Amendment 0002 - RM13-1458_amend_002_revdwgs_20211222.pdf

PDF 3 MB Posted

Attached to
RM-13-1458 DRY DOCK 1 CAISSON REPLACEMENT, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
Solicitation number
N4008521R0272
Issued by

About this file

This document package includes engineering drawings and specifications for a replacement caisson for Dry Dock #1 at Portsmouth Naval Shipyard in Kittery, Maine. The project requires steel fabrication of the new caisson including mechanical and electrical systems, installation in the dry dock, and testing. Construction will primarily occur offsite with delivery to the shipyard for final testing. The existing caisson will then be removed, demolished and disposed of including hazardous materials handling. The solicitation number is N4008521R0272 for this work to be performed for the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OA202

PR

O

FI

LE

C

EN

TE

R

LI

N E

EL

EV

AT

IO

N

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

2.

8.

1.

\H eg er \C

LI

EN

TS

\S

TA

N

TE

C

\4

5- D

R ep la ce m en t C ai ss on fo r P

N

SY

D D

1\ D w g\

-D R ep la ce m en t C ai ss on fo r P N

SY

D

D 1\

O A2

P

R O

FI

LE

C

EN

TE

R

LI

N E

EL

EV

AT

IO

N .d w g

L

AY

O U

T N

AM

E:

O A2

P

R O

FI

LE

C

EN

TE

R

LI

N E

EL

EV

AT

IO

N P

LO

TT

ED

: W ed ne sd ay

, D ec em be r 2 2,

- 1

:5 3p m U

SE

R

: J as on

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

NA

VA

L S

TA

TI

ON

, N

OR

FO

LK

V

IR

GI

NI

A

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

DRAWFORM REVISION: 10 OCTOBER 2014

CHECK GRAPHIC SCALE BEFORE USING

KI

TT

ER

Y, M

AI

N E

PO

R

TS

M

O U

TH

N

AV

AL

S H

IP

YA

R D

XXXXXX-XX-X-XXXX

NPL / NPL

GRAPHIC SCALE

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

1630175

CONSTR. CONTR. NO.

SCALE: AS SHOWN

HEGER DRY DOCK, Inc.

65 NETWORK DRIVE

BURLINGTON, MA 01803

FY

S

PE

CI

AL

P

RO

JE

CT

R M

-1 3-

DR

Y

DO

CK

C

AI

SS

O N

RE

PL

AC

EM

EN

T

- F

AB

RI

CA

TI

O

N

EJA

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

DSN

DJD

PHS MDNJAH

SCALE: 3/16" = 1'-0"

ELEVATION - CENTERLINE PROFILE A4OA101

FR 5-2 FR 4-2 FR 3-2 FR 2-2 FR 1-2 FR 0 FR 1-1 FR 2-1 FR 3-1 FR 4-1 FR 5-1

3/16" = 1'-0" 16'12'8'4'04'

BASELINE (TOP OF 1" KEEL PLATE)

WT OPERATIONS DECK

WT WEATHER DECK

GIRDER NO. 1

CONCRETE BALLAST FLOOD THROUGH 18"Ø PIPING

FLAT FACE OF GATE

SHOWN FOR REFERENCE

GENERAL NOTES:

1. SIZE OF FLOOD VALVES AND PUMP ARE SCHEMATIC.

SEE MECHANICAL DRAWINGS FOR EXACT SIZES.

CL

12852153

MUSHROOM VENTILATOR RELIEF

TRIM TANK VENT

10"Ø PIPING (TYP)

ELECTRIC ACTUATOR

WITH HAND WHEEL (TYP)

VALVE MANUAL ACTUATOR

WITH HAND WHEEL (TYP)

MAIN/TRIM TANK EQUALIZING

10"Ø PIPINGMAIN TANK FLOOD

10"Ø PIPING

GRATING

HANGING LIGHTS (TYP)

MAIN TANK VENT

12"Ø PIPING

(TYP)

HVAC

SWITCHBOARDS

ELECTRICAL ENCLOSURE

BRANCH PANEL

(TYP)

SAFETY SWITCHES

(TYP)

FIRE ALARM

CONTROL PANEL

TRANSFORMERS

SHORE POWER CONNECTION

DEWATERING

PUMP MOTOR

(TYP)

SUPERFLOOD PUMP MOTOR

(TYP)

SUPERFLOOD PUMP 16"Ø

DISCHARGE COLUMN

MAIN TANK DEWATERING

12"Ø DISCHARGE COLUMN

AD

D

ED

S U

M P

/2

2/

PH

S

9/23/21

A4

OA403

OA402

FI

XE

D C

O N

C R

ET

E

BA

LL

AS

T

- A R

R

AN

G

EM

EN

T

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

2.

8.

1.

\H eg er \C

LI

EN

TS

\S

TA

N

TE

C

\4

5- D

R ep la ce m en t C ai ss on fo r P

N

SY

D D

1\ D w g\

-D R ep la ce m en t C ai ss on fo r P N

SY

D

D 1\

O A4

F

IX

ED

C O

N C

R

ET

E

BA

LL

AS

T

- A

R R

AN

G

EM

EN

T.

dw g L

AY

O

U T

N

AM

E:

O

A4

F

IX

ED

C

O N

C R

ET

E

BA

LL

AS

T

- A R

R

AN

G

EM

EN

T

P

LO

TT

ED

: W ed ne sd ay , D ec em be r 2

2,

- 1 :5

3p m

U

SE

R : J as on

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

NA

VA

L S

TA

TI

ON

, N

OR

FO

LK

V

IR

GI

NI

A

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

DRAWFORM REVISION: 10 OCTOBER 2014

CHECK GRAPHIC SCALE BEFORE USING

KI

TT

ER

Y, M

AI

N E

PO

R

TS

M

O U

TH

N

AV

AL

S H

IP

YA

R D

XXXXXX-XX-X-XXXX

NPL / NPL

GRAPHIC SCALE

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

1630175

CONSTR. CONTR. NO.

SCALE: AS SHOWN

HEGER DRY DOCK, Inc.

65 NETWORK DRIVE

BURLINGTON, MA 01803

FY

S

PE

CI

AL

P

RO

JE

CT

R M

-1 3-

DR

Y

DO

CK

C

AI

SS

O N

RE

PL

AC

EM

EN

T

- F

AB

RI

CA

TI

O

N

EJA

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

DSN

DJD

PHS MDNJAH

3/16" = 1'-0" 16'12'8'4'04'

SCALE: 3/16" = 1'-0"

PLAN - TOP OF CONCRETE C3OA402

7' -9

CONCRETE BALLAST

GENERAL NOTES:

1. SIZE OF FLOOD VALVES AND PUMPS ARE SCHEMATIC.

SEE MECHANICAL DRAWINGS FOR EXACT SIZES.

2. AS-DESIGNED DENSITY OF CONCRETE IS 173 PCF.

DENSITY TO BE FINALIZED AFTER AS-BUILT WEIGHT OF

GATE (STEEL AND EQUIPMENT) HAS BEEN DETERMINED.

