contractor be allowed to use the rigging during fit up testing in the dry dock?

No, this rigging equipment will remain the property of the Contractor. All rigging to be provided by the Contractor.

101 4/7/2021 Please provide installation details for interior lighting fixtures.

See Vol 2 E‐001 Note 12, which refers to details on A‐509 and A‐

510. Similarly, see Vol 3 E‐001 Note 13, which refers to details on A‐509 and A‐510.

102 4/7/2021 330 Vol 2 Dwgs Please provide wiring requirements for the cabling shown on Drawing E513, Detail C1, between POE network switch and the SRE Intercom devices.

Cabling shall be Cat 6. See Section 27 10 00 Para 2.3.2.1. 5

103 4/7/2021 331 Vol 2 Dwgs Drawing E514, Detail A5 SECNET Riser diagram indicates to install 2‐fiber, Multimode cable out to data drop locations. Please provide specification on the connectors at the SECNET data drop locations.

Provide type LC connectors. See 27 10 00 Para 2.5.3. 5

104 4/7/2021 330 Vol 2 Dwgs Volume 2C, Drawing E513 Detail C1 indicates a 12 fiber between new SRE Intercom Cabinet and Cabinet within Bldg. 96. Is the cabinet within Bldg. 96 existing or to be provided under this contract?

See Vol 1 ES‐405 Keyed Note 1: Provide wall mounted data rack to support equipment.

105 4/7/2021 328, 331 Vol 2 Dwgs Drawing E511 Detail B4 indicates a CAT 6 cables from Patch Panel in SECNET cabinet, however Drawing E514 Detail A5 does not indicate any patch panel within SECNET cabinet. Please clarify.

In addition to Fiber patch panel shown on E514/A5 provide CAT6 patch panel in SECNET rack for interior cameras.

106 4/7/2021 153 Vol 3 Dwgs Volume 3, Drawing EY101 callout 7 indicates to wire CAT 6 cable for WIFI connection, back to connector at passageway door. Volume 2C drawing E514 Detail B5 doesn't appear to account for enough CAT 6 cables to pick up this point. Please clarify.

Two CAT6 cables should be provided from PORTSNET Networking Equipment Rack to Shipside Enclosure. These connections will be through connector C‐7‐2‐1 and C‐7‐4‐11 per Vol3 E‐603 Connector Schedule.

107 4/7/2021 65, 69 Vol 3 Dwgs On S‐520, Contract Note indicates connecting T‐bolts to existing channel in drydock floor. In section A3 of the same drawing, a straight rod anchor bolt is depicted with a note referring to detail C5/S‐524, but there is no detail C5 on S‐524. Please provide details of the existing floor channel and required T‐bolt connection.

T‐bolt is detailed on C2/S‐521. Channel is existing in dry dock floor.

SOLICITATION NO. N40085‐21‐R‐1225 PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX PREAWARD INQUIRY FORM (TEMPLATE)

108 4/7/2021 65 Vol 3 Dwgs Note 2/S‐520 indicates survey to be conducted prior to steel fabrication to accommodate elevation variations.

Are there any other preparations of the drydock floor or existing anchoring channel that needs to be included as part of this bid?

No modifications or alterations to dry dock floor are desired. 5

109 4/7/2021 9, 39, 6 Vol 3 Dwgs Sheet S‐221 shows a W16x67 beam with top of steel at Elev 1'‐4 3/8". Sheet S‐120 and S‐520 shows a W12x65.

Please clarify correct beam size and TOS elevations.

W12x65 with T.O. Steel elevation of 1'‐0 1/8" ‐ sheet S‐520 shows this build up accurately.

110 4/7/2021 35 Vol 1 Dwgs Post‐Installed anchor notes say proof testing of anchors must be performed in accordance with the project specifications.

Please provide the specification that describes Anchor Testing requirements and frequency.

See spec section 05 05 20.00 27 5

111 4/7/2021 34 11 00 The specification speaks to rail being installed on ties.

Can you verify if any track/rail is being installed on wood ties?

Please refer to the detail A3 provided on S‐508, the rail is to be mounted to steel plate with rail clips.

112 4/7/2021 34 11 00 What size is the existing rail? Existing rail is 110#RB 5 113 4/7/2021 34 11 00 To thermite weld new 115RE rail to existing rail, the existing rail will need to be unclipped and raised to make proper alignment and perform the thermite weld process.

Can new rail be jointed to existing rail?

Yes new rail can be joined to existing rail, using a compromise joints to connect 110#RB with 115#RE, thermite welding will be required.

Amendment 0005