1630175-DWG-1of2_rev_20211005.pdf
PDF 18 MB Posted
- Solicitation number
- N4008521R0272
About this file
This solicitation is for a replacement caisson for Dry Dock #1 at Portsmouth Naval Shipyard in Kittery, Maine. The proposed project involves steel fabrication of the replacement caisson including installation of mechanical and electrical systems. Construction will primarily occur offsite with delivery to the shipyard for final testing at the dry dock. Upon successful delivery and acceptance of the new caisson, the existing Dry Dock #1 Caisson will be removed from the site, demolished, and disposed of including handling and disposal of any hazardous materials contained within. The Department of the Navy Naval Facilities Engineering Command is the contracting agency for this project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATION, SECTION AND DETAIL SYMBOLS
LA
U
N
C
H
R
A
M
P
AREA (CIA) FENCE
CONTROLLED INDUSTRIAL
FENCE
CIA
NOT TO SCALE
SITE PLAN
PASS
OFFICE
PWD-MAINE
OFFICE
N
MA.
VT.
MAINE
CANADA
CANADA
U.S. NAVAL ACTIVITIES
KITTERY, ME
PORTSMOUTH
AUGUSTA
PORTLAND
0 20 40 60 100
SCALE: MILES
AREA MAP
N.H.
WORK LOCATION
DETAIL
ELEVATION
SECTION
INDICATES DIRECTION
OF CUTTING PLANE
SECTION NUMBER
SHEET NUMBER WHERE
SECTION IS DRAWN
INDICATES DIRECTION
OF CUTTING PLANE
ELEVATION NUMBER
SHEET NUMBER WHERE
ELEVATION IS DRAWN
DETAIL NUMBER
SHEET NUMBER WHERE
DETAIL IS DRAWN
APPROVED
SIGNATURE BADGE # DATE
THE SIGNATURES ALSO ACKNOWLEDGE THAT
THE CONSTRUCTION DOCUMENTS (DRAWINGS
AND SPECIFICATIONS) ACCURATELY
REPRESENT THE PROJECT REQUIREMENTS.
APPROVED: PNSY DRY DOCK CONTROL BOARD
APPROVED
APPROVED
APPROVED
C984 DD BRANCH HEAD:
C-102
D3
C-102
B4
C-102
C1
1B
KITTERY
PORTSMOUTH
U.S.NAVAL
ACTIVITIES
PORTSMOUTH
HARBOR
M
A
I
N
E
N
E
W
H
A
M
P
S
H
I
R
E
P I S
C A
T A
Q U
A
R
I V
E R
R
T
B
Y
P
A
S
S
0 500 1000
SCALE: YARDS
VICINITY MAP
-G-001
T I T
L
S
E
E T
12852126
DPA CHG VMG
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
N
M
E
U
S F
S
H A
R E
D P
R O
J E
C T
S c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
T
I T
E
E T d w g
Y O
U T
M
E
G
T
I T
E
P
O
T T
E D
M o n d a y
A u g u s t p m
E
R h f r i b e r g
D E
P A
R T
M E
O
F
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
K
V
I R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
C
R
M
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
KITTERY, ME
PORTSMOUTH NAVAL SHIPYARD
AUGUST 30, 2021
9/23/21
-G-004
G E
N E
R A
L
N
O T
H E
12852129
DPA CMG VMG
GENERAL NOTES:
1. EXISTING CONDITIONS AT THE START OF CONSTRUCTION WILL REFLECT
ONGOING CONSTRUCTION PROJECTS THAT WILL IMPACT THE AREA
THAT THE RM13-1458 CONTRACTOR WILL WORK. THE CONTRACT PLANS
WERE PREPARED TO REFLECT THE DESIGN DOCUMENTS FOR THESE
CONSTRUCTION PROJECTS BUT DO NOT REFLECT AS-BUILT
CONDITIONS. THE SURVEY PLANS PROVIDED HEREIN ARE BASED ON
THE DOUCET SURVEY INC. FIELD SURVEY, WHICH WAS COMPLETED
PRIOR TO THE COMPLETION OF WORK IN THOSE CONTRACTS. THE
CONTRACTOR MUST UTILIZE THE REFERENCE DRAWINGS FOR THE
APPLICABLE ADJACENT CONTRACTS, COUPLED WITH THE SURVEY
PLANS, AS THE ANTICIPATED EXISTING CONDITIONS.
2. THE DRAWINGS AND SPECIFICATIONS FORM A PART OF THE CONTRACT
DOCUMENTS. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS. KEEP A COPY OF THE DRAWINGS AND
SPECIFICATIONS ONSITE DURING THE PROJECT.
3. EXISTING CONDITIONS ARE INTENDED TO PROVIDE GENERAL OVERVIEW
OF STRUCTURES BUT DO NOT INCLUDE ALL APPURTENANCES AND
CONDITIONS.
4. DIMENSIONS AND DETAILS OF THE EXISTING CONSTRUCTION ARE FROM
CONSTRUCTION DRAWINGS. ALL DIMENSIONS, ELEVATIONS &
CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY DISCREPANCIES
MUST BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER
BEFORE ORDERING MATERIALS AND PROCEEDING WITH THE AFFECTED
PART OF THE WORK.
5. ELEVATIONS ARE IN DECIMALS OF FEET AND DIMENSIONS ARE IN FEET
AND INCHES.
6. PROVIDE AND MAINTAIN HORIZONTAL AND VERTICAL CONTROLS IN THE
MAINE STATE PLANE COORDINATE SYSTEM. VERTICAL DATUM IS
NAVD88.
7. PROTECT EXISTING BENCHMARKS, SYSTEMS, AND SURFACES TO
REMAIN. ALL DAMAGED SYSTEMS AND SURFACES MUST BE REPAIRED
OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER AT NO
ADDITIONAL COST TO THE GOVERNMENT.
8. COORDINATE WITH PNSY OPERATIONS THROUGHOUT THE DURATION OF
THE PROJECT.
9. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE MUST BE
LEFT IN A NEAT AND CLEAN MANNER.
10. WORK MUST CONFORM WITH LOCAL, STATE AND FEDERAL CODES AND
ORDINANCES WHICH APPLY TO THIS PROJECT.
11. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT FEATURES.
12. DO NOT USE YELLOW OR ORANGE-YELLOW COLORED MATERIALS FOR
THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS,
SHEETING, TARPS, POLYETHYLENE BOTTLES OR OTHER CONTAINERS,
TAPES, BAGS, BANDING, IDENTIFICATION MARKS ON TOOLS, BOUNDARY
MARKERS, RIBBONS, VENT DUCTS, ETC. YELLOW COLORED WASTE
MUST BE DISPOSED OF OFF-YARD. SHIPYARD REFUSE CONTAINERS
MUST NOT BE USED FOR THE DISPOSAL OF YELLOW COLORED WASTE
MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED ABOVE ARE
OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SUBJECT
TO STRICT CONTROLS. YELLOW COLORED DEBRIS MUST BE BAGGED IN
NON-TRANSLUCENT CONTAINERS, AND PROMPTLY REMOVED FROM
PNSY.
13. REPORT SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS
SUBSTANCES (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING
DURING THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON
DISCOVERY, REGARDLESS OF THE QUANTITY. CALL THE FIRE
DEPARTMENT AT 207-438-2333 TO REPORT THE SPILL. THE
GOVERNMENT RESERVES THE RIGHT TO CLEAN UP, PACKAGE AND
DISPOSE OF SPILLS OCCURRING ON THE SHIPYARD, AND BILL SUCH
COSTS.
14. IF UNFORESEEN HAZARDOUS MATERIAL, SUCH AS PCB, LEAD PAINT,
AND FRIABLE AND NON-FRIABLE ASBESTOS AND OTHER MATERIAL THAT
MAY BE HAZARDOUS TO HUMAN HEALTH UPON DISTURBANCE DURING
CONSTRUCTION OPERATIONS IS ENCOUNTERED, STOP THAT PORTION
OF THE WORK AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.
15. ALL MATERIAL DEMOLISHED AND NOT REUSED OR SALVAGED TO THE
GOVERNMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND MUST BE REMOVED DAILY FROM THE GOVERNMENT'S PROPERTY.
REMOVED MATERIAL MUST BE DISPOSED OF IN ACCORDANCE WITH ALL
LOCAL, STATE, AND FEDERAL LAWS.
UTILITY NOTES: CONSTRUCTION NOTES:
1. FIELD VERIFY THE LOCATION OF UNDERGROUND UTILITIES BEFORE
COMMENCING WORK. UNDERGROUND UTILITY LOCATIONS ARE
APPROXIMATE. LOCATIONS SHOWN ARE A COMPILATION OF FIELD
INVESTIGATIONS AND EXISTING RECORD DRAWINGS. THE EXACT
LOCATION OF UTILITIES MUST BE CONFIRMED IN THE FIELD BY DIRECT
OR INDIRECT (ELECTRONIC, MAGNETIC, GPR) MEANS. THE RESULTS OF
THE INVESTIGATIONS MUST BE RECORDED ON THE DRAWINGS
HIGHLIGHTING CHANGES OR CONFLICTS WITH DESIGN DRAWINGS.