C3

OA402

1 (FWD)CL

A (STBD)

B (PORT)

2 (AFT)

BASELINE (TOP OF 1" KEEL PLATE)

WT OPERATIONS DECK

WT WEATHER DECK

1 (FWD)2 (AFT)

FR 5-2 FR 4-2 FR 3-2

WT BHD

FR 2-2 FR 1-2 FR 0 FR 1-1 FR 2-1 FR 3-1

WT BHD

FR 4-1 FR 5-1

FR 5-2 FR 4-2 FR 2-2 FR 1-2 FR 0 FR 1-1 FR 2-1 FR 4-1 FR 5-1

CL

12852157

CL

B4

OA403

B4

OA403

16'-0"

2'-6"

GRATING

NOT SHOWN FOR CLARITY

SLOPE SLOPE

AFT

TRIM TANK

FWD

TRIM TANKMAIN TANK

FR 3-2

WT BHD

FR 3-1

WT BHD

3'-0"

(TYP)

TOP OF CONCRETE

SLOPESLOPE

SLOPESLOPE SLOPESLOPE

AFT

TRIM TANK

FWD

TRIM TANKMAIN TANK

SUMP

4'-6" 7'-3"

A4

OA403B2

OA403

B4

OA403

B4

OA403

1 1/8"

3' -0

SUMP

SCALE: 3/16" = 1'-0"

ELEVATION AT CENTERLINE

2'-6"

HORIZONTAL (TYP)

2'-6"

HORIZONTAL (TYP)

8'-0"

HORIZONTAL (TYP)

6'-9"6'-3"

A1

OA403

A1

OA403

SUMP

SUMP

2'-6"

AD

D

ED

S U

M P

/2

2/

PH

S

OA403

FI

XE

D C

O N

C R

ET

E

BA

LL

AS

T

- I N

ST

AL

LA

TI

O N

PR

O

C

ED

U R

E

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

2.

8.

1.

\H eg er \C

LI

EN

TS

\S

TA

N

TE

C

\4

5- D

R ep la ce m en t C ai ss on fo r P

N

SY

D D

1\ D w g\

-D R ep la ce m en t C ai ss on fo r P N

SY

D

D 1\

O A4

F

IX

ED

C O

N C

R

ET

E

BA

LL

AS

T

- I

N

ST

AL

LA

TI

O

N P

R O

C

ED

U R

E.

dw g L

AY

O

U T

N

AM

E:

O

A4

F

IX

ED

C

O N

C R

ET

E

BA

LL

AS

T

- I N

ST

AL

LA

TI

O N

P R

O C

ED

U

R E

P

LO

TT

ED

: W ed ne sd ay , D ec em be r 2

2,

- 1 :5

3p m

U

SE

R : J as on

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

NA

VA

L S

TA

TI

ON

, N

OR

FO

LK

V

IR

GI

NI

A

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

DRAWFORM REVISION: 10 OCTOBER 2014

CHECK GRAPHIC SCALE BEFORE USING

KI

TT

ER

Y, M

AI

N E

PO

R

TS

M

O U

TH

N

AV

AL

S H

IP

YA

R D

XXXXXX-XX-X-XXXX

NPL / NPL

GRAPHIC SCALE

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

1630175

CONSTR. CONTR. NO.

SCALE: AS SHOWN

HEGER DRY DOCK, Inc.

65 NETWORK DRIVE

BURLINGTON, MA 01803

FY

S

PE

CI

AL

P

RO

JE

CT

R M

-1 3-

DR

Y

DO

CK

C

AI

SS

O N

RE

PL

AC

EM

EN

T

- F

AB

RI

CA

TI

O

N

EJA

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

DSN

DJD

PHS MDNJAH

12852158

SCALE: 3/8" = 1'-0"

SECTION - SUMP FOR DEWATERING PUMP INTAKE A4OA402

CL

CONCRETE BALLAST

6' -3

BASELINE (TOP OF KEEL PLATE)

SCALE: 3/8" = 1'-0"

SECTION - TYPICAL B4OA402

CL

CONCRETE BALLAST

VA

R

IE

S

BASELINE (TOP OF KEEL PLATE)

3/8" = 1'-0" 8'4'04'

6" = 1'-0" 3"

2"

1"

0 3" 6"

3'-0"

4' -6

TOP OF CONCRETE

TOP OF CONCRETE

SUMP BOTTOM

SCALE: 3/8" = 1'-0"

SECTION - FRAME 0 B2OA402

CL

CONCRETE BALLAST 7'

-3

BASELINE (TOP OF KEEL PLATE)

TOP OF CONCRETE

1 1/8"

SCALE: 6" = 1'-0"

DETAIL B5OA403

#4 BAR SPACED 24" OC

L4 x 4 x 3/8"

(ALL AROUND)

2"

7"

45°

2"

GRATING SUPPORT

(ALL AROUND)

3/8"

1/

2"

B5

OA403

GRATING ALL FOUR CORNERS

GRATING

SCALE: 3/8" = 1'-0"

SECTION - SUMP FOR EQUALIZING VALVE & PIPE A1OA402

CL

CONCRETE BALLAST

VA

R

IE

S

BASELINE (TOP OF KEEL PLATE)

6' -3

TOP OF CONCRETESUMP BOTTOM

B5

OA403 SIMILAR

1'-6" 3'-0"

AD

D

ED

S U

M P

/2

2/

PH

S

C E

N

TE

R

LI

N E

O F

C A

IS

S

O N

A N

D S

Y M

M E

TR

Y

PL 1/2

W12 x 53

BASELINE T/KEEL

GIRDER NO. 1 BOS

WT OPERATIONS

DECK B.O.P.

WT WEATHER

DECK B.O.P.

PL 1/2

PL 3/8

PL 3/8PL 5/8

PL 1

PL 3/8

OPENING FOR TANK EQUALIZING

PIPE. COORDINATE OPENING

SIZE AND LOCATION WITH

MECHANICAL REQUIREMENTS.

3/8" = 1'-0" 8'4'04'

BF 180mm x 10mm

TYP

BF 180mm x 10mm

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N A

M E

: Q :\N

O R

\1

-0

1\ ca dd

A ct iv e\

_6

-D R

Y D

-1

-S

TR

U C

TU

R

A L\

1-

D R

Y D

-1

-O S

4-

A M

M E

N D

M E

N T

1.

dw g L

A Y

O U

T N

A M

E : C

A

IS

S O

N F

R A

M E

P

LO

TT

E D

: W ed ne sd ay , D ec em be r 2

2,

- 5 :1

0p m

U S

E R

: i m ar za ri

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

NA

VA

L

ST

AT

IO

N, N

OR

FO

LK

V

IR

GI

NI

A

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

DRAWFORM REVISION: 10 OCTOBER 2014

CHECK GRAPHIC SCALE BEFORE USING

K

IT

TE

R

Y , M

A

IN

E P

O R

TS

M

O U

TH

N

A V

A L

S H

IP

Y

A R

D

NPL / NPL

EJA

09/23/21

GRAPHIC SCALE

DSN

NBJ

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

65 NETWORK DRIVE

BURLINGTON, MA 01803

FY

S

PE

CI

AL

P

RO

JE

CT

R M

-1 3-

DR

Y

DO

CK

C

AI

SS

O N

RE

PL

AC

EM

EN

T

- F

AB

RI

CA

TI

O

N

RDW TNT2 WMS

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

08/30/21

-OS304

C A

IS

S

O N

F R

A M

E

12852182

DO.

