Amendment 0007.pdf
PDF 104 KB Posted
- Solicitation number
- N4008521R1225
About this file
This document contains an amendment to a solicitation for the Dry Dock 2 Complex project at the Portsmouth Naval Shipyard in Kittery, Maine.
The solicitation is for construction services for the Dry Dock 2 Complex project, with an estimated value over $25 million. The Naval Facilities Engineering Command is the contracting agency. The amendment provides responses to contractor questions to clarify contract requirements. Key clarifications include acceptable insulation and wall types for various areas, equipment support details, and confirmation of testing standards for reinforced concrete pipe used in storm drainage. The question submission period was extended by one week to May 12th to allow additional time for contractors to obtain necessary information from subcontractors and suppliers before submitting pricing.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide PPI responses.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R1225
X 9B. DATED (SEE ITEM 11)
22-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-May-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R1225
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
SOLICITATION NO. N40085‐21‐R‐1225
PROJECT TITLE/LOCATION: DRY DOCK 2 COMPLEX
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
155 4/27/2021 07 05 23 1.1 Paragraph states to employ an independent agency to conduct the pressure test on the building envelope in accordance with this specification section and ASTM E779.
ASTM E779 is a standard test method for determining air leakage rate not water infiltration. Will air leakage testing be required on top of the water infiltration testing?
See PPI 48 & 89. 7
156 4/27/2021 07 05 23 1.6.4 Submitting a final report within 48 hours of testing is not practical. Will NAVFAC allow a summary of test results within 48 hours and a final report submitted within two weeks after the completion of testing?
Final report to be submitted per specification requirements.
157 4/27/2021 94 Vol 3 Dwgs
Keynote 2/A‐205 (Vol 3) indicates a 1/4" stainless steel panels to be attached tucked under the bottom edge of the IMP and to extend down to elevation 0'‐0". Please provide detail for how this closure panel attaches to the structural steel and IMP.
See B3/A‐505 For IMP Closure. S.S.
Plate to be stich welded (3" per 12") full length, to structure. Provide continuous L3x3x1/4 at top and bottom of panel support. Angle to be maintained level, until it is fully attached, during welding to ensure no sagging or deformation occurs. No sagging or deformation will be acceptable. Level tolerance to be no more than 1/4" over 20'‐0".
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on Amend No.
July 2011
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
158 4/27/2021 242, Volume 2 Dwgs
Drawing M‐201 and M‐202 please provide a detail for attachment, support, and height of filter housing FH‐42, 43, & 44 to the roof deck.
Provide W6x8.5 I‐Beam rail under Filter Housings with welded shims to create equipment level faying surface.
Per Specification Section 23 74 00 paragraph 2.2.2.c, provide a minimum of 6" clearance from the bottom of the lowest filter housing door to the deck below.
159 4/27/2021 242, Volume 2 Dwgs
Drawing M‐201 and M‐202 please provide a detail for attachment, support, and height of Fan F‐1, 2, & 3 (and associated spring isolators) to the roof deck.
Fan supports will be adapted from the supports shown for duct supports welded to the roof on D2/D3 on S‐513 in Vol 2.
160 4/27/2021 242, Volume 2 Dwgs
Drawing M‐201 and M‐202 please provide a detail for attachment, support, and height of Coil Casing CC‐3 to roof deck. (Please note, coil casing will need to be elevated to accommodate the condensate drain trap.)
Provide W6x8.5 I‐Beam rail under Filter Housings with welded shims to create equipment level faying surface.
161 4/27/2021 242, Volume 2 Dwgs
Drawing M‐201 and M‐202 please provide a detail for attachment, support, and height of Heat Pump HP‐1, 2, & 3 to roof deck. (Please note, the heat pumps should be elevated to prevent condenser coil icing during heat mode in the winter, which will cause the heat pump to condensate)
Provide supports adapted from the supports shown for duct supports welded to the roof on D2/D3 on S‐513 in Vol 2. The Heat Pumps will be elevated 18" above roof deck to match the Fan Supports.
162 4/27/2021 242, Volume 2 Dwgs
Drawing M‐201 and M‐202 please provide a detail for attachment, support, and height of the Energy Recovery Ventilator ERV‐1 to roof deck.
Provide support adapted from the supports shown for duct supports welded to the roof on D2/D3 on S‐513 in Vol 2. The ERV will be elevated 18" above roof deck to match the Fan Supports.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
163 4/27/2021 169 Volume 2
Dwgs On A‐3/A‐413 (Vol 2) please clarify if closure plates at risers are intended to extend under the grating treads for full width of tread. Is this plate intended to be smooth and galvanized?
Intent is for solid riser and grated tread to create an assembly that will prevent significant gaps (>2") while permitting drainage. Plate to be galvanized.
164 4/27/2021 Price Proposal
Please provide clarification on which item(s) to include the cost for the dockside and shipside passageways and headhouses.