DISCREPANCIES MUST BE REPORTED TO THE CONTRACTING OFFICER.
UTILITY MAPPING MUST BE PERFORMED IN COORDINATION WITH THE
PNS "DIG SAFE" PROGRAM. SECURE A "DIGGING" PERMIT AND CONTACT
"DIG SAFE" AT 1-888-344-7233 AND OBTAIN A "DIG SAFE" PERMIT AT LEAST
14 WORKING DAYS PRIOR TO EXCAVATION OR POST DRIVING (3" DEEP
OR MORE). STAKE OR PAINT THE LIMITS OF CONSTRUCTION PRIOR TO
NOTIFYING DIG SAFE. IN ADDITION, THE CONTRACTOR / EXCAVATOR
MUST FULLY COMPLY WITH THE STATE OF MAINE "DIG SAFE" LAW (TITLE
23. MRSA 33 60-A)
2. THE CONTRACTOR MUST PREPARE A "PWD MAINE DIG SAFE UTILITY
LOCATE REQUEST FORM" AT LEAST 14 CALENDAR DAYS PRIOR TO THE
COMMENCEMENT OF EXCAVATION OR GROUND PENETRATING ACTIVITY
AND SUBMIT THE FORM TO THE CONTRACTING OFFICER.
3. THE GOVERNMENT WILL LOCATE AND MARK THE UNDERGROUND
UTILITIES WITHIN 14 CALENDAR DAYS OF RECEIVING THE DIG SAFE
NOTIFICATION.
4. EXCAVATION OR GROUND PENETRATION ACTIVITIES CANNOT
COMMENCE UNTIL THE UTILITIES HAVE BEEN MARKED IN THE FIELD AND
THE PWD MAINE DIG SAFE UTILITY LOCATE REQUEST FORM HAS BEEN
RETURNED INDICATING THE PWD MAINE DIG SAFE REVIEW PROCESS
HAS BEEN COMPLETED AND EXCAVATION HAS BEEN APPROVED BY THE
CONTRACTING OFFICER.
5. IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT
COMMENCE WITHIN 27 DAYS OF DIG SAFE NOTIFICATION OR THE
EXCAVATION WORK IS EXPANDED OUTSIDE THE LOCATION ORIGINALLY
SPECIFIED IN THE NOTIFICATION, RE-NOTIFY DIG SAFE, THE
CONTRACTING OFFICER AND THE PWD MAINE DIG SAFE COORDINATOR.
6. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES
AND MAINTAIN UNINTERRUPTED SERVICE. ANY DAMAGE INCURRED
MUST BE REPAIRED IMMEDIATELY TO THE SATISFACTION OF THE
CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. NOTIFY THE
CONTRACTING OFFICER A MINIMUM OF 15 DAYS IN ADVANCE OF ANY
OUTAGES.
7. UTILITIES LOCATED WITHIN AND UNDER CONCRETE SLABS OR PIER
STRUCTURES, BRIDGES, PARKING AREAS, AND SIMILAR AREAS, ARE
DIFFICULT TO IDENTIFY. WHENEVER CONTRACT WORK INVOLVES
CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE,
BITUMINOUS PAVEMENT OR OTHER IMPERVIOUS SURFACES, PROVIDE
THE SERVICES OF A THIRD PARTY, INDEPENDENT, PRIVATE LOCATING
COMPANY TO LOCATE UTILITIES WITHIN THE LIMITS OF WORK. THE
THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY MUST
LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADAR
(GPR), X-RAY, BORE SCOPE, ULTRASOUND OR OTHER MEANS PRIOR TO
THE START OF DEMOLITION/CONSTRUCTION. OUTAGES TO ISOLATED
UTILITY SYSTEMS MUST BE USED IN CIRCUMSTANCES WHERE UTILITIES
ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF HISTORICAL
DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING
THIS REQUIREMENT. REVISE TWO (2) SETS OF PAPER DRAWINGS BY
RED-LINE PROCESS TO SHOW THE AS-BUILT CONDITIONS DURING THE
EXECUTION OF THE PROJECT.
8. THE EXACT SIZE & LOCATION OF ALL EXISTING UTILITIES MUST BE FIELD
VERIFIED BY THE CONTRACTOR PRIOR TO START OF CONSTRUCTION.
CONTRACTOR MUST TAKE CARE TO PROTECT CRANE RAILS AND
UTILITIES IN THE WORK AREA AND ALL CONSTRUCTION MUST BE
COORDINATED WITH THE CONTRACTING OFFICER.
1. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS, AND REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER, PROCEED WITH THE
WORK ONLY AFTER THE DISCREPANCY(IES) HAS(HAVE) BEEN RESOLVED
BY THE GOVERNMENT.
2. WORK FROM GIVEN DIMENSIONS AND LARGE SCALE DETAILS ONLY. DO
NOT SCALE DRAWINGS.
3. STORAGE AND LAYDOWN AREAS ARE LIMITED TO THE WORK AREAS
SHOWN ON THE PLANS. ADDITIONAL SPACE IS NOT AVAILABLE FOR USE
ON THE SHIPYARD.
4. TRANSPORT CONSTRUCTION MATERIALS TO AND FROM THE SITE IN
COVERED VEHICLES. ON A DAILY BASIS, PROVIDE A VACUUM ASSISTED
STREET SWEEPER, AT THE SITE, TO KEEP PAVED AREAS CLEAN.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SECURITY
OF HIS/HER EQUIPMENT.
6. COMPLY WITH APPLICABLE O.S.H.A. REGULATIONS AND ARMY CORPS OF
ENGINEERS EM 385 SAFETY REQUIREMENTS.
7. CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50 MPH
WIND VELOCITY AND ARE TO BE PREPARED BY A PROFESSIONAL SIGN
COMPANY WITH A MINIMUM OF THREE (3) YEARS EXPERIENCE.
8. WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO
REMAIN, TO FACILITATE INSTALLATION OF WORK FOR THIS PROJECT,
THE CONTRACTOR SHALL REPLACE THE EXISTING FEATURES AT NO
ADDITIONAL COST TO THE GOVERNMENT.
9. THE LIMIT OF CONSTRUCTION LINE INDICATED ON THE DRAWINGS IS AN
APPROXIMATION ONLY. COORDINATE WITH THE CONTRACTING OFFICER.
THE CONTRACTING OFFICER MAY MODIFY THIS LINE TO ACCOMMODATE
THE EFFICIENCY OF THE CONSTRUCTION PROJECT.
10. CONSTRUCTION DETAILS AND SPECIFICATIONS ARE REQUIRED TO MEET
THE STANDARDS OF THE NAVFAC MID ATLANTIC PUBLIC WORKS
DEPARTMENT MAINE, PNSY, KITTERY, MAINE.
11. UNLESS OTHERWISE DIRECTED, DETERMINATION OF ERECTION
PROCEDURES AND SEQUENCING, TO ENSURE THE SAFETY OF THE
FACILITIES AND THEIR COMPONENTS, DURING DEMOLITION AND
ERECTION, IS SOLELY THE CONTRACTOR'S RESPONSIBILITY. THIS
INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING,
TEMPORARY BRACING, GUYS OR TIEDOWNS. SUCH MATERIAL MUST
REMAIN THE PROPERTY OF THE CONTRACTOR AFTER COMPLETION OF
THE PROJECT.
12. METHODS OF DEMOLITION, CONSTRUCTION, AND ERECTION ARE THE
CONTRACTOR'S RESPONSIBILITY UNLESS OTHERWISE SPECIFIED.
13. THE GOVERNMENT MAY CHARGE ANY ADDITIONAL COST OF
REINSPECTION OR RETEST WHEN PRIOR REJECTION MAKES
REINSPECTION OR RETEST NECESSARY.
14. ALL WORK MUST BE PROVIDED IN COMPLIANCE WITH THAT INDUSTRY'S
STANDARDS AND PERFORMED IN A WORKMANLIKE PROFESSIONAL
MANNER.
15. MECHANICAL MEANS OF EXCAVATION MUST NOT BE USED WHEN
EXCAVATING WITHIN TWO (2) FEET OF MARKED UNDERGROUND
UTILITIES UNTIL THE UNDERGROUND UTILITY HAS BEEN EXPOSED.
MECHANICAL MEANS MAY BE USED FOR INITIAL PENETRATION AND
REMOVAL OF PAVEMENT, ROCK, OR OTHER MATERIALS REQUIRING USE
OF MECHANICAL MEANS OF EXCAVATION. ONCE THE MATERIALS
REQUIRING MECHANICAL MEANS EXCAVATION HAVE BEEN REMOVED,
FURTHER EXCAVATION MUST EMPLOY REASONABLE PRECAUTIONS TO
AVOID DAMAGE TO THE UTILITY, INCLUDING BUT NOT LIMITED TO,
SUBSTANTIAL WEAKENING OF STRUCTURAL OR LATERAL SUPPORT OF
UTILITY OR PENETRATION OR DESTRUCTION OF UTILITY OR ITS
PROTECTIVE COATING.