BF 180mm x 10mm

DO.

DO.

DO.

DO.

C5

OS303

B1

OS501

C3

OS501

L6x4x1/2 SLV

DOCKING SUPPORT

STRUCTURE SEE

SHEET OS510 FOR

MORE INFORMATION

A3

OS102

OS101, OS203

SECTION - WT BKHD - FR 3

SCALE: 3/8"=1'-0 A2

6" LAP MIN, TYP

3/8 TYP

1" TYP

2" TYP

OS302, OS304 A4DETAIL

SCALE: 3"=1'-0

3" = 1'-0" 4"

3"

2"

1"

0 6" 1'

TYP A4

OS304

HULL PL

LONG. BF

FB 5x1/2

BKHD BF

HULL PL

LONG. BF

FB 5x1/2

BKHD PL

BKHD BF

C4

OS304

OS304 C4DETAIL

SCALE: 3"=1'-0

TYP

FB 1/2 x 5

TYP

TYP

3" MIN

TYP

RE

V.

S

TI

FF

EN

ER

S

FO

R

TA

NK

E

Q.

P

IP

E

M

OV

E

/2 2/

RD

W

A2

OP303

WTHR DECK BOP

EL 34.08

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

MOLDED PL LINE

EL 8.50

BASELINE T/KEEL

EL 0.00

BASELINE T/KEEL

EL 0.00

A4

OP302

A2

OP302

A4

OP303

FR 0 FR 1-1 FR 2-1 FR 3-1 FR 4-1 FR 5-1FR 1-2FR 2-2FR 3-2FR 4-2FR 5-2

/8

/4

ACCESS HATCH (TYP.)

15V-23 (BEYOND)

16V-24

3P-2

10V-6

6V-10

10 V-8

5 V-9 4 P-3

13 V-17

14 V-18

18 V-25

UNIVERSAL

JOINT (TYP.)

C12x25 OR W8x58 (TYP.)

VALVE STEM

GUIDE (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

CHECK GRAPHIC SCALE BEFORE USING

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

GRAPHIC SCALE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:3 P

M

P R

O C

E S

S S

E C

T

IO

N

L O

N G

IT

U

D

IN

A L S

E C

T

IO

N

OP301

KWS PRP BES

12852214

OP101SCALE: 3/16" = 1'-0" A3

PROCESS LONGITUDINAL SECTION

4' 0' 4' 8' 12' 16'

3/16" = 1'-0"

KEYNOTES:

GENERAL NOTES:

1. FOR GENERAL AND PROCESS MECHANICAL NOTES SEE

DRAWING OP001.

2. MINIMUM CLEAR SPACING BETWEEN PUMP/MOTOR AND

VALVE ACTUATORS SHALL BE 1'-3". COORDINATE WITH

PUMP/MOTOR, VALVE AND VALVE ACTUATOR

MANUFACTURERS TO PROVIDE EQUIPMENT WITH

PROPER ORIENTATION TO ACHIEVE THIS MINIMUM

SPACING.

3. REFER TO STRUCTURAL DRAWINGS FOR PUMP

FOUNDATION PLANS AND DETAILS.

4. FOR DETAILS SEE DRAWINGS OP501, OP502, OP503 AND

OP504.

1 PROVIDE MAIN TANK VENT 12"Ø PIPING AND DIP TUBE.

PROVIDE GOOSENECK FITTING WITH BIRD SCREEN AT

WEATHER DECK. CUT DIP TUBE TO EXACT PIPE LENGTH

AFTER CAISSON SUBMERGENCE TEST/DOCK TRIALS.

2 PROVIDE TRIM TANK VENT 10"Ø PIPING AND DIP TUBE.

PROVIDE GOOSENECK FITTING WITH BIRD SCREEN AT

WEATHER DECK. CUT DIP TUBE TO EXACT PIPE LENGTH

AFTER CAISSON SUBMERGENCE TEST/DOCK TRIALS.

3 PROVIDE DEWATERING PUMP, BASEPLATE, 12"Ø DISCHARGE

COLUMN, IMPELLER BOWL ASSEMBLY, SUCTION INLET WITH

FLANGED END, INTAKE STRAINER, SUPPORTS AND MOTOR

ASSEMBLY.

4 PROVIDE SUPERFLOOD PUMP, BASEPLATE, 16"Ø DISCHARGE

COLUMN, IMPELLER BOWL ASSEMBLY, SUCTION INLET WITH

FLANGED END, SUPPORTS AND MOTOR ASSEMBLY.

5 PROVIDE SUPERFLOOD 16" CHECK VALVE, SUPPORTS AND

GASKETS.

6 PROVIDE SUPERFLOOD 16" BUTTERFLY VALVE, ELECTRIC

ACTUATOR, FLOOR STAND, STUFFING BOX, STEM, GUIDE

BEARINGS, SUPPORTS AND GASKETS.

7 PROVIDE SUPERFLOOD 16"Ø 90° ELBOW.

8 PROVIDE SUPERFLOOD 16"Ø PIPING.

10 PROVIDE FLOOD THROUGH 18"Ø BUTTERFLY VALVE,

ELECTRIC ACTUATOR, FLOOR STAND, STUFFING BOX, STEM,

GUIDE BEARINGS, SUPPORTS AND GASKETS.

11 PROVIDE FLOOD THROUGH 18" X 16" TEE FITTING AND

GASKETS BETWEEN FLANGE CONNECTIONS.

13 PROVIDE MAIN TANK FLOOD 10"Ø GATE VALVE, MANUAL

HANDWHEEL ACTUATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

14 PROVIDE MAIN TANK FLOOD 10"Ø BUTTERFLY VALVE, MANUAL

HANDWHEEL ACTUATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

15 PROVIDE TRIM TANK FLOOD 8"Ø GATE VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

16 PROVIDE TRIM TANK FLOOD 8"Ø BUTTERFLY VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

17 PROVIDE TANK EQUALIAING 10"Ø PIPING.

18 PROVIDE TANK EQUALIZING 10"Ø GATE VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

9 PROVIDE SUPERFLOOD PUMP DISCHARGE VENT 2"Ø PIPING.

12 PROVIDE FLOOD THROUGH 18" X 18" TEE FITTING AND

GASKETS BETWEEN FLANGE CONNECTIONS.

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

S

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

BASELINE T/KEEL

EL 0.00

A3

OP301

A

C L

ACCESS HATCH AND LADDER

17 V-23

18 V-24

20V-26

UNIVERSAL JOINT, TYP.

C12x25 OR W8x58 (TYP.)