Costs for the passageways and headhouses are to be tracked based on the drawing volume they are included in.
165 4/30/2021 Vol 3 Dwgs
B1/A‐602 indicates "Mineral Fiber Insulation, Full Perimeter, Pinned". C3/A‐602 indicates "FIP Insulation behind frame perimeter, minimum 6" thick". Please confirm insulation type and thickness required for both details.
Insulation to be Mineral Fiber, Full Perimeter, Pinned. Full depth, for 24" of width.
166 4/30/2021 Vol 3 Dwgs
The uppermost drawing for both A3 & A5/A‐304 shows Insulation completely filling the gap between the 3/16" Metal Roof Plate and the 1/2" Plascore Liner Panel. Detail A5/A‐502 shows only a single layer between the Plate and Panel, but has a note stating that the entire void space is to be filled with Insulation. Please confirm the entire void space is to be filled with Insulation, regardless of what is drawn in any related detail.
See Specifcation 07 21 16, 2.1.1. R‐36 (Ceiling/roof) is to be provided. The entire void may be filled to achieve this.
167 4/30/2021 Vol 2 Dwgs
Please provide a distinct pattern for the MLCP, similar to how the ACT has a distinct pattern provided for it, at all locations on the Reflected Ceiling Plans (A‐115 to A‐126, inclusive).
See Specification 07 42 13 for MLCP information. No distinct pattern will be provided.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
168 4/30/2021 Vol 2
Dwgs The Finish Schedule on A‐601 indicates an MLCP ceiling finish for Room # 011 Stair B. Plan sheet A‐116 does not indicate any MLCP for Stair 011. Please clarify.
In room 11, MCLP to be provided per A‐601. Note: A‐116 is not at the underside of the ceiling levels, see A‐ 118 & A‐122, which correspond to A‐ 601, calling out MLCP with note 6 & 1.
169 4/30/2021 Vol 3 Dwgs
Support Tower Level 1 plan on S‐121 (Vol 3) shows a passageway enclosure in the west tower. A‐525 shows basic construction, but minimal details. Please clarify if this is to have same wall details as the passageway enclosures in Volume 2, if its permanently installed inside the support tower, and how it is attached to the support tower structure.
Support tower passageway is to have the same wall construction as other passageway sections. Passageway is to be permanently fastened to support tower structure by bolting base HSS to support tower structure with 1/2" dia bolts minimum at support tower framing members.
170 4/30/2021 52 41 22 13.14
2.3.3.3 Reference Spec 41 22 13.14 ‐ 2.3.3.3 which states "Speed control shall be infinitely variable type for each function".
Please confirm as to the following: Is this to mean "stepless infinitely variable" or "stepped infinitely variable".
The term "infinitely variable" means "stepless infinitely variable".
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
171 4/30/2021 Amendme nt 5 PPI Answer
Per the PPI answer "ASTM C1103 is standard practice for Joint Acceptance Testing of installed Precast Concrete Pipe Sewer Lines" All RCP on this project is being used as storm water drainage pipe. We are being told by RCP manufacturers in the New England region that RCP is not used commonly in a sewer application within New England and they don't manufacture RCP sewer line. To meet this requirement bidders will have to find a RCP supplier to price RCP sewer line from elsewhere in the country and it will likely come at a premium. Please advise if you would still like RCP storm drain on the project to pass ASTM C 1103.
It appears that sewer and stormwater are being used interchangeably here.
To be clear the sanitary sewer on this project is to be 8" PVC‐SDR35. The stormwater system is to be constructed with RCP. This does not appear to be out of the ordinary as NHDOT in the last quaarter of 2020 installed thousands of linear feet of RCP Stormwater Pipe.
172 4/30/2021 Amendme nt 6
PPI Answer
In response to PPI Answer 131, please provide the manufacturer used in the basis of design for the man doors.
No basis of design information is allowed to be provided.
173 4/30/2021 Amendme nt 6
PPI Answer
Further clarification is requested based on response to PPI
122. This question is related to how to price CLIN 0010, 0011, 0012 and 0013. We suggest to only include the escalation or acceleration costs associated with delaying the award in CLIN's 0010, 0011, 0012 and 0013 so that costs are not doubled up among the CLINs making the base bid plus CLINs an inflated value.
The CLIN structure has been developed in accordance with NAVFAC Acquisition policy and will not be revised
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
174 4/30/2021 Amendme nt 4 PPI Question
Per the PPI response we were directed to sheets S‐103 & S‐ 104 for crack repair quantities. Notes on these sheets direct the contractor to fill existing cracks and provide a quantity of concrete repair area but do not address the amount of crack repair to be assumed. Please provide a crack repair linear footage for basis of bid.
Assume 200 lf of crack repair required, average crack depth three inches. Provide unit cost for crack repair as well.