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s f s h a r e d p r o j e c t s c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
G
E N
E R
A L
N
O T
H E
F d
Y O
M
E
G
G
E N
E R
A L
N
O T
H E
O
T T
E D
M o n d a y
A u g u s t
E
R h f r i b e r g
D E
P A
R T
M E
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
NOT IN CONTRACT
NOT IN CONTRACT
-G-005
E
N E
R A
L
N
O T
H E
12852130
DPA CMG VMG
ELEVATION REFERENCE TABLE
REFERENCE LOCAL TIDAL DATUM PNSY DATUM NGVD29 NAVD88
FEMA FLOOD ZONE VE (NAVD88 ELEV 14')
18.623 110.779 14.767 14.000
FEMA FLOOD ZONE AE (NAVD88 ELEV 10')
14.623 106.779 10.767 10.000
HIGHEST OBSERVED WATER LEVEL (2/7/1978) PROVIDED
BY PNSY)
12.690 104.900 8.834 8.067
HIGHEST OBSERVED WATER LEVEL (2/7/1978) SEAVEY
ISLAND STATION
12.516 104.672 8.660 7.893
MEAN HIGHER HIGH WATER (MHHW)
8.839 100.995 4.983 4.216
MEAN HIGH WATER (MHW)
8.428 100.584 4.572 3.805
NORTH AMERICAN VERTICAL DATUM (NAVD88)
4.623 96.779 0.767 0.000
MEAN SEA LEVEL (MSL)
4.432 96.588 0.576 -0.191
MEAN TIDE LEVEL (MTL)
4.373 96.529 0.517 -0.250
NATIONAL GEODETIC VERTICAL DATUM (NGVD29)
3.856 96.012 0.000 -0.767
MEAN LOW WATER (MLW)
0.322 92.478 -3.534 -4.301
MEAN LOWER LOW WATER (MLLW)
0.000 92.156 -3.856 -4.623
LOWEST OBSERVED WATER LEVEL (11/30/1955)
-3.353 88.803 -7.209 -7.976
THE LOCAL TIDAL DATUM INFORMATION AND THE RELATIONSHIP BETWEEN LOCAL TIDE AND NAVD88 IS BASED ON DATA PUBLISHED BY THE U.S. DEPARTMENT OF
COMMERCE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NATIONAL OCEAN SERVICE FOR STATION "SEAVEY ISLAND, PORTSMOUTH HARBOR", STATION ID: 8419870, TIDAL EPOCH 1983-2001. THE RELATIONSHIP BETWEEN THE PORTSMOUTH NAVAL SHIPYARD DATUM AND NGVD29/NAVD88 IS BASED ON A
REPORT ENTITLED "SURVEY CONTROL REPORT, PORTSMOUTH NAVAL SHIPYARD, U.S. NAVAL ACTIVITIES, SEAVEY ISLAND; KITTERY, MAINE", PREPARED BY CIVIL
CONSULTANTS, DATED FEBRUARY 22, 2002.
ABBREVIATIONS:
ADD'L ADDITIONAL
API AMERICAN PETROLEUM INSTITUTE
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
BIT BITUMINOUS
CB CATCH BASIN
C CENTER LINE
CLR, OR CL CLEAR
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
C'SINK COUNTERSINK
DI DUCTILE IRON
DIA OR Ø DIAMETER
DIP DUCTILE IRON PIPE
DMH DRAIN MANHOLE
E EAST
EL OR ELEV ELEVATION
ELEC ELECTRIC
FT FOOT
GV GATE VALVE
HDG HOT DIP GALVANIZED
IBC INTERNATIONAL BUILDING CODE
INV INVERT
LB POUND
LBS POUNDS
LF LINEAR FEET
LG LONG
MACH MACHINE
MIN MINIMUM
MAX MAXIMUM
MHW MEAN HIGH WATER
N NORTH
NO NUMBER
NOS NUMBERS
OC ON CENTER
PCF POUNDS PER CUBIC FOOT
PL PLATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
SCHED SCHEDULE
SPCS SPACES
STA STATION
SST STAINLESS STEEL
S SOUTH
SQ SQUARE
TEL TELEPHONE
TYP TYPICAL
W WEST
L
DEMOLITION NOTES:
1. PROVIDE CONTROL MEASURES AS REQUIRED BY ENVIRONMENTAL
REGULATIONS AND AS REQUIRED TO PREVENT DEBRIS
CONTAMINANTS (SOLID, LIQUID OR DISSOLVED) FROM ENTERING
THE RIVER. UNDERWATER INSPECTIONS MAY BE CONDUCTED BY
THE CONTRACTING OFFICER TO ENSURE THE CONTRACTOR HAS
REMOVED ALL DEMOLITION AND CONSTRUCTION DEBRIS FROM THE
MUDLINE.
2. ALL MATERIAL DEMOLISHED AND NOT REUSED OR SALVAGED TO
THE GOVERNMENT MUST BECOME THE PROPERTY OF THE
CONTRACTOR AND MUST BE REMOVED DAILY FROM THE
GOVERNMENT'S PROPERTY. REMOVED MATERIAL MUST BE
DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL LAWS.
3. PROVIDE CONNEX BOXES TO PROTECT ALL SALVAGED
APPURTENANCES PRIOR TO REINSTALLATION.
LEGEND:
DEMOLITION / REMOVAL KEYNOTE NUMBER
NEW WORK KEYNOTE NUMBER
SPECIALITY KEYNOTE
EXISTING FEATURES SHOWN THUS
FEATURES TO BE PROVIDED UNDER THIS CONTRACT
SHOWN THUS
AREA OF DEMOLITION
AS-BUILT NOTES:
1. REVISE TWO (2) SETS OF PAPER DRAWINGS BY RED-LINE PROCESS
TO SHOW THE AS-BUILT CONDITIONS DURING THE PROSECUTION
OF THE PROJECT. KEEP THE AS-BUILT DRAWINGS CURRENT ON A
WEEKLY BASIS AND KEEP AT LEAST ONE SET AVAILABLE ON THE
SITE. CHANGES FROM THE CONTRACT PLANS WHICH ARE MADE IN
THE WORK OR ADDITIONAL INFORMATION WHICH MIGHT BE
UNCOVERED IN THE COURSE OF CONSTRUCTION MUST BE
ACCURATELY AND NEATLY RECORDED AS THEY OCCUR BY MEANS
OF DETAILS AND NOTES. PREPARE AND PROVIDE TO THE
CONTRACTING OFFICER WORKING RECORD (AS-BUILT) DRAWINGS
AFTER THE COMPLETION OF EACH DEFINABLE FEATURE OF WORK
AS LISTED IN THE CONTRACTOR QUALITY CONTROL PLAN
(FOUNDATIONS, UNDERGROUND UTILITIES, STRUCTURAL STEEL,
ETC., AS APPROPRIATE FOR THE PROJECT). IF WORKING AND FINAL
RECORD DRAWINGS ARE NOT MAINTAINED AS SPECIFIED HEREIN,
THE CONTRACTING OFFICER WILL DEDUCT FROM THE MONTHLY
PROGRESS PAYMENT AN AMOUNT REPRESENTING THE ESTIMATED
COST OF MAINTAINING THE RECORD DRAWINGS. THIS MONTHLY
DEDUCTION WILL CONTINUE UNTIL AN AGREEMENT CAN BE
REACHED BETWEEN THE CONTRACTING OFFICER AND THE
CONTRACTOR REGARDING THE ACCURACY AND COMPLETENESS
OF UPDATED DRAWINGS. INFORMATION SHOWN ON THE WORKING
AND FINAL RECORD DRAWINGS MUST INCLUDE, BUT IS NOT LIMITED
TO, THE FOLLOWING:
A. THE ACTUAL LOCATION (DEPTH AND HORIZONTAL
COORDINATES) AND SIZES OF ALL SUBSURFACE UTILITY
LINES. IN ORDER THAT THE LOCATION OF THESE LINES AND
APPURTENANCES MAY BE DETERMINED IN THE EVENT THE
SURFACE OPENINGS OR INDICATORS BECOME COVERED
OVER OR OBSCURED, SHOW BY OFFSET DIMENSIONS TO
TWO PERMANENTLY FIXED SURFACE FEATURES AT THE END
OF EACH RUN INCLUDING EACH CHANGE IN DIRECTION ON
THE RECORD DRAWINGS OR HORIZONTAL COORDINATES
BASED ON THE SHIPYARD DATUM. LOCATE VALVES, SPLICE
BOXES AND SIMILAR APPURTENANCES BY DIMENSIONING
ALONG THE UTILITY RUN FROM A REFERENCE POINT. ALSO,
RECORD THE DEPTH BELOW THE SURFACE OF EACH RUN OF
PIPE, FITTINGS, VALVES, ETC.
B. CHANGES IN GRADE, ELEVATIONS, CROSS SECTION, OR
ALIGNMENT OF PAVEMENTS, EARTHWORK, STRUCTURES OR
UTILITIES.