VALVE STEM GUIDE (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

BASELINE T/KEEL

EL 0.00

A3

OP301

A

C L

ACCESS HATCH AND LADDER

3 P-2

5 V-15

6 V-16

12V-19

13V-20

3' - 0"

VALVE STEM GUIDE (TYP.)

C12x25 OR W8x58 (TYP.)

UNIVERSAL JOINT (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

/8

CHECK GRAPHIC SCALE BEFORE USING

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

GRAPHIC SCALE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:4 P

M

P R

O C

E S

S S

E C

T

IO

N S

S

H E

E T

O

F

OP302

KWS PRP BES

12852215

SCALE: 1/4" = 1'-0" OP101 A2

SECTION

SCALE: 1/4" = 1'-0" OP101 A4

SECTION

4' 0' 4' 8'

1/4" = 1'-0"

KEYNOTES:

GENERAL NOTES:

1. FOR GENERAL AND PROCESS MECHANICAL NOTES SEE

DRAWING OP001.

2. MINIMUM CLEAR SPACING BETWEEN PUMP/MOTOR AND

VALVE ACTUATORS SHALL BE 1'-3". COORDINATE WITH

PUMP/MOTOR, VALVE AND VALVE ACTUATOR

MANUFACTURERS TO PROVIDE EQUIPMENT WITH PROPER

ORIENTATION TO ACHIEVE THIS MINIMUM SPACING.

3. REFER TO STRUCTURAL DRAWINGS FOR PUMP

FOUNDATION PLANS AND DETAILS.

4. FOR DETAILS SEE DRAWINGS OP501, OP502, OP503 AND

OP504.

1 PROVIDE MAIN TANK VENT 12"Ø PIPING AND DIP TUBE.

PROVIDE GOOSENECK FITTING WITH BIRD SCREEN AT

WEATHER DECK. CUT DIP TUBE TO EXACT PIPE LENGTH

AFTER CAISSON SUBMERGENCE TEST/DOCK TRIALS.

2 PROVIDE TRIM TANK VENT 10"Ø PIPING AND DIP TUBE.

PROVIDE GOOSENECK FITTING WITH BIRD SCREEN AT

WEATHER DECK. CUT DIP TUBE TO EXACT PIPE LENGTH

AFTER CAISSON SUBMERGENCE TEST/DOCK TRIALS.

3 PROVIDE DEWATERING PUMP, BASEPLATE, 12"Ø DISCHARGE

COLUMN, IMPELLER BOWL ASSEMBLY, SUCTION INLET WITH

FLANGED END, INTAKE STRAINER, SUPPORTS AND MOTOR

ASSEMBLY.

4 PROVIDE MAIN TANK DEWATERING 12" PIPING.

5 PROVIDE MAIN TANK DEWATERING 12" CHECK VALVE,

SUPPORTS AND GASKETS.

6 PROVIDE MAIN TANK DEWATERING 12" GATE VALVE,

ELECTRIC ACTUATOR, FLOOR STAND, STUFFING BOX, STEM,

GUIDE BEARINGS, SUPPORTS AND GASKETS.

11 PROVIDE MAIN TANK FLOOD 10"Ø PIPING.

12 PROVIDE MAIN TANK FLOOD 10"Ø GATE VALVE, ELECTRIC

ACTUATOR, FLOOR STAND, STUFFING BOX, STEM, GUIDE

BEARINGS, SUPPORTS AND GASKETS.

13 PROVIDE MAIN TANK FLOOD 10"Ø BUTTERFLY VALVE,

ELECTRIC ACTUATOR, FLOOR STAND, STUFFING BOX, STEM,

GUIDE BEARINGS, SUPPORTS AND GASKETS.

16 PROVIDE TRIM TANK FLOOD 8"Ø PIPING.

17 PROVIDE TRIM TANK FLOOD 8"Ø GATE VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

18 PROVIDE TRIM TANK FLOOD 8"Ø BUTTERFLY VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

19 PROVIDE MAIN/TRIM TANK EQUALIZING 10"Ø PIPING.

20 PROVIDE TANK EQUALIZING 10"Ø GATE VALVE, MANUAL

HANDWHEEL OPERATOR, FLOOR STAND, STUFFING BOX,

STEM, GUIDE BEARINGS, SUPPORTS AND GASKETS.

10 PROVIDE MAIN TANK FLOOD 10"Ø INLET SCREEN.

15 PROVIDE TRIM TANK FLOOD 8"Ø INLET SCREEN.

7 PROVIDE MAIN TANK DEWATERING 12"Ø INLET SCREEN.

8 PROVIDE MAIN TANK DEWATERING 12"Ø HINGED BLIND

FLANGE.

9 PROVIDE MAIN TANK FLOOD 10"Ø HINGED BLIND FLANGE.

14 PROVIDE TRIM TANK FLOOD 8"Ø HINGED BLIND FLANGE.

1 1

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

1"x6" ROLLED PLATE PIPE SLEEVE

(1 SIZE LARGER THAN OUTSIDE

SURFACE OF PIPE OD)

BULKHEAD PLATE

SCH 40

1"x6" ROLLED PLATE PIPE

SLEEVE (1 SIZE LARGER THAN

OUTSIDE SURFACE OF PIPE OD)

BULKHEAD

OD

WT

WT

5/16

5/16

5/16

5/16

1"

5"

WT

WT

5/16

5/16

5/16

5/16

HULL PLATE

SCH 80 BETWEEN VALVE

AND HULL, TYPICAL

HULL

1"x6" ROLLED PLATE PIPE

SLEEVE (1 SIZE LARGER THAN

OUTSIDE SURFACE OF PIPE OD)

OD

6" 5"

1"

1"x6" ROLLED PLATE PIPE SLEEVE

(1 SIZE LARGER THAN OUTSIDE

SURFACE OF PIPE OD)

1"x6" ROLLED

PLATE PIPE

SLEEVE

VENT PIPE

OPERATIONS

DECK

WT, T&B

WT

WEATHER

DECK

1/4 T&B

1/4

1/4

1/4

10"Ø GATE VALVE

10"Ø PIPING

WATERTIGHT BULKHEAD

VALVE STEM

CL ELEV = 7' - 2"

BOX OUT CONCRETE BALLAST

FOR PIPE SUPPORT

INSTALLATION, 3" MIN CLEAR

ALL AROUND. LEVEL WITH NON-

SHRINK GROUT, SEE NOTE 3.

10"Ø PIPE SUPPORT

10" TANK EQUALIZING PIPE

SUPPORTED BY CUT OUT

THRU BULKHEAD

3/8

(4) 7/8"Ø EPOXY ADHESIVE

ANCHORS WITH LEVELING NUTS

AND ANCHOR NUTS, SEE NOTE 2.

8" MIN EMBEDMENT DEPTH

3" MIN

TRIM TANKMAIN TANK PIPE FLANGE SUPPORTS ON

BALLAST SURFACE. PROVIDE

TEMPORARY SUPPORT PRIOR TO

POURING OF BALLAST (TYP.)