176 4/30/2021 Vol 2 Dwgs
Keyed Note 7 on A‐204 indicates 6" IMP is required on the W side of the Dockside Access, in the area of Column Line D1. Sheets A‐103 and A‐132 do not indicate any 6" IMP for this location. Please clarify the wall type required along the W side of the Dockside Passageway, between Building Lines 11 & 12.
Passageway west facade to be wall type H per A‐132.
178 4/30/2021 Vol 2 Dwgs
Keyed Notes on plan sheets A‐206, A‐207, & A‐208 indicate 3/16" Metal Plate, 3" Cavity, 5/8" Hat Channel, 20 ga Aluminum Siding, 14 ga Aluminum Panel (Roofing), and 20 ga Aluminum Bottom Panels for the Dockside and Shipside Passageways and Headhouses. A3/A‐310 has a note stating "Structural Channels filled with continuous Mineral Wool Insulation. Please confirm that Mineral Wool Insulation is required at all roof, wall, and floor sections of both the Dockside and Shipside Passageways and Headhouses, per the noted detail.
Mineral wool insuluation is rewuired at all roof, wall, and floor sections of the both dockside and shipside passageways as noted in the drawings and details.
179 4/30/2021 Vol 2 Dwgs
A‐102 indicates Wall Type D2 along the 11 Line, from A to E. Wall Type D2 on A‐520 indicates 3" IMP on a 14" Concrete Wall. Keyed Note 2 on A‐202 indicates 6" IMP (2 Hr Fire Rated) at the same location (11 Line, A to E). Please confirm the wall type for the noted location.
Wall type to be D3 ‐ Concrete wall with 6" IMP (2 Hr Fire Rated).
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
180 4/30/2021 Vol 2
Dwgs A‐109 indicates Wall Type B1 along the 2.6 Line, from H to the outside edge of the building. Wall Type B1 on A‐520 indicates 6" IMP on a with an 8" Cavity and 2" Studless Wall Panel. Keyed Note 1 on A‐203 indicates 3" IMP at the same location (2.6 Line, H to the outside edge of the building). Please confirm the wall type for the noted location.
Wall type to be B1, per A‐109. 7
181 4/30/2021 Vol 3 Dwgs
The Scale given for A1/M‐503 is 1/2" = 1'0". The Scale appears to be 1‐1/2" = 1'0". Please confirm the correct scale for A1/M‐503.
The scale should read 1‐1/2" = 1'0". 7
182 5/3/2021 5 09 97 13.26
3.4 Spec section 09 97 13.26, para 3.4 indicates steel surfaces to be field welded can be shop primed, then field prepped and field overcoated after welding is completed. This approach is particularly appropriate roof deck plates that are extensively field welded and require a topcoat.
However, the specified primer (Amercoat235) has a maximum recoat window of only 14 days at 70 deg F. It is not possible to deliver, erect, and field topcoat in 14 days, so topcoat must be applied in the shop with masking at all weld seams and intermediate beams and touching up after welding. Although this approach will provide application compliant with specification and manufacturers recommendations, the appearance of the topcoat will have variations in sheen and texture due to the mix of shop applied and field applied surface coating methods. Please confirm that these variations in sheen and texture are acceptable. If not, please specify a primer coat option that provides sufficient maximum recoat window to fully field apply topcoat at one time and provide a consistent appearance.
The following primers are also acceptable; AMERCOAT, 240, AMERCOAT 370, AND AMERCOAT
385.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
183 5/3/2021 Amendme nt 006 Response to PPI #139 references the response to PPI #48, which does not confirm the scope of testing. Please confirm whether the specification for testing calls for the total length of all panel joints to be tested in accordance with AAMA 501.2
Per 07 05 23, 2.1 ‐ Locations to be tested, at a minimum, include but are not limited to, panels joints, top edge, penetrations, base detail, corners, overhead doors, personnel doors, removable hatch covers, passageway/building interfaces, penetrations of structural, electrical, mechnical, and other componets, among others. 100% of penetrations must be tested. [Not 100% of panel joints].
185 5/3/2021 Vol 2 Dwgs
A1/A‐311 is a N‐S cut through Corridor A, and shows a 6" IMP Ceiling which is 1" above the 1/2" Plascore Liner Panel Ceiling, and has all beams in the ceiling being above the 6" IMP. C2/A‐415 provides a similar N‐S cut through Corridor A, but shows a different ceiling layout, including a vertical 3" IMP wall. Please clarify Corridor A ceiling details.
Corridor A Ceiling to be per A1/A‐311 (Volume 2).
193 5/5/2021 Due to the complexity of this project and tight bidding window, we had a difficult time getting "confirmation to bid" from some of the key subcontractors and vendors.
While we have endeavoured to have all questions in by the cutoff period, there will be additional questions that come from these key partners. Please consider extending the question period for an additional 7 calendar days?
This will result in a better price proposal to NAVFAC.
The Gov’t will extend the question period until May 12th at 1200