C. THE TOPOGRAPHY, INVERT ELEVATIONS AND GRADES OF
DRAINAGE SYSTEMS PROVIDED OR AFFECTED AS PART OF
THE PROJECT CONSTRUCTION.
D. CHANGES IN DETAILS OF DESIGN OR ADDITIONAL
INFORMATION OBTAINED FROM WORKING DRAWINGS
SPECIFIED TO BE PREPARED AND/OR FURNISHED; INCLUDING
BUT NOT LIMITED TO FABRICATION, ERECTION, INSTALLATION
PLANS, DETAILS, PIPE SIZES, INSULATION MATERIAL,
DIMENSIONS OF EQUIPMENT FOUNDATIONS, ETC.
E. WHERE CONTRACT DRAWINGS OR SPECIFICATIONS PRESENT
OPTIONS, SHOW ONLY THE OPTION SELECTED FOR
CONSTRUCTION ON THE FINAL AS-BUILT PRINTS.
F. WHERE UTILITY LOCATIONS DIFFER FROM THOSE IDENTIFIED
ON THE PLANS.
G. MODIFICATIONS (INCLUDE WITHIN MODIFICATION PRICING THE
COST TO CHANGE WORKING AND FINAL RECORD DRAWINGS
TO REFLECT MODIFICATIONS).
H. CHANGES OR MODIFICATIONS WHICH RESULT FROM THE
FINAL INSPECTION.
ENVIRONMENTAL CONTROL NOTES:
1. PROVIDE AND MAINTAIN ENVIRONMENTAL CONTROLS WHICH MUST
CONFORM TO ALL STATE, LOCAL, AND FEDERAL REGULATIONS AND
PERMITS; AND SPECIFICATION SECTION 01 57 19.00 22 TEMPORARY
ENVIRONMENTAL CONTROLS. ENVIRONMENTAL CONTROLS MUST
INCLUDE BUT NOT BE LIMITED TO EROSION AND SEDIMENT
CONTROL & DUST CONTROL.
2. MEASURES MUST BE TAKEN TO PREVENT DEBRIS, WELD SLAG, AND
WASTE WATERS FROM CONCRETE WORK AND DEMOLITION WORK
FROM ENTERING THE STORM WATER DRAINS AND RIVER.
3. CONCRETE WASH WATER CONTAINMENT STRUCTURES MUST BE
USED TO RETAIN, COLLECT AND SOLIDIFY CONCRETE WASH WATER
BY PROMOTING HARDENING THROUGH EVAPORATION OF EXCESS
LIQUIDS. CONTAINMENT STRUCTURES MUST BE STABLE AND
SECURE. ALL LIQUIDS FROM CONTAINMENT STRUCTURES MUST BE
DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS.
4. CHLORINATED WATER MUST NOT BE DIRECTLY DISCHARGED TO
STORM DRAINS OR SANITARY SEWERS WITHOUT PRIOR
AUTHORIZATION OF THE SHIPYARD ENVIRONMENTAL STAFF (CODE
106.3) AND WITHOUT FIRST NEUTRALIZATION BY THE CONTROLLED
ADDITION OF A REDUCING CHEMICAL.
5. PROVIDE CATCH BASIN FILTER SACK INLET PROTECTION. CLEAN
SEDIMENT CONTROL STRUCTURES ON A PERIODIC BASIS AND
AFTER SIGNIFICANT RAIN EVENTS. ALL DRAINAGE STRUCTURES
MUST BE CLEANED AND DEBRIS REMOVED PRIOR TO FINAL
COMPLETION.
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s f s h a r e d p r o j e c t s c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
G
E N
E R
A L
N
O T
H E
F d
Y O
M
E
G
G
E N
E R
A L
N
O T
H E
O
T T
E D
M o n d a y
A u g u s t
E
R h f r i b e r g
D E
P A
R T
M E
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
-0+50 -0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
5+506+006+507+007+508+008+509+009+509+65
-4+00-3+00-2+00-1+000+00
DD1 REPLACEMENT
CAISSON, IN OUTER SEAT
EXTENDED SEAT, SOUTH
REMOVE EXISTING AND PROVIDE
HANDRAILS ON DRY DOCK ACCESS
STAIRS TYPICAL NORTH AND SOUTH.
PROVIDE OSHA COMPLIANT ACCESS
ON NORTH AND SOUTH STAIRWAYS
THROUGHOUT THE WORK
PROVIDE ACCESS PLATFORM TO
VALVE 23 INSIDE DD1 PUMPWELL
EXTENDED SEAT, NORTH
AREAS OF CONCRETE REPAIRS,
NORTH
DRY DOCK NO. 1
TUNNEL BASELINE
NORTHERN GALLERIES
DRY DOCK NO. 1
SOUTHERN GALLERIES
FUTURE CRANE RAILS (P381)
AREAS OF CONCRETE REPAIRS,
SOUTH
DRY DOCK NO. 1
TUNNEL BASELINE
3'-6"
3'-6" 4'-10"
4'-10"
4'-10" 4'-10"
3'-8" 4'-10"
4'-10" 6'-0"
4'-10" 4'-10" 4'-10" 4'-10" 3'-8" 4'-10" 4'-10" 4'-10" 4'-4 1/2"
10 1/2"
DRY DOCK NO. 1
BASELINE
WP START
WP1
WP2
WP3
WP4
WP END
WP5
WP6
DRY DOCK BASELINE STA. -4+60.29 =
DRY DOCK TUNNEL BASELINE STA. 456.46
CAISSON BY
OTHERS
CAISSON BY
OTHERS
1" = 20'
20' 0 20' 40'
-G-101
D R
Y
D
O C
K
N
O
N
E R
S
E L
I N
E
K
A
N
12852131
DPA CMG VMG
SCALE: 1" = 20'
PLAN
NORTH
DRY DOCK NO. 1 GENERAL & BASELINE KEY PLAN
DRY DOCK NO. 1 TUNNEL BASELINE WORKING POINTS
POINT NO. STATION NORTHING EASTING
START -0+50 90854.8379 2798855.1267
WP1 3+87.71 90987.6200 2799272.2100
WP2 4+29.97 90967.4700 2799309.3600
WP3 4.86+04 90914.0400 2799326.3700
WP4 5+28.30 90876.1300 2799307.7000
END 9+65 90743.6105 2798891.5958
WP5 0+00 90802.1536 2798878.9389
WP6 -4+60.2917 90942.2229 2799317.4011
1. FOR SURVEY CONTROL POINT COORDINATES,
SEE DRAWING V-001.
BASELINE NOTES:
P-310 SUPER FLOOD BASIN
P-381 MULTI-MISSION DRY DOCK NO.1
MDEP PERMIT NUMBER
L-21179-26-BZ-N/L-21179-4E-CA-N
MARCH 7, 2019
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U
S F
S
H A
R E
D P
R O
J E
C T
S c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
D
D
C
K
N
O
G
E N
E R
A
S
E L I N
E
K
A
N d
Y O
M
E
G
D
C
K
N
O
G
E N
E R
A
S
E L I N
E
K
O
T T
E D
M o n d a y
A u g u s t
E
R h f r i b e r g
D E
P A
R T
M E
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
KEY PLAN
GRAPHIC SCALE
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
NOT IN CONTRACT
NOT IN CONTRACT
NOT IN CONTRACT
C
B
MAIN SITE ACCESS ROUTE
GATE 2 ACCESS ROUTE
PROJECT LIMITS
FLOATING BARRIER
EXISTING FLOATING
BARRIER
MAIN SITE ACCESS ROUTE
CIA FENCE
PASS OFFICE
TRUCK INSPECTION AREA
PUBLIC WORKS MAIN OFFICE
PROJECT LIMITS
MAIN GATE
B A C K
C H A N N E L
BOAT
HOUSE
CIA GATE
CIA FENCE
BRIDGE 1
BRIDGE 2
GATE 2
ACCESS ROUTE
GATE 2
1. CONTRACTOR SHALL COORDINATE ALL
BARGE ACCESS AND MOORING LOCATIONS
WITH THE CONTRACTING OFFICER.
2. CONTRACTOR SHALL COORDINATE USE OF
GATES 1 AND 2 FOR WIDE LOAD
DELIVERIES WITH CONTRACTING OFFICER.
3. PROVIDE EMERGENCY VEHICLE AND FIRE
LANES AT ALL TIMES.
4. LAYDOWN AREA LOCATION TO BE
DETERMINED WITH CONTRACTING
OFFICER.
5. COORDINATE THE WORK WITH ONGOING
SHIPYARD OPERATIONS AND THE WORK OF
PROJECTS.