CONCRETE BALLAST

SIDE

NOTES:

1. WHILE CAISSON IS ACTIVELY BEING FLOODED OR DEWATERED, CROSS-CONNECT VALVES MAY BE OPENED TO EFFECTIVELY CONNECT TRIM TANKS TO THE MAIN TANK. HOWEVER, BOTH CROSS-CONNECT VALVES SHALL BE SECURED IF FLOODING/DEWATERING PROCESS IS PAUSED.

2. DRILL AND INSTALL TWO-COMPONENT INJECTABLE HIGH STRENGTH EPOXY RESIN ADHESIVE WITH 7/8" DIA. HOT DIPPED GALVANIZED STEEL THREADED ROD, NUTS AND WASHERS. REFER TO MANUFACTURER'S RECOMMENDED INSTRUCTIONS FOR STORAGE, PREPARATION OF

CONCRETE SURFACE, DRILL SIZE DIAMETER AND INSTALLATION OF EPOXY ADHESIVE SYSTEM.

3. FOLLOWING INSTALLATION OF PIPE SUPPORT, FILL IN BOX-OUT AND LEVEL WITH NON-SHRINK, NON-METALLIC GROUT. NON-SHRINK SHALL HAVE A MINIMUM COMPRESSION STRENGTH OF 5,000 PSI AT 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTMC109.

4. PRIOR TO INSTALLATION OF GROUT, COAT ALL METAL PIPE SUPPORT SURFACES, AS SPECIFIED.

FRONT

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

5/16

10"Ø PIPE

WATERTIGHT BULKHEAD

BOX OUT CONCRETE BALLAST

FOR PIPE SUPPORT

INSTALLATION, 3" MIN CLEAR

ALL AROUND. LEVEL WITH NON-

SHRINK GROUT, SEE NOTE 3.

10"Ø PIPE SUPPORT

(4) 7/8"Ø EPOXY ADHESIVE

ANCHORS WITH LEVELING NUTS

AND ANCHOR NUTS, SEE NOTE 2.

PIPE FLANGE SUPPORTS ON

BALLAST SURFACE. PROVIDE

TEMPORARY SUPPORT

PRIOR TO POURING OF

BALLAST (TYP.)

CONCRETE BALLAST

10"Ø GATE VALVE

VALVE STEM

8" MIN EMBEDMENT DEPTH

3" MIN

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:3

:2 P

M

B A

L L A

S T

F

L O

O D

-T H

R O

U G

H S

Y S

T E

M S

D E

T A

IL

S

S

H E

E T

O

F

OP502

KWS PRP BES

12852218

SCALE: 3/4" = 1'-0" C2

TYPICAL BULKHEAD PLATE

PENETRATION DETAIL

SCALE: 3/4" = 1'-0" A2

TYPICAL HULL PLATE PENETRATION

DETAIL

SCALE: 1 1/2" = 1'-0" A4

TYPICAL VENT PENETRATION DETAIL

1'

9"

6" 0' 1' 2'

3"

1 1/2" = 1'-0"

1' 0' 4'2'1'

3/4" = 1'-0"

OP104SCALE: 3/4" = 1'-0" C4

TANK EQUALIZING DETAIL

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

SEE DETAIL B3

THIS SHEET

SEE DETAIL B2

THIS SHEET

SEE DETAIL B5

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A5

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL B3

THIS SHEET

SEE DETAIL B2

THIS SHEET

SEE DETAIL B5

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A5

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL C4

ON OP502

SEE DETAIL C4

ON OP502

VALVE STEM GUIDE. SEE

DETAIL C5 ON OP501 (TYP.)

SEE DETAIL C2 ON OP504 FOR W12X50

TO W10X26 GIRDER TO GIRDER

CONNECTION (TYP.)

SEE DETAIL A3

THIS SHEET

SEE DETAIL A3

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A2

THIS SHEET

SEE DETAIL A2 ON OP504 FOR W10X26

TO W10X26 GIRDER TO GIRDER

CONNECTION (TYP.)

SEE DETAIL C4 ON OP504 FOR

BULKHEAD CONNECTION (TYP.)

C12x25 OR W8x58 (TYP.)

NOTE:

1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OF PIPE SUPPORTS AND VALVE GUIDE BEARINGS.

B (PORT)

A (STB)

1 (FWD)2 (AFT) C

L

9"9" W10 X 26

5/16

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

18"Ø PIPE

2' - 0"

NOTE: SUPPORT IS OFFSET TO AVOID VALVE STEM.

18"Ø BUTTERFLY VALVE

W10 X 26

5/16

DRILL BOLT HOLES

TO MATCH FLANGE

18"Ø PIPE

7/8"

5/16

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

8"Ø BUTTERFLY VALVE

9" W10 X 26

1' - 6"

8"Ø BUTTERFLY VALVE

DRILL BOLT HOLES

TO MATCH FLANGE

8"Ø GATE VALVE

5/16

WELD PLATE AT END OF W10 X 26

TO LEVEL SPAN, FIELD VERIFY

FOR REQUIRED THICKNESS.W10 X 26

9" 9"

5/16

W10 X 26

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

12"Ø PIPE

2' - 0" W10 X 26

DRILL BOLT

HOLES TO

MATCH FLANGE

5/16

12"Ø GATE VALVE

12"Ø CHECK VALVE

12"Ø PIPE

DRILL BOLT HOLES

TO MATCH FLANGE

9"

1/2" PLATE

5/16

10"Ø PIPE

1' - 6"

W10 X 26

SEE DETAIL C2

ON OP504

SEE DETAIL A2

ON OP504

DRILL BOLT HOLES

TO MATCH FLANGE

HULL

10"Ø GATE VALVE

10"Ø PIPE

5/16

10"Ø BUTTERFLY

VALVE

W10 X 26

SEE DETAIL A2

ON OP504

5/16

W10 X 26

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

16"Ø PIPE

W12 FRAMING

2"Ø VENT PIPE

16"Ø BUTTERFLY VALVE 16"Ø CHECK VALVE

5/16

W10 X 26

SEE DETAIL A2

ON OP504

SEE DETAIL C2

ON OP5049" 9"

5/16

W10 X 26

DRILL BOLT HOLES

TO MATCH FLANGE

1/2" PLATE

16"Ø PIPE

2' - 0"

SEE DETAIL A2

ON OP504

SEE DETAIL C2

ON OP504

18"Ø PIPE

3 1/4" (TYP)

3 3/4"

1/2" PLATE

1/4" THICK

NEOPRENE

LINER

1"Ø U-BOLTS

W12 FRAMING

W12 FRAMING

5/16

1/2" PLATE

18"Ø PIPE

1' - 6" 1' - 6"

8"8"

(2) 1"Ø U-BOLTS

CL 18" PIPE

5/16

TYP

5/16 5/16

TYP

1/2" PLATE

5/16

TYP

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:4 P

M

P R

O C

E S

S S

U P

P O

R T

S

S H

E E

T

O F

OP503

KWS PRP BES

12852219

SCALE: 1/4" = 1'-0" C3

PROCESS - PIPE SUPPORTS AND GUIDE BEARINGS

SCALE: 1/2" = 1'-0" A2

TYPICAL 18 INCH PIPE SUPPORT

SCALE: 1/2" = 1'-0" B5

TYPICAL 8 INCH PIPE SUPPORT

SCALE: 1/2" = 1'-0" B2

TYPICAL 12 INCH PIPE SUPPORT

SCALE: 1/2" = 1'-0" B3

TYPICAL 10 INCH PIPE SUPPORT

SCALE: 1/2" = 1'-0" A5

TYPICAL 16 INCH PIPE SUPPORT

SCALE: 1/2" = 1'-0" A3

TYPICAL 18 INCH SADDLE PIPE SUPPORT

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

FR 0 FR 1-1 FR 2-1 FR 3-1 FR 4-1 FR 5-1FR 1-2FR 2-2FR 3-2FR 4-2FR 5-2

V-23

V-24

8"Ø TRIM TANK

FLOOD (TYP. OF 2)

10"Ø TRIM TANK VENT/DIP

TUBE (TYP. OF 2)

V-26

P-2

V-16

V-15

V-7

V-8

V-5

V-6

P-4

12"Ø MAIN TANK VENT/DIP

TUBE (TYP. OF 2)

10"Ø MAIN/TRIM TANK

EQUALIZING (TYP. OF 2)

10"Ø MAIN TANK

FLOOD (TYP. OF 2)

16"Ø SUPERFLOOD PUMP

DISCHARGE (TYP. OF 2)

18"Ø FLOOD THROUGH /

SUPERFLOOD (TYP. OF 4)

12"Ø MAIN TANK DEWATERING

PUMP DISCHARGE (TYP. OF 2)

V-21

V-22

V-25

P-1

V-14

V-13

V-2

V-1

V-4

V-3

P-3

V-11 V-12 V-9 V-10

V-17

V-18

V-19

V-20

B (PORT)

A (STB)

1 (FWD)2 (AFT) CL

CHECK GRAPHIC SCALE BEFORE USING

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

GRAPHIC SCALE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:4 P

M

S Y

S T

E M

D

IA

G R

A M

S

C H

E D

U L E

S

OP601

KWS PRP BES

12852221

P-4 16 SUPERFLOOD VERTICAL TURBINE, AXIAL FLOW PROPELLER ON/OFF

P-3 16 SUPERFLOOD VERTICAL TURBINE, AXIAL FLOW PROPELLER ON/OFF

P-2 12 DEWATERING VERTICAL TURBINE, MIXED FLOW IMPELLER ON/OFF

P-1 12 DEWATERING VERTICAL TURBINE, MIXED FLOW IMPELLER ON/OFF

TAG SIZE (IN) SERVICE TYPE OPERATION

PUMP SCHEDULE

OM301SCALE: 3/16" = 1'-0" C3

PROCESS - SYSTEM DIAGRAM

V-26 10 SIDE 2 TANK EQUALIZING GATE VALVE VARIABLE MANUAL HANDWHEEL

V-25 10 SIDE 1 TANK EQUALIZING GATE VALVE VARIABLE MANUAL HANDWHEEL

V-24 8 SIDE 2 TRIM TANK FLOOD BUTTERFLY VALVE VARIABLE MANUAL HANDWHEEL

V-23 8 SIDE 2 TRIM TANK FLOOD GATE VALVE VARIABLE MANUAL HANDWHEEL

V-22 8 SIDE 1 TRIM TANK FLOOD BUTTERFLY VALVE VARIABLE MANUAL HANDWHEEL

V-21 8 SIDE 1 TRIM TANK FLOOD GATE VALVE VARIABLE MANUAL HANDWHEEL

V-20 10 SIDE 2 MAIN TANK FLOOD BUTTERFLY VALVE VARIABLE MANUAL HANDWHEEL

V-19 10 SIDE 2 MAIN TANK FLOOD GATE VALVE VARIABLE MANUAL HANDWHEEL

V-18 10 SIDE 1 MAIN TANK FLOOD BUTTERFLY VALVE VARIABLE MANUAL HANDWHEEL

V-17 10 SIDE 1 MAIN TANK FLOOD GATE VALVE VARIABLE MANUAL HANDWHEEL

V-16 12 SIDE 2 TANK DEWATERING GATE VALVE VARIABLE MOTOR

V-15 12 SIDE 2 TANK DEWATERING CHECK VALVE OPEN/CLOSE SPRING LOADED

V-14 12 SIDE 1 TANK DEWATERING GATE VALVE VARIABLE MOTOR

V-13 12 SIDE 1 TANK DEWATERING CHECK VALVE OPEN/CLOSE SPRING LOADED

V-12 16 SIDE 2 SUPERFLOOD DISCHARGE BUTTERFLY VALVE VARIABLE MOTOR

V-11 16 SIDE 2 SUPERFLOOD DISCHARGE CHECK VALVE OPEN/CLOSE SPRING LOADED

V-10 16 SIDE 1 SUPERFLOOD DISCHARGE BUTTERFLY VALVE VARIABLE MOTOR

V-9 16 SIDE 1 SUPERFLOOD DISCHARGE CHECK VALVE OPEN/CLOSE SPRING LOADED

V-8 18 SIDE 2 FLOOD/SUPERFLOOD SUCTION B (PORT) BUTTERFLY VALVE VARIABLE MOTOR

V-7 18 SIDE 2 FLOOD/SUPERFLOOD SUCTION A (STBD) BUTTERFLY VALVE VARIABLE MOTOR

V-6 18 SIDE 2 FLOOD/SUPERFLOOD DISCHARGE B (PORT) BUTTERFLY VALVE VARIABLE MOTOR

V-5 18 SIDE 2 FLOOD/SUPERFLOOD DISCHARGE A (STBD) BUTTERFLY VALVE VARIABLE MOTOR

V-4 18 SIDE 1 FLOOD/SUPERFLOOD DISCHARGE B (PORT) BUTTERFLY VALVE VARIABLE MOTOR

V-3 18 SIDE 1 FLOOD/SUPERFLOOD DISCHARGE A (STBD) BUTTERFLY VALVE VARIABLE MOTOR

V-2 18 SIDE 1 FLOOD/SUPERFLOOD SUCTION B (PORT) BUTTERFLY VALVE VARIABLE MOTOR

V-1 18 SIDE 1 FLOOD/SUPERFLOOD SUCTION A (STBD) BUTTERFLY VALVE VARIABLE MOTOR

TAG SIZE (IN) SERVICE TYPE POSITION ACTUATOR

VALVE SCHEDULE

4' 0' 4' 8' 12' 16'

3/16" = 1'-0"

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

MAIN TANK VENT 12"Ø PIPING AND DIP

TUBE. GOOSENECK FITTING WITH BIRD

SCREEN AT WEATHER DECK. (TYP. OF 2)

DEWATERING PUMP MOTOR

AND BASEPLATE (TYP. OF 2)

SUPERFLOOD PUMP MOTOR

AND BASEPLATE (TYP. OF 2)