NOTES:
PLAN
KITTERY
LEGEND:
G-102
12852132
DPA CMG VMG
S I T
E
A
C C
E S
S
A
Y
D O
E
A
P
L A
N
B
E
R
B
E
R
E
R
TH
P310 WEST CLOSURE
WALL & ENTRANCE
P310 SUPER FLOOD BASIN
SOUTH CLOSURE WALL
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U
S F
S
H A
R E
D P
R O
J E
C T
S c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
S
I T
E
A
C C
E S
S
A
Y D
O W
N
A
R E
A
P
L A
N d
Y O
M
E
G
S
I T
E
A
C C
E S
S
A
Y D
O W
N
A
R E
A
P
L
O
T T
E D
M o n d a y
A u g u s t
E
R h f r i b e r g
D E
P A
R T
M E
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
KEY PLAN
GRAPHIC SCALE
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
PROVIDE ± 50' X 100' LAYDOWN AREA
WITH CONTINUOUS BERM, IN LOCATION
DIRECTED BY THE CONTRACTING
OFFICER. SEE DRAWING G-103
-G-104
R
O S
I O
N
C
O N
T R
T
T
A I L
S
12852134
DPA CMG VMG
EROSION CONTROL NOTES:
A. GENERAL NOTES
1. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE DESIGNED IN
ACCORDANCE WITH THE MAINE EROSION AND SEDIMENT CONTROL HANDBOOK FOR
CONSTRUCTION: BEST MANAGEMENT PRACTICES, LATEST EDITION.
2. DURING CONSTRUCTION, AND THEREAFTER, EROSION CONTROL MEASURES ARE TO
BE IMPLEMENTED AS NOTED. THE SMALLEST PRACTICAL AREA OF LAND MUST BE
EXPOSED AT ONE TIME DURING CONSTRUCTION. WHEN LAND IS EXPOSED DURING
DEVELOPMENT, THE EXPOSURE MUST BE KEPT AT A MAXIMUM OF 30 DAYS.
3. EROSION AND SEDIMENT CONTROL PRACTICES INCLUDE THE USE OF THE FOLLOWING:
SILT FENCE BARRIERS, CONTINUOUS BERMS, SILT SACKS, INLET PROTECTION,
TEMPORARY CONSTRUCTION EXITS, TEMPORARY DIVERSION DIKES, SEDIMENT
BASINS, DUST CONTROL, AND PUMPED DISCHARGE SEDIMENT CONTROL DEVICES.
4. EROSION AND SEDIMENT MUST BE CONTROLLED AT THE LOCATION GENERATING THE
MATERIAL.
5. DESIGNATE A QC MANAGER OR AN ENVIRONMENTAL MANAGER WHO MUST BE
RESPONSIBLE FOR INSPECTING ALL INSTALLED EROSION CONTROL MEASURES,
MONITOR AND REPORT THEIR EFFECTIVENESS, AND ASSESS AND REPORT
RE-VEGETATION PROGRESS. THE PERSON COMPLETING THE INSPECTION MUST BE
CERTIFIED IN EROSION CONTROL PRACTICES BY THE MAINE DEPARTMENT OF
ENVIRONMENTAL PROTECTION.
6. SUBMIT EROSION AND SEDIMENT CONTROL INSPECTION REPORTS TO THE
CONTRACTING OFFICER ONCE EVERY 7 CALENDAR DAYS AND BEFORE AND AFTER (24
HOURS) A STORM EVENT PRIOR TO PERMANENT STABILIZATION. EROSION AND
SEDIMENT CONTROL MEASURES REQUIRING MODIFICATION OR REPAIRS, OR IF
ADDITIONAL MEASURES ARE DEEMED NECESSARY MUST BE COMPLETED WITHIN 7
DAYS AND PRIOR TO THE NEXT STORM EVENT.
7. THE PLACEMENT OF SEDIMENT BARRIERS MUST BE COMPLETED IN ACCORDANCE
WITH GUIDELINES ESTABLISHED BY MEDEP STANDARDS AND IN ACCORDANCE WITH
THE EROSION CONTROL PLAN DEVELOPED BY THE CONTRACTOR. EROSION CONTROL
MEASURES MUST CONFORM TO THE LATEST REVISION MAINE EROSION AND SEDIMENT
CONTROL BMPS, PUBLISHED BY BUREAU OF LAND AND WATER QUALITY MAINE
DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THESE CONTRACT DOCUMENTS.
8. PREPARE DETAILED SCHEDULE AND MARKED UP SITE PLAN INDICATING AREAS OF
WORK AND DATES OF DISTURBANCE. EROSION CONTROL MEASURES MUST REMAIN
INSTALLED AND MAINTAINED UNTIL ALL EXPOSED SLOPES HAVE A MINIMUM 90%
VIGOROUS PERENNIAL COVER OR PAVEMENT THAT ELIMINATES EROSION. EROSION
CONTROL MEASURES MUST BE REMOVED WITHIN 30 DAYS FOLLOWING PERMANENT
VEGETATIVE STABILIZATION BEING ATTAINED.
9. INSTALL ADDITIONAL MEASURES TO CONTROL EROSION AS IS NECESSARY GIVEN SITE
AND WEATHER CONDITIONS.SITE ENTRANCES AND ADJACENT ROADWAYS MUST BE
PERIODICALLY SWEPT TO MINIMIZE TRACKING OF SEDIMENT AND DEBRIS. ALL CATCH
BASINS AND DRAINAGE INLETS SUBJECT TO RUNOFF FROM PROJECT SITE MUST BE
CLEANED AFTER THE SITE HAS BEEN FULLY STABILIZED.
10. KEEP DUST DOWN AT ALL TIMES, INCLUDING DURING NONWORKING PERIODS.
SPRINKLE, OR TREAT, THE SOIL AT THE SITE, HAUL ROADS, AND OTHER AREAS
DISTURBED BY OPERATIONS WITH APPROVED DUST SUPPRESSANTS. DRY POWER
BROOMING WILL NOT BE PERMITTED. VACUUMING, WET MOPPING, WET SWEEPING, OR
WET POWER BROOMING ARE PERMITTED.
11. HAY BALES ARE NOT AN APPROPRIATE EROSION AND SEDIMENT CONTROL DEVICE
FOR PNSY. AS SUCH, THEIR USE WILL NOT BE PERMITTED.
12. EROSION AND SEDIMENT CONTROL PRACTICES TO BE IN PLACE AT ALL SOIL
STOCKPILES IN ACCORDANCE WITH MAINE EROSION AND SEDIMENT CONTROL BMP'S
(2016 OR LATEST EDITION).
B. STRUCTURAL MEASURES
1. SILT FENCES: SILT SCREEN BARRIERS MUST BE INSTALLED IN ACCORDANCE WITH
CONTRACTOR'S EROSION CONTROL PLANS. THEY ARE INTENDED PRIMARILY TO INTERCEPT
AND FILTER SMALL VOLUMES OF "SHEET FLOWING" RUNOFF, OR AS SEDIMENT TRAPS IN
SMALL SWALES.
C. MAINTENANCE: DURING THE PERIOD OF CONSTRUCTION
1. ALL SILT SCREEN BARRIERS MUST BE CHECKED WEEKLY. REPAIRS MUST BE MADE TO
CORRECT UNDERMINING OR DETERIORATION OF THE BARRIERS.
D. WINTER CONSTRUCTION
1. "WINTER CONSTRUCTION" IS CONSTRUCTION ACTIVITY PERFORMED DURING THE PERIOD
FROM NOVEMBER 1 THROUGH APRIL 15. IF DISTURBED AREAS ARE NOT STABILIZED WITH
PERMANENT MEASURES BY NOVEMBER 1 OR IF NEW SOIL DISTURBANCE OCCURS AFTER
NOVEMBER 1, BUT BEFORE APRIL 15, THEN THESE AREAS MUST BE PROTECTED AND
RUNOFF FROM THEM MUST BE CONTROLLED BY ADDITIONAL MEASURES AND
RESTRICTIONS.
2. WINTER EROSION CONTROL MEASURES MUST CONFORM TO MAINE EROSION AND
SEDIMENT CONTROL BMPS SECTION A-3.
3. WINTER EXCAVATION AND EARTHWORK MUST BE COMPLETED SUCH THAT NO MORE THAN 1
ACRE OF THE SITE IS WITHOUT STABILIZATION AT ANY ONE TIME. LIMIT THE EXPOSED AREA
TO THOSE AREAS IN WHICH WORK IS TO OCCUR DURING THE FOLLOWING 15 DAYS AND
THAT CAN BE STABILIZED IN ONE DAY PRIOR TO ANY SNOW EVENT.
4. DISTURBED SOILS - BY SEPTEMBER 15 THE CONTRACTOR MUST STABILIZE ALL DISTURBED
SOILS ON THE SITE.