SUPERFLOOD 16" CHECK VALVE,

BUTTERFLY VALVE AND PIPING (TYP. OF 2)

FLOOD THROUGH 18"Ø BUTTERFLY VALVES,

PIPING AND INLET SCREENS WITH HINGED BLIND

FLANGES (TYP. OF 4)

MAIN TANK FLOOD 10"Ø BUTTERFLY

VALVE, GATE VALVE, PIPING AND

INLET SCREEN (TYP. OF 2)

TRIM TANK FLOOD 8"Ø BUTTERFLY

VALVE, GATE VALVE, PIPING AND

INLET SCREEN (TYP. OF 2)

TRIM TANK VENT 10"Ø PIPING AND DIP

TUBE. GOOSENECK FITTING WITH BIRD

SCREEN AT WEATHER DECK. (TYP. OF 2)

MAIN/TRIM TANK EQUALIZING 10"Ø

PIPING AND GATE VALVE (TYP. OF 2)

SUPERFLOOD PUMP DISCHARGE VENT 2"Ø

PIPING, ISOLATION BALL VALVE, VACUUM

RELIEF VALVE AND RETURN PIPING (TYP. OF 2)

VALVE MANUAL ACTUATOR

WITH HAND WHEEL AND

FLOOR STAND (TYP. OF 10)

VALVE ELECTRIC ACTUATOR

WITH HAND WHEEL AND

FLOOR STAND (TYP. OF 12)

VALVE STEM (TYP. OF 22)

SUPERFLOOD PUMP 16"Ø

DISCHARGE COLUMN,

PROPELLER BOWL ASSEMBLY

AND SUCTION INLET WITH

FLANGED END (TYP. OF 2)

MAIN TANK DEWATERING 12"Ø DISCHARGE

COLUMN, IMPELLER BOWL ASSEMBLY,

SUCTION INLET WITH FLANGED END AND

INTAKE STRAINER (TYP. OF 2)

MAIN TANK DEWATERING 12"Ø

CHECK VALVE, GATE VALVE

AND PIPING (TYP. OF 2)

UNIVERSAL JOINT (TYP. OF 22)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:4 P

M

F U

L L S

Y S

T E

M I S

O M

E T

R

IC

OP901

KWS PRP BES

12852222

SCALE: A4

PROCESS - FULL SYSTEM ISOMETRIC

GENERAL NOTES:

1. FOR GENERAL AND PROCESS MECHANICAL NOTES SEE

DRAWING OP001.

2. PIPE SUPPORTS, VALVE STEM GUIDES AND

ASSOCIATED STRUCTURAL MEMBERS ARE NOT SHOWN

FOR CLARITY.

3. FOR DETAILS SEE DRAWINGS OP501, OP502, OP503 AND

OP504.

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

S

8"Ø BUTTERFLY VALVE

VALVE MANUAL ACTUATOR

WITH HAND WHEEL AND

FLOOR STAND (TYP.)

VALVE STEM (TYP.)

VALVE STEM GUIDE (TYP.)

8"Ø PIPE SUPPORT

8"Ø PIPE

8"Ø GATE VALVE

8"Ø PIPE

C12 X 25 (TYP.)

W10 X 26

8"Ø PIPE

8"Ø INLET SCREEN AND

HINGED BLIND FLANGE

UNIVERSAL JOINT (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

SEE DETAIL C2 ON OP504 FOR

W12X50 TO W10X26 GIRDER TO

GIRDER CONNECTION

12"Ø CHECK VALVE

DEWATERING PUMP

MOTOR AND BASEPLATE

VALVE STEM

12"Ø PIPING

DEWATERING PUMP 12"Ø DISCHARGE

COLUMN, IMPELLER BOWL ASSEMBLY

AND SUCTION INLET WITH FLANGED

END AND INTAKE STRAINER

12"Ø GATE VALVE

12"Ø PIPE SUPPORT

12"Ø PIPE

VALVE STEM GUIDE

C12 X 25

VALVE ELECTRIC ACTUATOR WITH

HAND WHEEL AND FLOOR STAND

W10 X 26

12"Ø HINGED

BLIND FLANGE

UNIVERSAL JOINT (TYP.)

SEE DETAIL C2 ON

OP504 FOR W12X50 TO

W10X26 GIRDER TO

GIRDER CONNECTION

SEE DETAIL C4 ON OP504

FOR BULKHEAD CONNECTION

VALVE MANUAL ACTUATOR WITH HAND

WHEEL AND FLOOR STAND (TYP.)

VALVE STEM GUIDE (TYP.)

C12 X 25 (TYP.)

10"Ø GATE VALVE

10"Ø PIPE

VALVE STEM (TYP.)

UNIVERSAL JOINT (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

10"Ø EQUALIZATION

PIPE SUPPORT

W10 X 26 (TYP.) 18"Ø TEE

18"Ø X 16"Ø TEE

18"Ø FLANGE PIPE

SUPPORT (TYP.)

VALVE STEM GUIDE (TYP.)

C12 X 25 (TYP.)

18"Ø PIPE

18"Ø INLET SCREEN AND

HINGED BLIND FLANGE (TYP.)

18"Ø PIPE

18"Ø PIPE18"Ø BUTERFLY VALVE (TYP.)

18"Ø PIPE

VALVE STEM (TYP.)

VALVE ELECTRIC ACTUATOR

WITH HAND WHEEL AND

FLOOR STAND (TYP.)

18"Ø PIPE

18"Ø PIPE

18"Ø PIPE

18"Ø PIPE

UNIVERSAL JOINT (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

18"Ø SADDLE PIPE

SUPPORT (TYP.)

SEE DETAIL C2 ON OP504 FOR

W12X50 TO W10X26 GIRDER TO

GIRDER CONNECTION (TYP.)

SEE DETAIL C4 ON OP504 FOR

BULKHEAD CONNECTION (TYP.)

10"Ø BUTTERFLY VALVE

VALVE MANUAL ACTUATOR

WITH HAND WHEEL AND

FLOOR STAND (TYP.)

VALVE STEM (TYP.)

VALVE STEM GUIDE (TYP.)

10"Ø PIPE SUPPORT 10"Ø PIPE

10"Ø GATE VALVE

C12 X 25 (TYP.)

10"Ø PIPE

W10 X 26

10"Ø INLET SCREEN AND

HINGED BLIND FLANGE

UNIVERSAL JOINT (TYP.)

RIGID SHAFT MID SPAN

FLANGED COUPLER (TYP.)

SEE DETAIL C2 ON OP504 FOR

W12X50 TO W10X26 GIRDER TO

GIRDER CONNECTION (TYP.)

SEE DETAIL A2 ON OP504 FOR

W10X26 TO W10X26 GIRDER

TO GIRDER CONNECTION

16"Ø CHECK VALVE

SUPERFLOOD PUMP

DISCHARGE VENT 2"Ø

VACUUM RELIEF VALVE

SUPERFLOOD PUMP 16"Ø

DISCHARGE COLUMN,

PROPELLER BOWL

ASSEMBLY AND SUCTION

INLET WITH FLANGED END

SUPERFLOOD PUMP

MOTOR AND BASEPLATE

VALVE ELECTRIC ACTUATOR WITH

HAND WHEEL AND FLOOR STAND

16"Ø 90° ELBOW

16"Ø PIPE SUPPORT (TYP.)