SEAL
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U
S F
S
H A
R E
D P
R O
J E
C T
S c a d r e v i t g e n e r a l c a i s s o n g e n e r a l G
E
R O
S I O
N
C
O N
T R
O L
N
O T
T
A I L S d
Y O
M
E
G
E
R O
S I O
N
C
O N
T R
O L
N
O T
T
A I
O
T T
E D
M o n d a y
A u g u s t
E
R h f r i b e r g
D E
P A
R T
M E
T
V
Y N
A V
A L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
R
G I N
I A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
K I T
T E
R Y
M
A I N
E
F Y
S
P E
C I A
L
P
R O
J E
D R
Y
D
O C
I S
S O
N
R
E P
L A
C E
M E
A B
R I C
A T
I O
N
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE:
AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering
Director, with PWD Maine, via email
DSN
NBJ
H-39
H-38
H-37
H-40
H-129
H-128 H-127
H-130
H-131
H-136
H-132
H-134 H-135
BM V-B12E
BM V-13A
BM V-TIDAL 7
BM V-TIDAL 5
H-45
DOUCET
SURVEY LL
C
R
Serving Your Professional Surveying & Mapping Needs 102 Kent Place, Newmarket, NH 03857 (603) 659-6560
2 Commerce Drive (Suite 202) Bedford, NH 03110 (603) 614-4060 10 Storer Street (Riverview Suite) Kennebunk, ME (207) 502-7005 http://www.doucetsurvey.com
LOCATION MAP (N.T.S.)
SURVEY NOTES
P I S C A T A Q U A R I V E R
SU
R
VE
Y
N O
TE
S
TA
BL
ES
DATUM ELEVATION REFERENCE TABLE
REFERENCE TIDAL NGVD29 NAVD88
FEMA FLOOD ZONE VE (NAVD88 ELEV. 14') 18.623 14.767 14.000
FEMA FLOOD ZONE AE (NAVD88 ELEV. 10') 14.623 10.767 10.000
HIGHEST OBSERVED WATER LEVEL
(02/07/1978) (PROVIDED BY PNSY) 12.690 8.834 8.067
HIGHEST OBSERVED WATER LEVEL
(02/07/1978) (SEAVEY ISLAND STATION) 12.516 8.660 7.893
MEAN HIGHER HIGH WATER (MHHW) 8.839 4.983 4.216
MEAN HIGH WATER (MHW) 8.428 4.572 3.805
NORTH AMERICAN VERTICAL DATUM
(NAVD88) 4.623 0.767 0.000
MEAN SEA LEVEL (MSL) 4.432 0.576 -0.191
MEAN TIDE LEVEL (MTL) 4.373 0.517 -0.250
NATIONAL GEODETIC VERTICAL DATUM
(NGVD29) 3.856 0.000 -0.767
MEAN LOW WATER (MLW) 0.322 -3.534 -4.301
MEAN LOWER LOW WATER (MLLW) 0.000 -3.856 -4.623
LOWEST OBSERVED WATER LEVEL
(11/30/1955) -3.353 -7.209 -7.976
PNS DATUM 92.156 96.012 96.779
THE TIDAL DATUM INFORMATION AND THE RELATIONSHIP BETWEEN
SAID TIDAL DATUM AND NAVD88 IS BASED ON THE BENCH MARK
SHEET PUBLISHED BY THE U.S. DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NATIONAL
OCEAN SERVICE FOR STATION "SEAVEY ISLAND, PORTSMOUTH
HARBOR", STATION ID: 8419870, PUBLISHED: 08/23/2016, LENGTH OF
SERIES: 1 YEAR, TIME PERIOD: NOVEMBER 2000 - OCTOBER 2001,
TIDAL EPOCH: 1983-2001, CONTROL TIDE STATION: 848150 PORTLAND
- CASCO BAY.
THE RELATIONSHIP BETWEEN THE PORTSMOUTH NAVAL SHIPYARD
DATUM AND NGVD29/NAVD88 IS BASED ON A REPORTED TITLED
"SURVEY CONTROL REPORT, PORTSMOUTH NAVAL SHIPYARD, US
NAVAL ACTIVITIES, SEAVEY ISLAND, KITTERY MAINE", PREPARED BY
CIVIL CONSULTANTS, DATED FEBRUARY 22, 2002.
FEMA FLOOD ZONE DATA BASED ON REVISED PRELIMINARY FIRM
MAP NUMBER 23031C0728G DATED APRIL 14, 2017
1. FIELD SURVEY PERFORMED BY DOUCET SURVEY LLC. ON
JANUARY 7, 2021 USING A TRIMBLE S6 TOTAL STATION WITH A
TRIMBLE TSC3 DATA COLLECTOR AND A TRIMBLE DINI DIGITAL
AUTO LEVEL. ADDITIONAL FIELD SURVEY PERFORMED DURING
JANUARY 2021 USING A LEICA HDS SCANNER. TRAVERSE
ADJUSTMENT BASED ON LEAST SQUARE ANALYSIS.
2. HORIZONTAL DATUM BASED ON NAD83/96 MAINE WEST 1802 AND
VERTICAL DATUM BASED ON NAVD 88 PER PORTSMOUTH NAVAL
SHIPYARD CONTROL SURVEY OF 2002. CONTROL POINTS H-40,
H-45, H-130 & H-131 WERE USED FOR THIS SURVEY.
3. PROPER FIELD PROCEDURES WERE FOLLOWED IN ORDER TO
GENERATE CONTOURS AT 1' INTERVALS. ANY MODIFICATION OF
THIS INTERVAL WILL DIMINISH THE INTEGRITY OF THE DATA, AND
DOUCET SURVEY WILL NOT BE RESPONSIBLE FOR ANY SUCH
ALTERATION PERFORMED BY THE USER.
4. UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON
OBSERVED PHYSICAL EVIDENCE AND PAINT MARKS FOUND
ON-SITE. UNDERGROUND UTILITIES (ELECTRIC, GAS/FUEL, STEAM,
TELECOM, WATER) SHOWN WITHIN AREA "LIMITS OF BSI UTILITY
SURVEY/LIMITS OF 2020 SUE PROJECT LIMITS" PROVIDED BY
STANTEC ON MAY 31, 2016 & AUG 21, 2020. DOUCET SURVEY
MAKES NO CLAIM TO THE ACCURACY OR COMPLETENESS OF
SAID UTILITIES AS SHOWN HEREON. THE ACCURACY OF
MEASURED UTILITY INVERTS AND PIPE SIZES/TYPES IS SUBJECT
TO NUMEROUS FIELD CONDITIONS, INCLUDING; THE ABILITY TO
MAKE VISUAL OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS
ELEMENTS, MANHOLE CONFIGURATION, ETC.
5. STRUCTURES LABELED WITH SHIPYARD NUMBERING SYSTEM
UNLESS NOT MARKED ON STRUCTURE.
6. NON-SURVEY LOCATED UNDERGROUND UTILITIES (VAULT
LOCATIONS, NOTED UTILITY LINES, ETC.) SHOWN HEREON PER
"TOTAL-MAP-NAD-83" (AUG. 2018) AS PROVIDED IN DIGITAL
FORMAT BY NAVFAC-MIDLANT, PWD-MAINE. DOUCET SURVEY, LLC
MAKES NO CLAIM TO THE ACCURACY OR COMPLETENESS OF
SAID UTILITIES.
7. DRY DOCK MODEL & ELEVATION VIEWS ARE BASED ON A
COMPILATION OF A TERRESTRIAL LASER SCAN SURVEY (SEE
NOTE 1) AND NAVFAC PLANS TITLED "PORTSMOUTH NAVAL
SHIPYARD, KITTERY, ME, DRY DOCK 1 OUTER SEAT
MODERNIZATION CONTRACT NO. N40086-08-2117, DATED APRIL
2012". THE CAISSON WAS PLACED IN THE OUTER SEAT AT THE
TIME OF THE LASER SCAN SURVEY. DIFFERENCES WERE
OBSERVED BETWEEN MEASUREMENTS SHOWN ON THE
AFOREMENTIONED 2012 PLAN AND THOSE TAKEN FROM THE
LASER SCAN DATA. THE 3D MODEL SHOWN IN THIS 2021 PLAN SET
RELIES PRIMARILY ON DOUCET SURVEY SCAN & CONVENTIONAL
SURVEY DATA, AND SUPPLEMENTS THAT SURVEY DATA WITH
INFO FROM SAID 2012 PLAN WHEN DETAILS WERE NOT
OBSERVABLE IN THE 2021 SURVEY.
8. A REPORT TITLED "STANTEC DD1 CAISSON OUTER SEAT
UNDERWATER INSPECTION REPORT" DATED DECEMBER 2020
FROM APPLEDORE MARINE ENGINEERING WAS USED TO
VALIDATE OUTER SEAT DIMENSIONS THAT WERE FOUND IN THE
REFERENCE PLAN MENTIONED IN NOTE 7. SEE SHEET V-101 FOR
THE LOCATION OF THE 0+00 REFERENCE POINT MENTIONED IN
THAT REPORT.
VENT PIPE
CATCH BASIN
ELECTRIC MANHOLE (AC)
CONCRETE
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
SURVEY LEGEND
POST
EDGE OF PAVEMENT
HANDRAIL
SPOT GRADE
H HORIZONTAL CONTROL
SURVEY CONTROL POINT COORDINATES
STATION NORTHING EASTING ELEV. MON. TYPE.
H-40* 90931.872 2798551.677 9.727 BRONZE DISK
H-45** 90886.504 2798878.035 9.750 BRONZE DISK
H-130 91003.135 2798874.112 9.249 MAG NAIL
H-131 90944.159 2799007.379 9.727 BRONZE DISK
*=APPARENT SEASONAL MOVEMENT UP TO 0.04' HORIZONTALLY HAS BEEN
OBSERVED OVER THE PAST 2 YEARS. MOVEMENT HAS GENERALLY BEEN IN
THE LENGTHWISE ORIENTATION OF THE BERTH THE POINT IS SET ON.
COORDINATE VALUES SHOWN HEREON REPRESENT THOSE OBSERVED
DURING JANUARY OF 2020.
**=APPARENT ONE TIME MOVEMENT MAY HAVE TAKEN PLACE AT SOME
POINT IN THE PAST. SEASONAL MOVEMENT HAS NOT BEEN OBSERVED.
COORDINATE VALUES SHOWN HEREON REPRESENT THOSE OBSERVED
DURING JANUARY OF 2020.
HORIZONTAL DATUM BASED ON NAD83/96 MAINE WEST 1802 AND VERTICAL
DATUM BASED ON NAVD88 PER PORTSMOUTH NAVAL SHIPYARD CONTROL
SURVEY OF 2002.
MANHOLE
ELECTRIC LINE
ALTERNATING CURRENT
INNER SEAT
UNDERGROUND VAULT
SUBSURFACE UTILITY INFORMATION (SEE NOTE 7)
COMPRESSED AIR
ELECTRIC
HIGH PRESSURE COMPRESSED AIR
AIR LINE
WATER
CLEATEDGE OF CONCRETE
V-001
UTILITY LOCATIONS PER REFERENCE (SEE NOTE 6)
CONCRETE
CHANGE IN QUALITY LEVEL
RADIUS
BM
BRONZE DISK
REBAR / 3D MONUMENT
'X' CUT
MAG NAIL
PLAN
NORTHSURVEY CONTROL NETWORK
SCALE: 1" = 300'
BENCHMARK
BOTTOM CHAMFER ELEVATION
TOP CHAMFER ELEVATION
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
C
:\U se rs \M ik e\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
2\
S
U R
VE
Y.
dw g
L
AY
O U
T N
AM
E:
-C P
LO
TT
ED
: M on da y, A ug us t 3 0,
- 4
:4 1p m U
SE
R
: M ik e
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
KI
TT
ER
Y, M
AI
N E
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
NBJ
MJCMTL
12852135
V-201
PISCATAQUA RIVER
DRY DOCK NO.1
V-301
V-201
PLAN
NORTHEXISTING CONDITIONS - DRY DOCK NO.1 SEATS
SCALE: 1" = 5'
DOUCET
SURVEY LL
C
R
Serving Your Professional Surveying & Mapping Needs 102 Kent Place, Newmarket, NH 03857 (603) 659-6560
2 Commerce Drive (Suite 202) Bedford, NH 03110 (603) 614-4060 10 Storer Street (Riverview Suite) Kennebunk, ME (207) 502-7005 http://www.doucetsurvey.com
1"=5' 10'5'05'
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
- D
R Y
D O
C K
N O
. 1 S
EA
TS
ALL SURVEY NOTES ARE ON SHEET V-001
V-101
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
C
:\U se rs \M ik e\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
2\
S
U R
VE
Y.
dw g
L
AY
O U
T N
AM
E:
V (1
)-C
P
LO
TT
ED
: M on da y, A ug us t 3
0,
- 4 :4
1p m
U
SE
R : M ik e
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
KI
TT
ER
Y, M
AI
N E
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
KEY PLAN
GRAPHIC SCALE
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
NBJ
MJCMTL
12852136
V-301
V-301
DOUCET
SURVEY LL
C
R
Serving Your Professional Surveying & Mapping Needs 102 Kent Place, Newmarket, NH 03857 (603) 659-6560
2 Commerce Drive (Suite 202) Bedford, NH 03110 (603) 614-4060 10 Storer Street (Riverview Suite) Kennebunk, ME (207) 502-7005 http://www.doucetsurvey.com
1"=5' 10'5'05'
EX
IS
TI
N
G E
LE
VA
TI
O
N S
- D R
Y D
O C
K N
O . 1
S
EA
T
EN
TR
AN
C
ES
ALL SURVEY NOTES ARE ON SHEET V-001
*SEE NOTE 7*
V-201
NORTH WALL VIEW - DRY DOCK NO. 1
SCALE: 1" = 5" 1
SOUTH WALL VIEW - DRY DOCK NO. 1
SCALE: 1" = 5" 2
DATUM ELEVATIONS ARE BASED ON NAVD88 ELEVATIONS
(SEE SHEET V-001 DATUM ELEVATIONS REFERENCE TABLE)
DATUM ELEVATIONS ARE BASED ON NAVD88 ELEVATIONS
(SEE SHEET V-001 DATUM ELEVATIONS REFERENCE TABLE)
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
C
:\U se rs \M ik e\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
2\
S
U R
VE
Y.
dw g
L
AY
O U
T N
AM
E:
V (2
)-C
P
LO
TT
ED
: M on da y, A ug us t 3
0,
- 4 :4
1p m
U
SE
R : M ik e
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
KI
TT
ER
Y, M
AI
N E
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
GRAPHIC SCALE
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
NBJ
MJCMTL
12852137
ALL DIMENSIONS MEASURED AT ELEVATION
9.70' UNLESS OTHERWISE NOTED
DOUCET
SURVEY LL
C
R
Serving Your Professional Surveying & Mapping Needs 102 Kent Place, Newmarket, NH 03857 (603) 659-6560
2 Commerce Drive (Suite 202) Bedford, NH 03110 (603) 614-4060 10 Storer Street (Riverview Suite) Kennebunk, ME (207) 502-7005 http://www.doucetsurvey.com
1"=5' 10'5'05'
EX
IS
TI
N
G S
EC
TI
O N
D
R Y
D O
C K
N O
. 1
IN
N
ER
S
EA
T
EN
TR
AN
C E
EA
ST
V
IE
W
V-301
EXISTING SECTION - DRY DOCK NO. 1
INNER SEAT ENTRANCE EAST VIEW
SCALE: 1" = 5" 1
ALL SURVEY NOTES ARE ON SHEET V-001
*SEE NOTE 7*
NOTE:
THE COMBINATION OF THE SLOPING SIDEWALLS OF THE DRYDOCK AND THE SLIGHT VARIATIONS IN THE ELEVATIONS OF THE “GROUND-LEVEL” CONCRETE SURFACES TOP-SIDE MAKE IT CRITICAL THAT USERS OF THE INFORMATION SHOWN ON THIS SHEET UNDERSTAND EXACTLY WHERE THE DIMENSIONS ARE TAKEN FROM. THE FOLLOWING IS INTENDED TO EXPLAIN THOSE DETAILS.
THE LOCATIONS OF THE SLOPING SIDEWALLS SHOWN HEREON WERE ESTABLISHED BY USING LEICA CYCLONE SOFTWARE TO PERFORM A LEAST-SQUARES ANALYSIS OF LASER-SCAN SURVEY POINTS ALONG THE (NOMINALLY) FLAT SURFACES OF THE SLOPING WALLS IN THE INNER SEAT AND SILL AREAS ON THE NORTH AND SOUTH WALLS. LEICA CYCLONE SOFTWARE THEN ESTABLISHED A PLANAR SURFACE THAT BEST-FIT THE SAMPLES OF SURVEY POINTS IN EACH OF THOSE FOUR AREAS, REFER TO THE TABLE SHOWN ON THIS SHEET FOR RESULTS. THE LOCATIONS OF THE DD#1 SIDEWALLS SHOWN ON THIS SHEET ARE THOSE FOUR PLANAR SURFACES DESCRIBED ABOVE. SIMILARLY, LEICA CYCLONE SOFTWARE WAS USED TO ANALYZE THE LASER-SCAN POINTS ALONG A BAND OF THE FLOOR OF THE DRYDOCK IN THE SILL AREA ADJACENT TO THE STEEL CAISSON SEAT ARMORING, AND AGAIN THAT SOFTWARE BEST-FIT A PLANE TO THAT CONCRETE SURFACE. A SIMILAR PROCESS WAS EMPLOYED ON PORTIONS OF THE LASER SCAN POINT CLOUD FOR FOUR CURVED CONCRETE AREAS BETWEEN THE FLOOR AND THE SLOPING SIDEWALLS (NORTH AND SOUTH SEAT AND SILL) AND THE SOFTWARE BEST-FIT CYLINDERS TO THE CURVES FOR THOSE AREAS.
THE RESULTS OF THAT ANALYSIS ARE ALSO SHOWN IN THE TABLE HEREON. THE DD#1 INNER SEAT FLOOR WAS UNDER SEVERAL INCHES OF WATER WHILE THE LASER SCANNING WAS BEING PERFORMED, SO NO SCAN DATA IS AVAILABLE THERE.
THE FLAT SURFACE SHOWN FOR THE SEAT FLOOR IS A SECTION OF THE SURFACE GENERATED FROM CONVENTIONAL SURVEY
DATA OBTAINED IN THAT AREA FOLLOWING THE LASER SCAN SURVEY.