W10 X 26 (TYP.)

18"Ø TEE

16"Ø PIPING

VALVE STEM

16"Ø BUTTERFLY VALVE

SUPERFLOOD PUMP

DISCHARGE VENT

2"Ø PIPING

SUPERFLOOD PUMP

DISCHARGE VENT 2"Ø

RETURN PIPING

SUPERFLOOD PUMP

DISCHARGE VENT 2"Ø

ISOLATION BALL VALVE

18"Ø X 16"Ø TEE

16"Ø PIPING

UNIVERSAL JOINT (TYP.)

SEE DETAIL A2 ON OP504 FOR

W10X26 TO W10X26 GIRDER TO

GIRDER CONNECTION (TYP.)

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:5 P

M

IS

O

M E

T R

IC

S

OP902

KWS PRP BES

12852223

SCALE: C2

TRIM TANK FILL ISOMETRIC

SCALE: A5

DEWATERING ISOMETRIC

SCALE: C4

TANK EQUALIZATION ISOMETRIC

SCALE: A4

FLOOD-THROUGH ISOMETRIC

SCALE: C5

MAIN TANK FILL ISOMETRIC

SCALE: A2

SUPERFLOOD ISOMETRIC

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

K W

S

WTHR DECK BOP

EL 34.08

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

MOLDED PL LINE

EL 8.50

BASELINE T/KEEL

EL 0.00

BASELINE T/KEEL

EL 0.00

FR 0 FR 1-1 FR 2-1 FR 3-1 FR 4-1 FR 5-1FR 1-2FR 2-2FR 3-2FR 4-2FR 5-2

MUSHROOM

VENTILATOR

RELIEF

MUSHROOM

VENTILATOR

INTAKE

MV

MV

EUH

DHU

EHC

A2

OM302

A4

OM302

A2

OM303

A4

OM303

CP

AHU HMI

CP

GD

3/4" PUMPED

CONDENSATE

3/4" CONDENSATE

DRAIN

3/4" PUMPED

CONDENSATE

3/4" CONDENSATE

DRAIN

/2

EUH

36"x36"

BACKDRAFT

DAMPER

26" OA

AHU

22"x26" SA 20"x20" SA 16"x18" SA

DHU

SF

/4

26"ø RA

/4

/4

/2

WTHR DECK BOP

EL 34.08

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

OPER DECK BOP

EL 23.00

FR 0 FR 1-1FR 1-2FR 2-2

A2

OM303

SF

S-2

2500 CFM

S-2

2500 CFM

14"x32" SA14"x32" SA

25"x20" SA

26"x32" SA

CHECK GRAPHIC SCALE BEFORE USING

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

GRAPHIC SCALE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:3 P

M

M E

C H

A N

IC

A

L L

O N

G

IT

U D

IN

A

L S

E C

T

IO

N

OM301

TJE DFA PJD

12852226

3/16" = 1'-0"OM301

B1 MECHANICAL LONGITUDINAL SECTION

4' 0' 4' 8' 12' 16'

3/16" = 1'-0"

3/16" = 1'-0"OM301

A2 MECHANICAL SECTION AT SF-1

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

T

JE

TOP OF DD1

EL 6.50

TOP OF DD1

EL 6.50

WTHR DECK BOP

EL 34.08

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

MOLDED PL LINE

EL 8.50

A B1

OM301

EUH

3/4" CONDENSATE

DISCHARGE

THROUGH HULL

3/4" CONDENSATE

DISCHARGE

THROUGH HULL

3/4" CONDENSATE

DRAIN TO COND.

PUMP CP-1

DHU

CP

TOP OF DD1

EL 6.50

TOP OF DD1

EL 6.50

WTHR DECK BOP

EL 34.08

WTHR DECK BOP

EL 34.08

OPER DECK BOP

EL 23.00

OPER DECK BOP

EL 23.00

GIRDER NO-1 BOS

EL 13.00

GIRDER NO-1 BOS

EL 13.00

MOLDED PL LINE

EL 8.50

MOLDED PL LINE

EL 8.50

A

B1

OM301

MV

26"x22"

SA DUCT

MV

AHU

CHECK GRAPHIC SCALE BEFORE USING

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

GRAPHIC SCALE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

K

IT

T E

R Y

M

A

IN

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

-A

T L A

N T

IC

XXXXXX-XX-X-XXXX

1630175

AS SHOWN

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

NPL / NPL

EJA

DSN

ALG

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

OF

CONSTR. CONTR. NO.

SCALE:

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

C I C

O R

E N

A V

A L

S

TA

TI

O

N , N

O R

FO

LK

V

IR

G

IN

IA

F Y

S P

E C

IA

L

P R

O

JE

C T

R M

-1 3-

D R

Y D

O C

K

C A

IS

S

O N

R E

P

LA

C E

M E

N T

F

A B

R

IC

A T

IO

N

DRAWFORM REVISION: 10 OCTOBER 2014

UNCLASSIFIED

U N C L A S S

IF

IE

D

UNCLASSIFIED

65 NETWORK DRIVE

BURLINGTON, MA 01803

Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email

C

U se rs

P u b lic

D o c u m e n ts

-D

R Y

D -1

-O

M E P

_H a ro ld

.F ri b e rg st a n te c

.c o m .r v t

/2

/2

:4

:3 P

M

M E

C H

A N

IC

A

L S

E C

T

IO

N S

S

H E

E T

O

F

OM302

TJE DFA PJD

12852227

4' 0' 4' 8'

1/4" = 1'-0"

SCALE: 1/4" = 1'-0" OM101 A2

SECTION

SCALE: 1/4" = 1'-0" OM101 A4

SECTION

A

D

JU

S T

E D

E Q

P

IP

E

B A

L L

A S

T

/2

/2

T

JE

OA202 - PROFILE - CENTERLINE ELEVATION
OA402 - FIXED CONCRETE BALLAST - ARRANGEMENT
OA403 - FIXED CONCRETE BALLAST - INSTALLATION PROCEDURE
OS304 - CAISSON FRAME 3
OP301 - PROCESS SECTION -LONGITUDINAL SECTION
OP302 - PROCESS SECTIONS -SHEET 1 OF 2
OP502 - BALLAST & FLOOD-THROUGH SYSTEMS DETAILS -SHEET 2 OF 2
OP503 - PROCESS SUPPORTS -SHEET 1 OF 2
OP601 - SYSTEM DIAGRAM & SCHEDULES
OP901 - FULL SYSTEM ISOMETRIC
OP902 - ISOMETRICS
OM301 - MECHANICAL LONGITUDINAL SECTION
OM302 - MECHANICAL SECTIONS -SHEET 1 OF 2

File details come from the government source that posted it. Updated .