THE DIMENSIONS SHOWN FOR THE OVERALL WIDTH OF THE DD#1 SEAT AND SILL AREAS ARE TAKEN AT THE INTERSECTION OF THE PLANAR SURFACES (FOR THE SLOPING WALLS) DESCRIBED ABOVE WITH A LINE DRAWN AT ELEVATION 9.70 FEET ACROSS THE TOP OF DD#1. THERE ARE OF COURSE AREAS WHERE THE “GROUND LEVEL” CONCRETE SURFACE TOPSIDE IS SLIGHTLY HIGHER OR LOWER THAN 9.70 FEET, AND BECAUSE THE SIDE WALLS OF THE DRYDOCK ARE SLOPED, DIMENSIONS MEASURED ACROSS THE DRYDOCK IN VARIOUS PLACES WILL DIFFER SLIGHTLY AS POINTS FROM THE LASER SCAN DATA ARE SAMPLED AT ELEVATIONS SLIGHTLY ABOVE OR BELOW 9.70 FEET. IN ORDER TO HAVE A REPRODUCEABLE METHOD TO WORK FROM, WE BASE WIDTH MEASUREMENTS SHOWN ON THIS SHEET FROM THOSE SAMPLED AT THE 9.70 ELEVATION UNLESS OTHERWISE NOTED.
POINTS POINTS ERROR ERROR ABS. ERROR MAX. ABS.
ANALYZED USED IN FINAL FIT MEAN (ft) STD. DEV. (ft) MEAN (ft) ERROR (ft)
PLANE - NORTH WALL SEAT 57,696 57,690 0.000 0.007 0.006 0.037
PLANE - NORTH WALL SILL 161,739 98,140 0.003 0.012 0.009 0.039
PLANE - SOUTH WALL SEAT 203,807 99,999 0.000 0.007 0.005 0.039
PLANE - SOUTH WALL SILL 147,417 99,999 0.000 0.012 0.010 0.038
PLANE - DD#1 FLOOR (SILL) 90,779 90,729 0.000 0.011 0.009 0.039
CYLINDER - NORTH WALL SEAT 735,174 99,999 0.000 0.006 0.005 0.038
CYLINDER - NORTH WALL SILL 272,711 99,994 0.000 0.009 0.007 0.039
CYLINDER - SOUTH WALL SEAT 337,791 99,983 0.000 0.011 0.009 0.039
CYLINDER - SOUTH WALL SILL 228,625 99,522 0.000 0.016 0.013 0.039
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
C
:\U se rs \M ik e\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
2\
S
U R
VE
Y.
dw g
L
AY
O U
T N
AM
E:
V (3
)-C
P
LO
TT
ED
: M on da y, A ug us t 3
0,
- 4 :4
1p m
U
SE
R : M ik e
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
KI
TT
ER
Y, M
AI
N E
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
GRAPHIC SCALE
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
NBJ
MJCMTL
12852138
DOUCET
SURVEY LL
C
R
Serving Your Professional Surveying & Mapping Needs 102 Kent Place, Newmarket, NH 03857 (603) 659-6560
2 Commerce Drive (Suite 202) Bedford, NH 03110 (603) 614-4060 10 Storer Street (Riverview Suite) Kennebunk, ME (207) 502-7005 http://www.doucetsurvey.com
NORTH WALL
SOUTH WALL
EX
IS
TI
N
G
IS
O M
ET
R
IC
D R
Y D
O C
K N
O . 1
N O
R
TH
W
ES
TE
R
LY
V
IE
W
V-701
EXISTING ISOMETRIC - DRY DOCK NO. 1
NORTH WESTERLY VIEW
NOT TO SCALE 1
ALL SURVEY NOTES ARE ON SHEET V-001
*SEE NOTE 7*
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
C
:\U se rs \M ik e\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
2\
S
U R
VE
Y.
dw g
L
AY
O U
T N
AM
E:
V (7
)-C
P
LO
TT
ED
: M on da y, A ug us t 3
0,
- 4 :4
1p m
U
SE
R : M ik e
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
KI
TT
ER
Y, M
AI
N E
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
65 NETWORK DRIVE
BURLINGTON, MA 01803
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
NPL / NPL
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
NBJ
MJCMTL
12852139
OA001
AR
C
H
IT
EC
TU
R
AL
N O
TE
S, L
EG
EN
D
A
BB
R
EV
IA
TI
O
N S
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
2.
8.
1.
\H eg er \C
LI
EN
TS
\S
TA
N
TE
C
\4
5- D
R ep la ce m en t C ai ss on fo r P
N
SY
D D
1\ D w g\
-D R ep la ce m en t C ai ss on fo r P N
SY
D
D 1\
O A0
A
R C
H
IT
EC
TU
R
AL
N O
TE
S, L
ED
G
EN
D
A
BB
R
EV
IA
TI
O N
S.
dw g L
AY
O
U T
N
AM
E:
O
A0
A R
C H
IT
EC
TU
R
AL
N
O
TE
S L
ED
G
EN
D
A
BB
R
EV
IA
TI
O
N S
P
LO
TT
ED
: M on da y, A ug us t 3
0,
- 7 :3
3a m
U
SE
R : J as on
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
XXXXXX-XX-X-XXXX
NPL / NPL
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
OF
1630175
CONSTR. CONTR. NO.
SCALE: AS SHOWN
HEGER DRY DOCK, Inc.
65 NETWORK DRIVE
BURLINGTON, MA 01803
FY
S
PE
CI
AL
P
RO
JE
CT
R M
-1 3-
DR
Y
DO
CK
C
AI
SS
O N
RE
PL
AC
EM
EN
T
- F
AB
RI
CA
TI
O
N
EJA
Approved by Jeff Hoyt, Project Management & Engineering Director, with PWD Maine, via email
DSN
DJD
PHS MDNJAH
ARCHITECTURAL NOTES
FURNISH NECESSARY OUTFITTING ITEMS FOR THE REPLACEMENT CAISSON FOR DRY
DOCK NO. 1. THE WORK SHALL INCLUDE ALL MATERIALS, EQUIPMENT, TESTING AND
SUBMITTALS REQUIRED FOR THE COMPLETE OUTFIT.
I. GENERAL NOTES
A. SCOPE
B. KEY HYDROSTATIC PROPERTIES (AS DESIGNED)
LIGHT SHIP CONDITION:
DRAFT = 18.50 FEET
DISPLACEMENT = 565 LT (SP. GR. = 1.0125)
TRANSVERSE GM = GMT = 1.90 FEET
LONGITUDINAL GM = GML= 49.80 FEET
MAXIMUM SUBMERGENCE CONDITION:
DRAFT = 32.33 FEET
DISPLACEMENT = 1,145 LT (SP. GR. = 1.0125)
TRANSVERSE GM = GMT = 5.80 FEET
LONGITUDINAL GM = GML = 29.90 FEET
*FOR CURVES OF FORM AND HYDROSTATIC PROPERTIES SEE SHEETS OA003 AND OA601 RESPECTIVELY.
C. REFERENCES AND STANDARDS
D. TIDAL/CONTROL DATA (NAVD88)
PERMANENT BALLAST SHALL BE CONCRETE AS SHOWN ON SHEET OA402 & OA403.
CONCRETE BALLAST DENSITY TO BE FINALIZED AFTER AS-BUILT WEIGHT OF GATE
(STEEL AND EQUIPMENT) HAS BEEN DETERMINED.
III. MATERIALS LIST
CONTRACTOR SHALL PREPARE A MATERIAL LIST INCLUDING MAKE, MODEL, AND ALL
NAME PLATE DATA FOR ALL PURCHASED OUTFITTING ITEMS. THIS LIST SHALL BE
PLACED ON THIS PAGE AS PART OF THE AS BUILT DRAWINGS.
ABBREVIATIONS AND SYMBOLS
MOORING HARDWARE (AND THEIR FOUNDATIONS) TO BE OUTFITTED ON THE CAISSON
GATE SHALL HAVE THE FOLLOWING MINIMUM RATED CAPACITIES:
36" CLEAT 70,000 LBS
OPEN CHOCK 70,000 LBS
RECESSED BITT 55,000 LBS
TOP OF REMOVABLE FLOOD-WALLS +12.70
EXTREME HIGH WATER (EHW) +11.66'
SUPERFLOOD ELEVATION (SFE) +10.25'
HIGHEST ASTRONOMICAL TIDE (HAT) +5.90'
MEAN HIGHER HIGH WATER (MHHW) +4.22'
MEAN HIGH WATER (MHW) +3.81'
NAVD88 DATUM 0.00
MEAN SEA LEVEL -0.19'
MEAN TIDE LEVEL -0.25'
MEAN LOW WATER (MLW) -4.30'
MEAN LOWER LOW WATER (MLLW) -4.62'
LOWEST ASTRONOMICAL TIDE (LAT) -6.29'
SILL ELEVATION -21.48'
SEAT ELEVATION -22.98'
IV. MOORING HARDWARE CAPACITY
II.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .